P R O J E C T T E A M
Fishbeck, Thompson, Carr & Huber Inc. Engineers | Architects | Scientists | Constructors
Providing services for over 50 years.
City of Rochester AIN STREET MAKEOVER
Michigan Department of Transportation
Contractor
Angelo Iafrate Construction Co. NCI EngineeringHubbell Roth & Clark Inc.
City of Rochester Rochester DDA
Design Engineers
Owners
Construction Engineer
What Was done?
•Reconstruction of downtown Main Street
between the Clinton River Bridge and Paint
Creek Bridge.
•Water main replacement and utility upgrades.
•Traffic signal and sign upgrades.
•Streetscape and lighting improvements.
Questions?Jaymes VettrainoCity [email protected]
Tom Gray II, P.E.Vice President/Senior Civil [email protected]
05.15 06.04 07.1708.02
09.2706.01 07.09
Exposed aggregate sidewalk construction begins.
Placement of concrete pavement is completed.
Exposed aggregate sidewalk complete.
Water main complete.
•Full closure opened to traffic. •One lane of traffic in each direction and a center
turn lane is opened to traffic between Second Street and University Drive.
•Single lane closures begin along NB and SB M-150.
•Pavement removal begins•Sidewalk removal begins.•Pedestrian traffic is maintained
along sidewalk adjacent to building using temporary fence.
Full closure starts between Second Street and University Drive.
10.15
M-150RECONSTRUCTION
STA
RT
04.22
04.24
Water main installation begins. Human remains discovered in front of Home Bakery at the NE corner of Third Street and Main Street.
Human remains discovered in front of bridal shop at the SE corner of Third Street and Main Street.
11.17
PROJECT OPENTO TRAFFIC
11.21Concrete paving begins.