City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · •...

15
City of Johannesburg’s Preparation for CAPCO Power

Transcript of City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · •...

Page 1: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

City of Johannesburg’s

Preparation for CAPCO Power

Page 2: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20082

Objectives

•Proposal for delegation of CAPCO powers

•Need for preparation

•Work done

•Outcomes

Page 3: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 2008

CAPCO POWERS

The City of Johannesburg was delegated with the

CAPCO Powers on the 14th of August 2008

Page 4: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20084

Need for Preparation

APPA Review Process:

• Only one industry sector in Johannesburg

• City responsible for updating industry

Page 5: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20085

Work Done – Electronic Database

Page 6: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20086

Work Done – Electronic Database

Page 7: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20087

Work Done – Findings

• Appointment of Air Pollution Officer

• Specialised processes� SABS Standard Setting Process

• Emissions Data� Different Sampling Methods� Different Types of Emission Reports � SABS Standard Setting Process

Page 8: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20088

• Prepare the City of Johannesburg for licensing

• Ensure a smooth and seamless APPA-AQA transition

• Reduce the current burden on the DEAT officials

Purpose of Delegation of CAPCO Powers

Page 9: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 20089

Arrangements

• Process current outstanding applications

• Process expired Provisional APPA Certificates

• Begin the APPA RC review for conversion to AQA

AEL

Page 10: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 200810

Considerations on Application Processing

• Best Available Technology & Best Practicable

Environmental option (Listed Activity and Standards

Process)

• Use of ADMS-Urban in application processing

Page 11: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 200811

Considerations on Application Processing

• Compliance history/record (APPA Registration

Certificates)

• The incorporation of Cleaner Production principles

on certificate conditions

• AEL System & EIA

Page 12: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 200812

•Activities listed under AQA are listed under EIA

(R.386 & R.387)

•Avoid a case of licensing an illegal operation

•Ensure that license conditions are part of ROD

•Promote Integrated Environmental Management

•Support principles of co-operative governance

EIA Process

Page 13: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 200813

Challenges

• APPA – EIA Linkages

� Processing applications awaiting an ROD

• Enforcement Section of DEAT/GDACE� Consultation on enforcement work and other litigation issues

• Relations with MOE � Adaptation of work planned

� Advisory role of Department

Page 14: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 200814

Outcomes

• Better understanding of industries in Johannesburg

• Understanding challenges of licensing

• Knowing what areas to focus on

• Preparation for licensing function

Page 15: City of Johannesburg’s Preparation for CAPCO Power Proceedings/2008/3-4-city-of... · • Appointment of Air Pollution Officer • Specialised processes SABS Standard Setting Process

Air Quality & Climate Change: 200815

Thank You