Sciennes Primary School
Stakeholder Meeting 1
Thursday 4 June 2015
City of Edinburgh Council - FSM
CO
NTE
NTS 1 Introduction/ Who we are
2 Where we are / where we are going to be?
3 Site and Location
4 The Accommodation - initial thoughts
5 Design - Feasibility Study
1Who we are
Scott Brownrigg is an award-winning international design practice providing architecture, masterplanning, urban design, interior design and town planning services. Recognised as one of the top architectural practices in the United Kingdom, the practice undertakes projects across sectors that include business space, education, residential, hospitality, defence,industrial and regeneration.
Scott Brownrigg has offices in London, Guildford, Cardiff, Edinburgh, Croatia and Singapore. This geographic spread, supported by strategic alliances in Russia and the Middle East, enables the practice to serve its growing international client and project base.
The practice’s recent track record includes projects for leading global brands such as Google, Cisco, KPMG, Quintiles, Thomson Reuters and BP. Major projects include thedesign of Skolkovo Park in Moscow, Cardiff Pointe in Wales and the University of Reading’s new Malaysian Campus. Recently the practice has also had the honour of seeing one of its projects from the 1960s, the Yvonne Arnaud Theatre in Guildford, awarded Grade II listed status.
Scott Brownrigg is proud of its 100 year history creating inspirational environments for working, living, learning or relaxing. Everyone within the practice focuses on providing clients with a service that combines commercial intelligence with excellence in creative design. Each project evolves by developing a deep empathy with the client, investing time at the outset to understand their objectives and vision. The aim is to ensure that each project makes a positive lasting impact on everyone that visits or experiences it.
Scott Brownrigg are currently working with Hub Southeast to deliver the Rising Rolls Phase 3 school extensions which are due to be opened after the summer break in 2015.
Who we are
2Where we are / where we are going to be?
Programme
DateTBC
DateTBC
Completion
Week 2Week 1 Week 3
Stakeholdermeetings
Feedback
Design
Pre-planning submission
presentation?
Stakeholder Meeting
Stakeholder Meeting
Summer holidays
Formative review & final
comments
Planning Submission TBC
2015
Planning approval
Sciennes Primary School
TBC?
3Site and Location
Site Assessment
Sciennes Primary School
10
1
MILLER
FIELDPLA
CE
11
20
21
14For Sick Children
18
HATTON PLACE
18
School
1
5
2
12 to 15
19
SCIENNES ROAD 17
Sciennes Primary
LIVING
STON
EPLA
CE
14
10
11
9
13
19
1110
6
16
15to
18
23
SCIENNES
RILL B
AN
KT E R
RA
CE
Royal Hospital
6
Site of
21 to 25
1
26 to 29
18to20
GLA
DSTO
NE TER
RA
CE
Priory
LB
11
18
1
TAN
TALL
ON
PLA
CE
12
20
±
CITY DEVELOPMENTCorporate Property & Contingency Planning
Asset InvestmentWaverley Court, 4 East Market Street
Edinburgh EH8 8BG
Sciennes Primary SchoolSciennes Road
EdinburghEH9 1LG
SCALE:DATE: March 2011PROPERTY ID: 1313
1:1000
– Utilises an area of the school grounds which is currently underused
– Has no impact on the playground space to the south
– Has a good connection to existing points for services/ delivery
Pedestrian Access Vehicular AccessProposed location
Proposed
Extension
Location
4The Accommodation
Dining Extension and Servery
BRIEF:
• Kitchen servery and ancillary 131m2
• Dining area 244m2
• Storage 16m2
• Additional area - extension 166m2
Design Princinples:
• The new ining area provides a high quality environment, fit for its purpose and intergrated into the existing school
• The proposed materials are appropriate and durable for the building purpose
• The building is equipped with low energy consuming systems
• The building is operationally simple and efficient, thereby minimising whole-life costs of maintenance, renewal and energy consumption.
5Design
Feasibility Study
Feasibility StudyFeasibility Study
For discussion
• Ramp access?
• Service access zone width?
• Rooflights
• Windows
• Planning
• Programme
• Acoustics
Feasibility Study