CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4....

30
CITY OF DANBURY 155 DEER HILL AVENUE DANBURY, CONNECTICUT 06810 CHARLES J. VOLPE, JR (203) 797-4571 PHONE PURCHASING AGENT (203) 796-1527 FAX [email protected] February 19, 2020 ADDENDUM #5 To Bid #10-19-20-05 “Richter House Improvements” This addendum shall be part of the Purchasing documents for the above captioned Bid. This addendum is to be acknowledged by the bidder by signing as provided below and returning with the bidder’s proposal. SEE ATTACHED: Addendum #58, dated February 19, 2020, 29-pages BID DUE DATE: Remains: 10:00 AM, Tuesday, February 25, 2020 Receipt of the addendum is hereby acknowledged. Bidder ______________________________ Signature ______________________________ Title ______________________________ Date ______________________________ Charles J. Volpe, Jr. Purchasing Agent City of Danbury

Transcript of CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4....

Page 1: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

CITY OF DANBURY 155 DEER HILL AVENUE

DANBURY, CONNECTICUT 06810

CHARLES J. VOLPE, JR (203) 797-4571 PHONE

PURCHASING AGENT (203) 796-1527 FAX [email protected]

February 19, 2020

ADDENDUM #5

To

Bid #10-19-20-05 “Richter House Improvements”

This addendum shall be part of the Purchasing documents for the above captioned Bid. This addendum is to be acknowledged by the bidder by signing as provided below and returning with the bidder’s proposal.

SEE ATTACHED: Addendum #58, dated February 19, 2020, 29-pages

BID DUE DATE: Remains: 10:00 AM, Tuesday, February 25, 2020

Receipt of the addendum is hereby acknowledged.

Bidder ______________________________

Signature ______________________________

Title ______________________________

Date ______________________________

Charles J. Volpe, Jr. Purchasing Agent City of Danbury

Page 2: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

860.678.1291 21 Talcott Notch Road, Farmington, CT 06032 www.FRIAR.com

Richter House Improvements and Renovations 100 Aunt Hack Road Danbury, CT 06811 Friar Project #: 2018‐137A  Addendum # 5 February 19, 2020   Mechanical, Electrical, Plumbing and Site Utility:  Electrical 

• See attached narrative from CES.  Mechanical 

• See attached narrative from CES.    Revisions to Specifications:  Section 231113 – Facility fuel oil piping Section 231300 – Facility fuel – storage tanks Section 283100 – Fire detection and alarm   Attachments: 

• Reissued specification sections with revisions: o 231113 o 231300 o 283100 

 • Reissued drawings with revisions: 

o E‐000.00 o E‐110.00 o M‐200.00 o SU‐200.00 

  

END OF ADDENDUM NO. 5  

Page 3: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

C o n s u l t i n g E n g i n e e r i n g S e r v i c e s , I n c .

811 Middle Street, Middletown, CT 06457 T 860.632.1682 F. 860.632.1768 cesct.com

February 18, 2020

Jim Wilson Friar Architecture 21 Talcott Notch Road Farmington, CT 06032

Re: The Richter House – Addendum #2

Dear Jim,

Please issue the following narrative as an addendum to the Contract Documents.

Electrical:

1. REVISED: Drawing E-000.00 – Fire Alarm Riser Diagram change manufacturer from Notifier to Silent Knight.

2. REVISED: Specification section 283100, paragraph 2.1, add Silent Knight as an approved manufacturer.

3. ADD: Drawing SU-100.00, E-110.00 – Provide circuit breaker and branch wiring to serve (2) type P pole-mounted lighting fixtures at the second parking lot island. Contractor to price separately as an add alternate for the owner.

4. CLARIFIED: Drawing SU-100.00 – Clarified scope of new electrical service during each phase, see keynote #1.

5. CLARIFIED: Drawing SU-100.00 – Clarified scope of new site lighting during each phase, see keynote #10.

6. CLARIFIED: Drawing SU-100.00 – Detail 5 and site plan symbols for type P fixtures revised to reflect the fixture configuration more closely.

Mechanical:

7. CLARIFIED: Drawing M-200.00 & spec section 231300 – Clarified specification for new oil tank.

8. ADD: Drawing M-200.00 & spec section 231113 – Provide leak detection system for fuel oil piping/tank as an add alternate for the owner.

9. DELETE: Specification sections 232144, 232500, 235239, 235700, and 238300.

Sincerely,

CONSULTING ENGINEERING SERVICES, Inc.

James Kowalski

James Kowalski, P.E. Associate

Page 4: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 1

SECTION 231113 - FACILITY FUEL-OIL PIPING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes: 1. Fuel oil piping - above ground. 2. Unions and flanges. 3. Relief valves. 4. Back pressure regulating valves. 5. Strainers. 6. Flexible connectors. 7. Leak detection system

B. Related Sections: 1. Division 01 – General Requirements. 2. Section 07 - Thermal and Moisture Protection. 3. Section 08 - Openings. 4. Section 09 - Finishes. 5. Section 23 04 00 – General Conditions for Mechanical Trades 6. Section 23 05 03 - Pipes and Tubes for HVAC Piping and Equipment:

Piping materials for fuel oil piping systems. 7. Section 23 05 23 - General-Duty Valves for HVAC Piping: Valves for fuel

oil piping systems. 8. Section 23 05 29 - Hangers and Supports for HVAC Piping and

Equipment: Product requirements for pipe hangers and supports and firestopping for placement by this section.

9. Section 23 05 53 - Identification for HVAC Piping and Equipment: Product requirements for valve and pipe identification for placement by this section.

10. Section 31 - Earthwork

1.2 REFERENCES

A. American Society of Mechanical Engineers: 1. ASME B16.3 - Malleable Iron Threaded Fittings. 2. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings. 3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure

Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 - Power Piping. 6. ASME B31.9 - Building Services Piping. 7. ASME B36.10M - Welded and Seamless Wrought Steel Pipe. 8. ASME Section IX - Boiler and Pressure Vessel Code - Welding and

Brazing Qualifications.

B. ASTM International:

Page 5: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 2

1. ASTM A53 - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless.

2. ASTM A234 - Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service.

3. ASTM B32 - Standard Specification for Solder Metal. 4. ASTM B88 - Standard Specification for Seamless Copper Water Tube. 5. ASTM B749 - Standard Specification for Lead and Lead Alloy Strip,

Sheet, and Plate Products. 6. ASTM D1785 - Standard Specification for Rigid Poly (Vinyl Chloride)

(PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds.

7. ASTM D2241 - Standard Specification for Polyethylene (PE) Plastic Pipe (SIDR-PR) Based on Controlled Inside Diameter.

8. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

C. American Welding Society: 1. AWS A5.8 - Specification for Filler Metals for Brazing and Braze Welding. 2. AWS D1.1 - Structural Welding Code - Steel.

D. American Water Works Association: 1. AWWA C105 - American National Standard for Polyethylene Encasement

for Ductile-Iron Pipe Systems.

E. National Fire Protection Association: 1. NFPA 30 - Flammable and Combustible Liquids Code. 2. NFPA 31 - Standard for the Installation of Oil-Burning Equipment.

F. Underwriters Laboratories Inc.: 1. UL 536 - Flexible Metallic Hose. 2. UL 567 - Pipe Connectors for Flammable Liquids and Combustible

Liquids and LP-Gas. 3. UL 842 - Valves for Flammable Fluids. 4. UL 913 - Intrinsically Safe Apparatus and Associated Apparatus for Use

in Class I, II, and III, Division 1, Hazardous Locations.

1.3 SYSTEM DESCRIPTION

A. Provide piping of material as specified in PART 2.

B. Where more than one piping system material is specified, provide compatible system components and joints. Use non-conducting dielectric connections when joining dissimilar metals in systems.

C. Provide flanges, unions, or couplings at locations requiring servicing. Use unions, flanges, or couplings downstream of valves and at equipment connections. Do not use direct welded or threaded connections to valves, equipment.

Page 6: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 3

D. Flexible Connectors: Use at or near pumpswhere piping configuration does not absorb vibration.

1.4 SUBMITTALS

A. Substitutions: Section 01 - General Requirements

B. Shop Drawings: 1. Piping System: Indicate layout of each piping system to scale of 1/8”=1’-

0” Indicate piping system routing showing pipe sizes, elevations, pipe lengths, fitting locations, valve locations, manhole locations, expansion joints, expansion loop locations, anchor locations, joint locations, weld locations. Indicate on shop drawings leak detection and locating system routing and panel location.

C. Product Data: 1. Piping: Submit data on pipe materials, fittings, and accessories. Submit

manufacturers catalog information. 2. Valves: Submit manufacturer’s catalog information with valve data and

ratings for each service. 3. Fuel Piping Specialties: Submit manufacturer’s catalog information

including capacity, rough-in requirements, and service sizes. 4. Leak Detection and Location System: Submit manufacturer’s catalog

information for controller, alarm unit, cable type.

D. Test Reports: Submit written test results for piping system pressure test.

E. Manufacturer's Installation Instructions: Submit piping system, piping accessories and leak detection and location system data.

1.5 CLOSEOUT SUBMITTALS

A. Division 01 – General Requirements.

B. Project Record Documents: Record actual locations of valves, piping system, and system components.

C. Project Record Documents: Record actual locations of piping mains with invert elevations, valves, manholes, and leak detection and location system.

D. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.

E. Operation and Maintenance Data: Submit spare parts lists , exploded assembly views for leak detection and location system .

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with NFPA 30 and NFPA 31.

Page 7: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 4

B. List and label flexible connectors and hoses in accordance with UL 536.

C. Perform Work in accordance with ASME B31.1 and ASME B31.9 code for installation of piping systems and ASME Section IX for welding materials and procedures.

D. Perform Work in accordance with authority having jurisdiction]for welding hanger and support attachments to building structure.

E. Evaluate leak detection and location system by independent third party according to Third Party Procedures developed according to US EPS's "Standard Test Procedure for Evaluating Leak Detection Methods: Liquid-Phase Out-of-Tank Product Detectors." Evaluation results to verify system manufacturer's claim regarding sensitivity, range and other performance data.

F. On grooved installations, all components including grooving tools shall be provided by the same manufacturer.

G. Maintain one copy copy of each document on site.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years [documented] experience.

B. Leak Detection Systems: Company specializing in manufacturing products specified in this section with minimum three years documented experience.

C. Installer: Company specializing in performing Work of this section with minimum three years documented experience approved by manufacturer.

D. Design piping system, hangers and supports under direct supervision of Professional Engineer experienced in design of this Work and licensed at Project location.

1.8 PRE-INSTALLATION MEETINGS

A. Section 01 General Requirements.

B. Convene minimum one week prior to commencing work of this section.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 - General Requirements.

B. Accept valves on site in shipping containers with labeling in place. Inspect for damage.

C. Protect piping and fittings from soil and debris with temporary end caps and closures. Maintain in place until installation.

Page 8: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 5

1.10 ENVIRONMENTAL REQUIREMENTS

A. Section 01 - General Requirements

B. Do not install underground piping when bedding is wet or frozen.

1.11 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.12 COORDINATION

A. Section 01 - General Requirements: Requirements for coordination.

1.13 WARRANTY

A. Section 01 - General Requirements: Product warranties and product bonds.

B. Furnish five year manufacturer warranty for valves excluding packing.

1.14 EXTRA MATERIALS

A. Section 01 - General Requirements: Spare parts and maintenance products.

B. Furnish two packing kits for each type and size valve.

PART 2 PRODUCTS

2.1 FUEL OIL PIPING - ABOVE GROUND

A. Copper Tubing in Concealed Locations: ASTM B88, Type L drawn. 1. Fittings: ASME B16.18 cast copper alloy or ASME B16.22 wrought

copper and bronze. 2. Joints: AWS A5.8 Classification BCuP-3 or BCuP-4 silver braze.

B. Copper Tubing in Accessible Locations: ASTM B88, Type L annealed. 1. Fittings: ASME B16.26 cast bronze. 2. Joints: Flared.

C. Steel Pipe: ASTM A53/A53M or ASME B36.10M Schedule 40 black. 1. Fittings: ASME B16.3, malleable iron, or ASTM A234/A234M wrought

carbon steel and alloy steel welding type. 2. Joints: Threaded for pipe 2 inch and smaller; welded for 2-1/2” and larger.

Victaulic grooved for pipe 2-1/2 inches and larger shall be acceptable for use outside, underground only, and in accordance with manufacturer’s limitations and the Authority Having Jurisdiction.

Page 9: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 6

2.2 FUEL OIL PROTECTOR PIPING

A. PVC Pipe: ASTM D1785, Schedule 40 or ASTM D2241, SDR 21 or 26, polyvinyl chloride (PVC) material. 1. Fittings: [ASTM D2466, Schedule 40, PVC] , [ASTM D2464 PVC,

threaded]. 2. Joints: ASTM D2855, solvent weld with ASTM D2564 solvent cement.

2.3 UNIONS AND FLANGES

A. Unions for Pipe 2 inches and Smaller: 1. Ferrous Piping: Class 150, malleable iron, threaded. 2. Copper Piping: Class 150, bronze unions with [soldered] [brazed joints]. 3. Dielectric Connections: Union with galvanized or plated steel threaded

end, copper solder end, water impervious isolation barrier.

B. Flanges for Pipe 2-1/2 inches and Larger: 1. Ferrous Piping: Class 150, forged steel, slip-on flanges or Victaulic flange

adapters for direct transition to grooved piping systems. 2. Copper Piping: Class 150, slip-on bronze flanges. 3. Gaskets: 1/16 inch thick preformed neoprene gaskets.

2.4 RELIEF VALVES

A. Manufacturers: 1. Preferred Utilities 2. Nibco 3. Watts 4. Substitutions: Section 01 - General Requirements

B. UL listed for fuel oil and capacities, ASME certified and labeled. Maximum working temperature: 450 degrees F. Body: Bronze. Seat: Viton. Stem and Springs: Stainless steel. Threaded ends. Automatic type, direct pressure actuated at maximum 60 psi.

2.5 BACK PRESSURE REGULATING VALVE

A. Manufacturers: 1. Preferred Utilities 2. Cashco 3. Substitutions: Section 01 - General Requirements 4. Product Description: Iron body, spring housing, threaded ends, Buna-N

diaphragm, stainless steel seat disc, ring body and seat, maximum inlet pressure: 250 psig.

2.6 STRAINERS

A. Manufacturers: 1. Preferred Utilities

Page 10: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 7

2. Mueller Steam Specialty 3. Spirax Sarco, Inc. 4. Hayward 5. Substitutions: Section 01 –- General Requirements]

B. 2 inch and Smaller: Y pattern, bronze body, threaded ends, Class 150, 3/64 inch stainless steel perforated screen.

2.7 FLEXIBLE CONNECTORS

A. Manufacturers: 1. Flex-Hose Co., Inc. 2. Flex-Weld, Inc. 3. The Metraflex Company 4. Victaulic 5. Substitutions: Section 01 - General Requirements.

B. Corrugated Type 304 stainless steel inner hose with single layer of Type 304 stainless steel exterior braiding, minimum 9 inches long with copper tube ends; for maximum working pressure 200 psig.

2.8 LEAK DETECTION AND LOCATION SYSTEM (ADD ALTERNATE)

A. Manufacturers: 1. Preferred Utilities 2. ASAS/Tysol 3. Dorlen

4. Substitutions: Section 01 - General Requirements

B. Product Description: Microprocessor based monitoring unit, sensor cable, probes, system layout map, and auxiliary equipment to provide continuous monitoring of sensing strings for leaks, shorts, breaks, and probe activation. When any of these conditions occur at any point along cable, alarm sounds, type of condition is identified and location displayed. System shall monitor interstitial space of double contained piping. Construct system to meet requirements of UL 913.

C. Performance:

1. Detect and identify location of first leak within 0.2percent of sensor string length or 5 feet, whichever is greater. Identify type of alarm.

2. Sensing String Length: Monitor up to 800 feet of cable for each sensor string from single monitoring unit.

3. Multiple Leaks: Detect and locate multiple leaks or additional liquid on sensor cable.

Page 11: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 8

4. Breaks and Shorts: Identify location of breaks and shorts on cable. When faults occur, sound alarm, and display on front of monitoring unit type of fault and location of fault.

5. Liquids Detected: Detect liquids, including aqueous, hydrocarbon, conductive, and nonconductive liquids.

6. Remote Annunciation: Furnish relays for remote indication of alarm conditions. Relays indicate no alarm conditions exist, alarm condition exists but has not yet been acknowledged, and alarm condition exists and has been acknowledged. Communications available via RS-232 and ASCII communication protocols to allow central point monitoring and control via remote computer.

7. Archives: Record significant events in nonvolatile memory with capacity of 900 events. When memory becomes full, recorded events are deleted from memory on first-in-first-out basis. Each recorded event includes time and date event occurred. Archives retrievable through RS-232 and ASCII communication protocols.

8. System Status: Continuously give positive indication of monitoring sensing string and status of sensing string. System clock indicates time and date on LCD of monitoring panel. System clock is programmable. Include time and date indication for events recorded in memory.

9. Security: Assignable password security for varying levels of system access. Minimum of 20 passwords available within system. System to not allow unauthorized modifications to sensing string to be made without causing alarm condition.

10. Sensor Types: Capable of monitoring sensor cables, probe sensors, and switch sensors such as float switches, and pressure switches, from same monitoring panel. English language displays indicate status of sensors.

11. Sensitivity: System to not detect incidental liquid contact. Sensitivity field adjustable to increase or decrease amount of wetted cable needed to cause alarm.

D. Components: 1. Monitoring Unit:

a. Indicates when liquid comes in contact with sensor cable by sounding alarm, actuating output relays, displaying message leak has been detected and giving location of leak on sensing string.

b. Unit furnished with green LED on panel front indicates unit is powered. Furnish two line by forty character backlit LCD visible from front of unit to provide system data. Red LED on panel front indicates alarm condition has occurred. Unit power requirements: 120/240 VAC, 100 VA, 50/60 Hz, single phase. Equip with RS-232 communication port and minimum of one common and one SPDT output relay for each cable, rated for 250 VAC, 10 amp.

c. Enclose in modified NEMA 250 Type 7 enclosure. UL listed to provide connections for intrinsically safe sensor circuits for use in hazardous locations. Ability to locate leak does not

Page 12: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 9

depend on battery backed up functions. In event of power failure, store system conditions and parameters in nonvolatile memory allowing unit to automatically resume monitoring, without resetting, upon restoration of power. Furnish on-off switch in panel.

2. Sensor Cable: Coaxial construction consisting of insulated copper center conductor, spacer material, and outer braid. Center conductors not less than 20 AWG for mechanical strength. Cables field repairable.

PART 3 EXECUTION

3.1 EXAMINATION

A. Division 01 - General Requirements.

B. Verify excavations are to required grade, dry, and not over-excavated.

3.2 PREPARATION

A. Ream pipe and tube ends. Remove burrs. Bevel or groove plain end ferrous pipe.

B. Remove scale and dirt, on inside and outside, before assembly.

C. Prepare piping connections to equipment with flanges or unions.

3.3 FIELD QUALITY CONTROL

A. Division 01 –- General Requirements.

B. Pressure test fuel oil piping in accordance with NFPA 31.

C. Field Testing Leak Detection System: 1. Perform tests to demonstrate ability of system to detect and locate

breaks, shorts and probes on sensor string. 2. Perform leak testing in accordance with the following procedure to verify

operation and ability to work with condensation pools or other static moisture: a. Wet sensor cable near start of sensor string and acknowledge

detection or location alarm and recheck system. b. Wet sensor cable near end of sensor string with first location still

wetted and acknowledge detection or location alarm and recheck system.

c. Wet sensor cable in three additional locations between first and second leak locations with each detection or location alarm being acknowledged and prior leak locations still wetted.

Page 13: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-OIL PIPING 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 10

3. Prepare and submit report verifying each leak location and detection accuracy. Furnish history print out of test results from panel. Submit TDR traces for each test run to allow verification of wet locations.

3.4 MANUFACTURER'S FIELD SERVICES

A. Division 01 - General Requirements: Requirements for manufacturer’s field services.

B. Furnish factory trained representative of system supplier for 16 hours of on-site time during leak detection and location system sensor and electronics installation.

C. Furnish factory trained representative of system supplier for 16 hours of on-site time during final checkout of leak detection and location system.

END OF SECTION 231113

Page 14: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-STORAGE TANKS 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 1

SECTION 23 13 00

FACILITY FUEL-STORAGE TANKS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Aboveground fuel storage tanks.

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete: Product requirements for concrete

ballast and fill pads for underground tank for placement by this section.

2. Section 05 50 00 - Metal Fabrications: Product and execution requirements for

bollards for placement by this section.

3. Section 23 04 00 – General Conditions for Mechanical Trades

4. Section 26 05 26 - Grounding and Bonding for Electrical Systems: Product and

execution requirements for grounding for placement by this section.

5. Section 31 23 16 - Excavation: Product and execution requirements for

excavation and backfill required by this section.

6. Section 31 23 23 - Fill: Requirements for backfill to be placed by this section.

1.2 REFERENCES

A. American Petroleum Institute:

1. API 12P - Fiberglass Reinforced Plastic Tanks.

2. API 650 - Welded Steel Tanks for Oil Storage.

3. API 1615 - Installation of Underground Petroleum Storage Systems.

4. API 1632 - Cathodic Protection of Underground Petroleum Storage Tanks and

Piping Systems.

5. API 2000 - Venting Atmospheric and Low-Pressure Storage Tanks:

Nonrefrigerated and Refrigerated.

B. NACE International:

1. NACE RP-02-85 - Corrosion Control of Underground Storage Tank Systems by

Cathodic Protection.

C. National Electrical Manufacturers Association:

1. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum).

D. National Fire Protection Association:

1. NFPA 30 - Flammable and Combustible Liquids Code.

2. NFPA 31 - Standard for the Installation of Oil-Burning Equipment.

E. Petroleum Equipment Institute:

Page 15: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-STORAGE TANKS 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 2

1. PEI 100 - Recommended Practices for Installation of Underground Liquid

Storage Systems.

F. Steel Tank Institute:

1. STI ACT-100 - Specification for External Corrosion Protection of FRP

Composite Steel Underground Storage Tanks.

G. Underwriters Laboratories Inc.:

1. UL 58 - Steel Underground Tanks for Flammable and Combustible Liquids.

2. UL 142 - Steel Aboveground Tanks for Flammable and Combustible Liquids.

3. UL 567 - Pipe Connectors for Flammable Liquids and Combustible Liquids and

LP-Gas.

4. UL 913 - Intrinsically Safe Apparatus and Associated Apparatus for Use in Class

I, II, and III, Division 1, Hazardous Locations.

5. UL 1316 - Glass Fiber Reinforced Plastic Underground Storage Tanks for

Petroleum Products, Alcohols, and Alcohol-Gasoline Mixtures.

6. UL 2085 - Standard for Safety for Insulated Aboveground Tanks Flammable and

Combustible Liquids.

1.3 SYSTEM DESCRIPTION

A. Provide aboveground tank of single wall welded steel construction.

1. Provide tank with tank gage.

2. Provide tank with cathodic protection.

3. Tank Capacity:

a. Volume: 275 gallons.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Shop Drawings:

1. Tanks: Indicate for fuel oil tanks dimensions; number, size, and location of

openings; number, size, and location of manholes; number and location of hold

down straps, and accessories. Indicate dimensions, reinforcing steel size, and

reinforcing steel location of pads.

C. Product Data:

1. Tanks: Submit manufacturer’s catalog information including capacity.

D. Test Reports: Submit written test results for tank pressure test.

E. Manufacturer's Installation Instructions: Submit tank

F. Manufacturer's Certificate:

1. Certify Products meet or exceed specified requirements.

Page 16: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-STORAGE TANKS 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 3

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Closeout procedures.

B. Project Record Documents: Record actual locations of tanks

C. Identify and describe unexpected variations to subsoil conditions or discovery of

uncharted utilities.

D. Operation and Maintenance Data: Submit spare parts lists &exploded assembly views for

tanks.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with NFPA 31.

B. Maintain one copyof each document on site.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section

with minimum three years experience.

B. Above Ground Fuel Storage Tanks: Company specializing in manufacturing products

specified in this section with minimum three years experience.

C. Installer: Company specializing in performing Work of this section with minimum three

years experience.

1.8 PRE-INSTALLATION MEETINGS

A. Section 01 30 00 - Administrative Requirements: Pre-installation meeting.

B. Convene minimum one week prior to commencing work of this section.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Product storage and handling requirements.

1.10 ENVIRONMENTAL REQUIREMENTS

A. Section 01 60 00 - Product Requirements.

B. Do not install underground tank when bedding is wet or frozen.

C. Do not install tank foundations when bedding is wet or frozen.

Page 17: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-STORAGE TANKS 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 4

1.11 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.12 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

1.13 WARRANTY

A. Section 01 70 00 - Execution and Closeout Requirements: Product warranties and product

bonds.

B. Furnish five year manufacturer warranty for tanks.

PART 2 PRODUCTS

2.1 ABOVEGROUND FUEL STORAGE TANKS

A. Manufacturers:

1. Granby

2. Stanwade

3. Liquidynamics

4. Highland

5. Xerxes

6. Safe-T-Tank

7. Substitutions: Section 01 60 00 - Product Requirements

B. Product Description: Tank constructed of 10 GA steel

C. Tank Configuration: Vertical .

D. Primary Tank: Single wall steel tank constructed in accordance with UL 142 not less than

10 GA thick.

E. Finish: Factory painted with industrial epoxy and urethane coating with dry film

thickness of 4 mils. Color: Black.

F. Fill Connection: Furnish fill containment assembly. Furnish with hinged locking cover,

stainless steel hinges, handle, safety chain, and lock hasp.

G. Normal Vent: Furnish each compartment of primary tank with 2 inch vent . Size vent in

accordance with NFPA 30.

Page 18: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-STORAGE TANKS 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 5

H. Emergency Vent: Furnish each compartment of primary tank with emergency vent sized

in accordance with NFPA 30. Do not use access openings for emergency venting

purposes.

I. Accessories:

1. Level Gage: Mechanical float activated level gage capable of indicating

approximate fluid level in tank reading in feet and inches.

2. Tank Decals: Furnish warning and tank identification signs located prominently

on tank following local fire code requirements.

J. Capacity:

1. Volume: 275 gallons.

2. Width: 27” inches.

3. Overall Length: 60 inches.

4. Height: 44”

5. Tank Fittings:

a. Fill: 2 inch.

b. Vent: 2 inch, galvanized, including "T" and elbow assembly with 1/4

inch square mesh screen over inlet.

c. Suction: 1/2 inch anti-siphon connection to tank bottom with foot valve.

d. Return: 1/2 inch.

e. Gage fitting

PART 3 EXECUTION

3.1 EXAMINATION

A. 01300 - Administrative Requirements: Coordination and project conditions.

B. Verify tank foundation are ready for tank installation.

3.2 INSTALLATION - ABOVEGROUND TANKS

A. Install aboveground tanks in accordance with API 1615, PEI 100, and NFPA 31.

B. Check factory installed equipment and accessories for loosening during transit.

C. Clean and flush tanks after installation. Seal until pipe connections are made.

D. Install aboveground tanks on concrete foundation. Refer to Section 03 30 00. Secure with

hold-down straps and turnbuckles.

E. Backfill tank foundation in accordance with Section 31 23 23

F. Install piping connections to tanks. Provide venting in accordance with API 2000.

Page 19: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

231113 FACILITY FUEL-STORAGE TANKS 02/18/20

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

231113 - Page 6

G. Tank Accessories:

1. Install tank accessories shipped loose with tank.

2. Install the following tank accessories: anti-siphon devices, vents, gages,

emergency vents

H. Adjust liquid level gages before initial start-up and after filling of tank.

I. Fill tanks completely at Project turnover with appropriate fuel.

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements 01 70 00 -: Field inspecting, testing, adjusting,

and balancing.

B. Pressure test aboveground tanks in accordance with NFPA 31.

END OF SECTION

Page 20: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 1

SECTION 283100 – FIRE DETECTION AND ALARM

PART 1 GENERAL

1.1 SUMMARY

A. Section includes fire alarm control panels, manual fire alarm stations, automatic smoke and heat detectors, fire alarm signaling appliances, and auxiliary fire alarm equipment and power and signal wire and cable.

B. Related Sections: 1. Section 08 71 00 - Door Hardware: Door closers, electric locks, electric releases. 2. Section 23 33 00 - Air Duct Accessories: Smoke dampers. 3. Section 25 50 00 - Integrated Automation Facility Controls. 4. Section 26 05 19 - Electrical Power Conductors and Cables. 5. Section 26 05 26 - Grounding and Bonding for Electrical Systems.

1.2 REFERENCES

A. National Fire Protection Association:

1. NFPA 72 - National Fire Alarm Code.

2. NFPA 262 - Standard Method of Test for Flame Travel and Smoke of Wires and Cables for Use in Air-Handling Spaces.

1.3 SYSTEM DESCRIPTION

A. The intent of this work is to provide a new addressable fire alarm system including main fire alarm control panel, remote annunciator panels, notification appliances, strobe lights, detection devices, duct mounted smoke detectors and fire alarm input and control relay modules as required for the renovation of the building. Existing conventional devices shall be reconnected into the new fire alarm panel.

B. Fire Alarm System: NFPA 72, manual and automatic local fire alarm system with connections to municipal system.

C. Alarm Sequence of Operation: Actuation of initiating device causes the following system

operations:

1. Local fire alarm signaling devices sound and display with signal.

2. Zone-coded signal transmits to municipal connection.

3. Location of alarm zone indicates on fire alarm control panel.

4. Signal transmits to building mechanical controls, shutting down fans and

operating dampers.

5. Signal transmits to release door hold-open devices.

6. Signal releases magnetic door hold opens.

Page 21: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 2

7. Signal releases electric door locks.

D. Drill Sequence of Operation: Manual drill function causes alarm mode sequence of operation.

E. Trouble Sequence of Operation: System or circuit trouble causes the following system operations:

1. Visual and audible trouble alarm indicates by zone at fire alarm control panel.

2. Visual and audible trouble alarm indicates at remote annunciator panel.

3. Trouble signal transmits to municipal connection.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate system wiring diagram showing each device and wiring connection; indicate annunciator layout, and design calculations.

C. Product Data: Submit catalog data showing electrical characteristics and connection requirements.

D. Test Reports: Indicate procedures and results for specified field testing and inspection.

E. Manufacturer's Field Reports: Indicate activities on site, adverse findings, and recommendations.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Closeout procedures.

B. Project Record Documents: Record actual locations of fire alarm equipment.

C. Operation and Maintenance Data: Submit manufacturer’s standard operating and maintenance instructions.

1.6 QUALITY ASSURANCE

A. Provide wiring materials located in plenums with peak optical density not greater than 0.5, average optical density not greater than 0.15, and flame spread not greater than 5 feet (1.5 m) when tested in accordance with NFPA 262.

B. Perform Work in accordance with State and City standards.

C. Coordinate installation with the local Fire Department.

Page 22: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 3

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years documented experience, and with service facilities within 100 miles of project.

B. Installer: Certified fire alarm installer with service facilities within 100 miles of Project.

C. Design fire alarm under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Massachusetts.

1.8 MAINTENANCE SERVICE

A. Section 01 70 00 - Execution and Closeout Requirements: Maintenance service.

B. Furnish service and maintenance of fire alarm equipment for one year from Date of Substantial Completion.

1.9 MAINTENANCE MATERIALS

A. Section 01 70 00 - Execution and Closeout Requirements: Spare parts and maintenance products.

B. Furnish ten manual station break-glass rods.

C. Furnish six keys of each type.

D. Provide (4) manual fire alarm pullstations, complete with all labor, material, and programming, to be located in the field as directed by the Local Authority having Jurisdiction.

E. Provide (4) fire alarm audio/visual appliances, complete with all labor, material, and programming, to be located in the field as directed by the Local Authority having Jurisdiction.

F. Provide (4) addressable ceiling type heat detectors, complete with all labor, material, and programming, to be located in the field as directed by the Local Authority Having Jurisdiction.

G. Provide (4) addressable duct mounted smoked detectors, including all labor, material, and programming, to be located in the field as directed by the Local Authority having Jurisdiction.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Silent Knight

B. Notifier

C. Simplex

D. Edwards

Page 23: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 4

E. Siemens

F. Substitutions: Section 01 60 00 - Product Requirements

2.2 CONTROL PANEL

A. Product Description: Modular fire alarm control panel with flush wall-mounted enclosure. Hybrid style panel compatible with existing conventional devices and new addressable devices.

B. Power supply: Adequate to serve control panel modules, remote detectors, remote annunciators, smoke dampers, relays, and alarm signaling devices. Include battery-operated emergency power supply with capacity for operating system in standby mode for 24 hours followed by alarm mode for 5 minutes.

C. System Supervision: Component or power supply failure places system in trouble mode.

D. Initiating Device Circuits: Supervised zone module with alarm and trouble indication; occurrence of single ground or open condition places circuit in trouble mode but does not disable circuit from initiating alarm.

E. Indicating Appliance Circuits: Supervised signal module, sufficient for signal devices connected to system; occurrence of single ground or open condition places circuit in trouble mode but does not disable circuit from signaling alarm.

F. Municipal Trip Circuit: Output connections for connection to municipal master fire alarm box. Include municipal trip disconnect switch.

G. Auxiliary Relays: Sufficient SPDT auxiliary relay contacts for each detection zone to provide accessory functions specified.

2.3 MANUAL FIRE ALARM STATIONS

A. Product Description: Manual station with break-glass rod.

B. Mounting: Semi-Flush.

C. Type: Non-coded.

D. Backbox: Manufacturer's standard.

2.4 SPOT HEAT DETECTOR

A. Product Description: Fixed temperature spot heat detector.

B. Temperature Rating: 135 degrees F.

2.5 CEILING SMOKE DETECTOR

A. Product Description: NFPA 72, photoelectric type ceiling smoke detector with the following features: 1. Adjustable sensitivity. 2. Plug-in base. 3. Visual indication of detector actuation.

Page 24: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 5

B. Mounting: 4 inch outlet box.

C. Furnish two-wire detector with common power supply and signal circuits.

2.6 DUCT-MOUNTED SMOKE DETECTOR

A. Product Description: NFPA 72, photoelectric type with the following features: 1. Auxiliary SPDT relay contact. 2. Key-operated normal-reset-test switch. 3. Duct sampling tubes extending width of duct. 4. Visual indication of detector actuation. 5. Duct-mounted housing.

B. Furnish two-wire detector with common power supply and signal circuits.

2.7 ALARM LIGHTS

A. Product Description: NFPA 72, strobe lamp and flasher with white lettered "FIRE" on red housing.

B. Provide field selectable multi-candela strobe lights with clearly visible visual indication of setting.

2.8 ALARM HORN

A. Product Description: NFPA 72, flush type fire alarm horn with the following features: 1. Sound Rating: 87 dB at 10 feet. 2. Provide with integral strobe lamp and flasher with white lettered “FIRE” on red

housing where indicated on drawings.

2.9 DOOR RELEASE

A. Product Description: Magnetic door holder with integral diodes to reduce buzzing.

B. Coil voltage: 24 VDC.

2.10 WIRE AND CABLE

A. Product Description: Power limited fire-protective signaling cable, copper conductor, 300 volts insulation rated 105 degrees C.

B. Cable Located Exposed in Plenums: Power limited fire-protective signaling cable classified for fire and smoke characteristics, copper conductor, 300 volts insulation rated 105 degrees C, suitable for use in air handling ducts, hollow spaces used as ducts, and plenums.

C. Fire alarm circuit conductors shall have insulation color or code to match existing system scheme. Coordinate requirements with School and local Fire Department.

Page 25: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 6

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

B. Verify products and systems receiving devices are ready for installation.

3.2 EXISTING WORK

A. Test existing devices and circuits to remain.

B. Remove exposed abandoned fire alarm wiring, including abandoned wiring above accessible ceiling finishes. Cut cable flush with walls and floors, and patch surfaces.

C. Disconnect and remove abandoned fire alarm equipment.

D. Maintain access to existing fire alarm equipment and other installations remaining active and requiring access. Modify installation or provide access panel.

E. Extend existing fire alarm installations using materials and methods compatible with existing installations.

F. Clean and repair existing fire alarm equipment to remain or to be reinstalled.

3.3 INSTALLATION

A. Install manual station with operating handle 4 feet 6 inches feet above floor.

B. Install audible and visual signal devices 7 feet 6 inches feet above floor.

C. Install 16 AWG minimum size conductors for fire alarm detection and signal circuit conductors.

D. Mount end-of-line device in box with last device or separate box adjacent to last device in circuit.

E. Mount outlet box for electric door holder to withstand 80 pounds pulling force.

F. Connect conduit and wire to door release devices, sprinkler flow switches, sprinkler valve tamper switches, fire suppression system control panels, duct smoke detectors.

G. Automatic Detector Installation: Conform to NFPA 72 and local codes.

H. Install engraved plastic nameplates.

I. Ground and bond fire alarm equipment and circuits in accordance with Section 26 05 26.

J. All conduit, junction boxes, conduit supports and hangers shall be concealed in finished areas and may be exposed in unfinished areas. Smoke detectors shall not be installed prior to the system programming and test period. If construction is ongoing during this period, measures shall be taken to protect smoke detectors from contamination and physical damage.

Page 26: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SECTION 283100 FIRE DETECTION AND ALARM 02/18/2020

Printed: 2/18/2020 The Richter House - Improvements and

Renovations

262819 - Page 7

K. All fire detection and alarm system devices, control panels and remote annunciators shall be flush mounted when located in finished areas and may be surface mounted when located in unfinished areas, or on existing block constructed walls with no means to fish wiring.

L. Perform setup programming to synchronize strobe flashing between existing conventional devices and the new addressable devices.

3.4 FIELD QUALITY CONTROL

A. Section 01 70 00 - Execution and Closeout Requirements: Field inspecting, testing, adjusting, and balancing.

B. Test in accordance with NFPA 72 and local fire department requirements.

3.5 MANUFACTURER'S FIELD SERVICES

A. Section 01 40 00 - Quality Requirements: Manufacturer’s field services.

B. Include services of certified technician to supervise installation, adjustments, final connections, and system testing.

3.6 DEMONSTRATION AND TRAINING

A. Furnish 4 hours of instruction each for two persons, to be conducted at project site with manufacturer's representative. Instruction shall be provided as required for operating the system. Hands-on demonstrations of the operation of all system components and the entire system including program changes and functions shall be provided.

B. The contractor and/or the systems manufacturer's representatives shall provide a typewritten "Sequence of Operation" to the owner.

END OF SECTION

Page 27: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

SPD

J J

D

OS

3

H

S

SURFACE MOUNTED PANELBOARD

RECESSED PANELBOARD

DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

ELECTRICAL MOTOR

TRANSFORMER

ELECTRICAL METER

SURGE PROTECTION DEVICE

BRANCH CIRCUIT WIRING, CONCEALED IN WALLS OR CEILINGS

HOMERUN TO PANELBOARD, UNLESS INDICATED OTHERWISE SHALL BECONNECTED TO A 1 POLE, 20 AMP CIRCUIT BREAKER

BRANCH CIRCUIT WIRING, SWITCHED

JUNCTION BOX

EXISTING DUPLEX WALL MOUNTED RECEPTACLE, REFER TO POWER PLAN KEYNOTES FOR SCOPE OF WORK

DOUBLE DUPLEX WALL MOUNTED RECEPTACLE

DUPLEX RECEPTACLE, MOUNT ABOVE COUNTER HEIGHT

DUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTION

DUPLEX RECEPTACLE WITH WEATHERPROOF COVER

SPECIAL PURPOSE CONNECTION

SPECIAL PURPOSE RECEPTACLE, NEMA CONFIGURATION AS INDICATED

DUPLEX / TELEPHONE / DATA FLOOR OUTLET

SINGLE POLE TOGGLE SWITCH

THREE WAY TOGGLE SWITCH

SWITCH WITH INTEGRAL OCCUPANCY SENSOR

DIMMER SWITCH

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED HEAT DETECTOR - TEMPERATURE RATING AS INDICATED ON DRAWINGS

SYMBOL DESCRIPTION

ELECTRICAL SYMBOL LIST

a

GFI

WP

CO CEILING MOUNTED CARBON MONOXIDE DETECTOR

LD 120V PLUG-IN LEAK DETECTOR FURNISHED AND INSTALLED BY PLUMBER

TX

S/CO COMBINATION SMOKE AND CARBON MONOXIDE DETECTOR

HALF CONTROLLED (SWITCHED OR DIMMED) DUPLEX WALL MOUNTED RECEPTACLE

SINGLE-GANG HIGH-CAPACITY BACKBOX FOR TELE/DATA. PROVIDE 1-1/4" CONDUIT UP TO NEAREST ACCESSIBLE CEILING. FACEPLATES, JACKS, CABLING, AND HEAD-END EQUIPMENT TO BE PROVIDED BY OWNER. COORDINATE FINAL LOCATION WITH ARCHITECT.

E EMERGENCY CALL TOGGLE SWITCH

EMERGENCY CALL FOR AID COMBINATION BUZZER / LIGHT

EXTERIOR BUILDING MOUNTED LIGHTING FIXTURE

SURFACE MOUNTED LIGHTING FIXTURE

RECESSED DOWNLIGHT FIXTURE

WALL MOUNTED LIGHTING FIXTURE

SELF CONTAINED EXIT SIGN AND EMERGENCY LIGHTING FIXTURE WITH BATTERY BACKUP. HALF-TONED SYMBOL DENOTES EXISTING FIXTURE. REFER TO KEYNOTES ON PLANS FOR SCOPE OF WORK.

WALL MOUNTED EXIT SIGN, DOUBLE FACED

WALL MOUNTED EXIT SIGN

CEILING MOUNTED EXIT SIGN

CEILING MOUNTED EXIT SIGN, DOUBLE FACED

FACP FIRE ALARM CONTROL PANEL

WALL MOUNTED COMBINATION HORN / STROBE LIGHT WITH AN ADA 15/75 CANDELA STROBE. MOUNT AT 6'-8" AFF.

WALL MOUNTED ADA 15/75 CANDELA STROBE UNIT ONLY.

F WALL MOUNTED FIRE ALARM MANUAL PULL STATION. MOUNT AT 48" AFF.

CEILING MOUNTED LIGHTING FIXTURE, REFER TO NOTES ON PLANS FOR ADDITIONAL INFORMATION AND REQUIREMENTS

DUPLEX WALL MOUNTED RECEPTACLE

1. ALL SWITCHES, RECEPTACLES, SMOKE DETECTORS, AND ALL OUTLETS ARE SHOWN IN AN APPROXIMATE LOCATION. THE CONTRACTOR MUST INSTALL THE BACK BOX FOR EACH DEVICE, PRIOR TO WIRING, FOR FINAL PLACEMENT APPROVAL BY THE ARCHITECT, ENGINEER, & OWNER. A PORTION OF THESE DEVICES MAY BE RELOCATED, BY THE ARCHITECT OR ENGINEER, PRIOR TO FINAL WIRING. NO CHANGE ORDER SHALL BE ACCEPTED FOR FINAL LOCATION ADJUSTMENTS.

2. UNLESS OTHERWISE INDICATED, ALL PLUGS, SWITCHES, AND WALLPLATES SHALL BE WHITE.A. IN ROOMS WITH WOOD FINISHES, PLUGS AND SWITCHES SHALL BE BLACK WITH

FORGED BRASS WALLPLATES.B. COORDINATE FINAL FINISHES AND COLORS WITH THE ARCHITECT.

3. COORDINATE WITH ARCHITECTURAL PLANS, DETAILS, ELEVATIONS AND ARCHITECT FOR LOCATIONS.

4. PROVIDE TAMPER PROOF RECEPTACLES.

SWITCH, DEVICE & RECEPTACLE NOTE

LIGHTING NOTE

1. UNLESS OTHERWISE INDICATED, ALL BRANCH CIRCUIT WIRING WITHIN BUILDING SHALL BE 2#12, 1#12G MC CABLE. (TYPICAL).

2. LOW VOLTAGE LIGHT FIXTURES MUST BE WIRED WITH 90° OR 105° 2#12,1#12G MC CABLE AS REQUIRED. REFER TO LIGHTING CONSULTANTS AND MANUFACTURERS LIGHTING FIXTURE SPECIFICATIONS.

3. ALL WIRING SHALL BE CONCEALED IN WALLS OR ABOVE THE CEILING. NO EXPOSED WIREMOLD OR CONDUIT SYSTEMS WILL BE ALLOWED.

4. REFER TO LIGHTING FIXTURE SPECIFICATIONS FOR SPECIAL WIRING REQUIREMENTS.5. PROVIDE FIRE-PROOFING FOR ALL PENETRATIONS AS REQUIRED.6. PROVIDE GFCI CIRCUIT BREAKERS AS REQUIRED PER EQUIPMENT SPECIFICATIONS

AND PER THE NEC.7. PROVIDE AFCI AND GFCI CIRCUIT PROTECTION PER THE NEC.8. PROVIDE 20A-1P DEDICATED CIRCUITS FOR BATHROOMS AS INDICATED ON DRAWINGS.9. PROVIDE (1) DEDICATED CIRCUIT FOR EVERY TWO KITCHEN COUNTER RECEPTACLES.

WIRING NOTES

APPLIANCE/EQUIPMENT RECEPTACLE NOTE

1. COORDINATE LOCATION OF POWER OUTLETS WITH APPLIANCE MANUFACTURER'S REQUIREMENTS AND ARCHITECT.

2. PROVIDE DEDICATED 120V OR 208V CIRCUITS, AMPERAGE AS REQUIRED, FOR APPLIANCE POWER.

GENERAL ELECTRICAL NOTE

1. REFER TO ONE-LINE RISER DIAGRAM AND DETAILS FOR FURTHER INFORMATION.2. REFER TO MECHANCIAL/PLUMBING/ARCHITECTURAL/LIGHTING/

COMMUNICATIONS/ETC. PLANS FOR FURTHER INFORMATION ON COMPLETE SCOPE OF WORK AND EQUIPMENT REQUIREMENTS. CONTRACT TO INCLUDE ALL ELECTRICAL WORK FOR A COMPLETE WORKING SYSTEM. REFER TO SPECIFICATIONS FOR ALL TRADES.

1. COORDINATE WITH ARCHITECTURAL FINAL DRAWINGS AND ARCHITECT FOR LOCATIONS OF SWITCHES, LIGHT FIXTURES AND SWITCHING ZONES.

2. REFER TO ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLAN.3. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE SPECIFICATIONS.4. COORDINATE SWITCHED RECEPTACLE LOCATIONS WITH ARCHITECT'S FINAL PLANS

AND ARCHITECT.5. PROVIDE ADEQUATE WIRING, QUICK CONNECT PLUGS FOR LIGHTING FIXTURES THAT

LAND ON A REMOVABLE ACCESS PANEL, AND/OR JAMB SWITCHES FOR HINGED ACCESS PANELS.

6. REVIEW LIGHTING FIXTURE SPECIFICATIONS AND COORDINATE VENTED ACCESSIBLE LOCATIONS FOR REMOTE TRANSFORMER AND LED DRIVERS AS REQUIRED.

1. LIFE SAFETY DEVICES SHALL BE INSTALLED IN COMPLIANCE WITH ALL LOCAL AND STATE LIFE SAFETY CODES.

LIFE SAFETY NOTE

SWITCHED RECEPTACLE NOTE

MECHANICAL EQUIPMENT NOTE

1. REFER TO MECHANICAL AND PLUMBING EQUIPMENT PLANS, RISERS, & SCHEDULES FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

2. PROVIDE DEDICATED CIRCUIT, AMPERAGE, PHASE, AND WIRE SIZE AS REQUIRED FOR EACH PIECE OF MECHANICAL EQUIPMENT.

1. THESE DRAWINGS INCLUDE A NEW TELEPHONE AND DATA RACEWAY SYSTEM INCLUDING CONDUITS, BACKBOXES, AND PULLSTRINGS FOR AREAS AFFECTED BY DEMOLITION IN THE EXISTING MAIN HOUSE..

2. TELEPHONE AND DATA CABLING, JACKS, AND HEAD-END EQUIPMENT HAVE NOT BEEN INCLUDED ON THESE DRAWINGS. REFER TO THE ARCHITECTS AND/OR OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS FOR LOCATIONS AND SPECIFICATIONS. COORDINATE WITH ARCHITECT.

DATA/TELEPHONE NOTE

1. COORDINATE SWITCHED RECEPTACLE LOCATIONS WITH FINAL ARCHITECTURAL PLANS AND ARCHITECT.

2. LABEL LIGHTING CONTROL WIRING USED TO SWITCH RECEPTACLES IN RECEPTACLE J-BOX.

ELECTRICAL ABBREVIATIONS

FIRE ALARM CONTROL PANELFACP

POWER FACTORPF

MOLDED CASE CIRCUIT BREAKERMCCB

MOTOR CONTROL CENTERMCC

THOUSAND CIRCULAR MILSKCMIL

HOURHR

WEATHERPROOFWP

WG WIRE GUARD

WATT, WIREW

VAC VOLTS ALTERNATING CURRENT

VOLT AMPEREVA

V VOLTS

UNIT HEATERUH

TYP TYPICAL

TRANSFORMERT/TX

CATV CABLE TELEVISION

TELEVISIONTV

TELE TELECOMMUNICATIONS/TELEPHONE

SWITCHBOARDSWBD

SPEC SPECIFICATION

SECONDARY ELECTRICAL SERVICESE

RTU ROOFTOP UNIT

ROOMRM

RGS RIGID GALVANIZED STEEL CONDUIT

POLYVINYL CHLORIDE CONDUITPVC

PNL PANEL

PHASEPH/∅

PE PRIMARY ELECTRICAL SERVICE

POLEP

NTS NOT TO SCALE

NOT IN CONTRACTNIC

NEC NATIONAL ELECTRIC CODE

MAU MAKE UP AIR UNIT

NOT APPLICABLENA

MLO MAIN LUGS ONLY

MAXIMUMMAX

MINIMUMMIN

MH METAL HALIDE

KILOWATTKW

KVA KILOVOLT AMPERE

JUNCTION BOXJB

IN INCHES

ISOLATED GROUNDIG

HZ HERTZ

HIGH PRESSURE SODIUMHPS

HP HORSE POWER

GROUND FAULT CIRCUIT INTERRUPTERGFCI

G GROUND

FAN COIL UNITFCU

FC FOOT CANDLE

FIRE ALARMFA

F FAHRENHEIT

ELECTRIC WATER HEATEREWH

EWC ELECTRIC WATER COOLER

ELECTRIC UNIT HEATEREUH

EMT ELECTRIC METALLIC TUBING

ELEVATORELEV

ELEC ELECTRICAL

EXHAUST FANEF

DWG DRAWING

DOWNDN

DIA/∅ DIAMETER

DEGREE°

CUH CABINET UNIT HEATER

CONDENSING UNIT, COPPERCU

CT CURRENT TRANSFORMER

CONDENSATE PUMPCP

COMP COMPRESSOR

CIRCUITCKT

C/B CIRCUIT BREAKER

CONDUITC

BSMT BASEMENT

AMERICAN WIRE GAUGEAWG

ATS AUTOMATIC TRANSFER SWITCH

AMPS INTERRUPTING CURRENTAIC

AIR CONDITIONING UNITACU

AHU AIR HANDLING UNIT

ABOVE FINISHED GRADEAFG

AFF ABOVE FINISHED FLOOR

ALTERNATING CURRENTAC

AMPEREA/AMP

EXISTING TO REMAINREMOVE EXISTING

RELOCATE EXISTING

NEW LOCATION OF EXISTING RELOCATED

NEW TO REPLACE EXISTING

REMOVE AND REPLACE ON NEW SURFACERR

NR

NL

RL

REETR

ARC FAULT CIRCUIT INTERRUPTERAFCI

SPD SURGE PROTECTION DEVICE

MAIN CIRCUIT BREAKERMCB

ALUMINUMAL

MW MICROWAVE

WARMING DRAWERWD

1. ELECTRICAL DEVICES SHALL BE REMOVED AS INDICATED ON PLANS WITH KEY NOTES. REMOVAL SHALL BE COMPLETE INCLUDING BOXES, BRACKETS, HANGERS AND BRANCH CIRCUIT WIRING BACK TO SOURCE PANELBOARD OR LAST ACTIVE DEVICE TO REMAIN (EXCEPT WHERE NOTED OTHERWISE).

2. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL ITEMS TO BE REMOVED IN A SAFE, LEGAL AND RESPONSIBLE MANNER.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR STORAGE AND HANDLING OF EXISTING TO BE RELOCATED EQUIPMENT.

4. CONTRACTOR SHALL MODIFY EXISTING CIRCUITS, WHEN EXISTING DEVICES ARE REMOVED, AS REQUIRED TO MAINTAIN CIRCUIT CONTINUITY.

5. THIS PLAN IS DIAGRAMMATIC AND NOT INTENDED TO DEPICT THE ENTIRE SCOPE OF ELECTRICAL DEMOLITION. ADDITIONAL DEMOLITION AND MODIFICATION WORK NOT SHOWN SHOULD BE ANTICIPATED.

6. THIS PROJECT COMPRISES ALTERATIONS AND RENOVATIONS TO THE EXISTING BUILDING. THE EXISTING BUILDING IS CURRENTLY OCCUPIED AND THE PROJECT WILL PROCEED IN A MANNER WHICH WILL MINIMIZE ANY INCONVENIENCE TO THE BUILDING OCCUPANTS.

7. PRIOR TO SUBMITTING BID, VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK TO BE PERFORMED. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY IDENTIFIED BY EXPERIENCED OBSERVERS. INCLUDE IN THE BID ALL DEMOLITION WORK REQUIRED.

8. EXISTING EXTERIOR DOOR ALARM SENSORS ARE TO REMAIN.

ELECTRICAL DEMOLITION NOTES

G

N

MAIN SERVICE PANEL

BONDING JUMPER AS PER NEC ARTICLE 250

GROUNDING ELECTRODE CONDUCTOR PER NEC ARTICLE 250

FEEDER CIRCUIT BREAKER

G

N

NEUTRAL CONDUCTOR

NORMAL EQUIPMENT GROUNDING CONDUCTOR SIZED AS PER NEC ARTICLE 250

CONTINUOUS METALLIC PIPING BETWEEN MAIN STRUCTURE AND DETACHED STRUCTURE. (METAL CONDUIT, WATER PIPING, LIGHTNING PROTECTION CONDUCTOR, ETC.)

PANEL AT DETACHED STRUCTURE

REFER TO GROUNDING GRID DETAIL ON THIS SHEET.

NORMAL GROUND BUS BAR IN PANEL BOARD (TYPICAL)

1" RIGID GALVANIZED STEEL CONDUIT, REFER TO GROUND GRID DETAIL FOR EACH BUILDING FOR GROUND WIRE SIZE (TYPICAL)

EXTERNAL GROUND GRID, PER NEC ARTICLE 250. REFER TO GROUNDING GRID DETAIL ON THIS SHEET (TYPICAL).

UNDERGROUND MAIN FEEDER

LIGHTING FIXTURE SCHEDULE

TYPE MANUFACTURER AND MODEL LAMPS

LIGHTING FIXTURE NOTES1. COORDINATE FINAL FINISHES, DIMENSIONS, AND COLORS WITH THE ARCHITECT.

REMARKS

A

VOLT

DAY-BRITE2SAVC2-CF40-SPMW-120-LPT835

40W LED3500K

3150LM

CEILING SURFACE MOUNTED 2X2 INDIRECT/DIRECT FIXTURE WITH SOFT WHITE BAKED ENAMEL FINISH.120

B GARDCOBR840-42-14L-175-NW-G2-3-UNV-

PCB-[FINISH]

8.2W LED4000K986LM

EXTRUDED ALUMINUM BOLLARD WITH CAST ALUMINUM SHIELDING LOUVERS, INTEGRAL PHOTOCELL CONTROL, AND INTEGRAL SURGE SUPPRESSION.

REFER TO DETAIL 4/SU-100 FOR ADDITIONAL REQUIREMENTS.

120

T SPECTRUM LIGHTINGTL020GU10-TM3-[FINISH]

/ [LENGTH]-FTR-3WIRE-[FINISH]

10W LED4000K??LM

DIE-CAST ALUMINUM TRACK LIGHTING. PROVIDE TRACK LENGTHS AND TRACK HEADS AS INDICATED ON DRAWINGS. PROVIDE CONNECTORS AND ACCESSORIES AS REQUIRED TO CREATE A COMPLETE SYSTEM.

120

W GARDCO101L-16L-530-NW-G1-3-EBPC-120-DD-

PCB-[FINISH]

28W LED4000K

2687LM

WALL MOUNT CAST ALUMINUM AREA LIGHT WITH HIGH PERFORMANCE LEDS. PROVIDE WITH INTEGRAL PHOTOCELL OVERRIDE AND BATTERY BACKUP. MOUNTED TO BUILDING FACADE AT 9'-0" ABOVE GRADE.

120

P LUMECMPTR-55W32LED-4K-G2-LE5-120-

DMG-PH8-[FINISH] / RTA400-F-10-[FINISH]

56W LED4000K

5300LM

ARCHITECTURAL STYLE POLE-MOUNTED LED AREA LUMINAIRE WITH INTEGRAL PHOTOCELL OVERRIDE. ONE PIECE DIE-CAST ALUMINUM ALLOY AND TEMPERED GLASS HOUSING. PROVIDE 10' POLE, COORDINATE WITH MANUFACTURER'S REQUIREMENTS. REFER TO DETAILS 3/SU-100 AND 5/SU-100 FOR ADDITIONAL REQUIREMENTS. CONTROLLED VIA CONTACTOR AND TIMECLOCK.

120

C SUNPARK1018D-3000K-[FINISH]

23W LED3000K

2000LM

SURFACE MOUNT CEILING FIXTURE WITH DIE-FORMED COLD-ROLLED STEEL HOUSING AND FROSTED SWIRL GLASS. 120

X1 DUAL-LITELES-C-S-R-[CHEVRONS]-[FINISH]-AC

LED<5W

CEILING MOUNT LED EXIT SIGN:RED LETTERS, AC ONLY, SINGLE FACE. PROVIDE CHEVRONS AS INDICATED ON PLANS.120

X2 DUAL-LITELES-C-D-R-[CHEVRONS]-[FINISH]-AC

LED<5W

CEILING MOUNT LED EXIT SIGN:RED LETTERS, AC ONLY, DOUBLE FACE. PROVIDE CHEVRONS AS INDICATED ON PLANS.120

X1E EVENLITEHCZ-U-R-[FINISH]

LED<5W

CEILING MOUNT LED EXIT SIGN WITH INTEGRAL BATTERY-OPERATED EMERGENCY LIGHTING:RED LETTERS, AC ONLY. PROVIDE SINGLE/DOUBLE FACE AND CHEVRONS AS INDICATED ON PLANS.

120

D LIGHTOILERFD-4R-07-9-30-TE-1-W

13W LED3000K700LM

FLAT LED DOWNLIGHT FIXTURE WITH ALUMINUM FLANGE AND HARD PLASTIC DIFFUSED PATTERN LENS.120

S SUNPARKMDF030D-3000K

14W LED3000K

1050LM

ARCHITECTURAL STYLE SURFACE-MOUNTED LED WALL SCONCE WITH DIE-FORMED COLD-ROLLED STEEL HOUSING AND HIGH TRANSMISSION GLASS SHADE. 120

W1 GARDCO101L-16L-700-NW-G1-3-EBPC-120-DD-

PCB-[FINISH]

37W LED4000K

3458LM

WALL MOUNT CAST ALUMINUM AREA LIGHT WITH HIGH PERFORMANCE LEDS. PROVIDE WITH INTEGRAL PHOTOCELL OVERRIDE AND BATTERY BACKUP. MOUNTED TO BUILDING FACADE AT 20'-0" ABOVE GRADE.

120

SX SUNPARK3-6001D-2-E

9W LED3000K820LM

VINTAGE STYLE SURFACE-MOUNTED LED WALL SCONCE WITH DIE-CAST ALUMINUM HOUSING AND POWDER COATED FINISH. 120

PROVIDE GROUNDING ELECTRODE CONDUCTOR (GEC), #6 AWG COPPER OR SIZED PER NEC 250.66, BACK TO PANEL

PROVIDE GROUNDING ELECTRODE GROUND ROD:10' X 3/4" DIAMETER COPPER CLAD GROUND ROD.(TYPICAL OF 2)

20'-0"

BONDING ELECTRODE CONDUCTOR:#6 AWG COPPER OR SIZED PER NEC 250.66

EXOTHERMICALLYWELDED

8" MINIMUM COVER

6" MINIMUM COVER

FINISHED GRADE

EOL

F S

CONNECT NEW DEVICES TONOTIFICATION CIRCUIT

PROVIDE BATTERIES, CONTROL CARDS, EXPANSION MODULES,ETC TO ACCOMMODATE ALL CONNECTED DEVICES AS REQUIRED BY MANUFACTURER. PROVIDE TESTING AND PROGRAMMING OF CONTROL PANEL TO ACCOMMODATE ALL CONNECTED DEVICES.

PROVIDE NEW SILENT KNIGHT ADDRESSABLE HORN/STROBE ANDSTROBE-ONLY DEVICES IN LOCATIONS INDICATED ON FLOOR PLANS.PROVIDE ALL NECESSARY SYNCHRONIZATION OF STROBES.

CONNECT NEW DEVICES TO INITIATION CIRCUIT

NOTES:

1.

2.

PROVIDE WIRING CLASS/STYLE AS REQUIRED BY THE MANUFACTURER AND CODE. PROVIDE METAL-CLAD CABLING WHENCONCEALED AND WIRE IN RACEWAY WHERE EXPOSED.

3.

DEVICES SHOWN ARE DIAGRAMMATIC, REFER TO FLOOR PLANS FOR QUANTITY AND LOCATION OF DEVICES.

4.

EOL

NEW SILENT KNIGHTADDRESSABLE FIRE ALARM CONTROL PANEL

LOCATED IN FOYER 105

H S/CO

MAIN HOUSE CONCESSION STAND

120VAC WITH CIRCUIT

BREAKER LOCK

EOL

F S

CONNECT NEW DEVICES TONOTIFICATION CIRCUIT

CONNECT NEW DEVICES TO INITIATION CIRCUIT

EOL

H S/CO

SHEET NO.

DATE:

PROJECT NO:DRAWN:

CHECKED:

ISSUED FOR:

REVISIONS: 2

ELECTRICALABBREVIATIONS

NOTES ANDSYMBOLS

RICHTER HOUSE

100 AUNT HACKROAD DANBURY,

CT 06810

02/18/2020

2019123.00

MWTMWT

BID SET

E-000.00

CES #2019123.00

REVISIONS

NO. DATE DESCRIPTION

1 01/16/2020 ADDENDUM 1

2 02/18/2020 ADDENDUM 2

NTS1

DETACHED STRUCTURE PANELBOARD GROUNDING DETAIL

MOTOR CIRCUIT SCHEDULE

MARK PANEL CIRCUIT # VOLTAGE PHASE FLA MCA MOPAPPARENT

POWERLOCAL

DISC. SW BRANCH CIRCUIT

MOTOR STARTER

REMARKSSIZE TYPE LOCATION

CU-1 PPH1 18,20 208 V 1 23.2 A 29 A 44 A 5568 VA 30A FDS 3#8 & 1#10G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

CU-2 PPH1 23,25 208 V 1 23.2 A 29 A 44 A 5568 VA 30A FDS 3#8 & 1#10G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

CU-3 PPH1 22,24 208 V 1 28.8 A 36 A 42 A 6912 VA 60A NFDS 3#8 & 1#10G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

CU-4 PPH1 19,21 208 V 1 28.8 A 36 A 42 A 6912 VA 60A NFDS 3#8 & 1#10G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

EF-1 PPH1 42 120 V 1 0.5 A 0.6 A 15 A 120 VA 15A-TS 2#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

EF-2 PPH1 42 120 V 1 0.2 A 0.3 A 15 A 120 VA 15A-TS 2#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

EF-3 PPH1 42 120 V 1 0.5 A 0.6 A 15 A 120 VA 15A-TS 2#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

EF-4 PPC 15 120 V 1 0.4 A 0.4 A 15 A 42 VA 15A-TS 2#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 CONCESSIONS

EF-5 PPC 15 120 V 1 0.4 A 0.4 A 15 A 42 VA 15A-TS 2#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 CONCESSIONS

FCU-1-1 PPH1 6,8 208 V 1 4.5 A 5.6 A 15 A 1351 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

FCU-1-2 PPH1 10,12 208 V 1 3.3 A 4.1 A 15 A 991 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

FCU-1-3A PPH1 14,16 208 V 1 0.2 A 0.2 A 15 A 46 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

FCU-1-3B PPH1 14,16 208 V 1 0.3 A 0.4 A 15 A 91 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

FCU-2-1 PPH1 7,9 208 V 1 4.5 A 5.6 A 15 A 1351 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

FCU-2-2 PPH1 11,13 208 V 1 4.5 A 5.6 A 15 A 1351 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

FCU-3 PPH1 15,17 208 V 1 2.4 A 3 A 15 A 720 VA 15A-TS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

MAU-1 PPH1 44 120 V 1 2 A 2.5 A 15 A 120 VA 15A-TS 2#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 MAIN HOUSE

UH-1 PPC 23,25 208 V 1 17.4 A 21.8 A 30 A 4080 VA 30A NFDS 3#12 & 1#12G, 3/4" C. BY DIV 23 BY DIV 23 CONCESSIONS

NTS2

GROUND GRID DETAILNTS

3FIRE ALARM RISER DIAGRAM

Page 28: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

H

H

H

OS

OS

H

S/CO

UH-1

REF

FRZ

MWWD

HOTDOG ROLLER

PRETZEL WARMER

GF

CI, a

GF

CI, a

GFCI

GFCI, a

GFCI, a

PPC, 7

PPC, 9

PPC, 12

PPC, 6PPC, 8PPC, 4

PPC, 2

PPC, 10

PPC, 11

PPC, 13

OS

OS

PPC, 14

PPC, 19

PPC, 21

PPC, 20

TO SECOND FLOOR

PPC, 17

A A

AA

A

A

A A

W

W

W

EB-1

EB-1

+48" A.F.F.

EF-5

EF-4NOTE: ELECTRICAL DESIGN OF THIS SPACE IS PENDING THE THEATRICAL LIGHTING SYSTEM DESIGN, INCLUDING FINAL QUANTITIES AND LOCATIONS OF RECEPTACLES, LIGHTING FIXTURES, AND OTHER ENERGIZED EQUIPMENT. REFER TO THE LIGHTING PANEL SCHEDULE, "PPL", ON THIS SHEET FOR PRELIMINARY CIRCUIT INFORMATION.

TO FIRST FLOOR

A

A

WH-2

EB-1

A

A

A

A

PPC, 18

PPC, 16

D

D

+48" A.F.F.

PPC

PPL

SHEET NO.

DATE:

PROJECT NO:DRAWN:

CHECKED:

ISSUED FOR:

REVISIONS: 2

CONCESSIONELECTRICAL

PLANS

RICHTER HOUSE

100 AUNT HACKROAD DANBURY,

CT 06810

02/18/2020

2019123.00

MWTMWT

BID SET

E-110.00

CES #2019123.00

1/4" = 1'-0"1

CONCESSION FIRST FLOOR ELECTRICAL PLAN1/4" = 1'-0"

2CONCESSION SECOND FLOOR ELECTRICAL PLAN

REVISIONS

NO. DATE DESCRIPTION

1 01/16/2020 ADDENDUM 1

2 02/18/2020 ADDENDUM 2

CIRCUITS FOR THIS PANEL ARE PENDING COMPLETION AND COORDINATION OF THE THEATRICAL LIGHTING SYSTEM DESIGN AND STAGE DESIGN POWER REQUIREMENTS.

REFER TO ELECTRICAL POWER PLANS FOR CIRCUITING INFORMATION FOR GENERAL RECEPTACLES. EXISTING CIRCUITS TO REMAIN SHALL BE RECONNECTED TO THIS NEW HOUSE PANEL.

CIRCUITS FOR THIS PANEL ARE PENDING COMPLETION AND COORDINATION OF THE THEATRICAL LIGHTING SYSTEM DESIGN AND STAGE DESIGN POWER REQUIREMENTS.

SERVICE ENTRANCE RATED

Notes: Total Amps: 341.22 A

Total Load: 122.93 kVA

Phase... 417.1 A 302.8 A 305.5 A

Phase Load: 50.01 kVA 36.33 kVA 36.62 kVA

41 SPACE -- -- 0.00 0.00 -- -- -- 42

39 SPACE -- -- 0.00 0.00 -- -- -- 40

37 SPACE -- -- 0.00 0.00 3 30 A SURGE PROTECTION DEVICE 38

35 SPACE -- -- 0.00 0.00 -- -- SPACE 36

33 SPACE -- -- 0.00 0.00 -- -- SPACE 34

31 SPACE -- -- 0.00 0.00 -- -- SPACE 32

29 SPACE -- -- 0.00 0.00 -- -- SPACE 30

27 SPACE -- -- 0.00 0.00 -- -- SPACE 28

25 SPACE -- -- 0.00 0.00 -- -- SPACE 26

23 SPACE -- -- 0.00 0.00 -- -- SPACE 24

21 SPACE -- -- 0.00 0.00 -- -- SPACE 22

19 SPACE -- -- 0.00 0.00 -- -- SPACE 20

17 SPACE -- -- 0.00 0.00 -- -- SPACE 18

15 SPACE -- -- 0.00 0.00 -- -- SPACE 16

13 SPACE -- -- 0.00 0.00 -- -- SPACE 14

11 SPACE -- -- 0.00 0.00 -- -- SPACE 12

9 SPACE -- -- 0.00 0.00 -- -- SPACE 10

7 SPACE -- -- 0.00 12.48 -- -- -- 8

5 -- -- -- 24.15 12.48 2 150 A STAGE DISCONNECT #2 6

3 -- -- -- 23.91 12.48 -- -- -- 4

1 PPH1 300 A 3 25.07 12.48 2 150 A STAGE DISCONNECT #1 2

CKT Circuit Description Trip Poles

A B C

Poles Trip Circuit Description CKT

Enclosure: Type 3R MCB Rating / MLO: 400 A MCB

Mounting: Surface Wires: 4 Bus Rating: 400 A

Supply From: Phases: 3 Bus Material: CU

Location: Volts: 120/208 Wye A.I.C. Rating: 42K

Branch Panel: MDP

PROVIDE AFCI AND GFCI BREAKERS AS REQUIRED BY CODE.

*** PROVIDE CIRCUIT BREAKER LOCK.

** PROVIDE POWER VIA TIMECLOCK & CONTACTOR. REFER TO DETAIL 3/SU-100.

Notes: Total Amps: 202.88 A

Total Load: 73.09 kVA

Phase... 209.2 A 199.2 A 201.5 A

Phase Load: 25.07 kVA 23.91 kVA 24.15 kVA

83 -- -- -- 0.00 0.00 -- -- SPACE 84

81 -- -- -- 0.00 0.00 -- -- SPACE 82

79 SURGE PROTECTION DEVICE 30 A 3 0.00 0.00 -- -- SPACE 80

77 SPACE -- -- 0.00 0.00 -- -- SPACE 78

75 SPACE -- -- 0.00 0.00 -- -- SPACE 76

73 SPACE -- -- 0.00 0.00 -- -- SPACE 74

71 SPACE -- -- 0.00 0.00 -- -- SPACE 72

69 SPACE -- -- 0.00 0.00 -- -- SPACE 70

67 -- -- -- 8.91 0.00 -- -- SPACE 68

65 -- -- -- 9.91 0.00 -- -- SPACE 66

63 PPC 150 A 3 10.02 0.00 -- -- SPACE 64

61 -- -- -- 0.00 0.00 -- -- SPACE 62

59 -- -- -- 0.00 0.00 -- -- SPACE 60

57 PPS 60 A 3 0.00 0.11 1 20 A LTG PARKING POLES #10 AWG ** 58

55 LTG OFFICE 113 20 A 1 0.05 0.01 1 20 A LTG EXTERIOR OFFICE 113 56

53 LTG OFFICE 112 20 A 1 0.02 0.07 1 20 A LTG BATH 213, 214, CORR 212 54

51 LTG STAIR 111, 211 20 A 1 0.07 0.07 1 20 A LTG BATH 108, 109, CORR 110 52

49 LTG BOLLARDS STAGE #10 AWG 20 A 1 0.03 0.05 1 20 A EXIT SIGNS & BATTERY LIGHTS 2ND 50

47 LTG BOLLARDS CONC. #10 AWG 20 A 1 0.04 0.05 1 20 A EXIT SIGNS & BATTERY LIGHTS 1ST 48

45 LTG PARKING POLES #10 AWG ** 20 A 1 0.11 0.02 1 20 A LTG ENTRY VESTIBULE 46

43 CHAIR LIFT 20 A 1 0.50 0.12 1 15 A MAU-1 44

41 REC OFFICE 112 20 A 1 0.72 0.36 1 15 A EF-1, EF-2, EF-3 42

39 REC OFFICE 113 20 A 1 0.72 0.54 1 20 A REC ATTIC 301 GFCI 40

37 REC GARAGE 114 GFCI 20 A 1 0.36 0.90 1 20 A REC OFFICE 204 38

35 REC CORR. 110, STAIR 111 20 A 1 0.36 0.90 1 20 A REC STORAGE 216 36

33 REC WATER FOUNTAIN 20 A 1 1.00 0.36 1 20 A REC CORR. 212, STAIR 211 34

31 REC WATER FOUNTAIN 20 A 1 1.00 0.18 1 20 A REC KITCHENETTE 215 GFCI a 32

29 REC BATHRM 108, 109 GFCI a 20 A 1 0.36 0.18 1 20 A REC KITCHENETTE 215 GFCI a 30

27 FIRE ALARM CONTROL PANEL *** 20 A 1 0.15 0.36 1 20 A REC BATHRM 213, 214 GFCI a 28

25 -- -- -- 2.78 0.01 1 20 A BATHROOM CALL FOR AID 26

23 CU-2 40 A 2 2.78 3.46 -- -- -- 24

21 -- -- -- 3.46 3.46 2 40 A CU-3 22

19 CU-4 40 A 2 3.46 2.78 -- -- -- 20

17 -- -- -- 0.36 2.78 2 40 A CU-1 18

15 FCU-3 15 A 2 0.36 0.07 -- -- -- 16

13 -- -- -- 0.68 0.07 2 15 A FCU-1-3A, FCU-1-3B 14

11 FCU-2-2 15 A 2 0.68 0.50 -- -- -- 12

9 -- -- -- 0.68 0.50 2 15 A FCU-1-2 10

7 FCU-2-1 15 A 2 0.68 0.68 -- -- -- 8

5 -- -- -- 0.00 0.68 2 15 A FCU-1-1 6

3 -- -- -- 0.00 2.25 -- -- -- 4

1 PPH2 100 A 3 0.00 2.25 2 30 A WH-1 WATER HEATER 2

CKT Circuit Description Trip Poles

A B C

Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating / MLO: 300 A MCB

Mounting: Surface Wires: 4 Bus Rating: 400 A

Supply From: MDP Phases: 3 Bus Material: CU

Location: BASEMENT 001 Volts: 120/208 Wye A.I.C. Rating: 22K

Branch Panel: PPH1

ETR = EXISTING TO REMAIN. PROVIDE AFCI/GFCI AS REQUIRED BY CODE

* PROVIDE NEW BREAKERS. FINAL CIRCUIT BREAKER SIZES TO MATCH EXISTING CIRCUIT BREAKERS BEING REPLACED.

* CONTRACTOR SHALL DISCONNECT AND RECONNECT ALL EXISTING CIRCUITS TO REMAIN, CLEARLY LABEL IN NEW PANELBOARD DIRECTORY.

Notes: Total Amps: 0 A

Total Load: 0.00 kVA

Phase... 0 A 0 A 0 A

Phase Load: 0.00 kVA 0.00 kVA 0.00 kVA

83 SPACE -- -- 0.00 0.00 -- -- SPACE 84

81 SPACE -- -- 0.00 0.00 -- -- SPACE 82

79 SPACE -- -- 0.00 0.00 -- -- SPACE 80

77 SPACE -- -- 0.00 0.00 -- -- SPACE 78

75 SPACE -- -- 0.00 0.00 -- -- SPACE 76

73 SPACE -- -- 0.00 0.00 -- -- SPACE 74

71 SPACE -- -- 0.00 0.00 -- -- SPACE 72

69 SPACE -- -- 0.00 0.00 -- -- SPACE 70

67 SPACE -- -- 0.00 0.00 -- -- SPACE 68

65 SPACE -- -- 0.00 0.00 -- -- SPACE 66

63 SPACE -- -- 0.00 0.00 -- -- SPACE 64

61 SPACE -- -- 0.00 0.00 -- -- SPACE 62

59 SPACE -- -- 0.00 0.00 -- -- SPACE 60

57 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 58

55 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 56

53 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 54

51 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 52

49 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 50

47 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 48

45 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 46

43 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 44

41 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 42

39 ETR CIRCUIT * 20 A 1 0.00 0.00 -- -- -- 40

37 ETR CIRCUIT * 20 A 1 0.00 0.00 2 30 A ETR CIRCUIT * 38

35 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 36

33 ETR CIRCUIT * 20 A 1 0.00 0.00 -- -- -- 34

31 ETR CIRCUIT * 20 A 1 0.00 0.00 2 40 A ETR CIRCUIT * 32

29 ETR CIRCUIT * 20 A 1 0.00 0.00 -- -- -- 30

27 ETR CIRCUIT * 20 A 1 0.00 0.00 2 100 A ETR CIRCUIT * 28

25 ETR CIRCUIT * 20 A 1 0.00 0.00 1 15 A ETR CIRCUIT * 26

23 ETR CIRCUIT * 20 A 1 0.00 0.00 1 15 A ETR CIRCUIT * 24

21 ETR CIRCUIT * 15 A 1 0.00 0.00 -- -- -- 22

19 ETR CIRCUIT * 15 A 1 0.00 0.00 2 15 A ETR CIRCUIT * 20

17 ETR CIRCUIT * 20 A 1 0.00 0.00 -- -- -- 18

15 -- -- -- 0.00 0.00 2 30 A ETR CIRCUIT * 16

13 ETR CIRCUIT * 20 A 2 0.00 0.00 1 15 A ETR CIRCUIT * 14

11 ETR CIRCUIT * 15 A 1 0.00 0.00 -- -- -- 12

9 ETR CIRCUIT * 15 A 1 0.00 0.00 2 20 A ETR CIRCUIT * 10

7 ETR CIRCUIT * 15 A 1 0.00 0.00 -- -- -- 8

5 ETR CIRCUIT * 15 A 1 0.00 0.00 2 20 A ETR CIRCUIT * 6

3 -- -- -- 0.00 0.00 -- -- -- 4

1 ETR CIRCUIT * 20 A 2 0.00 0.00 2 20 A ETR CIRCUIT * 2

CKT Circuit Description Trip Poles

A B C

Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating / MLO: MLO

Mounting: Surface Wires: 4 Bus Rating: 225 A

Supply From: PPH1 Phases: 3 Bus Material: CU

Location: BASEMENT 001 Volts: 120/208 Wye A.I.C. Rating: 22K

Branch Panel: PPH2

Notes: Total Amps: 79.88 A

Total Load: 28.78 kVA

Phase... 84.8 A 83.9 A 74.2 A

Phase Load: 10.02 kVA 9.91 kVA 8.91 kVA

41 SPARE 20 A 1 0.00 0.00 -- -- -- 42

39 SPARE 20 A 1 0.00 0.00 -- -- -- 40

37 SPARE 20 A 1 0.00 0.00 3 30 A SURGE PROTECTION DEVICE 38

35 SPARE 20 A 1 0.00 0.00 1 20 A SPARE 36

33 -- -- -- 2.25 0.00 1 20 A SPARE 34

31 WH-2 WATER HEATER 30 A 2 2.25 0.00 1 20 A SPARE 32

29 -- -- -- 1.25 0.00 1 20 A SPARE 30

27 EB-1 LIGHTING BOOTH 20 A 2 1.25 1.25 -- -- -- 28

25 -- -- -- 2.04 1.25 2 20 A EB-1 WOMEN'S BATHROOM 26

23 UH-1 CONCESSION STAND 30 A 2 2.04 1.25 -- -- -- 24

21 LTG MEN'S BATHROOM 20 A 1 0.08 1.25 2 20 A EB-1 MEN'S BATHROOM 22

19 LTG WOMEN'S BATHROOM 20 A 1 0.08 0.12 1 20 A LTG STAIR 20

17 LTG EXTERIOR DOORS 20 A 1 0.07 1.26 1 20 A REC LIGHTING BOOTH 18

15 EF-4, EF-5 15 A 1 0.08 0.29 1 20 A LTG LIGHTING BOOTH AND CLOSET 16

13 REC WOMEN'S BATHROOM GFCI a 20 A 1 0.18 0.12 1 20 A LTG CONCESSION STAND 14

11 REC MEN'S BATHROOM GFCI a 20 A 1 0.18 0.36 1 20 A REC CONCESSION GFCI a 12

9 FREEZER 15 A 1 0.43 0.54 1 20 A REC CONCESSION GFCI 10

7 REFRIGERATOR 15 A 1 0.32 1.42 1 15 A PRETZEL WARMER 8

5 -- -- -- 0.50 2.00 1 20 A MICROWAVE 6

3 -- -- -- 1.50 1.36 1 15 A WARMING DRAWER 4

1 PPL 100 A 3 1.50 1.10 1 15 A HOTDOG ROLLER 2

CKT Circuit Description Trip Poles

A B C

Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating / MLO: 150 A MCB

Mounting: Recessed Wires: 4 Bus Rating: 225 A

Supply From: PPH1 Phases: 3 Bus Material: CU

Location: Volts: 120/208 Wye A.I.C. Rating: 22K

Branch Panel: PPC

Notes: Total Amps: 9.72 A

Total Load: 3.50 kVA

Phase... 13.8 A 13.8 A 4.2 A

Phase Load: 1.50 kVA 1.50 kVA 0.50 kVA

41 -- -- -- 0.00 0.00 -- -- SPACE 42

39 -- -- -- 0.00 0.00 -- -- SPACE 40

37 SURGE PROTECTION DEVICE 30 A 3 0.00 0.00 -- -- SPACE 38

35 SPACE -- -- 0.00 0.00 -- -- SPACE 36

33 SPACE -- -- 0.00 0.00 -- -- SPACE 34

31 SPACE -- -- 0.00 0.00 -- -- SPACE 32

29 SPACE -- -- 0.00 0.00 -- -- SPACE 30

27 SPACE -- -- 0.00 0.00 -- -- SPACE 28

25 SPACE -- -- 0.00 0.00 -- -- SPACE 26

23 SPACE -- -- 0.00 0.00 1 20 A LTG SPARE 24

21 SPACE -- -- 0.00 0.00 1 20 A LTG SPARE 22

19 SPACE -- -- 0.00 0.00 1 20 A LTG SPARE 20

17 SPACE -- -- 0.00 0.00 1 20 A LTG SPARE 18

15 CONTROLS 20 A 1 0.25 0.00 1 20 A REC SPARE 16

13 CONTROLS 20 A 1 0.25 0.00 1 20 A REC SPARE 14

11 CONTROLS 20 A 1 0.25 0.00 1 20 A REC SPARE 12

9 CONTROLS 20 A 1 0.25 0.00 1 20 A REC SPARE 10

7 SHOW-CRITICAL ACCESSORIES 20 A 1 0.25 0.00 -- -- -- 8

5 UNINTERRUPTIBLE POWER SUPPLY 20 A 1 0.25 0.00 2 20 A THEATRICAL LIGHTING DIMMER 6

3 FOLLOW SPOT LIGHT 20 A 1 0.75 0.25 1 20 A AUDIO AMPLIFIER 4

1 FOLLOW SPOT LIGHT 20 A 1 0.75 0.25 1 20 A AUDIO AMPLIFIER 2

CKT Circuit Description Trip Poles

A B C

Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating / MLO: MLO

Mounting: Recessed Wires: 4 Bus Rating: 100 A

Supply From: PPC Phases: 3 Bus Material: CU

Location: Volts: 120/208 Wye A.I.C. Rating: 22K

Branch Panel: PPL

ETR = EXISTING TO REMAIN; PROVIDE AFCI/GFCI AS REQUIRED BY CODE

DIRECTORY. PROVIDE NEW BREAKERS. FINAL CIRCUIT BREAKER SIZES SHALL MATCH EXISTING CIRCUIT BREAKERS BEING REPLACED.

* CONTRACTOR SHALL DISCONNECT AND RECONNECT ALL EXISTING CIRCUITS TO REMAIN, CLEARLY LABEL AND IDENTIFY IN NEW PANELBOARD

Notes: Total Amps: 0 A

Total Load: 0.00 kVA

Phase... 0 A 0 A 0 A

Phase Load: 0.00 kVA 0.00 kVA 0.00 kVA

41 SPACE -- -- 0.00 0.00 -- -- SPACE 42

39 SPACE -- -- 0.00 0.00 -- -- SPACE 40

37 SPACE -- -- 0.00 0.00 -- -- SPACE 38

35 SPACE -- -- 0.00 0.00 -- -- SPACE 36

33 SPACE -- -- 0.00 0.00 -- -- SPACE 34

31 SPACE -- -- 0.00 0.00 -- -- SPACE 32

29 SPACE -- -- 0.00 0.00 -- -- SPACE 30

27 SPACE -- -- 0.00 0.00 -- -- SPACE 28

25 SPACE -- -- 0.00 0.00 -- -- SPACE 26

23 -- -- -- 0.00 0.00 1 20 A SPARE 24

21 -- -- -- 0.00 0.00 1 20 A SPARE 22

19 SURGE PROTECTION DEVICE 30 A 3 0.00 0.00 1 20 A SPARE 20

17 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A SPARE 18

15 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A SPARE 16

13 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 14

11 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 12

9 ETR CIRCUIT * 20 A 1 0.00 0.00 -- -- -- 10

7 ETR CIRCUIT * 20 A 1 0.00 0.00 2 30 A ETR CIRCUIT * 8

5 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 6

3 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 4

1 ETR CIRCUIT * 20 A 1 0.00 0.00 1 20 A ETR CIRCUIT * 2

CKT Circuit Description Trip Poles

A B C

Poles Trip Circuit Description CKT

Enclosure: Type 3R MCB Rating / MLO: 60 A MCB

Mounting: Surface Wires: 4 Bus Rating: 100 A

Supply From: PPH1 Phases: 3 Bus Material: CU

Location: Volts: 120/208 Wye A.I.C. Rating: 22K

Branch Panel: PPS

ADD ALTERNATE #E1

Page 29: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

UP

UP

DN

DN

UP

DN

UP

DN

DN

DN

UP

BASEMENT

001

FCU-1-1

FCU-1-2

REFER TO VRF HEAT PUMP RISER DIAGRAM FOR PIPE SIZES

(2) 5/8" RS & (2) 3/8" RL DOWN TO CRAWLSPACE

PROVIDE 275 GALLON VERTICAL OIL TANK SEE SPEC SECTION 231300 FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROIVDE OIL PIPING FROM NEW OIL TANK TO EXISTING TO REMAIN BOILER IN CELLAR.

PROVIDE OIL FILL LINE AND VENT TO TERMINATE ABOVE GRADE ON THE WEST SIDE OF THE BUILDING.

ETR STEAM BOILER

ADD ALTERNATE #M1: PROVIDE FUEL OIL LEAK DETECTION SYSTEM. SEE SPEC SECTION 231113 FOR ADDITIONAL INFORMATION.

FCU-1-3B

FCU-1-3A

PERFORMANCEROOM

102

MEETING ROOM

103

FOYER

105

MEETING ROOM

106

VESTIBULE

101

TOILET

104

KITCHEN

107

WOMEN

108

MEN

109

CORRIDOR

110

STAIR

111

OFFICE

112

OFFICE

113

GARAGE

114

CU-1

CU-2

CU-3

CU-4

(2) 5/8" RS & (2) 3/8" RL DOWN TO CRAWLSPACE

PENETRATIONS FOR (2) 5/8" RS & (2) 3/8" RL

PENETRATIONS FOR (2) 3/4" RS & (2) 3/8" RL

(2) 3/4" RS & (2) 3/8" RL UP TO SECOND FLOOR

REFER TO VRF HEAT PUMP RISER DIAGRAM FOR PIPE SIZES

1" COND1" COND

1" COND1" COND

1" COND OUT OF BUILDING 1

1 1 1

1

1

1

1

1 1

T

ETR THERMOSTAT FOR ETR HEATING SYSTEM

1 1

2

1

1. REFER TO MECHANICAL RISER DIAGRAM ON M-301.00 FOR REFRIGERANT PIPE SIZES.

MECHANICAL PIPING SHEET NOTES

CONTRACTOR TO CLEAN AND PROVIDE MAINTENANCE FOR ALL EXISTING RADIATORS AND STEAM TRAPS. CONFIRM THAT ALL EXISTING RADIATORS AND STEAM TRAPS ARE IN WORKING ORDER TO PROVIDE HEAT IN EACH ROOM OF THE BUILDING.

MECHANICAL PIPING KEY NOTES

1

RELOCATE EXISTING RADIATOR TO ACCOMODATE NEW DOORWAY.2

1. INSTALLATION OF VRF HEAT PUMP SYSTEM IS DEPENDENT ON FULL INSULATION OF THE EXISTING BUILDING ENVELOPE. COOLING SYSTEM IS NOT TO BE INSTALLED IF EXISTING BUILDING ENVELOPE IS NOT INSULATED. REFER TO DETAIL 1 ON A3.1 OF THE ARCH DRAWINGS FOR INFORMATION ON PROVIDING INSULATION IN EXISTING WALLS.

2. CONTRACTOR IS TO CLEAN AND PERFORM REQUIRED MAINTENANCE ON ALL EXISTING STEAM TRAPS AND HOLD AN ALLOWANCE FOR THE REPLACEMENT OF TWO STEAM TRAPS DUE TO AGE AND DEFICIENCY.

3. CONTRACTOR TO PROVIDE UNIT CHANGE PRICING FOR REPLACEMENT OF STEAM TRAP4. CONTRACTOR TO PROVIDE UNIT CHANGE PRICING FOR RADIATOR TO BE CONVERTED TO FIN TUBE5. EXISTING BOILER FIN TUBE RADIATION AND RADIATORS ARE EXISTING TO REMAIN.

MECHANICAL SHEET NOTES

SHEET NO.

DATE:

PROJECT NO:DRAWN:

CHECKED:

ISSUED FOR:

REVISIONS: 2

MAIN HOUSEBASEMENT AND

FIRST FLOORMECHANICALPIPING PLANS

RICHTER HOUSE

100 AUNT HACKROAD DANBURY,

CT 06810

02/18/2020

2019123.00

SWDJGK

BID SET

M-200.00

CES #2019123.00

1/4" = 1'-0"1

MAIN HOUSE BASEMENT MECHANICAL PIPING PLAN

REVISIONS

NO. DATE DESCRIPTION

1 01/16/2020 ADDENDUM 1

2 02/18/2020 ADDENDUM 2

1/4" = 1'-0"2

MAIN HOUSE FIRST FLOOR MECHANICAL PIPING PLAN

Page 30: CITY OF DANBURY3. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. 4. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 5. ASME B31.1 -

675

SANCO

VAN

25' SEPTIC

OFFSET

25' SEPTIC

OFFSET

75' SEPTIC

OFFSET

75' SEPTIC

OFFSET

EXISTING STAGE

NEW CONCESSION

STAND

3

1

NEW PANELBOARD "PPS" AND (2) 150A-1PHASE DISCONNECTS MOUNTED TO UNISTRUT GALVANIZED METAL MOUNTING FRAME WITH STAINLESS STEEL FITTINGS.

4

5

68

11

(TYP OF 4)

11

(TYP OF 5)

P

P12

12

7

13

2

SU-100.00

2

10

10

10

B

B

B

B

B

B

B

B

B

PHASE 1

PHASE 4

PHASE 3

PHASE 1

PHASE 2

9

14

P

P12

12

10

ADD ALTERNATE #E1

SITE PLAN KEY NOTES

1

2 PROVIDE (4) RECEPTACLES SPACED EVENLY ON WOODEN STAGE WALL WITH WEATHERPROOF-IN-USE COVERS. PROVIDE 2#12 & 1#12G IN BURIED 3/4" CONDUIT SERVED BY 20A-1POLE BREAKER IN SHED PANEL. COORDINATE LOCATIONS WITH ARCHITECT.

3

EXISTING UTILITY POLE. DURING PHASE 1, PROVIDE CONDUIT IN BURIED TRENCH ACROSS DRIVEWAY. DURING PHASE 2, EXTEND CONDUIT AND TRENCH TO NEW BUILDING DISTRIBUTION PANEL AND PROVIDE SERVICE CONDUCTORS, COORDINATE ROUTING WITH FIELD CONDITIONS, REMOVE EXISTING 1-PHASE SERVICE, AND COORDINATE NEW 3-PHASE SERVICE CONNECTION WITH EVERSOURCE.

NOTE: REFER TO THE ELECTRICAL RISER DIAGRAM FOR ADDITIONAL INFORMATION AND REQUIREMENTS INCLUDING WIRE AND CONDUIT, QUANTITIES AND SIZES, ETC. (TYPICAL)

NOTE: ALL LOCATIONS AND ROUTING SHOWN IS DIAGRAMMATIC, REFER TO SITE CIVIL PLANS FOR FINAL LOCATIONS.

EXISTING UTILITY METER TO BE REPLACED AS REQUIRED BY THE UTILITY, MAINTAIN CLEARANCES AS REQUIRED BY UTILITY COMPANY. EXISTING MDP PANEL TO BE REMOVED AND REPLACED. REFER TO E-100 & E-300 FOR ADDITIONAL SCOPE.

4 PROVIDE FEEDER IN BURIED CONDUIT TO SERVE NEW ELECTRICAL PANEL OUTSIDE THE EXISTING STAGE SHED.

5 PROVIDE BURIED 3" CONDUIT FOR LIGHTING CONTROL COMMUNICATIONS WIRING AND BURIED 2" CONDUIT FOR SPEAKER CABLES. REFER TO THEATRICAL LIGHTING CONSULTANT'S DRAWINGS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

6 PROVIDE POWER FEEDER IN BURIED CONDUIT TO NEW PANEL IN CONCESSION STAND.

7 PROVIDE (2) BURIED 2" CONDUITS FOR LIGHTING BOOTH DATA, AUDIO, AND VISUAL COMMUNICATIONS, (1) CONDUIT FOR FIRE ALARM, AND (1) BURIED 2" CONDUIT AS SPARE.

8 2" DCW OUT TO CONCESSION. SLOPE BACK TO MAIN HOUSE AT 1/8" PER FT TO ALLOW FOR DRAINBACK BEFORE WINTER. REFER TO PLUMBING RISERS ON SHEET P-300.

9

10

11 PROVIDE BOLLARD LIGHTS AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE. PROVIDE 2#10 & 1#10G IN BURIED 3/4" CONDUIT SERVED BY 20A-1POLE CIRCUIT BREAKER AND BRANCH WIRING FROM MAIN HOUSE POWER PANEL. PROVIDE CONTROL VIA 20A LINE VOLTAGE TOGGLE SWITCH, COORDINATE FINAL SWITCH LOCATION WITH ARCHITECT.

12 PROVIDE POLE-MOUNTED LIGHT FIXTURE FOR PARKING LOT ILLUMINATION AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE. PROVIDE 2#10 & 1#10G IN BURIED 3/4" CONDUIT SERVED BY 20A-1POLE CIRCUIT BREAKER AND BRANCH WIRING FROM MAIN HOUSE POWER PANEL. FIXTURES CONTROLLED VIA TIMECLOCK AND INTEGRAL PHOTOCELL. REFER TO LIGHTING FIXTURE SCHEDULE ON SHEET E-000 AND DETAIL 3 ON THIS SHEET.

13

FUEL OIL FILL LINE AND VENT TERMINATION

BURIED CONDUIT AND WIRING FROM MAIN HOUSE TO SITE LIGHTING. REFER TO PANEL SCHEDULES FOR ADDITIONAL CIRCUIT INFORMATION. NEW SITE LIGHTING SHALL BE CONNECTED TO EXISTING HOUSE PANEL AND NEW LIGHTING CONTACTOR IN PHASE 1, AND RECONNECTED INTO THE NEW HOUSE PANEL DURING PHASE 2 AND AFTER.

(4) VRF HEAT PUMPS REFER TO MECHANICAL SCHEDULES AND RISER FOR MORE INFORMATION

14 NEW 4" SAN OUT TO NEW SEPTIC SYSTEM. REFER TO CIVIL DRAWINGS FOR MORE INFORMATION.

GENERAL NOTES - SITE PLAN

1. REFER TO THE ELECTRICAL RISER DIAGRAM FOR ADDITIONAL INFORMATION AND REQUIREMENTS INCLUDING WIRE AND CONDUIT, QUANTITIES AND SIZES, ETC.

2. ALL LOCATIONS AND ROUTING SHOWN IS DIAGRAMMATIC, REFER TO SITE CIVIL PLANS FOR FINAL LOCATIONS.

PHASING NOTES

1. PHASING SHOWN ON PLAN IS DIAGRAMMATIC. REFER TO ARCHITECT FOR ADDITIONAL INFORMATION.A. PHASE 1 - SITE WORK INCLUDING BOLLARD LIGHTS AND PARKING LOT

LIGHTING.B. PHASE 2 - RICHTER HOUSE WORK INCLUDING THE ELECTRICAL DISTRIBUTION

CHANGES SHOWN ON THE ELECTRICAL RISER DIAGRAM, LIGHTING AND RECEPTACLE REPLACEMENTS, AND NEW HVAC EQUIPMENT. PROVIDE CAPPED CONDUIT AND PIPING STUBBED 10' FROM BUILDING OR PAST HARDSCAPING, WHICHEVER IS GREATER, FOR CONDUITS AND PIPING INTENDED FOR WORK IN FUTURE PHASES. WATER PIPING SHALL BE VALVED SUCH THAT THE FUTURE STUB IS NOT FILLED UNTIL CONCESSION STAND IS COMPLETED AND CONNECTED TO SYSTEM.

C. PHASE 3 - CONCESSION STAND WORK INCLUDING ALLOWANCES FOR FUTURE STAGE WORK. PROVIDE CAPPED CONDUIT STUBBED 10' FROM BUILDING OR PAST HARDSCAPING, WHICHEVER IS GREATER, FOR CONDUITS INTENDED FOR WORK IN FUTURE PHASES.

D. PHASE 4 - STAGE WORK, INCLUDING THE NEW SHED PANEL AS SHOWN ON THE ELECTRICAL RISER DIAGRAM AND COMMUNICATIONS WIRING FROM CONCESSION STAND LIGHTING BOOTH.

2. CONTRACTOR SHALL CONFIRM SCOPE OF WORK FOR EACH PHASE WITH ARCHITECT PRIOR TO BEGINNING WORK.

3. SYSTEMS SHALL BE LEFT COMPLETE AND FUNCTIONAL AT THE END OF EACH PHASE.

1' - 7" 3' - 0"

0' -

6"

1' -

7"

3' -

0"

0' - 6"

1' - 1"

3' -

6"

CU-1

CU-2

CU-3 CU-4

DOTTED LINES REPRESENTS MANUFACTUER REQUIRED OPERATING CLEARANCES FOR HEAT PUMP

MITSUBISHI VRF HEAT PUMP(TYP OF 4)

WIRING AS INDICATED ON PLANS

3000 PSI CONCRETE FOUNDATION BY G.C.

1"x45° CHAMFER ALL SIDES

ANCHOR BOLTS FURNISHED WITH FIXTURE. SET USING MFG'S BOLT CIRCLE TEMPLATE

SEE FIXTURE SCHEDULE

36"

SQ.

12"

MIN.

24"

GRADE LINE

ELEVATION

PHOTOCELL WHERE SPECIFIED

LIGHT POLE AS SPECIFIED

IN-LINE FUSE (ONE PER PHASE LEG)

BOND EQUIPMENT GROUND CONDUCTOR TO POLE

IN CONDUIT, SEE SITE PLAN

GROUND

NEUTRALPHASE LEGS

BOLT CIRCLE AND PROJECTION AS RECOMMENDED BY POLE MANUFACTURER TEMPLATES PROVIDED BY MANUFACTURER.

CONCRETE SHALL BE CLASS A 4000 PSI

SET POLE BASE ON UNDISTURBED SOIL

1" CHAMFER ALL AROUND

CONDUITS IN CONCRETE

3/4"X36"X3" GALVANIZED ANCHOR BOLTS VERIFY REQUIREMENTS WITH POLE MANUFACTURER

PLAN VIEW

10'-0" POLE

48"

MIN

.

24"M

IN.

3"

LUMINAIRE AS SPECIFIED

24" SQUARE

MINIMUM

GRADE

36"

SQUARE

WARNING - UNDERGROUND UTILITIES

TRENCHING NOTE

COMPACTED SAND BEDDING 6" MINIMUM ON ALL SIDES

BACKFILL WITH COMPACTED EXCAVATED MATERIAL IN 6" LIFTS

1'-0" MIN.

EXISTING PAVEMENT, WALK OREXISTING GROUNDLINE SEETRENCHING NOTES

REGRADE, REPAIR, ANDRESEED LAWN TO MATCHSURROUNDINGS.

ELECTRICAL CONDUIT, FOR SIZE AND DESIGNATION SEE DRAWINGS.

UNDISTURBED SOIL

COMPACTED SAND BEDDING 6" MINIMUM ON ALL SIDES

RED PLASTIC WARNING TAPE

1'-0" MIN.

24" MINIMUM

24"

MIN

IMU

M

48"

MIN

24"

MIN

IMU

M

TRENCH EXCAVATION SHALL CONSIST OF THE REMOVAL OF ALL MATERIALS, EXCAVATION, TRENCH WALL SUPPORTS, DEWATERING, TEMPORARY STREAM OF GROUND WATER DIVERSION: SATISFACTORY DISPOSAL OF ALL SURPLUS OR UNSUITABLE MATERIAL: BACKFILL AND COMPACTION NECESSARY FOR THE CONSTRUCTION OF THE WORK AT THE LOCATIONS AND TO THE DIMENSIONS AS SHOWN ON THE CONTRACT DRAWINGS OR AS DIRECTED BY THE ENGINEER.

ALL DIMENSIONS ARE MINIMAL ACCEPTABLE QUANTITIES.

WHEN EXISTING PAVEMENT HAS BEEN REMOVED, REPLACE WITH THE SAME TYPE AND THICKNESS OF PAVEMENT AND SUB-BASE. IF EXCAVATION IS WITHIN GRASS AREA, DISTURBED AREAS SHALL BE REPAIRED WITH SEED. IF EXISTING CURB IS DAMAGED OR REMOVED, REPLACE WITH SAME TYPE OF CURB TO DIMENSIONS OF EXISTING CURB. IF CONCRETE WALKS ARE DISTURBED, REPLACE WITH CONCRETE TO MATCH EXISTING THICKNESS.

WATER PIPING, FOR SIZE AND DESIGNATION SEE DRAWINGS.

THE CONTRACTOR IS TO BE FULLY RESPONSIBLE FOR CONTACTING THE LOCAL CABLE TELEVISION COMPANY, POWER COMPANY, TELEPHONE COMPANY, GAS COMPANY, WATER AND SEWER COMPANY, AND ANY OTHER UTILITY COMPANY WITHIN THE AREA PRIOR TO PROCEEDING WITH ANY EXCAVATION. BY LAW, THE CONTRACTOR IS REQUIRED TO CALL BEFORE DOING ANY EXCAVATION, DIGGING HOLES OR DRIVING POSTS REGARDLESS OF WHETHER IT IS WITHIN THE STREET LINE OR ON PRIVATE PROPERTY. OBTAIN INFORMATION REGARDING THE EXISTENCE AND LOCATION OF ANY UNDERGROUND FACILITIES BY CALLING 1-800-922-4455.

12" MINIMUM

PROVIDE 1' VERTICAL SEPARATION BETWEEN WATER & SEWER PER LOCAL CODE REQUIREMENTS.

SAN PIPING, FOR SIZE AND DESIGNATION SEE DRAWINGS.

L N

TO EXTERIOR LIGHT FIXTURESSEE PLANS FOR CIRCUITS (TYPICAL)

C

10 POLE ASCO #917 SERIES R.C. SWITCHIN NEMA 1 ENCLOSURE

LINE, NEUTRAL, AND GROUND CONDUCTORSFROM CIRCUIT BREAKERS IN PANELBOARD,SEE PLANS. (TYPICAL)

G

TORK #DZS200AASTRONOMIC, 365 DAYPROGRAMMABLETIMECLOCK - SEEPLANS FOR LOCATION

SHEET NO.

DATE:

PROJECT NO:DRAWN:

CHECKED:

ISSUED FOR:

REVISIONS: 2

SITE UTILITY PLAN

RICHTER HOUSE

100 AUNT HACKROAD DANBURY,

CT 06810

02/18/2020

2019123.00

MWTJGK

BID SET

SU-100.00

CES #2019123.00

1" = 20'-0"1

SITE PLAN

REVISIONS

NO. DATE DESCRIPTION

1 01/16/2020 ADDENDUM 1

2 02/18/2020 ADDENDUM 2

1/4" = 1'-0"2

CONDENSING UNIT CLEARANCES

NTS4

BOLLARD INSTALLATION DETAIL

NTS5

EXTERIOR LIGHT FIXTURE DETAIL

NTS6

PIPE TRENCH DETAIL

NTS3

EXTERIOR LIGHTING CONTRACTOR WIRING DIAGRAM