City of Carbondale, Illinois FY2021 5 Year Capital Improvement Program (CIP) (FY 2021 thru FY 2025) Prepared by the City of Carbondale’s Engineering Division Sean C. Henry, P.E. Director of Public Works Sean Pickford, P.E. City Engineer Mary Runion Administrative Assistant

Transcript of City of Carbondale, Illinois FY2021 5 Year Capital ......Mar 26, 2020  · City of Carbondale FY2021...

  • City of Carbondale, Illinois

    FY2021

    5 Year Capital Improvement Program (CIP)

    (FY 2021 thru FY 2025)

    Prepared by the City of Carbondale’s Engineering Division

    Sean C. Henry, P.E. – Director of Public Works

    Sean Pickford, P.E. – City Engineer

    Mary Runion – Administrative Assistant

  • City of Carbondale

    FY2021 - 5 Year Capital Improvement Program (CIP)

    (FY2021 thru FY2025)

    Section 1 General Information - Page 1 of 3

    Table of Contents

    Section 1 – General Information:

    Table of Contents

    Project Group Codes, Funding Source Codes, and Expenditure Division Account Numbers

    Expenditure Line Item Codes and Explanations

    Section 2 – Community Investment Program Projects

    Composite List of all Funded and Unfunded Projects

    Section 3 – Summary Information:

    5 Year Overall Summary of Project Expenses and Funding Sources

    FY2019 Projects and Estimated Actual Expenses

    FY 2020 Projects and Expenses

    FY 2021 Projects and Expenses

    FY2022 Projects and Expenses

    FY2023 Projects and Expenses

    FY2024 Projects and Expenses

    5 Year Summary of Local Improvement Fund Revenues and Expenses

    5 Year Summary of Motor Fuel Tax Fund (State) Revenues and Expenses

    5 Year Summary of Water & Sewer Fund Revenues and Expenses

    Section 4 – 5 Year Funded CIP Project Expenses, Estimates, and Descriptions:

    OS – Open Spaces & Parks

    PB – Public Buildings

    PK – Parking Lots

    SA – Sanitary Sewers

    SP – Special Projects

    SS – Storm Sewers & Drainage

    ST – Streets

    SW – Sidewalks

    TS – Traffic Signals

    WS – Water System

    WW – Wastewater System

    Section 5 – Unfunded Project Information

    Estimates for unfunded projects (as available) by Project Type

    Section 6 – Street Rating System

    Street Condition Survey for funded and unfunded Street Projects (as available)

    Section 7 – Fleet Management Plan

    Fleet Management Plan by Division

  • City of Carbondale

    FY2021 - 5 Year Capital Improvement Program (CIP)

    (FY2021 thru FY2025)

    Section 1 General Information - Page 2 of 3

    Section 8 – 5 Year Major Equipment (>50k) Purchase Needs

    5 Year Major Equipment Purchase Needs by Class

    Project Group Codes, Funding Source Codes, and Expenditure Division Account Numbers

    Project Group Codes:

    OS Open Space & Parks

    PB Public Buildings

    PK Parking Lots

    SA Sanitary Sewers

    SP Special Projects

    SS Storm Sewers & Drainage

    ST Streets

    SW Sidewalks

    TS Traffic Signals

    WS Water System

    WW Wastewater System

    Funding Source Codes:

    FA Federal Aid, Grant or Project Impact

    FB-GR Fund Balance - General Revenue

    FB-UR Fund Balance - Utility Fund Revenues, Water & Sewer User fees

    FB-SC Fund Balance - Service Charges, Parking meters, Refuse service revenues, etc.

    GC Gifts and Contributions

    GOB/LOAN General Obligation Bonds or Loans Secured by Mortgage

    LGA Local Government Agency

    PB Public Benefit Tax Levy Revenues

    PO Property Owner Contributions and Assessments

    RB Revenue Bond

    SA State Aid, Grant or Motor Fuel Tax

    TF (GF) Transfers from the General Fund

    TF (TIF) Transfers from TIF Funds

    Expenditure Division Account Numbers:

    00001 General Fund (01)

    40900 Transfers to Other Fund (01)

    41017 Motor Fuel Tax Fund (11)

    41401 Tax Increment Financing (TIF) District #1

    41501 Tax Increment Financing (TIF) District #2

    44007 Local Improvement Fund (40)

    47044 Waterworks & Sewerage Fund - Wastewater System (70)

    47045 Waterworks & Sewerage Fund - Water System (70)

    47150 Parking System Operations Fund (71)

  • City of Carbondale

    FY2021 - 5 Year Capital Improvement Program (CIP)

    (FY2021 thru FY2025)

    Section 1 General Information - Page 3 of 3

    Expenditure Line Item Codes and Explanations

    Miscellaneous Costs:

    Includes any and all project costs and expenses other than those listed below.

    Preliminary Engineering:

    These accounts include all costs for services prior to project design and layout

    (i.e. studies, proposals, projected service areas, etc.)

    520 – Engineering Division Services

    521 – Contractual Services

    Design Engineering:

    These accounts include all costs for design and layout of projects prior to construction.

    (i.e. production of construction plans, specifications, quantities, etc.)

    530 – Engineering Division Services

    531 – Contractual Services

    Resident Engineering:

    These accounts include all engineering costs incurred during project construction.

    (i.e. resident engineering, change orders, pay estimates, testing services, etc.)

    540 – Engineering Division Services

    541 – Contractual Services

    Property Acquisition:

    These accounts include all cost incurred related to land acquisition.

    (i.e. property purchase, obtaining easements, etc.)

    550 – Engineering Division Services

    522 – City Attorney Services

    553 – Contractual Services

    555 – Land Purchase Costs

    556 – Easement Costs (compensation costs)

    558 – Relocation Costs (relocation of businesses or tenants due to land purchase)

    Construction:

    These accounts include all costs incurred related to actual project construction

    (not including professional services for resident engineering and the like)

    560 – City Labor and Materials

    565 – Contractual (contract construction and major equipment purchases)

    580 – Contingency (budgetary account for unforeseen project expenses & change orders)

  • FY2021

    5 Year Capital Improvement Program (CIP)

    (FY 2021 thru FY 2025)

    Project Listing

    (all projects on the books)

  • OPEN SPACE & PARKS (OS):

    OS8301 Bikeway Network Plan

    OS0002 Drainway/Greenway Completion

    OS0901 (FP) Central Downtown Bike/Ped Path - Washington to Park

    OS0902 East Side Sidewalks/Bikeways

    OS1001 Friendship Plaza and Mill Street Underpass Fencing

    OS1702 Off Road Bike/Pedestrian Path East Side of Giant City Road (Walnut St to Dogwood Road)

    OS1703 Drainway/Greenway Path Safety Improvements

    OS1704 Northwest Pedestrian and Bicycle Path (Oakland to New Era Road)

    OS1801 College Street and Illinois Avenue Pocket Park

    OS1901 Northwest Bike/Pedestrian Trail - Phase II (New Era Road to State Highway 13)

    * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    3/27/2020 Page 1 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    PUBLIC BUILDINGS (PB):

    PB1001 Cemetery Maintenance and Office Building Replacement

    PB1002 Public Works Garage Improvements

    PB1003 MES/Public Works Storage Building Replacements

    PB1004 MES/Public Works Facility Truck and Equipment Barn

    PB1101 Cemetery Dry Soil Storage Building

    PB1501 Poplar Camp Beach Restroom and Concession Stand Replacement

    PB1902 Public Safety Center Dispatch Room HVAC Installation

    PB2001 Permanent Stage Washington Street Area Near Veteran's Park

    PB2002 MES Facility Genereator Replacement

    PB2003 Street Maintenance Rock Salt Storage Facility Reconstruction

    PB2004 Central Laboratory & Water Plant Office Security Upgrades (formerly WS2001)

    PB2005 Evergreen Park Accessible Restrooms

    PB2101 Old Depot HVAC Replacement

    PB2102 SEWWTP Remodel Control and Lab Areas (circa 1969)

    PB2103 SEWWTP Tuckpoint and Seal Buildings

    PB2104 MRP Office - Parking Lot Paving and Fencing

    PB2105 MES Facility - Storage Yard Repaving

    3/27/2020 Page 2 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    PARKING LOTS (PK):

    PK1701 Parking Lot #14 Reconstruction (City Hall/Civic Center)

    PK1702 Parking Lot #19 Reconstruction (Washington St., by Veterans Plaza)

    PK2001 IDOT - Walnut Street Resurfacing (Oakland Avenue to Lewis Lane)

    PK2101 Parking Lot #13 Patching and Resurfacing (Illinois Avenue, College to Multimodal)

    PK2102 Parking Lot #4 Patching and Resurfacing (Illinois Avenue, South of Grand)

    PK2103 Parking Lot #23 Resurfacing (between Jackson & Oak "Longbranch" Lot)

    PK2104 Parking Lot #11 Reconstruction (Old Depot on Illinois Avenue "Mary Lou's" Lot)

    3/27/2020 Page 3 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    SANITARY SEWERS (SA):

    SA7301 Washington Street Sanitary Sewer (Monroe Street to College Street)

    SA0001 Crestview Sanitary Sewer Rehabilitation

    SA0106 East/West Sanitary Sewer btwn Schwartz St & College St (West of Oakland)

    SA0107 Almond St Sanitary Sewer Rehab (Chestnut St. to Willow St. & Sewer 400' E. of Springer St.

    SA0901 Sanitary Sewer Rehabilitation Program (Manhole Lining)

    SA1001 Lakeland Subdivision Sanitary Sewer

    SA1301 Sanitary Sewer Inflow and Infiltration Study

    SA1302 Haake Jenkins Sanitary Sewer

    SA1601 SEWWTP Interceptor Sewer Extension (Park Street to Pleasant Hill Road)

    SA1801 Sycamore Street Sanitary Sewer Lining

    SA1802 Grand Avenue and Brehm Lane Sanitary Sewer Lining

    SA1803 West Main Street Sanitary Sewer Lining - Tributary to the Oak Street Pump Station

    SA1804 West Main Street Sanitary Sewer Lining Between Manhole Number 893 and 871C

    SA1805 Sunset Drvie Santiary Sewer Lining

    SA1806 Pinewood Drive Area Sanitary Sewer Lining

    SA1807 Industrial Interceptor Sewer Sanitary Sewer Lining

    SA1808 Heritage Hills Sanitary Sewer Study

    SA2001 Sanitary Sewer Lining (CCIP) Program

    3/27/2020 Page 4 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    SPECIAL PROJECTS (SP):

    SP0203 Bus Shelters

    SP0602 Carbondale Business Park East

    SP0901 Creating Entryways into the Community

    SP0903 Community Skateboard Park

    SP0904 Illinois Avenue Streetscape Improvements Phase 3 - Monroe to Oak (FY2022 Const)

    SP0905 City Buildings Signage

    SP1002 SIMMS - Multimodal Transportation Center

    SP1501 Old Historic Depot Walkway and Railings Rennovation/Reconstruction

    SP1701 West Main Street Overhead Utility Relocation (Wall to Lewis)

    SP1702 Safety Improvements to Railroad Crossing to Allow Carbondale a Railroad Quite Zone

    SP1703 East College Street at Illinois Central Railroad Tracks Improvements

    SP1704 East Grand Avenue at Illinois Central Railroad Tracks Imrprovements

    SP1804 (FP) IDOT East Side Multiuse Path - Phase II (Giant City Road to Reed Station Road)

    SP1805 (FP) IDOT Multiuse Path Route 13 Underpass (Wood Road)

    SP1901 (FP) IDOT Intersection Improvements - Reed Station Road

    SP1902 Emergency Warning Sirens

    SP1903 East Main Street (Lewis Lane to Wall Street) Installation of New Street Lighting

    SP1904 West Main Street Light Installation (Glenview to New Era)

    SP1906 Town Square Streetscape Improvements - Jackson & Washington (University to Main)

    SP1907 City Wide Utility Mapping

    SP2001 Update the City's GIS Utility Information (non water & sewer)

    3/27/2020 Page 5 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    STORM SEWERS & DRAINAGE (SS):

    SS9501 Lu Court/Deer Lake Drainage

    SS9601 East End of Oak Street to Piles Fork Creek Drainway

    SS9902 Replace Corrugated Metal Pipes in Southwest Quadrant

    SS0002 College/Freeman Storm Sewer (East of Poplar Street)

    SS0003 Short Street to Crab Orchard Creek Drainway

    SS0004 Oak Street Storm Sewer Improvements (310 East Oak)

    SS0005 Gary Drive and Grand Ave Loop (East of Giant City Road)

    SS0006 Oakland/Schwartz Area Drainage Ditch (behind homes)

    SS0301 Cherry Street Storm Sewer (Rawlings to Poplar Street)

    SS0401 Little Crab Orchard Creek Channelization (Southeast of NWWWTP to Charles Road)

    SS0601 Logan Street Area Storm Drainage

    SS0801 Valley Road Area Storm Drainage Improvements

    SS0802 South Side of Linden Street Drainage Improvements

    SS0901 Piles Fork Creek and Drainage Basin

    SS1001 Morningside Drive Storm Sewer Replacement

    SS1002 Cherry Street/Elm Street Storm Sewer Interceptor Replacement

    SS1003 Green Earth Drainway Improvements (back of Emerald Lane)

    SS1004 Dillinger Road Drainage Study/Improvements

    SS1005 Pine Lane Storm Sewer Replacement

    SS1101 Tripoli Storm Drainage Improvements

    SS1102 Hunter Woods/Short Street Drainage Study

    SS1401 City Wide Drainage Study and Master Plan

    SS1701 Storm Water Utility - Feasibility Study (Phase II)

    SS2001 Piles Fork Creek Erosion Control & Channelization (Grand Avenue to Main Street)

    3/27/2020 Page 6 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    STREETS (ST):

    ST8101 Wall Street Improvements (Fisher to Knight)

    ST8501 Oak Street Extension (Wall Street to Lewis Lane)

    ST8703 High Street Improvements (Springer Street to Eason Drive)

    ST8706 Owens Street Improvements (Bridge Street to Oakland Avenue)

    ST9002 McKinley Street Improvements ( West Sycamore to North Street)

    ST9503 Mill Street Extension (Wall Street to Lewis Lane)

    ST9505 Twisdale Avenue Improvements

    ST9507 Walkup Avenue Improvements (Valley Road to Oakland Avenue)

    ST9508 Johnson Avenue Improvements (Chautauqua Street to Walkup Avenue)

    ST9509 Carter Street Improvements (Johnson Avenue to Hill Avenue)

    ST9510 Hill Avenue Improvements (Johnson Avenue to Oakland Avenue)

    ST0001 Park Street/Wall Street Intersection West Approach from SIU Towers

    ST0002 Logan Street Improvements (Main Street to Walnut Street)

    ST0003 Graham Street Improvements (Main Street to Walnut Street)

    ST0005 Poplar Street/Mill Street/Lincoln Drive Intersection

    ST0006 Robert A Stalls Avenue Reconstruction (North of Fisher Street)

    ST0007 Pierce Street Reconstruction

    ST0008 McQueen Street Reconstruction

    ST0009 East Burke Street Reconstruction

    ST0010 Searing Street Reconstruction

    ST0011 Jenkins Street Reconstruction

    ST0012 Knight Street Reconstruction

    ST0013 Allman Street Reconstruction

    ST0015 Dillinger Road Improvement (McRoy Drive to Marion Street)

    ST0016 Dogwood Lane Improvements

    ST0017 Lake Heights Road Improvements (Walnut Street to Jackson County Housing)

    ST0018 Sycamore Street Reconstruction (Oakland Avenue to University Avenue)

    ST0101 Old West Main Street Reconstruction (Glenview Drive to Emerald Lane)

    ST0103 Billy Bryan Street Reconstruction (Sycamore Street to 1500 Feet North)

    ST0104 Gum Street Reconstruction

    ST0105 Connor Street Reconstruction

    ST0202 Oakland Avenue Improvements (Walnut Street to Chautauqua Street)

    3/27/2020 Page 7 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    ST0301 Dillinger Road Reconstruction (US Route 51 to McRoy Drive)

    ST0303 Town Square/Downtown Area Brick Pavement Repair

    ST0304 Striegel Road Reconstruction (Illinois Route 13 to New Era Road)

    ST0306 Norwest Lane Reconstruction

    ST0307 Gary Drive Reconstruction (Giant City Road to Drury Avenue)

    ST0308 Grand Avenue Reconstruction (Giant City Road to Drury Avenue)

    ST0309 Drury Avenue Reconstruction (Grand Avenue to Gary Drive)

    ST0310 Liberty Lane Reconstruction (Grand Avenue to Gary Drive)

    ST0402 Curb Replacement throughout Carbondale

    ST0503 Taylor Drive Reconstruction (Chautauqua Street to Freeman Street)

    ST0504 Valley Road Reconstruction (Taylor Drive to Freeman Street)

    ST0601 McLafferty and Chatauqua Intersection Improvments

    ST0602 Sycamore Street Extension to New Era Road

    ST0603 East/West Connector - Oakland Avenue to New Era Road at Oakland Cemetery

    ST0901 Cul-de-sac at End of West North Street

    ST0903 Lewis Lane and Grand Avenue Roundabout

    ST0905 Pedestrian Crosswalks on Illinois Route 13 at Giant City Road

    ST0906 Mill Street and Normal Avenue Intersection Design

    ST1002 Chautauqua Street Improvements

    ST1003 W. Pleasant Hill Road (from McLafferty to Rowden Road) Improvements

    ST1202 Oaklawn Subdivision, Hill, Carter, Johnson, Twisdale, Walkup Streets Improvements

    ST1203 Grand Avenue and Mill Street Boulevard Improvements

    ST1204 Annual Collector Street Resurfacing Program

    ST1302 Bridge Maintenance and Rehabilitation Program (Sunset Drive)

    ST1303 Bridge Maintenance and Rehabilitation Program (College Street)

    ST1304

    Bridge Maintenance and Rehabilitation Program (Chatauqua - Little Crab Orchard

    Creek)

    ST1501 Grand Avenue Reconstruction - Wall Street to Lewis Lane (add bicycle lanes)

    ST1502 Pleasant Hill Road - McLafferty to Union Hill Road Reconstruction

    ST1503 Poplar Street - Main Street to Sycamore Street Reconstruct to Include Bicycle Paths

    ST1504 New Era Road - Glenn Road to Airport Road Reconstruction

    ST1505 Frontage Road Improvements at Giant City and Route 13

    ST1601 West Main Street - Clinic Drive Frontage Road

    ST1701 West Mill Street Resurfacing (University to Oakland)

    3/27/2020 Page 8 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    ST1802 Street Condition Survey/Study

    ST1901 New Era Road Reconstruction (Glenn Road north 1,700 feet)

    ST1902 Extend Archie Jones Drive to Stalls Avenue

    ST1903 Grand Avenue Box Culvert (Piles Fork Creek)

    ST1904 Charles Road Bridge Replacement (Little Crab Orchard Creek)

    ST1905 Wall and Grand Intersection Improvements

    ST2001 Pavement Management Program - Street Improvements (Various)

    ST2002 College Street Reconstruction (Wall to Piles Fork Creek)

    ST2003 Giant City Road/Lewis Lane Connector (north of Route 13)

    ST2101 Reconstruct the Alleys Between University, Monroe, Illinois, and Main Streets

    ST2102 Reconstruct the Concrete Median at the Mill Street Underpass

    ST2103 Giant City Road & North Mall Frontage Road Safety Improvements

    3/27/2020 Page 9 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    SIDEWALKS (SW):

    SW9601 Dogwood Lane Sidewalk Improvements

    SW9602 Lark Lane Sidewalks (Murphysboro Road to Kent Drive)

    SW9603 Rod Lane Sidewalks (North & South of Sunset Drive)

    SW0702 Cherry Street Sidewalk/Storm Sewer (Forest Avenue to Oakland Avenue)

    SW0802 Sidewalk Eastside Wall (from Fisher to Searing)

    SW1001 State Street Sidewalks (from Mill Street to Hester Street)

    SW1402 East Walnut Street Sidewalks

    SW1802 West Sycamore Street ADA Sidewalk Improvements

    SW1804 Sidewalk Infill Program

    SW1902

    Sycamore at Route 13 and Emerald Lane (To walk north form Emerald across Route 13 to

    Sycamore)

    SW1903 Sidewalk ADA Transition Plan

    SW2002 Giant City Sidewalk beginning at 1100 S. Giant City Road to 8942 Giant City Road

    SW2101 Sidewalk Improvements

    SW2102 Washing Street Sidewalk Replacement - Monroe Street to Main Street

    SW2103 Grand Avenue & Wall Street Crosswalk Improvements

    3/27/2020 Page 10 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    TRAFFIC SIGNALS (TS):

    TS9601 Traffic Signals with Pedestrian Actuation (Walnut Street at Marion Street)

    TS9701 Oakland Avenue/Freeman Street Intersection Traffic Signals

    TS9702 Mill Street/Oakland Avenue Intersection Traffic Signals

    TS9703 Mill Street/Poplar Street Intersection Traffic Signals

    TS9704 Mill Street/University Avenue (Normal Avenue) Intersection Traffic Signals

    TS0201 Giant City Road/East Mall Entrance Road/Sunny Acres Road Intersection Traffic Signals

    TS0204 Add Audible Signals for the Visually Impaired (Illinois Avenue - Mill to Oak Street)

    TS0301 Grand Avenue/Lewis Lane Intersection Traffic Signals

    TS0801 Mill & Washington - Add Turn Arrows for Eastbound and Westbound Traffic

    TS1801 Traffic Signal Communication Upgrades Throughout the City

    TS2101 Grand Avenue & Wall Street Timing and Marking Improvements

    TS2102 Grand Avenue Audible Pedestrian Signal Upgrades (Giant City Road & Illinois Avenue)

    TS2103 Wall Street Audible Pedestrisn Signal Upgrades (Mill Street, Wanlut Street, & Main Street)

    3/27/2020 Page 11 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    WATER SYSTEM (WS):

    WS8502 Jackson Street Water Main (Washington Street to Wall Street)

    WS8503 Washington Street Water Main (Walnut Street to Grand Avenue)

    WS9202 Main Street Water Main (Glenview Drive to Emerald Lane)

    WS9502 Walnut Street Water Main (Illinois Avenue to Washington Street)

    WS9801 Water Line Extension East of McRoy Drive

    WS9807 Freeman Street Water Main Replacement (Oakland Avenue to Valley Road)

    WS9808 Jackson County Housing Water Line (Ashley, Chestnut, Brush, & Robert A Stalls Ave.)

    WS9813 Main Street Water Main Replacement Phase II (Cedarview to Wall-1,700 feet)

    WS9816 Norwest Lane/New Era Road Water Main Loop

    WS0103 Lincoln Street Water Line Replacement (College Street to Mill Street)

    WS0107 Hill Street Water Line Replacement (Carter Street to Oakland Avenue)

    WS0108 Cherry Street Water Line Replacement (Oakland Avenue to James Street)

    WS0112 Michaels Street Water Line Replacement (From Willow Street to 300 Ft North)

    WS0115 McKinley Street Water Main Replacement (Sycamore Street to North Street)

    WS0205 Billy Bryan Street Water Line Replacement (Gher Street to 150' North of Willow Street)

    WS0303 Elm Street Water Line Replacement (Washington Street to Marion Street)

    WS0801 Union Hill Road Raw Water Line Relocation

    WS0803 Crab Orchard Water District Improvements

    WS0901 Redundant Water Supply Study

    WS0903 Marion Street North from Fisher Street Water Line Replacement

    WS0904 Pecan Street Water Line Replacement (University to Smith - 3,200 Feet)

    WS0908 Cedar Lake Boat Access Program Development

    WS0909 Automatic Meter Reading System

    WS1001 Paint the Water Treatment Plant (Interior Structural Steel)

    WS1003 Water Plant Expansion

    WS1004 Cedar Lake Replace Water Control Structure

    WS1302 Feeder Water Main Repl. (Chautauqua-Oakland to Water Tower - 2,300 feet)

    WS1303 Feeder Water Main Repl. (Oakland-Main to Sycamore-1,600 feet)

    WS1304 Feeder Water Main Repl. (West Willow-Springer to Illinois - 2,200 feet)

    WS1305 Feeder Water Main Repl. (Illinois Ave-West Willow to Ready Mix - 2,200 feet)

    WS1306 Feeder Water Main Repl. (Illinois Ave-Ready Mix to Industrial Park Road - 4,000 feet)

    WS1307 Feeder Water Main Repl. (Charles Road to Bicentennial Industrial Park)

    3/27/2020 Page 12 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    WS1501 Cedar Lake Boat Launch Renovation (Cedar Creek Road Boat Launch)

    WS1503 Cedar Lake Sediment and Nutrient Load Reduction Projects

    WS1801 South Normal Avenue Watermain Replacement

    WS1802 Skyline Drive Watermain Replacement

    WS1803 Chautauqua Street Watermain Replacement

    WS1804 Orchard Drive Watermain Replacement

    WS1805 18" Feeder Watermain (Wall to Lewis - 2,700 Feet)

    WS1805B 18" Feeder Watermain (Lewis Lane to NE Corner of Superblock - 3,600 Feet)

    WS1806 East Walnut Street Watermain Replacement

    ** WS1807 Grand Avenue Water Main Extension

    WS1808 Water Treatment Plant Clarifier Rehabilitation and Painting

    WS1809 West Main Street Watermain Relocation

    WS1902 Oakland Avenue Watermain Loop (Industrial Park Road to Lipe Lane)

    WS1903 West Willow Street, West Laurel Street, West Willow Court Watermain Replacement

    WS1904 North Illinois Avenue Watermain Replacement

    WS1905 Sycamore Street Watermain Replacement

    WS1906 Cedar Lake Spillway Outfall Channel Erosion Control

    WS2002 Chautauqua Water Tower Repainting

    WS2003 Update the City's Water Utility Mapping in the GIS

    WS2004 Helen Street Water Tower Painting

    3/27/2020 Page 13 of 14

  • * Added during Council review, ** Caryover from previous FY (not completed) or added during FY

    FY2021 Capital Improvement Program (CIP) Project List

    XXYY## - (in bold) indicates the project is funded in the current 5 year CIP

    XX - Project type, YY - Fiscal Year the project was added, ## - the project number for that Fiscal Year

    (all projects currently on the books)

    Notation Legend:

    (FP) Project is complete pending final payment/invoicing from Grant Agency (future years expenses)

    WASTEWATER SYSTEM (WW):

    WW1001 NWWWTP Nutrient Removal Study & Upgrades

    WW1005 SEWWTP Mechanical Bar Screen

    ** WW1007 Kent Drive - Lift Station and Foremain Replacement

    WW1008 NWWWTP Primary Clarifier Rehabilitation

    WW1009 NWWWTP Effluent Pump Replacement

    WW1010 NWWWTP Upgrade - 2.64 MGD to 4.2 MGD

    WW1011 SEWWTP Upgrade - 6 MGD to 9 MGD (Oxidation Ditch Ring & Final Clarifier Addition)

    WW1501 SEWWTP Ultraviolet Light Disinfection

    WW1503 Murdale Lift Station Pump Addition

    WW1703 SEWWTP Logic Cabinet Upgrades

    WW1801 NWWWTP Industrial Pretraeatment Play Dystor Renovation

    WW1802 NWWWTP Industrial Pretreatment Plant Clarifier Reconstruction

    WW1803 Sanitary Sewer Lift Station Control Panel Upgrades and Replacements

    WW1804 NWWWTP Install a Screw Press to Enhance Solids Removal Capabilites

    WW1805 SEWWTP Sludge Lagoon #1 Rehabilitation

    WW1806 SEWWTP Clarifier and Grit Chamber Rehabilitation and Painting

    WW1807 SEWWTP Sludge Handling Upgrades

    WW1901 SEWWTP Blower Replacement

    WW1902 SEWWTP Final Clarifier Rehabilitation

    WW1903 NWWWTP Vacuum Station Replacement

    ** WW1905 NWWWTP Industrial Plant Effluent Gravity Flow Line

    WW2001 NWWWTP Replace Industrial Influent Pumps

    WW2002 NWWWTP Replace and Update the Electrical Switch Gear

    WW2003 SEWWTP Sludge Lagoon Rehabilitation (East Lagoon)

    WW2004 NWWWTP Trickler Filter Cover

    WW2101 NWWWTP Repl. Pumps and VFD's at Domestic Influent Pump Station

    WW2102 NWWWTP Phosphorus Feasibility Studies and Optimization Plan

    WW2103 SEWWTP Phosphorus Feasibility Studies and Optimization Plan

    WW2104 SEWWTP Nutrient Assessment Reduction Plan

    WW2105 NWWWTP Nutrient Assessment Reduction Plan

    WW2106 NWWWTP Replace Domestic Return Pumps

    3/27/2020 Page 14 of 14

  • FY2021

    5 Year Capital Improvement Program (CIP)

    (FY 2021 thru FY 2025)

    Funded Project Narrative Descriptions

  • FY2021 CIP Project Narratives Page 1 of 23

    FY2021 Capital Improvement Program Project Narratives

    OPEN SPACE & PARKS (OS):

    OS0901 – CENTRAL DOWNTOWN BIKE/PEDESTRIAN PATH – PHASE II

    Construct an eight foot wide multiuse bicycle/pedestrian path from the intersection of East Mill

    Street and South Washington Street, south across SIU property to the end of the pedestrian

    overpass.

    This project completed the southern segment of the downtown bicycle/pedestrian path and has

    been already constructed. Partial funding was secured for this project through the Illinois

    Transportation Enhancement Program (ITEP). Due to this funding the final billing of the

    project has not been received from the State.

    OS1702 – OFF ROAD BIKE/PEDESTRIAN PATH ALONG EAST SIDE OF GIANT CITY ROAD

    The purpose of this project is to construct an off-road pedestrian/bicycle path along Giant City

    Road from Walnut Street south to Dogwood Lane.

    This section of Giant City Road is very busy; additionally the Carbondale Community High

    School is located at the corner of Walnut Street and Giant City Road. Constructing an off-road

    multi-use path will increase safety for pedestrians and bicyclists.

    OS1703 – DRAINWAY/GREENWAY PATH SAFETY IMPROVEMENTS

    The purpose of this project is to add safety improvements as needed to the existing

    drainway/greenway path along Piles Fork Creek from Grand Avenue to Walnut Street.

    The drainway/greenway path was constructed in 1982-1983 and includes 9.5 acres of land for

    public outdoor recreation. The land for this project purchased through a State of Illinois Land

    and Water Conservation Fund Grant, as such the City is responsible to ensure the property and

    amenities are maintained, safe, and usable for the general public. Via a lease agreement with

    the City of Carbondale, the Carbondale Park District is responsible for the regular operation

    and maintenance of the path and its amenities; however the City is required by the Illinois

    Department of Natural Resources (IDNR) to ensure the recreational land and amenities are

    maintained and repaired. The Park District’s limited resources preclude making some of the

    needed safety improvements including: lighting upgrades, handrails modifications, and limited

    pathway surface reconstruction. As such the City desires to make some needed improvements.

    OS1704 – NW PEDESTRIAN AND BICYCLE PATH (OAKLAND TO NEW ERA ROAD)

    This project will provide a pedestrian/bicycle connector path between North Oakland Avenue

    and New Era road. The project will consist of an 8’ wide concrete path along with lighting and

    amenities.

    The City applied for and received Illinois Transportation Enhancement Program (ITEP) grant

    to assist with the constriction of this project, the grant will pay in an 80% (federal) / 20% (local

    match) grant that is estimated to pay for approximately 70% of the project cost.

  • FY2021 CIP Project Narratives Page 2 of 23

    OS1901 – NW BIKE/PEDESTRIAN TRAIL – PHASE II (NEW ERA RD TO STATE HWY 13)

    This project will complete the Northwest Bicycle/Pedestrian Trail along the old railroad right-

    of-way from New Era Road to State Highway 13.

    The Illinois Department of Transportation (IDOT) in cooperation with the City of Carbondale,

    City of Murphysboro, and Jackson County recently constructed a Bicycle/Pedestrian trail from

    Wood Road, under State Highway 13 (at the old railroad right-of-way bridges) and along State

    Highway 13 to Airport Road. Phase II of the Northwest Bicycle/Pedestrian Trail will connect

    the City’s bicycle/pedestrian trail (Phase I of the Northwest Bicycle/Pedestrian Trail) to the

    recently constructed trail to Airport Road. This will complete a trail loop to the Southern Illinois

    Airport.

  • FY2021 CIP Project Narratives Page 3 of 23

    PUBLIC BUILDINGS (PB):

    PB1001 – CEMETERY OFFICE AND MAINTENANCE BUILDING

    This project will construct a replacement building for Oakland Cemetery.

    The existing building is old and has been upgraded several times over the last decade; however

    it is fast approaching the end of its useful lifespan and will need to be replaced soon. A new

    building will be much more energy efficient and will provide more welcoming and useful office

    space for patrons and staff.

    PB1501 – POPLAR CAMP BEACH RESTROOM CONCESSION STAND REPLACEMENT

    This project includes the construction of new restroom, changing facilities, and concession

    stand areas at Cedar Lake.

    The existing restroom and changing facilities do not meet current Accessibility Standards, as

    such they need to be upgraded to meet required standards.

    PB2002 – MES FACILITY GENERATOR REPLACEMENT

    Replace the generator at the City’s Maintenance and Environmental Services (MES) Facility.

    The Generator at the City’s Maintenance and Environmental Services (MES) Facility is aging

    and in need of replacement to insure its continued reliability. The MES facility is a critical

    Public Works Facility that provides 24 hour support services to the City’s Public Works, Police,

    and Fire Operations, to ensure these services are available during power outages it is necessary

    to keep the backup power generation systems in reliable working condition.

    PB2003 – STREET MAINTENANCE ROCK SALT STORAGE FACILITY RECONSTRUCTION

    The City’s Rock Salt Storage Dome at the Maintenance and Environmental Services (MES)

    facility is in need of reconstruction and expansion.

    The City’s’ Rock Salt Storage dome at the MES Public Works yard needs to be reconstructed

    to insure it’s continued serviceability; additionally this structure needs to be expanded so that

    more rock salt can be on hand for winter operations. The expansion of this structure is needed

    due to recent Carbondale Revised Code changes in November 2018 that require all streets in

    the City to be cleared of snow and ice during winter events. Previously it was only required

    that the City’s designated snow routes be cleared of snow and ice and other City streets were

    cleared at the discretion of City staff as warranted.

    PB2004 – EVERGREEN PARK ACCESSIBLE RESTROOMS

    This project consists of the replacement of the existing restroom at Evergreen Park. The City

    is applying for grant funding thru grants that are administered by the Illinois Department of

    Natural Resources.

    The existing bathroom is in dilapidated and in need of replacement.

  • FY2021 CIP Project Narratives Page 4 of 23

    PARKING LOT (PK)

    PK2001 – IDOT – WALNUT ST RESURFACING (OAKLAND AVENUE TO LEWIS LANE)

    The Illinois Department of Transportation (IDOT) is resurfacing Walnut Street from Oakland

    Avenue to Lewis Lane, the City has on-street parking from Oakland Avenue to University

    Avenue and is required to pay for the resurfacing work in the parking lanes.

    IDOT is using State/Federal funds for this project, accordingly the City is only required to pay

    20% of the costs for resurfacing the parking lanes. This cost is estimated to be $10,350 and is

    a great value for the City.

  • FY2021 CIP Project Narratives Page 5 of 23

    SANITARY SEWERS (SA):

    SA0901 – SANITARY SEWER REHABILITATION PROGRAM

    Annual Sewer Rehabilitation Program to maintain and improve the integrity of the sewer

    system and repair problem areas. The early years of this program (primarily through FY2019)

    will concentrate on manhole lining with the later years of this project focusing on sanitary

    sewer lining and repairs.

    Many sewers are in need of repair to improve pipe condition and reduce infiltration and inflow.

    In addition, the program would reduce blockage in the sewer lines causing customer problems

    and possible damage to homes.

    SA1301 – SANITARY SEWER INFLOW AND INFILTRATION STUDY

    Evaluate the City’s Sanitary Sewer system to identify and correct sources of inflow and

    infiltration.

    FY 2021 will be the ninth (9th) consecutive year of this study. The project is now consisting of

    locating/inspecting manholes that have not been located due to various reasons, repairing

    manholes that were unable to have inspections performed, inspecting said manholes, and

    inspecting manholes that required special accommodations to have the inspections performed.

    In addition the City is having flow monitoring performed to further determine lines/basins that

    need rehabilitation performed.

    The City’s two wastewater treatment plants experience significant flow increases during rain

    events. These increases in flow are a direct result of rain and storm runoff waters entering the

    sanitary sewer system. An ongoing sanitary sewer inflow and infiltration study will aid the

    City in identifying major sources of inflow and infiltration and allow them to be corrected

    thereby reducing operating costs for the wastewater treatment plants.

    SA1302 – HAAKE JENKINS SANITARY SEWER

    This project will consist of replacing the existing Haake Jenkins Lift Station. The City has

    been unable to secure the needed easements for the construction of the original design of a

    gravity sewer. Given the age and the small size of the existing station, it was determined that

    replacing in kind is the most prudent action at this time.

    SA1601 – SEWWTP INTERCEPTOR SEWER EXTENSION (PARK ST TO PLEASANT HILL

    RD)

    This project includes the extension of the SEWWTP Interceptor Sewer from the intersection of

    Park Street at Wall Street through SIU Campus to U.S. Highway 51 at Pleasant Hill Road. This

    project will consist of approximately 2,900 feet of sanitary sewer.

    Over the last decade there have been some significant housing developments in the Grand

    Avenue, Park Street, and South 51 areas. These developments have significantly increased the

    demand on the sanitary sewers that serve these areas. Currently the City’s SEWWTP

    Interceptor Sewer terminates near the old water treatment plant at the corner of Park Street and

    Wall Street. From this point south, across SIU Campus, the sewer is of small diameter and

  • FY2021 CIP Project Narratives Page 6 of 23

    needs to be upsized in order to adequately handle the developments tributary to the sewer.

    SA1802 – GRAND AVENUE AND BREHM LANE SANITARY SEWER LINING

    The purpose of this project is to line the sewers in the Grand Avenue and Brehm Lane area.

    The City has over 130 miles of sanitary sewer lines, most of these were constructed of clay

    pipe with rubber joints. Over the years the joints in the clay pipe dry out; additionally clay pipe

    is subject to cracking. Both of these cause the pipe to leak. Lining the pipe from the inside is

    more cost effective, quicker, and provides little disruption in service.

    SA1807 – INDUSTRIAL INTERCEPTOR SEWER SANITARY SEWER LINING

    The purpose of this project is to line the Industrial Interceptor Sewers tributary to the

    NWWWTP.

    The City has over 130 miles of sanitary sewer lines, most of these were constructed of clay

    pipe with rubber joints. Over the years the joints in the clay pipe dry out; additionally clay pipe

    is subject to cracking. Both of these cause the pipe to leak. Lining the pipe from the inside is

    more cost effective, quicker, and provides little disruption in service.

    SA2001 – SANITARY SEWER LINING (CCIP) PROGRAM

    Annual Sewer Rehabilitation Program to maintain and improve the integrity of the sewer

    system and repair problem areas. This program will concentrate on in-place lining of sanitary

    sewers.

    Many sewers are in need of repair to improve pipe condition and reduce infiltration and inflow.

    In addition, the program would reduce blockage in the sewer lines causing customer problems

    and possible damage to homes.

  • FY2021 CIP Project Narratives Page 7 of 23

    SPECIAL PROJECTS (SP):

    SP0901 – CREATING COMMUNITY ENTRYWAYS

    New masonry monument style signs, similar to those at the entryways to campus, will be

    installed on the four (4) major entrances to the City. These signs will be elevated above the

    natural grade and positioned to provide ample view from passing vehicles. The new signs will

    also include sustainable landscaping and ground mounted lighting. These new masonry

    monument style signs will boldly state “Welcome to Carbondale” with the sub-text of “Home

    of Southern Illinois University”. The installation of these signs will be a cooperative project

    with Southern Illinois University.

    Southern Illinois University recently completed the construction of monument signs and

    landscaped entryways into the university. Creating similar signs and entryways on major

    corridors into the City will improve the aesthetic appeal and provide a coordinated look and

    feel between the City and University.

    SP0904 – ILLINOIS AVENUE STREESCAPE IMPROVEMENTS – PHASE 3

    The third and final phase of this project will include the installation of new street lighting, ADA

    compliant pedestrian walkways, trees, planters and other streetscape elements along Illinois

    Avenue from Monroe Street to Oak Street. Additional lighting only will be installed along

    Jackson from University to Washington, and along Washington from Oak to Main.

    This project has been helping to achieve some of the goals outlined in the Downtown Plan.

    SP1002 – MULTIMODAL TRANSPORTATION CENTER

    A new multimodal transportation center will be constructed on the site of the existing Amtrak

    Station. This new facility will stretch from Cherry Street to Walnut Street and is slated to

    include a parking garage facility. The City has secured a BUILD Grant to aid in the funding

    of the project.

    Public transportation usage is on the rise. In order to provide our citizens and visitors with

    comprehensive services at one central location, it is necessary to construct a multimodal

    transportation facility. This new facility will provide space which will allow for the

    consolidation of many local transit services including: Amtrak, Greyhound Bus, Saluki

    Express, Jackson County Mass Transit, Various Regional Bus Services, Taxi Cab Companies,

    and the like.

    SP1501 – OLD HISTORIC DEPOT WALKWAY RENNOVATIONS/RECONSTRUCTION

    The purpose of this project is to reconstruct the brick walkways around the Historic Train Depot

    in the downtown area. The brick walkways around the Historic Train Depot have settled and

    are in need of restoration.

    SP1703 – EAST COLLEGE STREET AT ICRR TRACKS IMPROVEMENTS

    Improve the pedestrian railroad crossings to conform to current accessible standards as allowed

    by the Canadian National Railroad and the Illinois Department of Transportation. This project

    is partially funded by a Railroad Safety Grant. The existing pedestrian crossings at the railroad

  • FY2021 CIP Project Narratives Page 8 of 23

    are rough and do not meet accessible standards, upgrades need to be made.

    SP1704 – EAST GRAND AVENUE AT ICRR TRACKS IMPROVEMENTS

    Improve the pedestrian railroad crossings to conform to current accessible standards as allowed

    by the Canadian National Railroad and the Illinois Department of Transportation. This project

    is partially funded by a Railroad Safety Grant. The existing pedestrian crossings at the railroad

    are rough and do not meet accessible standards, upgrades need to be made.

    SP1804 – IDOT EAST SIDE MULTIUSE PATH – PHASE II (GIANT CITY RD TO REED

    STATION RD)

    The Illinois Department of Transportation (IDOT) is constructing a new multiuse path for

    pedestrian and bicycles from Giant City Road to Reed Station Road as a part of the widening

    of State Highway 13 to six (6) lanes.

    The City has been requested to pay for 20% of the estimated project costs, not including bridge

    structures; as such the City needs to add this project into the CIP program so the required

    payment can be made to IDOT.

    SP1805 – IDOT MULTIUSE PATH ROUTE 13 UNDERPASS WOOD ROAD

    The Illinois Department of Transportation (IDOT) is constructing a new multiuse path for

    pedestrian and bicycles at Route 13 Underpass Wood Road as a part of replacing the old bridge

    structures.

    The City has been requested to pay for 20% of the estimated project costs, not including bridge

    structures; as such the City needs to add this project into the CIP program so the required

    payment can be made to IDOT.

    SP1901 – IDOT INTERSECTION IMPROVEMENTS – REED STATION ROAD

    IDOT is improving the intersection of Reed Station Road and Illinois Route 13. These

    improvements include the widening of the intersection to accommodate the future widening of

    Illinois Route 13, the addition of crosswalks at said intersection.

    Due to agreements between the City and IDOT, the City is to contribute 20% of the project.

    SP1902 – EMERGENCY WARNING SIRENS

    The upgrade of existing warning sirens and the addition of warning sirens as directed by the

    City Fire Department. The existing Emergency Warning System is in need of upgrade.

    SP2001 – UPGRADE THE CITY’S GIS UTILITY INFORMATION

    This project will contract consultants to help update the City’s GIS Utility Information.

    The City eliminated its in-house (Geographic Information System) GIS Mapping Technician

    in 2016 due to budget constraints. As such the City does not have dedicated staff to update and

    maintain its GIS mapping systems. Additionally much of the City’s utility information within

    the GIS system has never been physically mapped and is based on scans of mapping created in

  • FY2021 CIP Project Narratives Page 9 of 23

    the 1970’s to early 1990’s and needs to be properly mapped and georeferenced to the City’s

    aerial photography.

  • FY2021 CIP Project Narratives Page 10 of 23

    STORM SEWERS & DRAINAGE (SS):

    SS1002 – CHERRY/ELM STREET STORM SEWER INTERCEPTOR REPLACEMENT

    Replacement of the storm sewers from the West Cherry Street/University Avenue area to the

    East Elm Street/Marion Street area.

    The Cherry Street/University Avenue/Illinois Avenue is a low point and collector area for

    storm water runoff. The storm water from this area is conveyed under the railroad tracks to

    East Elm Street where it connects to other storm sewers that take the water to Piles Fork Creek.

    This area on the west side of the railroad tracks has experienced flooding for decades and

    warrants further study for possible storm sewer replacements to aid in alleviating the flooding

    problems.

    SS1401 – CITY WIDE DRAINAGE STUDY

    This project will take an overall look at the City’s storm water conveyance systems and identify

    and quantify needed infrastructure improvements.

    There are numerous locations around the City that flood during time of heavy rainfall.

    SS1701 – STORMWATER UTILITY – FEASIBILITY STUDY

    Perform a Stormwater Utility Feasibility Study. This study would identify potential costs and

    needs, which could be appropriately applied to a stormwater utility. This includes but not

    limited to; street cleaning, stormwater collection infrastructure, State required permitting

    activities. In addition, a Stormwater Utility Feasibility Study could determine possible

    revenues that could be generated from a Stormwater Utility Fee. This study would assist the

    City if it deemed appropriate to implement a Stormwater Utility Fee.

    The City Council has expressed interest in pursuing a stormwater utility fee, which would

    enable the City to have a dedicated revenue stream for future stormwater-related Capital

    Improvement Program (CIP) projects. In order to establish a stormwater utility fee, a feasibility

    study will need to be performed to identify potential costs, needs, and to determine possible

    revenues that could be generated.

    SS9902 – REPLACE CORRUGATED METAL PIPES IN SOUTHWEST CARBONDALE

    The area for this study is bounded by Sunset Drive on the north, Chautauqua Street on the

    south, Dixon Street on the east and Little Crab Orchard Creek on the west. When this section

    of Carbondale was developed, corrugated metal storm drainage systems were often used. These

    pipes are starting to deteriorate and fail. This study would identify the areas where corrugated

    metal pipes were used and note the areas that are failing. This information will provide the

    necessary data for establishing a program for repairs. Following the study, staff will prepare

    necessary construction documents to implement the upgrades and repairs needed to the system.

    As the study has not been completed, construction funds have been allocated based on planned

    funds availability within the Local Improvement Fund beginning in FY 2022.

    To maintain a satisfactory storm water drainage system.

  • FY2021 CIP Project Narratives Page 11 of 23

    STREETS (ST):

    ST0202 – OAKLAND AVENUE RECONSTRUCTION (WALNUT ST TO CHAUTAUQUA ST)

    The proposed improvements will reduce congestion by the addition of dedicated bicycle lanes

    on both side of the roadway, widen lane widths to 12 feet throughout the length of the project,

    improve intersections with side streets, and enhance the existing pedestrian facilities. This

    project will help remove bicycle/vehicular conflicts and improve the travel time for both modes

    of transportation (enhance the Level of Service) along this corridor. Intersection improvements

    along the corridor will also improve various levels of service.

    Oakland Avenue is one of the main entrances to Southern Illinois University (SIU). This

    project proposes to reconstruct and widen Oakland Avenue between Illinois State Route 13

    (Walnut Street) and Chautauqua Street (SIU Campus) to provide for a higher level of service

    and provide accommodations for heavy bicycle traffic. The current ADT of this section of

    roadway peaks at 7,700 vehicles per day and includes two intersections with other Federal Aid

    Routes (Freeman Street and Mill Street). The current roadway section is approximately 30 feet

    wide with left hand turn lanes and/or on-street parking that reduces the effective lane widths

    to 10 feet wide for much of the length.

    ST0601 – MCLAFFERTY AND CHAUTAUQUA INTERSECTION IMPROVEMENTS

    The project will consist of the design and replacement the existing intersection at McLafferty

    and Chautauqua with a roundabout. The City has applied for and secured HSIP funding for the

    project and looks to construct FY2021 if possible.

    ST1302 – BRIDGE MAINTENANCE AND REHABILITATION (LITTLE CRAB ORCHARD

    CREEK – SUNSET DRIVE)

    To proactively maintain and rehabilitate bridge structures throughout the City to extend the

    service life of these structures and avoid costly replacements.

    The City has numerous bridges throughout the community that it is responsible for inspecting,

    repairing, and maintaining. Many of these structures are beginning to show signs of their age.

    Recent inspections of several structures indicate that there is a growing need for heavy

    maintenance and/or rehabilitation which will likely continue for a number of years. This project

    will replace the bridge on Sunset Drive over Little Crab Orchard Creek.

    ST1303 – COLLEGE STREET BOX CULVERT REPLACEMENT (PILES FORK CREEK)

    This project consists of the replacement of the box culvert where College Street crosses Piles

    Fork Creek. The project will replace the culvert in kind while updating to current standards.

    The most recent bridge inspections identified this structure as in need of replacement.

    This project is to be funded in part with State Surface Transportation Unit Funds.

    ST1304 – CHAUTAUQUA BRIDGE REPLACEMENT (LITTLE CRAB ORCHARD CREEK)

    This project consists of the replacement of the bridge over Little Crab Orchard Creek at

    Chautauqua Street. The project will replace the bridge in kind while updating to current

    standards. The most recent bridge inspections identified this structure as in need of

  • FY2021 CIP Project Narratives Page 12 of 23

    replacement.

    The City is pursuing funds through the Illinois Special Bridge Program to assist in the majority

    of the cost of the reconstruction.

    ST1501 – GRAND AVENUE RECONSTRUCTION – WALL TO LEWIS LANE

    This section of roadway does not have bicycle lanes, reconstructing this section of street will

    allow bicycle lanes to be built.

    Adding bicycle lanes to this section of street will connect existing bicycle lanes east of Lewis

    lane and bicycle lanes on south Wall Street.

    ST1701 – WEST MILL RESURFACING (UNIVERSITY AVE TO OAKLAND AVE

    The existing concrete roadway surface needs resurfaced to provide a smoother and more

    aesthetically pleasing entrance to the campus.

    West Mill Street borders the northern edge of the Southern Illinois University Campus. As

    such, the roadway should be aesthetically pleasing and create a nice entryway to the campus.

    ST1802 – STREET CONDITION SURVEY/STUDY

    The purpose of this project it survey the condition of the existing vehicle travel surfaces on the

    City’s roadways and parking lots. The collected information will be input into software that

    provides a rated inventory of the City’s streets and will output reports as to the condition of the

    existing streets and recommended replacement schedule.

    This project will allow a systematic approach to prioritizing replacement/repair of the City

    streets and parking lots that are in the most need of repair.

    ST1901 – NEW ERA ROAD RECONSTRUCTION (GLENN ROAD NORTH 1,700 FEET)

    New Era Road has been improved with curb gutter and bike lanes from Main Street to just past

    Glenn Road. Carbondale Township is improving Airport Road. This project consists of

    improving approximately 1,700 feet of roadway from just past Glenn Road northward.

    Continuing the improvement of New Era Road from just past Glenn Road to Airport Road,

    (approximately 1,700.00 feet) would increase the level of service for vehicular, pedestrian, and

    bicycle access to Southern Illinois Airport. This project is consistent with the City’s 2010

    Comprehensive Plan. On November 28, 2017, City Council approved a resolution of

    commitment of $104,000 in local funds to provide matching funds for said project.

    ST2001 – PAVEMENT MANAGEMENT PROGRAM – STREET IMPROVEMENTS (VARIOUS)

    Provide funding to improve streets throughout the City based on the City’s Pavement

    Management Study, as initially completed in FY2019.

    The City hired a consulting firm to put together a pavement management program for the City.

    This program has identified a need to re-invest in our streets to insure their continued reliability

    by proactively addressing issues through pavement preservation, resurfacing, and

  • FY2021 CIP Project Narratives Page 13 of 23

    reconstruction of the pavements. As the pavement management program is a living document

    with priorities changing from year to year, this project will earmark funds to be used towards

    keeping the City’s streets in good shape. As needs are identified that require the reconstruction

    of streets, funds will be moved from this project to specific projects; other needs such as

    preservation and re-surfacing will be funded from this project on an annual basis. Based on the

    presentation to City Council in FY2019 the City needs to invest at least $1.25 million in funds

    annually just to maintain status quo and keep our City Streets in the condition they currently

    are.

    ST2002 – EAST COLLEGE ST RECONSTRUCTION (WALL ST TO PILES FORK CREEK)

    Reconstruction the section of East College Street from Wall Street to Piles Fork Creek.

    As identified in the City’s Pavement Management Program, this section of East College Street

    is in need of being reconstructed as the pavement is failing.

  • FY2021 CIP Project Narratives Page 14 of 23

    SIDEWALKS (SW):

    SW2101-SW2501 – SIDEWALK IMPROVEMENTS

    Repair dangerous and/or deteriorated sidewalks throughout the City. Improve sidewalks in the

    downtown area. Construct new sidewalks where missing sections of walk creates a cap in the

    sidewalk flow

    Remove hazardous situations and make the areas more aesthetically pleasing.

  • FY2021 CIP Project Narratives Page 15 of 23

    TRAFFIC SIGNALS (TS):

    TS0201 – GIANT CITY ROAD/EAST MALL ENTRANCE ROAD/SUNNY ACRES DRIVE

    TRAFFIC SIGNALS

    As development continues along Giant City Road between State Highway 13 and East Walnut

    Street, traffic has increased to the point where a traffic signal may be warranted.

    This project will study the intersections in this corridor to determine if a traffic signal is

    warranted; and construct signal(s) as may be needed to control traffic.

  • FY2021 CIP Project Narratives Page 16 of 23

    WATER SYSTEM (WS):

    WS0803 – CRAB ORCHARD WATER DISTRICT IMPROVEMENTS

    Improve areas served by the former Crab Orchard Water District by making connections to

    existing City Water lines where available and replace water lines as described in agreement

    with the former Crab Orchard water District. Work on this project will resume in FY 2020 and

    is planned to include waterlines along Grand Avenue.

    Many of the lines are in poor condition and need to be replaced.

    WS0901 – REDUNDANT/BACKUP WATER SUPPLY STUDY

    Study various options to provide adequate potable water for our community should there be a

    catastrophic failure of the City’s raw water supply system and/or water treatment plant.

    Develop and analyze various alternatives including interconnections to other regional water

    supplies and design and implement the chosen option(s).

    The City Reservoir (also referred to as Evergreen Lake) has been the City’s backup water

    supply for decades. Unfortunately the lake has now silted to a point that severely limits the

    amount of useful water that can be pumped from it to the water treatment plant. In the event of

    an emergency wherein the City was not able to pump water from Cedar Lake, the City would

    have difficulty getting adequate raw water to the plant for treatment.

    WS0904 – PECAN ST WATERLINE REPLACEMENT (UNIVERSITY TO SMITH – 3,200 FT)

    Replace 3,200 feet of six inch water line on Pecan Street.

    This line on Pecan Street has broken several times. It needs to be replaced.

    WS1302 – FEEDER WATERMAIN REPLACEMENTS (CHAUTAUQUA – OAKLAND TO

    WATER TOWER – 2,300FT)

    The purpose of this project is to replace dilapidated water main feeder lines of 10” and larger

    in diameter. This phase consists of replacing the existing watermain along Chautauqua Road

    from Oakland Avenue to the Water Tower located on Chautauqua Road.

    There are many water mains through the City that are dilapidated and in need of replacement.

    Priority should be given to the water systems feeder water mains that are 10” or larger in

    diameter as these lines feed many of the other lines throughout the City.

    WS1303 – FEEDER WATERMAIN REPLACEMENT (OAKLAND – MAIN TO SYCAMORE –

    1,600 FT)

    The purpose of this project is to replace dilapidated water main feeder lines of 10” and larger

    in diameter. This phase consists of replacing the watermain along Oakland Avenue from Main

    Street to Sycamore Street.

    There are many water mains through the City that are dilapidated and in need of replacement.

    Priority should be given to the water systems feeder water mains that are 10” or larger in

    diameter as these lines feed many of the other lines throughout the City.

  • FY2021 CIP Project Narratives Page 17 of 23

    WS1304 – FEEDER WATERMAIN REPLACEMENTS (WEST WILLOW – SPRINGER

    STREET TO ILLINOIS AVENUE – 2,200 FT)

    The purpose of this project is to replace dilapidated water main feeder lines of 10” and larger

    in diameter. This phase consists of replacing the watermain along West Willow Street from

    Springer Street to Illinois Avenue.

    There are many water mains through the City that are dilapidated and in need of replacement.

    Priority should be given to the water systems feeder water mains that are 10” or larger in

    diameter as these lines feed many of the other lines throughout the City.

    WS1305 – FEEDER WATERMAIN REPLACEMENT (ILLINOIS AVENUE – WEST WILLOW

    TO READY MIX – 2,200 FT)

    The purpose of this project is to replace dilapidated water main feeder lines of 10” and larger

    in diameter. This phase consists of replacing the watermain along Illinois Avenue from West

    Willow to Ready Mix Road.

    There are many water mains through the City that are dilapidated and in need of replacement.

    Priority should be given to the water systems feeder water mains that are 10” or larger in

    diameter as these lines feed many of the other lines throughout the City.

    WS1306 – FEEDER WATERMAIN REPLACEMENT (ILLINOIS AVENUE – READY MIX – TO

    INDUSTRIAL PARK 4,000 FT)

    The purpose of this project is to replace dilapidated water main feeder lines of 10” and larger

    in diameter. This phase consists of replacing the watermain along Illinois Avenue from Ready

    Mix Road to Industrial Park Road.

    There are many water mains through the City that are dilapidated and in need of replacement.

    Priority should be given to the water systems feeder water mains that are 10” or larger in

    diameter as these lines feed many of the other lines throughout the City.

    WS1307 – FEEDER WATERMAIN REPLACEMENT (CHARLES ROAD TO BICENTENNIAL

    INDUSTRIAL PARK)

    The purpose of this project is to replace dilapidated water main feeder lines of 10” and larger

    in diameter. This phase consists of replacing the watermain from Charles Road to Bicentennial

    Industrial Park.

    There are many water mains through the City that are dilapidated and in need of replacement.

    Priority should be given to the water systems feeder water mains that are 10” or larger in

    diameter as these lines feed many of the other lines throughout the City.

    WS1501 – CEDAR LAKE BOAT LAUNCH RENOVATION

    The purpose of this project is to renovate the existing boat launch at Cedar Lake, which is in

    need of repair.

  • FY2021 CIP Project Narratives Page 18 of 23

    WS150 – SEDIMENT AND NUTRIENT LOAD REDUCTION PROJECTS

    Stabilize 14,000 linear ft. of Cedar Lake shoreline; stabilize 20,000 linear ft. of gully and

    construct sediment control basins on 200 acres within the watershed.

    Identified impairments to Cedar Lake will be addressed by reducing phosphorous, nitrogen and

    sediment loading. The proposal will address shoreline erosion and turbid water with a

    reduction in these impairments, as well.

    WS1805 (B) – 18” FEEDER WATERMAIN REPLACEMENT (LEWIS LANE TO NORTHEAST

    CORNER SUPERBLOCK)

    This project will replace dilapidated sections of the City’s 18” feeder watermain system from

    Wall Street to Giant City Road.

    The City’s 18” feeder watermain from Wall Street to Giant City Road was originally used to

    supply the City’s water treatment plant (the old water treatment plant) with raw water from

    Crab Orchard Lake; portions of this waterline are extremely old and in need of replacement to

    help insure continued reliability of the City’s water infrastructure and distribution system.

    WS1807 – GRAND AVENUE WATERMAIN EXTENSION

    This project is a completely new watermain and will establish an interconnection between the

    eastside of the city to the center.

    The City of Carbondale absorbed the former Crab Orchard Water District in previous years.

    There are limited interconnections and the water systems are operating separately. This project

    will establish primary interconnections to unite the two systems.

    WS1808 – WATER TREATMENT PLANT CLAIFIER REHABILITATION AND PAINTING

    The purpose of this project is to rehabilitate the water treatment plant’s three clarifiers.

    The City’s water treatment plant was put online in 1994 as such many of the plants facilities

    and equipment is aging and in need of rehabilitation. The clarifiers are the last major pieces of

    equipment that need to be taken care of at this time.

    WS1906 – CEDAR LAKE SPILLWAY OUTFALL CHANNEL EROSION CONTROL

    This project will consist of provide erosion control and stabilizing the outfall channel of the

    Cedar Lake Spillway.

    The Cedar Lake Spillway was reconstructed during the summer of 2016, this project stabilized

    the main spillway itself but did not stabilize the outfall channel below the spillway. Erosion

    has continued to create problems downstream of the spillway and needs to be stabilized.

    WS2002 – CHAUTAUQUA WATER TOWER REPAINTING

    Repaint the Chautauqua Water Tower.

    The Water Tower on Chautauqua was constructed in the mid 1950’s and has been repainted

    several times over the years. The buildup of paint on the exterior of the tower needs to be

    completely removed down to the metal and the tower repainted.

  • FY2021 CIP Project Narratives Page 19 of 23

    WS2003 – UPDATE THE CITY’S WATER UTILITY MAPPING IN THE GIS

    This project will contract consultants to help update the City’s GIS Utility Information. This

    is a companion project to SP2001 and will provide funding from the Water and Sewer Fund to

    Update the City’s GIS Mapping.

    The City eliminated its in-house (Geographic Information System) GIS Mapping Technician

    in 2016 due to budget constraints. As such the City does not have dedicated staff to update and

    maintain its GIS mapping systems. Additionally much of the City’s utility information within

    the GIS system has never been physically mapped and is based on scans of mapping created in

    the 1970’s to early 1990’s and needs to be properly mapped and georeferenced to the City’s

    aerial photography.

    WS2004 – HELEN STREET WATER TOWER PAINTING

    Repaint the Helen Street Water Tower.

    As part of the operation and maintenance of elevated water storage tanks the exterior and

    interior coating systems will need to replacement. The exterior coating system of the Helen

    Street Water Tower needs to be recoated.

    WS9813 – EAST MAIN STREET WATERMAIN REPLACEMENT – PHASE II (CEDARVIEW

    TO WALL – 1,700 FEET)

    Replace or provide a new water main along East Main Street for 4200± feet. This project is

    scheduled to be constructed in phases: (1). The first project was to relocate the water main at

    Piles Fork Creek to accommodate the bridge widening and replacement which completion was

    in the summer of 2007. (2) Phase I was from Lewis Lane to Piles Fork Creek which was

    completed in 2013. (3) Phase three is from Piles Fork Creek to Wall Street. (4) The final phase

    is from Wall Street to Marion Street. Both permanent and temporary easements may be

    required in some areas.

    This older water main needs to be replaced and/or a new main installed to provide better water

    quality and improved fire protection.

  • FY2021 CIP Project Narratives Page 20 of 23

    WASTEWATER SYSTEMS (WW):

    WW1001 – NW WASTEWATER TREATMENT PLANT NUTRIENT REMOVAL UPGRADES

    The purpose of this project is to Study the existing capabilities of the treatment system to meet

    new nutrient removal requirements, make recommendations for improvements, and design and

    implement the chosen improvements.

    In order to meet forthcoming nutrient removal mandates from the Illinois Environmental

    Protection Agency (IEPA) as well as improve wastewater treatment efficiencies it is necessary

    to review the treatment processes and make needed changes.

    WW1005 – SE WASTEWATER TREATMENT MECHANICAL BAR SCREEN

    The purpose of this project is to replace the existing bar screen at the SEWWTP. The existing

    screen was installed in 2004 and typically has 15 year life span. The existing unit is starting to

    show signs of wear and looks to be nearing the end of its useful life.

    WW1007 – KENT DRIVE LIFT STATION & FORCEMAIN REPLACEMENT

    The purpose of this project is to evaluate the capacity and location of the Kent Drive Lift Station

    and Forcemain, study options for replacement, and design and implement the selected option.

    The Kent Drive Sanitary Sewer Lift Station and Forcemain are nearing capacity and need to be

    evaluated to ensure continued reliability. As the existing lift station is not in an ideal location,

    it is likely that a new lift station will need to be constructed in an alternate location.

    WW1008 – NW WW TREATMENT PLANT PRIMARY CLARIFIER REHABILITATION

    To upgrade plant components of the primary treatment which are more than 30 years old.

    To avoid a major break down in the treatment process, which will cause the plant effluent to

    go out of compliance with the plant’s NPDES permit.

    WW1009 – NWWWTP EFFLUENT PUMP REPLACEMENT

    The purpose of this project is to improve the energy efficiency and reliability of the effluent

    pumps at the NWWWTP. New pumping systems and controls will be designed and

    constructed.

    The effluent pumps at the NWWWTP are aging and highly inefficient, new pumps and variable

    frequency drives (VFD’s) would improve the efficiency of the plant during time of high flow.

    WW1501 – SEWWTP ULTRAVIOLET LIGHT DISINFECTION

    The purpose of this project is to install an ultraviolet disinfection system at the SEWWTP. Due

    to recent changes in the Plant’s NPDES Discharge Permit, the City is required to install

    disinfection to treat the effluent flow from the plant for which was previously exempted for a

    significant period of time.

  • FY2021 CIP Project Narratives Page 21 of 23

    WW1703 – SEWWTP LOGIC CABINET UPGRADES

    This project will provide for the design and construction of new logic cabinets and control

    systems at the SEWWTP. This will help insure plant reliability and operational efficiency. The

    main control systems at the SEWWTP are aging and nearing their “end of life” and in need of

    upgrading/replacement.

    WW1905 – NWWWTP INDUSTRIAL PLANT EFFLUENT GRAVITY FLOW LINE

    This project consist of re-routing the treated effluent flow from the Northwest Wastewater

    Treatment Plant’s (NWWWTP) Industrial Treatment Facility to the Headworks of the

    NWWWTP Domestic Treatment Facility.

    The current routing of the NWWWTP Industrial Treatment Facility routes the treatment

    effluent flow from the NWWWTP Industrial Treatment Facility Final Clarifier to the

    NWWWTP Domestic Treatment Facility Aerobic Basins. It has been discovered from the

    upgrades of the blower system that were completed in 2018, that the pumped treatment effluent

    flow from the NWWWTP Industrial Treatment Facility would affect the efficiency and

    operation of the NWWWTP Domestic Treatment Facility Aeration Basins. Rerouting the

    treated effluent flow of the NWWWTP Industrial Treatment Facility to the Headworks of the

    NWWWTP Domestic Treatment Facility will solve this issue.

    WW2101 – NWWWTP REPLACE PUMPS AND NFD’S AT DOMESTIC INFLUENT PUMP

    STATION

    This project consists of the replacement of the existing pumps and variable frequency drives

    that are part of the domestic influent pump station located at the Northwest Wastewater

    Treatment Plant (NWWWTP).

    The existing domestic influent pumps are nearing the end of their useful life and the City has

    recently had to replace one of the existing pumps due to failure. The remaining three pumps

    are currently operating at 83% of the design capacity and are near their end of the useful

    lifespan. In addition the variable frequency drives VFDs that start the pumps are also the same

    age and are nearing the end of their useful life. There has been recent failures at the NWWWTP

    of the drives of age and model.

    WW2102 - NWWWTP PHOSPHOROUS REDUCTION FEASIBILITY STUDY &

    OPTIMIZATION PLAN

    This project will provide for the preparation of a Phosphorous Reduction Feasibility Study and

    Optimization Plan as required for the National Pollution Discharge Elimination System

    (NPDES) Permit for Northwest Wastewater Treatment Plant (NWWWTP).

    On January 10th, 2020, the City was issued a NPDES permit from the Illinois Environmental

    Protection Agency which permits the discharge of the treated effluent from the NWWWTP

    into Federal and State waters. This new permit has included a list of new special conditions

    that the City must comply with to meet this permit that were not on previous permits. One of

    the special conditions is the preparation and submission of a Feasibility Study that identifies

    the method, timeframe, and costs of reducing phosphorus levels in its discharge to a level

    consistently meeting a potential future effluent limit of 1.0 mg/L, 0.5mg/L and 0.1 mg/L. The

    study shall evaluate the construction and O & M costs of the application of these limits on a

    monthly, seasonal and annual average basis. Another special condition for the permit is the

  • FY2021 CIP Project Narratives Page 22 of 23

    development and submission to the State of a Phosphorous Discharge Optimization Plan. In

    developing the plan, the City is reevaluate a range of measures, operational improvements, and

    minor facility modifications that will optimize reductions in phosphorous discharges from the

    NWWWTP. This project is required for compliance with said permit.

    WW2103 – SEWWTP PHOSPHOROUS REDUCTION FEASIBILITY STUDY &

    OPTIMIZATION PLAN

    This project will provide for the preparation of a Phosphorous Reduction Feasibility Study and

    Optimization Plan as required for the National Pollution Discharge Elimination System

    (NPDES) Permit for Southeast Wastewater Treatment Plant (SEWWTP).

    On January 10th, 2020, the City was issued a NPDES permit from the Illinois Environmental

    Protection Agency which permits the discharge of the treated effluent from the SEWWTP into

    Federal and State waters. This new permit has included a list of new special conditions that

    the City must comply with to meet this permit that were not on previous permits. One of the

    special conditions is the preparation and submission of a Feasibility Study that identifies the

    method, timeframe, and costs of reducing phosphorus levels in its discharge to a level

    consistently meeting a potential future effluent limit of 1.0 mg/L, 0.5mg/L and 0.1 mg/L. The

    study shall evaluate the construction and O & M costs of the application of these limits on a

    monthly, seasonal and annual average basis. Another special condition for the permit is the

    development and submission to the State of a Phosphorous Discharge Optimization Plan. In

    developing the plan, the City is reevaluate a range of measures, operational improvements, and

    minor facility modifications that will optimize reductions in phosphorous discharges from the

    SEWWTP. This project is required for compliance with said permit.

    WW2104 – SEWWTP NUTRIENT ASSESSMENT REDUCTION PLAN

    This project will provide for the preparation of a Nutrient Assessment Reduction Plans as

    required for the National Pollution Discharge Elimination System (NPDES) Permit for

    Southeast Wastewater Treatment Plant (SEWWTP).

    On January 10th, 2020, the City was issued a NPDES permit from the Illinois Environmental

    Protection Agency which permits the discharge of the treated effluent from the SEWWTP into

    Federal and State waters. This new permit has included a list of new special conditions that

    the City must comply with to meet this permit that were not on previous permits. It was stated

    in the permit that SEWWTP facility discharges into a waterbody segment that is at risk for

    eutrophication. It was further stated that the City shall develop, or be part of a watershed group

    that develops a Nutrient Assessment Reduction Plan (NARP). This project is required for

    compliance with said permit.

    WW2105 – NWWWTP NUTRIENT ASSESSMENT REDUCTION PLAN

    This project will provide for the preparation of a Nutrient Assessment Reduction Plans as

    required for the National Pollution Discharge Elimination System (NPDES) Permit for

    Northwest Wastewater Treatment Plant (NWWWTP).

    On January 10th, 2020, the City was issued a NPDES permit from the Illinois Environmental

    Protection Agency which permits the discharge of the treated effluent from the NWWWTP

    into Federal and State waters. This new permit has included a list of new special conditions

    that the City must comply with to meet this permit that were not on previous permits. It was

    stated in the permit that NWWWTP facility discharges into a waterbody segment that is at risk

  • FY2021 CIP Project Narratives Page 23 of 23

    for eutrophication. It was further stated that the City shall develop, or be part of a watershed

    group that develops a Nutrient Assessment Reduction Plan (NARP).

    This project is required for compliance with said permit.

  • FY2021

    5 Year Capital Improvement Program (CIP)

    (FY 2021 thru FY 2025)

    Summary

    and

    Budget Information

  • City of Carbondale Project No: 5 YR SUM

    FY2021 Five-Year Capital Improvement Program (CIP) Project Group: OVERALL CIP SUMMARY

    Revised Date: 03/27/2020

    Revised Time: 10:03:44 AM

    Project Description: TOTAL SUMMARY OF ALL PROJECTS FOR 5 YEAR CIP Prior Years Costs

    Expenditure Year Project Estimated Total Budgeted

    Total Total Cost Actual Prior Years Future Year

    Cost Category Estimated 5 Year FY2021 FY 2022 FY 2023 FY 2024 FY 2025 Thru Cost for Project Obligations

    Cost Cost FY 2019 FY 2020 Cost Not Expended

    Miscellaneous Costs: 0 0 0 0 0

    Preliminary Engineering:

    520 Eng. Svc. Div. 0 0 0 0 0

    521 Contractual 0 0 0 0 0

    Design Engineering

    530 Eng. Svc. Div. 1,584,729 1,000,200 185,500 196,700 187,500 249,500 181,000 399,956 184,573 584,529

    531 Contractual 5,751,888 4,505,500 1,392,000 1,283,500 571,500 707,000 551,500 353,632 892,756 1,246,388

    Resident Engineering

    540 Eng. Svc. Div. 2,152,703 1,549,000 311,500 307,500 348,000 279,000 303,000 441,355 92,348 533,703 70,000

    541 Contractual 482,628 386,000 110,500 57,500 70,000 120,000 28,000 1,628 5,000 6,628 90,000

    Property Acquisition:

    550 Eng. Svc. Div. 0 0 0 0 0

    552 Legal Svc. Div. 5,000 0 0 5,000 5,000

    553 Contractual 54,500 45,000 45,000 0 9,500 9,500

    555 Land Purchase 874,250 575,000 575,000 0 299,250 299,250

    556 Easements 0 0 0 0 0

    558 Relocation 0 0 0 0 0

    Construction:

    560 City Labor & Materials 272,317 10,000 10,000 188,443 73,874 262,317

    565 Contractual 58,010,096 42,882,350 5,406,350 6,243,000 16,038,000 9,365,000 5,830,000 5,856,468 2,447,791 8,304,259 6,823,487

    580 Contingency 615,000 25,000 25,000 90,000 0 90,000 500,000

    595 Capitalized Interest 0 0 0 0 0

    Project Totals: 69,803,111 50,978,050 8,050,850 8,088,200 17,215,000 10,720,500 6,903,500 7,331,482 4,010,092 11,341,574 7,483,487

    Project Funding

    Source Code Division

    FB-SC 47300 0 0 0 0 0

    FB-GR 44007 18,379,843 15,662,682 1,514,600 2,013,582 4,318,500 4,115,500 3,700,500 867,019 638,104 1,505,124 1,212,037

    TF (GF) 44007 0 0 0 0 0

    TF (TIF) 41401 0 0 0 0 0

    TF (TIF) 41501 1,118,000 0 0 0 0 1,118,000

    LGA 0 0 0 0 0

    SA 44007 0 0 0 0 0

    FA 44007 0 0 0 0 0

    LOAN 44007 0 0 0 0 0

    GOB 44007 0 0 0 0 0

    GRANT (Other) 44007 22,932,056 15,477,818 949,900 1,787,918 9,720,000 3,020,000 2,609,235 373,004 2,982,238 4,472,000

    0 0 0 0 0

    0 0 0 0 0

    FB-SC 47150 12,950 10,350 10,350 0 0 0 2,600

    TF (GF) 47150 0 0 0 0 0

    TF (47200) 47150 0 0 0 0 0

    LOAN 47150 0 0 0 0 0

    FB-UR 47044 11,952,749 8,352,200 2,095,000 2,399,700 1,181,000 1,579,500 1,097,000 2,080,077 1,075,472 3,155,549 445,000

    TF (GF) 47044 0 0 0 0 0

    TF (TIF) 47044 0 0 0 0 0

    SA 47044 0 0 0 0 0

    FA 47044 0 0 0 0 0

    LOAN 47044 0 0 0 0 0

    0 0 0 0 0

    FB-UR 47045 12,375,663 9,612,000 2,524,500 1,005,500 1,970,500 2,005,500 2,106,000 1,7