CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020656EXC
2ND and MENAUL INTERSECTION
Emergency valve installation.
04/18/2018 through 04/29/2018
ABCWUA - Paul Sanchez, (505) 289-3546Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
LANE CLOSURE FROM 7:00 PM TO 6:00 AM ONLY
Southbound lane closure on 2nd south of Menaul.
Permit NumberLocationProject
:
:
:
2018020716EXC
ALAMEDA west of LOUISIANA
Widen road.
04/23/2018 through 05/11/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Westbound shoulder closure on Alameda west of Louisiana.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020878EXC
ALAMEDA and SAN MATEO INTERSECTION
Bore fiber.
05/03/2018 through 05/11/2018
KELLY CABLE - James Richardson, (505) 343-1144Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Alameda east of San Mateo. Traffic will bemaintained in the inside lanes.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 1 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020752EXC
CENTRAL From SAN PABLO To MESILLA
Replace two handicap ramps, sidewalk, and curb/gutter.
04/25/2018 through 05/04/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Westbound right lane closure on Central at its intersection with Espanola.Total closure on Espanola at its intersection with Central.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Permit NumberLocationProject
:
:
:
2018020893EXC
CONSTITUTION and GEORGIA INTERSECTION
Repair gas main.
05/03/2018 through 05/11/2018
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details Eastbound closure with eastbound traffic being maintained in the center two way left turn laneon Constitution between Georgia and Illinois.Total street closure on Georgia south of Constitution.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Follow detour
Permit NumberLocationProject
:
:
:
2018019854EXC
8100 CONSTITUTION PL NE
Install bulb-out curbs, wheelchair ramps, and sidewalk.
03/19/2018 through 05/02/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Eastbound and Westbound parking lane and sidewalk closures on Constitution Pl. betweenConstitution and Wyoming.
Contractor may not leave open excavation unattended
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 2 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020855EXC
6725 EDITH NE
Dig out two valve collars
04/29/2018 through 05/14/2018
ABCWUA - Paul Sanchez, (505) 289-3546Contact :
Project Date(s) :
:Details Southbound right lane closure on Edith north of Bear Canyon.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020641EXC
EUBANK From SPAIN To ACADEMY
Place conduit.
04/26/2018 through 05/09/2018
ADB- Royal Harrison, (505) 934-1175Contact :
Project Date(s) :
:Details Northbound right lane and sidewalk closure on Eubank between Spain and Academy. Trafficwill be maintained in the inside left lane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018020766EXC
3809 EUBANK NE
Repair asphalt.
04/30/2018 through 05/01/2018
RODGERS PLUMBING - Norm, (505) 243-9703Contact :
Project Date(s) :
:Details Phase 1: Southbound center lane and left lane closure on Eubank between Pitt and SanGabriel. Traffic will be maintained in the right lane.Phase 2: Southbound right lane closure on Eubank between Pitt and San Gabriel. Traffic will bemaintained in the center and left lanes.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 3 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020041EXC
GIRARD From LOMAS To INDIAN SCHOOL
Replace pavement markings.
03/26/2018 through 05/04/2018
GANDYDANCER LLC - Lupita Pena , (505) 873-2222Contact :
Project Date(s) :
:Details Northbound and southbound lane closure on Girard between Lomas and Indian School usingmobile operation. Two way traffic maintained at all times.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Permit NumberLocationProject
:
:
:
2018020620SE
LOMAS From ALVARADO to LOUISIANA
04/26/2018 through 04/28/2018
NEW MEXICO STATE FAIR- Larry Trujillo, (505) 222-9727Contact :
Project Date(s) :
:Details GATHERING OF NATIONS 2018Eastbound right lane restriction on Lomas between San Pedro and Louisiana to provide accessto Gate 7.Southbound right lane restriction on Louisiana south of Lomas to provide access to Gate 8.All residential streets confined by Lomas, San Pedro, Copper, and Alvarado will be closed tothru traffic.Closures are continuous until event completion.
Permit NumberLocationProject
:
:
:
2018020544EXC
LOMAS From CHELWOOD PARK To EUBANK
Retrofit LED fixtures to streetlights.
04/15/2018 through 05/15/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Phase 1: Eastbound and Westbound lane and sidewalk closure using mobile operation onLomas between Eubank and Chelwood Park.Traffic will be maintained in the inside lanes.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 4 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020666SU
LOMAS From TRAMWAY To EUBANK
Retrofit LED fixtures on streetlights.
04/17/2018 through 05/17/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure using Truck mounted mobileoperation on Lomas between Eubank and Tramway. Traffic will be maintained in the inside lanein both directions.
LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018020559SU
MONTGOMERY and SAN PEDRO INTERSECTION
Place machinery to pave parking lot.
05/03/2018 through 05/03/2018
CUSTOM GRADING INC - Edward Martinez, (505) 897-4225Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Montgomery west of San Pedro extendingsouthbound to right lane closure on San Pedro.
LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018020730EXC
5800 MONTGOMERY BLVD NE
Sidewalk and Drivepad Replacement.
04/25/2018 through 05/04/2018
G & H Construction CO- Rick Hughes, (505) 821-9173Contact :
Project Date(s) :
:Details Eastbound sidewalk closure only on Montgomery between Madiera and San Pedro,continuously until complete
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 5 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020847EXC
MONTGOMERY and PITT INTERSECTION
Nondescript sidewalk, curb and gutter work.
05/02/2018 through 05/02/2018
COA Herman Trujillo (Streets), (505) 764-1505Contact :
Project Date(s) :
:Details Westbound right lane and sidewalk closure on Montgomery west of Pitt. Traffic will bemaintained in the center and left lanes.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020340EXC
5505 OSUNA NE
Emergency meter repair.
03/30/2018 through 04/30/2018
ABCWUA- Fran Smull, (505) 259-3501Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Westbound bike lane and sidewalk closure on Osuna between Seagull and San Mateo.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018020850EXC
MCLEOD southeast of PAN AMERICAN
Install hydrant tie ins.
04/30/2018 through 05/04/2018
FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :
Project Date(s) :
:Details Northbound right lane and sidewalk closure on Mcleod between Jefferson and Pan American.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 6 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020710EXC
6001 SAN MATEO NE
Splice fiber.
05/01/2018 through 05/05/2018
KELLY CABLE- Edwin Abeyta, (505) 974-1602Contact :
Project Date(s) :
:Details Southbound right lane, right turn lane and sidewalk closure on San Mateo north of Osuna.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018019356EXC
SAN PEDRO From GLENDALE To MODESTO
Utility Work
02/20/2018 through 05/04/2018
FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :
Project Date(s) :
:Details Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Total Street closure on San Pedro between Alameda and Florence from 3/20-3/21.
Permit NumberLocationProject
:
:
:
2018020851EXC
SAN PEDRO north of GLENDALE
Adjust storm manhole.
05/01/2018 through 05/01/2018
FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :
Project Date(s) :
:Details Northbound lane closure on San Pedro north of Glendale.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Follow detour
Permit NumberLocationProject
:
:
:
2018020862EXC
STAGECOACH From SOPLO To SAGEBRUSH
Bore power line.
04/30/2018 through 05/02/2018
KELLY CABLE- Saul Vasquez , (505) 343-1144Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 7 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020725EXC
UNIVERSITY From CLAREMONT To MENAUL
Install meter vault and piping.
04/24/2018 through 05/04/2018
ABCWUA - Joshua Doyle, (505) 289-3331Contact :
Project Date(s) :
:Details Southbound double lane closure on University between Claremont and Menaul. Traffic will bemaintained in the inside left lane.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020516EXC
WYOMING and MENAUL INTERSECTION
Replace two streetlights.
04/30/2018 through 04/30/2018
WILSON CONST- Perez Ciddio, (503) 349-7679Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on Wyoming south of Menaul.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 8 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020808EXC
2520 2ND NW
Emergency valve repair.
04/22/2018 through 05/04/2018
ABCWUA - Paul Sanchez, (505) 289-3546Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Southbound right lane closure on 2nd St between Menaul and Prospect. Traffic will bemaintained in the inside lane.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020811EXC
4TH and SUMMER INTERSECTION
Emergency curbstone pull.
04/22/2018 through 05/04/2018
ABCWUA - Paul Sanchez, (505) 289-3546Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Northbound right lane and sidewalk closure on 4th St. north of Summer. Traffic will bemaintained in the inside lane.
Permit NumberLocationProject
:
:
:
2018020883EXC
4TH From VINEYARD To CAMINO ESPANOL
Access manhole.
05/02/2018 through 05/03/2018
CENTURY LINK- Jason Buckner, (505) 264-4073Contact :
Project Date(s) :
:Details Southbound right lane closure on 4th St. between Camino Espanol and Vineyard. Traffic will bemaintained in the inside lane.
LANE CLOSURE FROM 9:00 AM to 3:00 PM ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 9 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020628SE
4TH From CENTRAL To COPPER
05/04/2018 through 05/06/2018
POSH NIGHTCLUB- Gerald Zamora, (505) 721-8589Contact :
Project Date(s) :
:Details CINCO DE MAYO WEEKEND BASH
Total closure of 4th St. between Central Ave and Copper Ave.Follow Detour6PM on 5/4/18 thru 4PM on 5/6/18.
Permit NumberLocationProject
:
:
:
2018020789EXC
1021 4TH NW
Nondescript service repair.
04/20/2018 through 05/03/2018
ABCWUA - Nikhil Lucas Kamat, (505) 289-3536Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Southbound right lane and sidewalk closure on 4th St. between Mountain and Granite.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018019754EXC
BEAR ARROYO TRAIL near CHAPPELL and OSUNA
Repair pedestrian bridge.
03/12/2018 through 04/30/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Bicycle and Pedestrian trail closed on Bridge across North Diversion Channel south of Osuna.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 10 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020901EXC
CANDELARIA and RIO GRANDE INTERSECTION
Pothole utilites.
05/02/2018 through 05/11/2018
COBB FENDLEY Mac Bowen, (505) 264-1531Contact :
Project Date(s) :
:Details Various short duration lane closures at the intersection of Rio Grande and Candelaria.
LANE CLOSURE FROM 9:00 AM to 3:00 PM ONLY
Follow detour
Permit NumberLocationProject
:
:
:
2018020898EXC
1450 CANDELARIA NW
Pull fiber.
04/30/2018 through 04/30/2018
KELLY CABLE - James Richardson, (505) 343-1144Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure on Candelaria west of PanAmerican. Traffic will be maintained in the inside lanes in both directions.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018020886EXC
CENTRAL From 5TH To 6TH
Replace HVAC unit with crane.
05/02/2018 through 05/02/2018
MOUNTAIN STATES CRANE- Doss Gunter, (505) 252-0555Contact :
Project Date(s) :
:Details Total street closure on Central between 5th and 6th.
LANE CLOSURE FROM 4:00 AM TO 7:00 AM ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 11 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020835EXC
COAL From ELM To LEAD
Clean sewer main.
05/01/2018 through 05/03/2018
ABCWUA - Angelo R. Baca, (505) 228-7428Contact :
Project Date(s) :
:Details Eastbound right lane closure on Coal between Elm and Oak. Traffic will be maintained in the leftlane.Northbound right lane closure on Oak between I25 Ramp and Lead.Traffic will be maintained in the left lane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018020745EXC
EAGLE RANCH From COORS To CORRALES MAIN CANAL
Multi-use path construction
04/18/2018 through 06/18/2018
STAR PAVING - Don Edwards , (505) 710-7292Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018020722EXC
EDITH From MONTANO To CANDELARIA
Nondescript Conduit and box work.
04/27/2018 through 05/11/2018
MWI- Christina J. Mahboub, (505) 508-0744Contact :
Project Date(s) :
:Details Northbound right lane and sidewalk closure on Edith between Claremont and Montano. CityJurisdiction is between Claremont and Pope, Industrial and Rankin, Rankin and Comanche.Traffic will be maintained in the inside lane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 12 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020908EXC
area encompassed by GOLF COURSE, WESTSIDE, IRVING, and UNIVERSE
Retrofit LED fixtures to streetlights.
05/04/2018 through 05/25/2018
B & D Industries, Inc. - Richard Yardman, (505) 299-4464Contact :
Project Date(s) :
:Details Right lane and sidewalk closure in both directions on McMahon between Universe and GolfCourse using Mobile operation. Traffic will be maintained in the inside lane in both directions.
Right lane and sidewalk closure in both directions on Irving between Universe and Golf Courseusing Mobile operation. Traffic will be maintained in the inside lane in both directions.
Residential lane and sidewalk closures using Truck Mounted mobile operation in the areaencompassed by Irving in the south, Golf Course in the east, Westside in the north andUniverse in the west.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY FOR RESIDENTIAL AREAS ONLY.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Bicycles Follow the posted detour
Permit NumberLocationProject
:
:
:
2018020712EXC
LEAD From ARNO To 2ND
Patch and repair bridge deck.
04/23/2018 through 05/11/2018
HASSE CONTRACTING CO- Leroy Molina, (505) 242-9226Contact :
Project Date(s) :
:Details Phase 1: Westbound left lane and sidewalk closure on Lead between Arno and 2nd St. Trafficwill be maintained in the right lane.Phase 2: Eastbound right lane and sidewalk closure on Lead between Arno and 2nd. Traffic willbe maintained in the left lane.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 13 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020399EXC
LOCUST and CENTRAL INTERSECTION
After the fact U-turn loop cut.
04/05/2018 through 05/03/2018
BRADBURY STAMM- Enrique Torres, (505) 249-7967Contact :
Project Date(s) :
:Details Eastbound U turn lane closure only on Central at Locust.
Barricades will remain in place continuously for this project and work will generally take placebetween 7:00 AM and 5:00 PM Monday-Friday, unless otherwise specified
Permit NumberLocationProject
:
:
:
2018020830EXC
LOMAS From 2ND To EDITH
Adjust manholes.
04/27/2018 through 04/30/2018
GANDYDANCER LLC - Lupita Pena , (505) 873-2222Contact :
Project Date(s) :
:Details Westbound right lane, center lane and sidewalk closure on Lomas between Railroad tracks and2nd St. Traffic will be maintained in the inside left lane.Northbound right lane closure on 2nd St. south of Lomas. Traffic will be maintained in the leftlane.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020568EXC
MENAUL From 2ND To TRAMWAY
Retrofit LED fixtures to streetlights.
04/13/2018 through 05/13/2018
BIXBY- Chris Perez, (505) 366-4660Contact :
Project Date(s) :
:Details Eastbound and Westbound lane and sidewalk closure using mobile operation on Menaulbetween 2nd St. and Tramway. Traffic will be maintained in the inside lanes in both directions.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 14 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020480EXC
RIO GRANDE From FLORAL To MOUNTAIN
Bore fiber.
04/16/2018 through 05/07/2018
MWI- Christina J. Mahboub, (505) 508-0744Contact :
Project Date(s) :
:Details Northbound right lane, bike lane and sidewalk closure on Rio Grande between Mountain andFloral.Closure will be in the increments of 1600' maximum. Traffic will be maintained in the insidelane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018020839EXC
RIO GRANDE and BELLAMAH INTERSECTION
Emergency valve repair.
04/23/2018 through 04/30/2018
ABCWUA - Ron Vigil, (505) 289-3583Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Eastbound right lane closure on Bellamah east of Rio Grande.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020736EXC
TIERRA PINTADA From STORMCLOUD To ARROYO VISTA
Install irrigation system, trees, and shrubbery in median and easment.
04/23/2018 through 05/30/2018
WESTWIND LANDSCAPE- Alicia Peterson, (505) 881-8925Contact :
Project Date(s) :
:Details Phase 1: Inside lane closures on Tierra Pintada between Mirehaven and Stormcloud.Phase 2: Inside lane closure on Tierra Pintada between Storm cloud and Arroyo Vista.Traffic will be maintained in outside lane in both directions.Phase 3: Southbound right lane and sidewalk closure on Tierra Pintada between Mirehaven andArroyo Vista.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 15 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020902EXC
WESTSIDE west of GOLF COURSE
Bore service lines.
04/30/2018 through 05/11/2018
FRANKLINS - Jeff Armstrong, (505) 234-1722Contact :
Project Date(s) :
:Details Westbound bike lane closure on Westside west of Golf Course.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Bicycles Follow the posted detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 16 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018019945EXC
CENTRAL From UNIVERSITY To STANFORD
ART- PUNCH LIST.
03/15/2018 through 05/31/2018
BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure on Central between University andStanford as per needed basis.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Intermittent lane closures due to roadway paving. Be prepared to stop
Permit NumberLocationProject
:
:
:
2018020857EXC
CENTRAL From WELLESLEY To HERMOSA
Replace cable.
04/30/2018 through 05/04/2018
KELLY CABLE - James Richardson, (505) 343-1144Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Central between Wellesley and Hermosa. Trafficwill be maintained in the left lane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018019946EXC
CENTRAL From MONROE To SAN MATEO
ART - PUNCH LIST.
03/15/2018 through 05/31/2018
BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure on Central between Monroe andSan Mateo as per needed basis.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Intermittent lane closures due to roadway paving. Be prepared to stop
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 17 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018019944EXC
CENTRAL From ALVARADO To SAN PEDRO
ART - PUNCH LIST.
03/15/2018 through 05/31/2018
BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closures on Central between Alvarado andSan Pedro as per needed basis.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Intermittent lane closures due to roadway paving. Be prepared to stop
Permit NumberLocationProject
:
:
:
2018020288EXC
CENTRAL From SAN PEDRO To LOUISIANA
ART: Punch List Work
03/28/2018 through 05/31/2018
BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :
Project Date(s) :
:Details Eastbound and westbound right lane and sidewalk closure on Central Ave between San PedroDr. and Louisiana Blvd. Traffic will be reduced to one lane and on-street parking will remainavailable.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018019607EXC
CENTRAL From MONTCLAIRE To SIERRA
Pour concrete and place steel.
03/01/2018 through 07/06/2018
KLINGER CONSTRUCTORS - Brent Callahan , (505) 980-1552Contact :
Project Date(s) :
:Details Eastbound lane closure on Central west of Montclaire. Traffic will be maintained in the ART buslane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 18 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018019943EXC
CENTRAL From SAN MATEO To ALVARADO
ART - PUNCH LIST.
03/15/2018 through 05/31/2018
BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure on Central between San Mateo andAlvarado as per needed basis.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Intermittent lane closures due to roadway paving. Be prepared to stop
Permit NumberLocationProject
:
:
:
2018020872EXC
13140 CENTRAL SE
Pull fiber.
05/02/2018 through 05/03/2018
KELLY CABLE - James Richardson, (505) 343-1144Contact :
Project Date(s) :
:Details Eastbound sidewalk and left turn lane to Shopping Center closure on Central just west ofTramway.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018020831EXC
GIBSON behind address, east of YALE
Nondescript inlet repair.
04/25/2018 through 05/01/2018
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Westbound right lane, bike lane and sidewalk closure on Gibson between Girard and Yale.Traffic will be maintained in the center and left lanes.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 19 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020795EXC
401 EUBANK SE
Bore Fiber to Address.
05/01/2018 through 05/04/2018
KELLY CABLE - James Richardson, (505) 343-1144Contact :
Project Date(s) :
:Details Eastbound lane closure with eastbound traffic being maintained in the westbound left lane onBell west of Eubank extending south on Eubank to sidewalk and right lane closure. Traffic onEubank will be maintained in the inside left lane.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018020335EXC
GEORGE From UNIVERSITY To YALE
Line ditches.
04/02/2018 through 05/04/2018
ARMOUR PAVEMENT- Samuel Marshall, (505) 239-7795Contact :
Project Date(s) :
:Details Phase 1: Westbound lane closure with westbound traffic being maintained in the center laneand partially in eastbound left lane on George between Yale and University.Phase 2: Eastbound total closure with eastbound traffic being maintained in the eastboundinside lane on George between University and Yale.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020483EXC
CENTRAL From GIRARD To CARLISLE
Punch List.
04/09/2018 through 05/31/2018
BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Eastbound right lane and sidewalk closure. ADA accessible pedestrian access must bemaintained.
West bound right lane and sidewalk closures. ADA accessible pedestrian access must bemaintained.
Closure on Central between Girard and Carlisle.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 20 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2018020609EXC
LOMAS From SAN PEDRO To VIRGINIA
Place conduit.
04/23/2018 through 05/08/2018
ADB- Royal Harrison, (505) 934-1175Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Lomas between San Pedro and Virginia.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Permit NumberLocationProject
:
:
:
2018020823EXC
SAN MATEO and CENTRAL INTERSECTION
Retire damaged gas service.
04/30/2018 through 05/11/2018
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure on Central east and west of San Mateo. Traffic willbe maintained in the inside lane.
LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY
Permit NumberLocationProject
:
:
:
2018020786EXC
UNIVERSITY From INDIAN SCHOOL To I40 EASTBOUND
Resurface road and mill curb.
04/25/2018 through 05/11/2018
CUTLER REPAVING - Douglas Cutler , (505) 350-3983Contact :
Project Date(s) :
:Details Phase I: Northbound double lane closure on University Blvd between I40 and Indian School Rd.NB traffic will be reduced to one lane and will shift to the center turn lane.Phase II: Southbound double lane closure on University Blvd between I40 and Indian SchoolRd. SB traffic will be reduced to one lane and will shift to the center turn lane.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 21 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2017012999EXC
1ST From COPPER To CENTRAL
Install precast and structural steel.
05/01/2017 through 05/01/2018
KLINGER CONST- Adam Leyba, (505) 379-0249Contact :
Project Date(s) :
:Details Total closure of 1st St. between Central Ave and Copper Ave.
Closures are continuous until construction is complete
Follow detour
Permit NumberLocationProject
:
:
:
2018020080SE
ATLANTIC From 8TH To 10TH
05/06/2018 through 05/06/2018
NEW MEXICO BIOPARK SOCIETY- Taylor Pellegrini, (505) 764-6227Contact :
Project Date(s) :
:Details RUN FOR THE ZOO 2018
Various outside lane closures and intermittent traffic control along various streets andintersections throughout the Barelas Neighborhood (near ABQ Biopark Zoo). Expect delays onBridge Blvd, 8th St., Tingley Dr., and the Paseo Del Bosque Trail.6AM to 2PMUSE EXTREME CAUTION AND WATCH FOR PEDESTRIANS!
Permit NumberLocationProject
:
:
:
2018020882EXC
ATRISCO From DRAXTON To SAN SAULO
Nondescript boring activity.
05/01/2018 through 05/07/2018
M3 COMMUNICATIONS LLC - Roberto Magana , (505) 977-2205Contact :
Project Date(s) :
:Details Southbound sidewalk closure and lane closure using flagging operation on Atrisco betweenDraxton and San Saulo.
LANE CLOSURE FROM 9:00 AM to 3:00 PM ONLY
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 22 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020869EXC
BLAKE and UNSER INTERSECTION
Install power pole to clear traffic signal.
05/02/2018 through 05/02/2018
WILSON CONSTRUCTION COMPANY - Russel Lacy , (505) 347-0435Contact :
Project Date(s) :
:Details Westbound right lane, bike lane and sidewalk closure with westbound traffic being maintained inthe center two way left turn lane on Blake west of Unser.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020870EXC
CENTRAL and UNSER INTERSECTION
Maintain power poles.
05/03/2018 through 05/03/2018
WILSON CONST- Perez Ciddio, (503) 349-7679Contact :
Project Date(s) :
:Details Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Sidewalk closure only on Central west of Unser, continuously until complete
Permit NumberLocationProject
:
:
:
2018020896EXC
CENTRAL and EDITH INTERSECTION
Replace ADA ramp.
04/27/2018 through 05/11/2018
BRADBURY STAMM- Enrique Torres, (505) 249-7967Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
West bound right lane and sidewalk closure on Central west of Edith. ADA accessiblepedestrian access must be maintained.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 23 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020818EXC
CENTRAL and TINGLEY INTERSECTION
Emergency dangerous manhole repair.
04/23/2018 through 05/04/2018
ABCWUA- Felimon Martinez, (505) 977-1265Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020833SU
COAL From 8TH To 9TH
Set Up Crane in Streets to Access building.
05/02/2018 through 05/02/2018
TRAVERS MECHANICAL- Mike Youngman, (505) 604-3315Contact :
Project Date(s) :
:Details Total street closure on Coal between 8th and 9th.
LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY
Follow Detour
Permit NumberLocationProject
:
:
:
2018020905EXC
COAL From 2ND To BROADWAY
Repair bridge deck and joints.
05/01/2018 through 05/11/2018
HASSE CONTRACTING CO- Leroy Molina, (505) 242-9226Contact :
Project Date(s) :
:Details Pahse 1: Eastbound right lane and sidewalk closure on Coal between 2nd St. and Broadway.Traffic will be maintained in the center and left lane.Pahse 2: Eastbound left lane and sidewalk closure on Coal between 2nd St. and Broadway.Traffic will be maintained in the center and right lane.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 24 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2018020592EXC
COAL From 4TH To 5TH
Remove sidewalk.
04/16/2018 through 07/23/2018
CUSTOM GRADING INC - Edward Martinez, (505) 897-4225Contact :
Project Date(s) :
:Details Eastbound sidewalk closure on Coal between 5th and 4th extending south to sidewalk closureon 4th between Coal and alley.Southbound parking lane closure on 4th between Coal and alley to accommodate temporarypedestrian access.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2018020827SE
424 GOLD AV
Event barricading
05/01/2018 through 05/01/2018
CHRISTIAN DIAZ DE BEDOYA, (505) 227-2700Contact :
Project Date(s) :
:Details Westbound lane closure on Silver Ave between 5th St. and 4th St.Follow Detour.7AM to 7PM
Permit NumberLocationProject
:
:
:
2018020720EXC
OLD COORS From GONZALES To BRIDGE
Nondescript conduit and box work.
04/20/2018 through 05/03/2018
MWI- Christina J. Mahboub, (505) 508-0744Contact :
Project Date(s) :
:Details Southbound right lane, bike lane and sidewalk closure on Old Coors between Gonzales andBridge. Traffic will be maintained in the left lane.
LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, April 27 2018Page 25 of 26
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 28-Apr-18 through 06-May-18
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2017013032EXC
800 SILVER SW
Barricade to provide site access and building construction
04/20/2017 through 05/20/2018
BRADBURY STAMM CONSTRUCTION- Adam Rael, (505) 998-9950Contact :
Project Date(s) :
:Details Sidewalk closures: On eastbound sSlver Ave from 9th St. to 8th St., On northbound 9th St. fromalley to Silver Ave, and on southbound 8th St. from Silver Ave to alley.
Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete