City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan Separate Our Sewers Save Our Streams Ohio OWEA Collection Systems Workshop Patrick Gsellman Genny Hanna Jim Hall Thursday, May 9, 2013 SOS

Transcript of City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River...

Page 1: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

City of Akron

Combined Sewer Overflow (CSO)

Long Term Control Plan

Separate Our Sewers

Save Our Streams

Ohio OWEA

Collection Systems Workshop

Patrick Gsellman

Genny Hanna

Jim Hall

Thursday, May 9, 2013

SOS

Page 2: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

AGENDA

City of Akron CSO LTCP Update

• Patrick Gsellman, PE, WW3

• Environmental Division Manager

Sewer Separation Projects: Design

• Genny Hanna, PE

• Project Manager, Senior Engineer

Sewer Separation Projects: Construction

• Jim Hall, PE

• Project Manager, Civil III

Questions

CSO Program Management Team Page 2

Page 3: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

City of Akron CSO LTCP Update

Benefits

– Cuyahoga River

– Water Quality

Federal Consent Decree Elements

CSO Long Term Control Plan

CSO Program Management Team Page 3

Page 4: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Cuyahoga River

Watershed Water Quality

CSO Program Management Team Page 4

POTW IMPROVEMENTS

WPCS Improvements

Elimination of Sanitary Sewer

Overflows

Implementation of Industrial

Pretreatment

Implementation of Combined

Sewer Overflow Nine Minimum

Controls

Rack Modifications

Maintenance/Inspection

Cuyahoga Street Storage Facility

(CSSF - CSO Rack 40)

Page 5: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Program Management Team Page 5

Reduction in Events, Hours and Volume of CSO

NO UNTREATED OVERFLOWS IN TYPICAL YEAR

Elimination of Overflows to the Ohio Canal

Biological Treatment of ALL WPCS Secondary

Bypass

Reduction in Mud Run Pump Station Overflows

Improved Operation and Maintenance of the Sewer

System

Supplemental Environmental Project (St Rt 82 Dam)

Benefits - Specific/Measurable

Page 6: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Program Management Team Page 6

Improved Water Quality (Chemical)

– Bacteria Reductions

– Solids Reductions

– Nutrient Reductions

– Reduction in Dissolved Oxygen Depletion

Improved Water Quality (Biological)

– Improved Fish Habitats

Improved Water Quality (Recreational)

– Bacteria Reductions

Benefits - Water Quality

Page 7: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Program Management Team Page 7

Compliance with CSO Policy provisions in the

Clean Water Act and furthering the goals of the

Cuyahoga River TMDL and RAP

Increased Recreation Opportunities in Akron

and Cuyahoga Valley National Park (Southern

Gateway)

Coordinated Activities with Ohio Canal and

Towpath and Possible Water Trail

Economic Development Potential Related to

Tourism and Natural Resource

Quality of Life Issues

Engineering and Construction Jobs

Money into the Local Economy

Benefits

Page 8: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Consent Decree Elements

SPECIFIC

ACTION

PROJECTS

CSO AND WPCS

CONTROL

MEASURES

CMOM, FOG

AND

EMERGENCY

RESPONSE

MUD RUN

PUMPING

STATION

Upgrade

WPCS to

130mgd

Separation

Projects (8,

25,21, 30 &

13)

Long Term Control

Plan Update and

Report

Program

Development

and

Implementation

Pump

Station

and

Collection

System

Study

CD: Complete all projects by October 15th, 2028

LTCP Update : October 31, 2027

CSO Program Management Team Page 8

Page 9: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Sewer Separation Projects Design

Rack 8 – Construction Complete

Rack 25 – Construction Complete

Rack 21 – Design Underway

Rack 30 - Design Underway

Rack 13 - Design Underway

CSO Program Management Team Page 9

Page 10: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Sewer Separation Drainage Areas

CSO Program Management Team Page 10

N

30

25

21 13

8

Page 11: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack Structures

CSO Program Management Team Page 11

Page 12: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Outlet Structures

CSO Program Management Team Page 12

Page 13: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 25 Sewer Separation Design

CSO Rack 25

• Located North of Downtown Akron

• Rack Located in a Manhole in Bass Avenue

• Overflowed to Little Cuyahoga River

CSO Program Management Team Page 13

Page 14: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 25 Sewer Separation Design

Pre-Design Work

• Researched Record Information

• Televised Existing Sewers

• Performed Smoke Testing

• Completed Flow Calculations

CSO Program Management Team Page 14

Page 15: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 25 Sewer Separation Design

Proposed Improvements

• New 8 inch sanitary sewer ( 3,500 feet)

• Existing combined sewer became the storm sewer

• Reconstruct 8 inch water main ( 1,300 feet)

CSO Program Management Team Page 15

Page 16: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 25 Sewer Separation Design

Design Challenges

• Steep Slopes

• Existing Utility Locations

• Land Acquisition

CSO Program Management Team Page 16

Page 17: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 8 Sewer Separation Design

CSO Rack 8

• Located Southeast of Downtown Akron

• Rack Located near Case Avenue and Kent Street

• Overflowed to Little Cuyahoga River

CSO Program Management Team Page 17

Page 18: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 8 Sewer Separation Design

Proposed Improvements

• New 8-15 inch Sanitary Sewer ( 5,000 feet)

• New 12-36 inch Storm Sewer ( 1,100 feet)

• Reconstruct 8-inch to 36-inch Sanitary and Storm Sewer with CIPP Lining ( 4,000 feet)

CSO Program Management Team Page 18

Page 19: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 8 Sewer Separation Design

Design Challenges

• Availability of Underground Record Information

• Accelerated Design Schedule

• Existing Utility Locations

• Coordination with Railroad

CSO Program Management Team Page 19

Page 20: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Sewer Separation Projects Construction

CSO Rack 25 Sewer Separation

Bid: 8/23/2011, Start: 12/6/2011, Finish: 11/9/2012

Time extension of 134 days (work in easement)

$ 1,159,000 Engineer’s Estimate

$ 965,000 Low Bid (-16.8%)

$ 1,060,500 Final Cost (-8.5%)

Additional work for existing sewer repairs

(project design began in 2004 – old CCTV

information) and easement restoration costs.

CSO Program Management Team Page 20

Page 21: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Sewer Separation Projects Construction

CSO Rack 8 Sewer Separation

Bid: 10/20/2011, Start: 1/9/2012, Finish: 10/4/2012

No time extensions

$ 2,839,000 Engineer’s Estimate

$ 1,995,000 Low Bid (-32.9%)

$ 2,096,000 Final Cost (-26.2%)

Additional work: existing lateral investigations

and connections on Case Avenue (shallow

rock), existing underground utilities (different

locations), and surface restorations on Dublin

Street, Roger Avenue, and Fulton Street.

CSO Program Management Team Page 21

Page 22: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 25 Sewer Separation

CSO Program Management Team Page 22

Page 23: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 25 Sewer Separation

CSO Program Management Team Page 23

Page 24: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 8 Sewer Separation

CSO Program Management Team Page 24

Page 25: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Rack 8 Sewer Separation

CSO Program Management Team Page 25

Page 26: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

CSO Program Management Team Page 26

Commissioning & Handover

Page 27: City of Akron Combined Sewer Overflow (CSO) Long Term … · 2013-05-15 · –Cuyahoga River –Water Quality ... Increased Recreation Opportunities in Akron and Cuyahoga Valley

Page 27

CSO Program Website

(www.akroncso.com)

330-375-2355

City of Akron Website

(www.akronohio.gov)

SOS

Separate Our Sewers

Save Our Streams

City of Akron CSO LTCP Update

• Pat Gsellman

[email protected]

Sewer Separation Projects: Design

• Genny Hanna

[email protected]

Sewer Separation Projects: Construction

• Jim Hall

[email protected]