City Council July 12, 2011 Finance Presentation
-
Upload
city-of-san-angelo-texas -
Category
News & Politics
-
view
405 -
download
2
description
Transcript of City Council July 12, 2011 Finance Presentation
Budget DiscussionJuly 12, 2011
Calendar
Water Rates
Franchise Fees
Benchmark Cities Franchise Fees
Abilene 5%Midland 5%-6%Odessa 5%Wichita Falls 5%
Franchise Fees
Impact of 5%
Gas $247,437Refuse Collection 75,000Cable -0-Water 192,410Wastewater 115,560
$630,407
Franchise Fees
Impact of 6%
Gas $494,874Refuse Collection 150,000Cable 225,000Water 384,820Wastewater 231,120
$1,485,814
Summary of Submitted Projects Competing for General Fund Capital
Project Type Number of Projects
Project Cost
Equipment 3 560,687Facility – Buildings,etc. 24 38,487,071Facility – Parks & Recreation 15 7,489,000Pedestrian 3 3,030,000Stormwater Quantity 26 54,568,925Streets/Traffic 66 158,298,708Technology 7 3,295,696Water/Wastewater 1 225,000
145 $ 265,955,087
Landfill
Calendar
OtherBudget Reviews
Purchasing Research uniform cleaning servicePurchasing Research standardization policyPlanning Present new fee structureParks Remove playground equipment, mow less frequentlyRecreation Present revenue, expense and cost per participant for
youth, adult and senior programsHealth Admin Reorg implemented to better utilize grantsPolice Minimize overtime by using Wednesday activity daysWIC Co-locate WIC and Nursing divisionsStormwater Research procedure for tree trimmingWater Charge franchise fee to user
OtherBudget Reviews
Customer Svc Implemented changes in manpower, cross training and standard operating procedures
Customer Svc Savings due to reorg with Water ConservationWater Engineering
Savings due to reorg with Utility Maintenance
Water Engineering
Research charging staff time and o&m to capital projects
Water Conservation
Drought level 1 increases workload
Twin Buttes Need $1 million for Lake Nasworthy dam gateLake Operations
Installing pipe rail fencing will reduce illegal dumping
OtherBudget Reviews
Water Production Research certification payWater Production Research harder pricing on carbon filtersWater Quality Lab Discuss impact of Hickory supply project to
operating budgetWater Distribution Demonstrate valve operating rig for City CouncilWater Distribution Implemented more efficient routes, crew, planning
and vehicle replacementWater Distribution Cross-training program unsuccessful due to
attritionWater Distribution Upgrade laptops to process work orders in fieldWater Distribution Work with TCEQ to conduct training locally
OtherBudget Reviews
Water Distribution Better inventory controlWater Distribution Address employee turnoverUtility Maintenance
Propose solution for sewer grinders at lake lots
Utility Maintenance
Employee retention
Utility Maintenance
Standardized equipment
Utility Maintenance
Savings due to reorg with Water Engineering
Wastewater Collection
Cross train with Water Distribution, Spread on-call duty across both divisions
OtherBudget Reviews
Vehicle Maintenance
Need to find a balance for equipment
Vehicle Maintenance
Look at managed competition
Health Insurance Bid out and reinstate employee assistance program
Workers Comp Fund safety camerasCivic Events Research credit card fee city wideFort Concho Relieve General Fund by using Hotel Occupancy
Tax for eligible divisionsCemetery Research selling steel vaults
Other• CIP data
Calendar