Citec Oil Gas References

4
Citec Oy Ab Head off ice: P. O. Box 109, FI-65101 Vaasa, Finland Tel. +358 6 3240 700 www.citec.com Citec Norway AS Post Box 231, 1379 Nesbru, Norway Tel. +47 90 88 77 48 www.citec.com Project Y ear Scope of work Company FSRU Höegh Gallant 2014 Interface Engineering Structural and Piping Höegh LNG FSRU Höegh Gallant 2014 Area Engineering for Regasication Module Wärtsilä O&GS Aje FEED 2014 Process work and verications - upgrade FPSO Front Pufn Rubicon Åsgard 2014 T opside manifold - Process Engineering IKM GDF Suez Neptune 2014 LNG Booster Pump Skid Wär tsilä O&GS Mariner 2013 High Pressure Nitrogen Compressor Skid; Project Management & Detail Eng. Inmaco Gina Krog 2013 High Pressure Nitrogen Compressor Skid; Project Management & Detail Eng. Inmaco Generic 2013 - 2014 Optimalization studies Wär tsilä Bream 2013 Layout & Weight Study Premier Oil Heimdal 2013 Compressed air Skid; Project Management & Detail Eng. Granzow Dhirubhai 1 2013 Wet Gas Boosting Study Aker Floating Prod Dhirubhai 1 2012 - 2013 Gas Injection Through Riser Study Aker Floating Prod Petroleo Nautipa FPSO 2012 - 2014 FPSO upgrade (Fuel Gas Package, Etame/ Seent Tie in, MEG skid, etc) Fred Olsen Filanovski 2012 Conceptual Engineering Compression Modules Siemens       0       8       /       2       0       1       4  Citec Oil & Gas References  R  E  F   C a r d  CI  T  E  C  CU  S  T  OM  E  R  R  E  F  E  R  EN  C  E

Transcript of Citec Oil Gas References

Page 1: Citec Oil Gas References

8/10/2019 Citec Oil Gas References

http://slidepdf.com/reader/full/citec-oil-gas-references 1/4

Citec Oy Ab

Head off ice: P.O. Box 109, FI-65101 Vaasa, Finland

Tel. +358 6 3240 700

www.citec.com

Citec Norway AS

Post Box 231, 1379 Nesbru, Norway 

Tel. +47 90 88 77 48

www.citec.com

Project Year Scope of work CompanyFSRU Höegh Gallant 2014 Interface Engineering Structural and Piping Höegh LNG

FSRU Höegh Gallant 2014 Area Engineering for Regasification Module Wärtsilä O&GS

Aje FEED 2014 Process work and verifications - upgrade FPSO Front

Puffin

Rubicon

Åsgard 2014 Topside manifold - Process Engineering IKM

GDF Suez Neptune 2014 LNG Booster Pump Skid Wärtsilä O&GS

Mariner 2013 High Pressure Nitrogen Compressor Skid; Project

Management & Detail Eng.

Inmaco

Gina Krog 2013 High Pressure Nitrogen Compressor Skid; Project

Management & Detail Eng.

Inmaco

Generic 2013 -

2014

Optimalization studies Wärtsilä

Bream 2013 Layout & Weight Study Premier Oil

Heimdal 2013 Compressed air Skid; Project Management & Detail

Eng.

Granzow

Dhirubhai 1 2013 Wet Gas Boosting Study Aker Floating Prod

Dhirubhai 1 2012 -

2013

Gas Injection Through Riser Study Aker Floating Prod

Petroleo Nautipa FPSO 2012 -

2014

FPSO upgrade (Fuel Gas Package, Etame/Seent Tie

in, MEG skid, etc)

Fred Olsen

Filanovski 2012 Conceptual Engineering Compression Modules Siemens

      0      8      /      2      0      1      4

 Citec Oil & Gas References

 R E F  Card CI T E C  CU

 S T OM E R  R E F E R EN

 C E

Page 2: Citec Oil Gas References

8/10/2019 Citec Oil Gas References

http://slidepdf.com/reader/full/citec-oil-gas-references 2/4

 R E F  Card CI T E C  CU

 S T OM E R  R E F E R EN

 C E 

Citec Oy Ab

Head off ice: P.O. Box 109, FI-65101 Vaasa, FinlandTel. +358 6 3240 700www.citec.com

Citec Norway AS

Post Box 231, 1379 Nesbru, NorwayTel. +47 90 88 77 48www.citec.com

 Citec Oil & Gas References

Project Year Scope of work Company

BW Pioneer 2012 Cost study for Banda Tie-In BW Offshore

Höegh LNG’s Generic FSRU’s 2011 -

2013

Area Engineering for Regasification Modules for

Höegh LNG (4 modules for FSRU’s to Indonesia,

Lithuania and Chile)

Hamworthy

Sendje Berge/ Okwori 2011 FEED Study - Multidiscipline Conceptual Engineering

of an Upgrade for Future Tie-ins.

BW Offshore

Concept 2011 -

2012

Concept study Floating Storage Regas and Power

Unit

Golar

Okwori 2011 Life Extension Study Sendje Berge BW Offshore

Knock Adoon 2011 Water Injection Reliability Study Fred.Olsen

Regas JRU Melaka 2011 -

2012

Detail Engineering Layout & Structural Hamworthy

Ekofisk LQ 2011 Detail Engineering Potable Hot Water Service

Package

Parat Halvorsen

Thermal Storage Tank Designing 2011 Engineering services for equipment designing MIS Kuwait

BS 171 - New Booster Station 2010 -

2011

Structural and foundation designing for

piperack PR5 and PR6

Saipem India

FSRU Khannur - West Java 2010 -

2011

Layout Detail Engineering of Floating Storage

Regasification Unit & LP Booster Pump Skid

Wasco

Okwori 2010 -

2011

Debottleneck study Sendje Berge BW Offshore

Gorgon 2010 -

2011

Detail Engineering Cooling Water Skid Parat/ Eptec

P-63 Papa Terra 2010 -

2011

M81/82 Utility and Heating & Cooling Medium

Modules - Engineering & eRoom Support

Prosimus/ Wasco

Ivar Aasen (Draupne/ Hanz) 2010 -

2011

Studies, process simulation, concept preparations,

Water Injection study

Det norske

ADCOP 2010 Multidiscipline Engineering C&J Engineering

Integrated Gas Development Habshan-5

Process Plant Project

2010 Saddle Calculation Adyard

QAPCO 2010 Concrete & Steel Structural design UDHE India

Pradip Refinery 2010 Structural designing for Equipment

supporting system

Toyo Engineering

Page 3: Citec Oil Gas References

8/10/2019 Citec Oil Gas References

http://slidepdf.com/reader/full/citec-oil-gas-references 3/4

 R E F  Card CI T E C  CU

 S T OM E R  R E F E R EN

 C E 

Citec Oy Ab

Head off ice: P.O. Box 109, FI-65101 Vaasa, FinlandTel. +358 6 3240 700www.citec.com

Citec Norway AS

Post Box 231, 1379 Nesbru, NorwayTel. +47 90 88 77 48www.citec.com

 Citec Oil & Gas References

Project Year Scope of work Company

QAPCO 2010 Designing in PDMS for Civil Scope UDHE India

GPC ChemOil 2010 Pre-Bid Engineering for Storage Tanks Topaz

GASCO 2010 Designing verification for Hydrogenation reactor Topaz

Hejre 2010 Concept Selection Verification Bayerngas

ICOL Paradip Refinery 2009 Pre-bid engineering for electrical IOCL

Qatar Petroleum 2009 Pre-bid engineering for tanks Petroserv Limited

Ebla Refinery 2009 Piping arrangement & Layouts Petrofac

Aker Smart 1 - Reliance 2009 Flare modifications + Increased export gas capacity

+ Increased Design temp

Aker Floating Prod

Takreer Refinery 2008 Piping & Instrumentation Adyard Shipyard

Essar Oil 2008 Multi-Discipline –FCCU Unit Multinational EPC

Contractor

Cascade & Chinook - Water 2008 -

2009

Detail Engineering for Cooling Medium and Water

Treatment Module (M11)

BW Offshore

Golar Freeze 2008 -

2011

Vent calculations and document control Golar

Tupi TLD FPSO/ Cidade de São Vicente 2008 -

2009

Detail engineering and fabrication of new Utility

Module (M71) and modification of existing Topside

Design

BW Offshore

Cascade & Chinook - Utility 2008 Detail Engineering for Subsea Utility Module (M71),

LER Module (M41), Water Skid (M11) and System

Engineering

BW Offshore

Hasdrubal Refinery 2007 Piping arrangement & Layouts Petrofac

Golar Spirit 2007 -2008

Engineering Mechanical Packages & Piping Golar

Golar Winter 2007 -

2008

Vent calculations / utility assistance/ piping &

valves engineering

Golar

Cascade & Chinook - Power 2007 -

2008

Detail Engineering for Power Module (M90) BW Offshore

Cascade & Chinook 2007 -

2011

Project Management BW Offshore

Page 4: Citec Oil Gas References

8/10/2019 Citec Oil Gas References

http://slidepdf.com/reader/full/citec-oil-gas-references 4/4

 R E F  Card CI T E C  CU

 S T OM E R  R E F E R EN

 C E 

Citec Oy Ab

Head off ice: P.O. Box 109, FI-65101 Vaasa, FinlandTel. +358 6 3240 700www.citec.com

Citec Norway AS

Post Box 231, 1379 Nesbru, NorwayTel. +47 90 88 77 48www.citec.com

 Citec Oil & Gas References

Project Year Scope of work Company

Deep Producer 2007 -

2008

Design M40 Manifold Module FPSOcean

Deep Producer 2007 FEED Study - Multidiscipline Conceptual Engineering

of Process Plant

FPSOcean

Aker Smart 1 - Reliance 2007 -

2008

Module Integration Team for AFP (interface,

simulations, flare, controls, etc) + Detail Engineering

of Topside Pipe Rack

Aker FP

Ormen Lange 2006 Steel structure design Vetco Aibel

FPSO East Fortune 2006 -

2007

Conceptual design of Topside Pipe Rack Nor techs/ Songa

Deep Producer 2006 Conceptual study work FPSOcean

Bilabri FPSO 2006 -

2007

Detail engineering of modified Topside Design BW Offshore

Ormen Lange 2005 Stress analysis, Pipe support design

Structural calculations, design & coordinatio

Aker Kvaerner

Engineering, India

Kashagan Refinery 2004 Steel design Reinertsen Engineering

Valero Refinery Company, Texas 2003 Steel design Prothius Engineering

Lion Oil Refinery, Arkansas 2003 Steel design Prothius Engineering

Conoco Phillips, San Fransisco 2003 Steel design Prothius Engineering

IOCL – Mathura Refinery, Baroda 2001 Steel design Petron Engineering

Baruani Expansion, Uttar Pradesh 2001 Steel design Petron Engineering

Oseberg Sör Snorre B 1998 -

1999

Pipe design, Pipe support design, Isometrics Aker Engineering

Heidron 1998 Pipe designer, Isometric drawings Reinertsen Engineering