T he ournal of the nti -S eismic ystems nternational ociety (ASSIS
CISN: C alifornia I ntegrated S eismic N etwork
description
Transcript of CISN: C alifornia I ntegrated S eismic N etwork
CISN:CISN: CCalifornia alifornia IIntegrated ntegrated
SSeismic eismic NNetworketworkThe Program Management Group (PMG):The Program Management Group (PMG):
Tony Shakal – Tony Shakal – CGSCGSDavid Oppenheimer – David Oppenheimer – USGS Menlo ParkUSGS Menlo ParkPeggy Hellweg & Doug Neuhauser – Peggy Hellweg & Doug Neuhauser – UC BerkeleyUC BerkeleyEgill Hauksson - Egill Hauksson - CaltechCaltechDoug Given – Doug Given – USGS PasadenaUSGS Pasadena
CISN Advisory Meeting Jan. 28, 2009CISN Advisory Meeting Jan. 28, 2009
Operate a reliable and robust statewide Operate a reliable and robust statewide systemsystem to record earthquake ground motions over the to record earthquake ground motions over the relevant range of frequencies and shaking levels relevant range of frequencies and shaking levels
Rapidly distribute informationRapidly distribute information about earthquakes after their occurrence for about earthquakes after their occurrence for emergency response and public information emergency response and public information
Create an easily accessible archiveCreate an easily accessible archive of California earthquake data for engineering and of California earthquake data for engineering and seismological research, including waveform data seismological research, including waveform data and derived productsand derived products
Develop new algorithmsDevelop new algorithms for analyzing earthquake data and creating for analyzing earthquake data and creating new new user productsuser products by applying the latest research by applying the latest research and technological discoveries.and technological discoveries.
CISN GoalsCISN Goals
(from Strategic Plan)(from Strategic Plan)
Who is the Who is the CISN?CISN? Core membersCore members
USGS (Pasadena & Menlo Park)USGS (Pasadena & Menlo Park) CaltechCaltech UC BerkeleyUC Berkeley Calif. Geological Survey Calif. Geological Survey
(CSMIP)(CSMIP) Calif. Office of Emergency Calif. Office of Emergency
ServicesServices Participating entitiesParticipating entities(real-time data contributors)(real-time data contributors) UC San DiegoUC San Diego UC Santa BarbaraUC Santa Barbara University of Nevada RenoUniversity of Nevada Reno Calif. Dept. of Water ResourcesCalif. Dept. of Water Resources Lawrence Livermore National Lawrence Livermore National
LabsLabs Lawrence Berkeley National Lawrence Berkeley National
LabsLabs PG&EPG&E EarthScope - US Array/PBOEarthScope - US Array/PBO CalpineCalpine CalElectricCalElectric
CISN is One of the 7 ANSS CISN is One of the 7 ANSS RegionsRegions
Inter-MountainInter-MountainWestWest
HawaiiHawaii
PacificPacificNorthwestNorthwest
CaliforniaCaliforniaMid-AmericaMid-America
NortheastNortheast
AlaskaAlaska
CISN Statewide MonitoringCISN Statewide Monitoring
Station InventoryStation InventoryUrban Strong MotionUrban Strong Motion 974974
Broadband + Strong MotionBroadband + Strong Motion 210210
Short Period + Strong MotionShort Period + Strong Motion 7777
Short Period (“analog”)Short Period (“analog”) 500500
BoreholeBorehole 5151
Geotechnical ArraysGeotechnical Arrays 2222
BuildingsBuildings 221221
BridgesBridges 7070
DamsDams 2626
OthersOthers 1313
Stations: New & UpgradedStations: New & Upgraded(since our last meeting)(since our last meeting)
New Broadband stationsNew Broadband stations 2 2 USArray stations retainedUSArray stations retained 5 5 Upgraded stationsUpgraded stations 6 6 Newly telemetered stations Newly telemetered stations
6 6 Newly imported stationsNewly imported stations
CalEnergy (EN)CalEnergy (EN) 8 8 PG&E (PG)PG&E (PG) 4 4
Three Rotational Three Rotational SeismometersSeismometers
Millikan Library (2) and Garner Valley
Eentec R-1 triaxial rotational velocity sensors
0.05 – 20/50 Hz bandwidth 50V per radian/sec ~0.1 radian/sec clip
Hector Mine aftershock Mw 5.1Hector Mine aftershock Mw 5.1
MHDP: Southern San Andreas MHDP: Southern San Andreas Build-outBuild-out• 20km 20km
spacingspacing• BB, SM, GPSBB, SM, GPS• 11 new sites11 new sites• 6 upgraded 6 upgraded sitessites• low data low data latencylatency• on-site on-site computercomputer
CI.SNOCI.SNO
CISN Software SystemCISN Software SystemFY 2008 AccomplishmentsFY 2008 Accomplishments
Leap second compliance finishedLeap second compliance finished All code in SVN repositoryAll code in SVN repository TRAC documentation begunTRAC documentation begun Reference system completedReference system completed Many improvements & bug fixesMany improvements & bug fixes
Northern California centerNorthern California center post processing done, real-time soonpost processing done, real-time soon
Southern California centerSouthern California center In process of upgrade to leap-second In process of upgrade to leap-second
versionversion Other ANSS regional networksOther ANSS regional networks
running at HVOrunning at HVO will be installed at UW and UU this yearwill be installed at UW and UU this year CERI & LDEO this year or nextCERI & LDEO this year or next
CISN Software Status CISN Software Status FY 2008 AccomplishmentsFY 2008 Accomplishments
Other AccomplishmentsOther Accomplishments Continuing support of Continuing support of
Earthquake Early WarningEarthquake Early Warning Statewide MStatewide MLL calibration calibration Handled Alum Rock & Chino Hills Handled Alum Rock & Chino Hills (Mw (Mw
5.4s)5.4s)
Helped NESMP converted 90 channel Helped NESMP converted 90 channel Factor Building Array to USGS Factor Building Array to USGS operationoperation
CIT hosted ANSS NetOps workshopCIT hosted ANSS NetOps workshop Participated in ShakeOutParticipated in ShakeOut
Other DevelopmentsOther Developments
ANSS Network performance ANSS Network performance standardsstandards
NSMP free-field site adoptionNSMP free-field site adoption ANSS Waveform Archive – RFP is ANSS Waveform Archive – RFP is
openopen Metadata Repository in GoldenMetadata Repository in Golden Seismic equipment depot at ASLSeismic equipment depot at ASL
Last Year’s Action ItemsLast Year’s Action Items
Modify MOU to alloy chair 3Modify MOU to alloy chair 3rdrd term. – term. – DoneDone PMG to document Japanese EEW PMG to document Japanese EEW
spending.spending. $500M initial, $23M/yr + $120M upgrade/10yr$500M initial, $23M/yr + $120M upgrade/10yr
Document steps toward EEWDocument steps toward EEW Draft EEW plan doneDraft EEW plan done
Address ShakeMap issuesAddress ShakeMap issues Provide talking points for Dick McCarthy’s Provide talking points for Dick McCarthy’s
trip to Japan. - trip to Japan. - DoneDone
Hasta la vista, baby!Hasta la vista, baby!