37
(Amt. in Lac) Date Amount 1 2 3 4 5 6 7 8 9 10 11 12 13 1 Kota Deposit Works Other/ Deposit Agri. Dept. Renovation & Extension of Office Building for Fertilizer Testing Laboratory at Nanta Farm, Kota 30.04.12 33.08 4.93 04.05.13 31.07.14 28.30 Finalized 2 Kota Deposit Works Other/ Deposit Agri. Dept. Construction of Government Pesticides Testing Laboratory, Nanta Farm Kota. 10.05.12 18.23 3.39 04.05.13 31.07.14 15.34 Finalized 3 Kota Deposit Works Other/ Deposit Agri. Dept. Repair of IPM Lab at ATC Bundi. 26.03.14 3.00 0.64 21.10.14 02.11.14 2.36 Finalized 4 Kota Deposit Works Other/ Deposit Agri. Construction of Solid Boundary wall at ATC Bundi 09-11-2014 30.00 29.97 13.09.15 0.03 Work in progress 5 Kota Deposit Works Other/ Deposit Agri. Maintenance of Office Building, Residential Building and Equipment Shed etc. at ATC Building (Distt. Bundi) 09-11-2014 14.00 13.93 13.09.15 0.02 Work in progress 6 Kota Deposit Works Other/ Deposit Agri. Const. of Soil Testing Lab Assistant Director (Agri) Office K.Patan Distt. Bundi 13-11-2014 21.46 17.93 01.10.15 0.07 Work in progress 7 Kota Deposit Works Other/ Deposit Agri. Construction of Dy. Director (Agri Ext.) Office Building Bundi. 02-12-2014 79.00 68.80 22.01.16 0.20 Work in progress 8 Kota Deposit Works Other/ Deposit Agri. Construction of Various Works at Office Building Joint Director Agri. Kota 13-11-2014 16.59 16.54 20.10.15 5.18 Work in progress 9 Kota Deposit Works Other/ Deposit Agri. Various Works at Rajhans Nursery, Raini Bagh, Kota. 04-02-2015 25.81 15.00 08.10.15 0.00 Work in progress 10 Kota Deposit Works Other/ Deposit Agri. Agri. Tech. Know. Resource Center at Bundi. 22-01-2015 85.40 85.40 NIT 11 Kota Bundi Agri. Agri. Various Works Under Rehibilitation of Premisses & on Farm Development at ATC Bundi (Part 'A') 22-01-2015 3.50 3.50 18.04.15 0.00 Work in progress 12 Kota Bundi Agri. Agri. Various Works Under Rehibilitation of Premisses & on Farm Development at ATC Bundi (Part 'B' & 'C') 22-01-2015 0.64 0.64 18.04.15 0.00 Work in progress 13 Kota Kota (G) Agri. Agri. Repair maintenance Soil testing lab Kota 23-03-2015 5.90 5.90 0.00 NIT 14 Kota Kota (G) RKVY Agri. Construction of Various Works for Skill Empowerment of Women in Dairy Cattle Management through Adoption of Improved Livestock Production Techniques in Kota District of Rajasthan. 12-02-2015 66.44 66.44 0.00 NIT 15 Kota Kota (G) RKVY Agri. Construction of Various Works for Processing & Value Addition of Seasonal Foods for Maximum Profitability and Income Generation Among Rural Youth of South East Rajasthan 12-02-2015 36.60 36.60 0.00 NIT RAJASTHAN STATE AGRICULTURAL MARKETING BOARD Physical & Financial Progress of Construction works CIRCLE : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date of compl. Month : April 2015 Exp. upto date Adm. Sanction Deposit Work KUMS Head State of work/ remarks

Transcript of Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S....

Page 1: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

(Amt. in Lac)

Date Amount

1 2 3 4 5 6 7 8 9 10 11 12 13

1 Kota Deposit Works

Other/ Deposit

Agri. Dept. Renovation & Extension of Office Building for FertilizerTesting Laboratory at Nanta Farm, Kota

30.04.12 33.08 4.93 04.05.13 31.07.14 28.30 Finalized

2 Kota Deposit Works

Other/ Deposit

Agri. Dept. Construction of Government Pesticides Testing Laboratory,Nanta Farm Kota.

10.05.12 18.23 3.39 04.05.13 31.07.14 15.34 Finalized

3 Kota Deposit Works

Other/ Deposit

Agri. Dept. Repair of IPM Lab at ATC Bundi. 26.03.14 3.00 0.64 21.10.14 02.11.14 2.36 Finalized

4 Kota Deposit Works

Other/ Deposit

Agri. Construction of Solid Boundary wall at ATC Bundi 09-11-2014 30.00 29.97 13.09.15 0.03 Work in progress

5 Kota Deposit Works

Other/ Deposit

Agri. Maintenance of Office Building, Residential Building andEquipment Shed etc. at ATC Building (Distt. Bundi)

09-11-2014 14.00 13.93 13.09.15 0.02 Work in progress

6 Kota Deposit Works

Other/ Deposit

Agri. Const. of Soil Testing Lab Assistant Director (Agri) OfficeK.Patan Distt. Bundi

13-11-2014 21.46 17.93 01.10.15 0.07 Work in progress

7 Kota Deposit Works

Other/ Deposit

Agri. Construction of Dy. Director (Agri Ext.) Office BuildingBundi.

02-12-2014 79.00 68.80 22.01.16 0.20 Work in progress

8 Kota Deposit Works

Other/ Deposit

Agri. Construction of Various Works at Office Building JointDirector Agri. Kota

13-11-2014 16.59 16.54 20.10.15 5.18 Work in progress

9 Kota Deposit Works

Other/ Deposit

Agri. Various Works at Rajhans Nursery, Raini Bagh, Kota. 04-02-2015 25.81 15.00 08.10.15 0.00 Work in progress

10 Kota Deposit Works

Other/ Deposit

Agri. Agri. Tech. Know. Resource Center at Bundi. 22-01-2015 85.40 85.40 NIT

11 Kota Bundi Agri. Agri. Various Works Under Rehibilitation of Premisses & on FarmDevelopment at ATC Bundi (Part 'A')

22-01-2015 3.50 3.50 18.04.15 0.00 Work in progress

12 Kota Bundi Agri. Agri. Various Works Under Rehibilitation of Premisses & on FarmDevelopment at ATC Bundi (Part 'B' & 'C')

22-01-2015 0.64 0.64 18.04.15 0.00 Work in progress

13 Kota Kota (G) Agri. Agri. Repair maintenance Soil testing lab Kota 23-03-2015 5.90 5.90 0.00 NIT14 Kota Kota (G) RKVY Agri. Construction of Various Works for Skill Empowerment of

Women in Dairy Cattle Management through Adoption ofImproved Livestock Production Techniques in Kota District ofRajasthan.

12-02-2015 66.44 66.44 0.00 NIT

15 Kota Kota (G) RKVY Agri. Construction of Various Works for Processing & ValueAddition of Seasonal Foods for Maximum Profitability andIncome Generation Among Rural Youth of South EastRajasthan

12-02-2015 36.60 36.60 0.00 NIT

RAJASTHAN STATE AGRICULTURAL MARKETING BOARDPhysical & Financial Progress of Construction works

CIRCLE : KOTAS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Month : April 2015

Exp. upto date

Adm. Sanction

Deposit Work

KUMS Head State of work/ remarks

Page 2: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

16 Kota Bundi Agri. Agri. Construction of Cold Storage for Store of F.M.D. Vaccine atDistrict Bundi

11-02-2015 10.17 1.98 0.00 NIT

17 Kota Bundi Agri. Agri. Construction of Interlocking Tiles in Campus of OfficeBuilding at ATC Bundi

22-01-2015 1.25 1.25 0.00 NIT

Total Agri 451.07 372.84 51.5018 Kota Deposit

WorksOther/

Deposit Hort. Dept. Const. of Pump Room, Tube Well, Pipe Line etc. at Nanta Kota 06.05.14 11.89 1.54 04.01.15 09.12.14 10.35 Finalized

19 Kota Deposit Works

Other/ Deposit

Hort. Dept. Construction of Gravel Road at Centre of Excellence CitrusNanta Kota.

10.09.14 23.10 3.99 09.01.15 09.01.15 19.11 Finalized

20 Kota Kota (G) Hort. Hort. Renovation of Existing Gravel Road & Construction of PipeCulverts

05.01.15 21.64 21.64 Estimate

21 Kota Kota (G) Hort. Hort. Renovation of Existing Shed Net at Rajhans ATC Nanta Kota 05.01.15 40.21 40.21 Estimate

22 Kota Kota (G) Hort. Hort. Construction of 2 Nos. Pipe Culverts De-Silting of ExistingMain Drain and Construction of New Kachcha Drain withGravel Road at ATC Nursery Nanta Kota

05.01.15 7.91 7.91 Estimate

23 Kota Kota (G) Hort. Hort. Raising of Existing Compound Wall with Beautification ofMain Gate at ATC Nursery Nanta Kota

05.01.15 19.49 19.49 Estimate

Total Horti 124.24 94.78 29.46Kota Deposit Work 575.31 467.62 80.96

24 Jhalawar Deposit Works

RRPM Other Const. of Soil Testing Lab at Assistant Director Agriculture, Extension Office, Bhawani Mandi

22.10.14 21.46 21.46 15.10.15 0.09 Work in progress

25 Jhalawar Deposit Works

RRPM Other Const. of Soil Testing Lab at K.U.M.S. Aklera 22.10.14 21.46 21.46 15.10.15 0.09 Work in progress

26 Jhalawar Deposit Works

RRPM Other Repair Work & KSK Bagher 13.11.14 1.84 1.84 0.00 Tender to be received on 11.05.15

27 Jhalawar Deposit Works

Agri Other Godown Repair Work of Khanpur 13.11.14 0.94 0.94 0.00 Work can't to be executed within sanction amount.

28 Jhalawar Deposit Works

Agri Other Repair Work of KSK Sojpur 13.11.14 1.84 1.84 0.00 Work can't to be executed within sanction amount.

29 Jhalawar Deposit Works

Agri Other Repair Work of KSK Khanpur 13.11.14 1.86 1.86 0.00 Work can't to be executed within sanction amount.

30 Jhalawar Deposit Works

Agri Other Const. of District Level Agriculture Technology KnowledgeResource Center at Jhalawar

22.01.15 85.40 85.40 - - 0.00 Tender to be received on 05.05.15

31 Jhalawar Deposit Works

Agri Other Const & S/R of Compound Wall & Other Repairing Works atRAJHANS Nursury Mahar Singh Bagh, Jhalawar

23.01.15 36.80 36.80 - - 0.00 Tender to be received on 13.05.15

32 Jhalawar Deposit Works

Cold Storage KUMS Cold Storage 4000 MT, Under KUMS B.Mandi 11.05.12 708.49 318.87 22.05.15 378.30 Work in progress

Page 3: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

33 Jhalawar J.Patan Agri. Agri Unvesity

Construction of Seed Godown at Aklera 41964 10.00 5.00 0.00 NIT due on dt 25.05.15

34 Jhalawar J.Patan Agri. Agri Unvesity

Construction of Seed Godown at Khanpur 41964 10.00 5.00 0.00 NIT due on dt 25.05.15

35 Jhalawar J.Patan Other Animal Husbandary

Construction of Cold Storage for store FMD vaccine atJhalawar

42046 10.17 1.88 0.00 NIT due on dt 11.05.15

Jhalawar Deposit Work 910.26 502.35 378.4836 Baran Deposit

WorksAgri RSAMB Const. of Soil Testing Lab at Asst. Dag. (Ext.) Chhabra. 22.10.2014 21.46 21.46 15.10.15 0.10 Work in progress

37 Baran Deposit Works

Agri RSAMB Const. of Soil Testing Lab at Siswali Under Dy. Dag. Baran 21.11.2014 21.46 21.46 15.10.15 0.08 Work in progress

38 Baran Deposit Works

Agri RSAMB Const. of remaining work of office of Dy. Dag. Baran 13.11.2014 50.07 50.07 01.12.15 0.00 Work in progress

39 Baran Deposit Works

Agri RSAMB Repair of Office Building Asst. Dag. (Ext.) Chhabra Distt.Baran

13.11.2014 2.73 2.73 15.10.15 0.25 Work in progress

40 Baran Deposit Works

Agri RSAMB Rasing of Compound wall with wire fencing and Earth fillingin deep portion Asst. Dag. (Ext.) Chhabra Distt. Baran

13.11.2014 10.50 10.50 15.10.15 7.01 Work in progress

41 Baran Deposit Works

Agri RSAMB Repair of Training hall of Asst. Dag. (Ext.) Chhabra Distt.Baran

13.11.2014 4.10 4.10 15.10.15 0.02 Work in progress

42 Baran Deposite work

Other Agriculture Department

A.S. Phool Barod Under Asst. Dag. (Ext.) Chhabra Distt.Baran.

13-11-2014 3.78 3.78 15.10.2015 0.01 Work in progress

43 Baran Deposit Works

Agri RSAMB Special repair of badly damaged Staff Quarter 2 Nos. andConst. of New Staff Quarter 1 No. of Asst. Dag. (Ext.) ChhabraDistt. Baran

13.11.2014 16.13 16.13 15.10.15 0.20 Work in progress

44 Baran Deposit Works

Agri RSAMB S/R of Staff Quarter 2 No. at Dy. Dag. Office Distt. Baran 13.11.2014 13.36 13.36 15.10.14 10.06 Work in progress

45 Baran Deposit Works

Agri RSAMB S/R of Staff Quarter 3 No. at Dy. Dag. Office Distt. Baran 13.11.2014 10.62 10.62 15.10.14 6.80 Work in progress

46 Baran Deposit Works

Agri RSAMB S/R of Staff Quarter Agr. Supervisior Atru Under Asst. Dag.(Ext.) Chhabra Distt. Baran

13.11.2014 1.32 1.32 20.10.15 0.01 Work in progress

47 Baran Deposit Works

Agri RSAMB S/R of Staff Quarter of Asst. Agr. Officer Atru Under Asst.Dag. (Ext.) Chhabra Distt. Baran

13.11.2014 7.18 7.18 20.10.15 0.03 Work in progress

48 Baran Deposit Works

Agri RSAMB S/R of Staff Quarter Agr. Supervisior Antana Under Asst. Dag.(Ext.) Chhabra Distt. Baran

13.11.2014 7.18 7.18 20.10.15 0.03 Work in progress

49 Baran Deposit Works

Agri RSAMB S/R of Staff Quarter Agr. Supervisior Kawai Under Asst. Dag.(Ext.) Chhabra Distt. Baran

13.11.2014 7.18 7.18 20.10.15 0.03 Work in progress

Baran Deposit Work 177.07 177.07 24.63

Page 4: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

M,L.A. Fund50 Baran Deposite

workOther MLA Fund Const. of Community Bhawan in Village Bambori kalan G.P.

Bamborikalan.21.11.14 5.00 4.49 28.09.2015 0.00 Work in progress

51 Baran Deposite work

Other MLA Fund Const. of Shamshan Ghat in village Bamborikaln G.P.Bamborikalan

21.11.14 7.00 6.33 28.09.2015 0.00 Work in progress

52 Baran Deposite work

Other MLA Fund Const. of Community Bhawan Near Balaji Temple in villageMau G.P. Mau

21.11.14 5.00 4.49 28.09.2015 0.00 Work in progress

53 Baran Deposite work

Other MLA Fund Const. of Teen Shade and Chabutra in Bakri Shamshan Koyla(Anta)

21.11.14 5.00 4.43 28.09.2015 0.00 Work in progress

54 Baran Deposit Works

Other MLA Fund Const of PublicToilets in Ward No. 16 in Village Mangrol(Baran)

27.10.14 5.00 4.58 28.09.2015 0.00 Work in progress

55 Baran Deposite work

Other MLA Fund Const. of Shamshan Ghat in village Theekariya P.S. Anta 26.11.14 5.00 4.43 28.09.2015 0.00 Work in progress

56 Baran Deposite work

Other MLA Fund Const. of Sefty wall and development of Children Garden ingram Tamkheda. P.S. Palsawa

21-11-2014 6.00 5.48 28.09.2015 0.00 Work in progress

57 Baran Deposite work

Other MLA Fund Const. of Compound wall of Public park at Bambuliya JogiyanRoad.

21.11.14 5.00 4.43 28.09.2015 0.00 Work in progress

58 Baran Deposite work

Other MLA Fund Renewal of Compound wall and Const. of C.C. Pavement atShamshan ghaat in Village Pachel kalan

21.11.14 5.00 4.50 28.09.2015 0.00 Work in progress

59 Baran Deposite work

Other MLA Fund Renewal of Rooms in Primary Health Centerl Anta. 21.11.14 6.00 5.60 28.09.2015 0.00 Work in progress

60 Baran Deposite work

Other MLA Fund Const. of C.C. Road with Drain Gram Gehun Khedi GramPanchayat Jepla P.S. Chhabra

09-04-2015 5.00 0.00 0.00 NIT invited

61 Baran Deposite work

Other MLA Fund Const. of C.C. Road with Drain Gram Khadiya GramPanchayat Kachnariya P.S. Chhipabarod

09-04-2015 5.00 0.00 0.00 NIT invited

62 Baran Deposite work

Other MLA Fund Const. of C.C. Road with Drain Gram Devriman Gram P.S.Chhipabarod

23-04-2015 10.00 0.00 0.00 NIT invited

63 Baran Deposite work

Other Agriculture Construction of Agricultural Technology KnowledgeResourse Centre at Baran

22.01.15 85.40 85.40 0.00 NIT to be floated

64 Baran Deposite work

Other Animal Husbandry

Const. of Cold Storage for store of F.M.D. Vaccine at Distt.Baran

23.02.15 10.17 10.17 0.00 NIT to be floated

Baran Deposit Work ( M.L.A. Fund) 169.57 144.33 0.00

65 Kota Kota (G) Yard Work KUMS Construction of Covered Auction Platform at Sub YardBapawar

27.06.13 34.87 29.05.14 29.05.14 32.75 Completed Package work

66 Kota Kota (G) Yard Work KUMS Construction of Check Post with Renovation of Main Gate atSub Yard Bapawar

27.06.13 13.67 29.05.14 6.93 Work almost completed

KUMS :

Page 5: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

67 Kota Kota (G) Yard Work KUMS Construction of Urinal Block, Water Supply line and repair ofexisting compound wall with raising by wire fencing at SubYard Bapawar

27.06.13 11.90 29.05.14 7.30 Work almost completed

68 Kota Kota (G) Yard Work KUMS S/R of Office Building in Sub Yard Sangod Under KUMS(Grain) Kota

09.05.14 17.80 09.06.15 10.60 Finishing work in progress

69 Kota Kota (G) Yard Work KUMS S/R of Existing Boundary Wall with Barbed Wire Fencing SubYard Sangod Under KUMS (Grain) Kota.

09.05.14 14.97 09.06.15 14.07 Work in progress

70 Kota Kota (G) Yard Work KUMS S/R of Existing Office Building with Covering of Platform inSub Yard Bapawar Under KUMS (Grain) Kota.

09.05.14 22.42 04.01.15 11.13 Work in Progress

71 Kota Kota (G) Yard Work KUMS S/R of Compound Wall by RCC Boundary Wall Along withRailway Line Side in Mandi Yard KUMS Kota (Grain)

16.09.2014 80.00 15.02.16 19.79 Work in Progress

72 Kota Kota (G) Yard Work KUMS S/R of Existing Water Huts (10 Nos.) at Mandi Yard KUMSKota (Grain)

16.09.2014 15.00 15.02.16 0.00 Work in Progress

73 Kota Kota (G) Yard Work KUMS S/R of Existing Urinal Block (06 Nos.) at Main Mandi YardKUMS Kota (Grain)

16.09.2014 9.00 15.02.16 0.00 Work in Progress

74 Kota Kota (G) Yard Work KUMS S/R of Nallah Back Side 'B' Block (B 37.56) at Mandi YardAnantpura KUMS Kota (Grain)

16.09.2014 22.80 15.02.16 6.57 Work in Progress

75 Kota Kota (G) Yard Work KUMS Const. of Canteen Building for Ksan Kaleva Scheme UnderKUMS Kota (Grain)

16.09.2014 25.04 15.02.16 0.00 Work in Progress

76 Kota Kota (G) Yard Work KUMS Beautification & Renovation of Main Gate of BhamashahMandi Under KUMS Kota (Grain)

16.09.2014 29.85 15.02.16 0.00 Work in Progress

77 Kota Kota (G) Yard Work KUMS Covered Sheds for Farmers at Various Places in Mandi YardUnder KUMS Kota (Grain)

16.09.2014 30.00 15.02.16 0.00 Work in Progress

78 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Saloniya TehsilKanwas From main road to Harinarayan ji House, ConstituencySangod Distt. Kota

22-12-2014 28.00 0.04 Work in Progress

79 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Nalodi TehsilKanwas From main road Mataji Temple To Maganpura DatanRoad, Constituency Sangod Distt. Kota

22-12-2014 28.00 0.04 Work in Progress

80 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Basyahedi TehsilKanwas From main road To Talab Ka Khura, ConstituencySangod Distt. Kota

22-12-2014 28.00 0.04 Work in Progress

81 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Aamli PanchyatKhajuri From Dhanpal Khati ke Makan se Chavad Matajimandir, Constituency Sangod Distt. Kota

22-12-2014 31.50 0.04 Work in Progress

82 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Tolya PanchyatLodhaheda From Main road Via Vaishnaw Basti To Chittar LalHouse, Constituency Sangod Distt. Kota

22-12-2014 21.00 0.03 Work in Progress

Page 6: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

83 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Aamli PanchyatKhajuri From Kanhaiya Lal Ke Makan se Trilok Chand Nagarke Khaliyan Ki Taraf, Constituency Sangod Distt. Kota

22-12-2014 28.00 0.04 Work in Progress

84 Kota Kota (G) Lk Rd. KUMS Construction of B.T. Pavement in Village Kanwas Sangod roadse Bachiheda Miner par Panchyat Hingoniya mein Hingoniya-Kaisholi Road, Constituency Sangod Distt. Kota

22-12-2014 39.00 0.05 Work in Progress

85 Kota Kota (G) Lk Rd. KUMS Construction of B/T. Pavement in Village Khadipur PanchyatDeoli To Aamli, Constituency Sangod Distt. Kota

22-12-2014 46.80 0.06 Work in Progress

86 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Pavement in Village Dara Panchyat MoruFrom Station To Gram Panchayat Bhavan, ConstituencySangod Distt. Kota

22-12-2014 24.50 0.03 Work in Progress

87 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Bapawar Tehsil SangodFrom Main Road Sohan Khandelwal's House to MukutjiNagar's House Constituency Sangod.

22-12-2014 21.00 0.03 Work in Progress

88 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Borinakalan TehsilSangod From Main Road Jagdish Nandawana's House toShaitan Singh's House Side Constituency Sangod.

22-12-2014 21.00 0.03 Work in Progress

89 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Dobada Panchayat Digod(Sangod) From Main Road to Brijmohan Meena's House SideConstituency Sangod.

22-12-2014 28.00 0.04 Work in Progress

90 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Dungarpur PanchayatLaturi From Mega High-way to Raju Karigar's House SideConstituency Sangod.

22-12-2014 24.50 0.03 Work in Progress

91 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Gurayata Tehsil SangodFrom Main Road Ratan Suman's House to Daulatram's HouseVia Rajendra Mehta's House Constituency Sangod.

22-12-2014 21.00 0.03 Work in Progress

92 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Haripura Tehsil SangodFrom Main Road Ramkalyan Nagar House to Gadar way toGhansilal's House Constituency Sangod.

22-12-2014 28.00 0.04 Work in Progress

93 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Khadiya Tehsil SangodFrom Main Road Ram Leela Chowk to Gehukhedi Road SideConstituency Sangod.

22-12-2014 28.00 0.04 Work in Progress

94 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Rolana Tehsil SangodFrom Main Road Hanumanji Mandir to Ganeshji Ke ChabutareSide Constituency Sangod.

22-12-2014 21.00 0.03 Work in Progress

Page 7: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

95 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Vinodkhurd TehsilSangod From Main Road Shiv Narayan' House to Ram BharosMehar's House Constituency Sangod.

22-12-2014 14.00 0.02 Work in Progress

96 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Budhadit PanchayatSamiti Sultanpur From Front of Surya Mandir to Main BazaarRaghunath Mandir Constituency Pipalda.

22-12-2014 28.00 06.05.16 0.04 Work in Progress

97 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road From Village Dhanwa Talai toFront side of Giriraj Yadav's House Via Golya ChabutaraConstituency Pipalda.

22-12-2014 24.50 06.05.16 0.03 Work in Progress

98 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Kanwarpura FromRehman's House to Kankali Mataji Mandir and MahaveerTiwari's House to Tejaji Main Road Constituency Sangod.

22-12-2014 26.25 06.05.16 0.04 Work in Progress

99 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Khandgaon FromHanumanji to Mahendra Kumar Suman's House SideConstituency Pipalda.

22-12-2014 28.00 06.05.16 0.04 Work in Progress

100 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Mehrana From GaneshjiMandir to Badrilal Nagar's Hand Pump Side ConstituencyPipalda.

22-12-2014 28.00 06.05.16 0.04 Work in Progress

101 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Simlya From Main RoadPower House Basti Side Mangilal Sharma's House toRameshwar Meena's House Constituency Sangod.

22-12-2014 28.00 06.05.16 0.04 Work in Progress

102 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Sultanpur Kota-SultanpurRoad to Sanjay Nagar along Khadi at Toran Road ConstituencyPipalda

22-12-2014 21.00 06.05.16 0.03 Work in Progress

103 Kota Kota (G) Lk Rd. KUMS Construction of B.T. Road From Village Bhojpura to JhalipuraMinor Constituency Ladpura

22-12-2014 26.64 0.04 Work in Progress

104 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Damdama From MainRoad to Mataji Mandir Constituency Ladpura

22-12-2014 21.00 0.03 Work in Progress

105 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Ganeshpura From MainRoad to Primary School Constituency Ladpura

22-12-2014 28.00 0.04 Work in Progress

106 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road From Village Khedli Pandey RoadNH-76 Constituency Ladpura

22-12-2014 31.50 0.04 Work in Progress

107 Kota Kota (G) Lk Rd. KUMS Construction of B.T. Road in Village Marwara Chowki GramPanchayat Tathed Sultanpur-Digod Main Road to VillageMarwara Chowki Dugdha Utpadak Samiti ConstituencyLadpura

22-12-2014 31.20 0.04 Work in Progress

Page 8: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

108 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Padampura PanchayatKalyakhedi From Sh. Bhim Singh's House to Shamshan GhatSide Constituency Ramganjmandi.

22-12-2014 17.50 0.02 Work in Progress

109 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Ranwatha PanchayatBhanwariya From Babu Lal Meghwal's House to PuraneThakur Mandir Side Constituency Ramganjmandi.

22-12-2014 21.00 0.03 Work in Progress

110 Kota Kota (G) Lk Rd. KUMS Construction of C.C. Road in Village Tholpura PanchayatKalyakhedi From Babu Singh's House to Ganeshji Mandir SideConstituency Ramganjmandi.

22-12-2014 17.50 0.02 Work in Progress

111 Kota Kota (G) Yard KUMS Construction of Cement Concrete Pavement in Yard No. 2 atMain Mandi Yard Anantpura KUMS (Grain) Kota.

24-04-2015 763.00 457.80 0.00 Estimate

112 Kota Kota (G) Yard KUMS S/R of Compound Wall by RCC Boundary Wall along ForestLand (South Side) in Mandi Yard KUMS Kota (Grain).

24-04-2015 78.75 47.25 0.00 Estimate

113 Kota Kota (G) Yard KUMS Development of Parking Area Between Kisan Bhawan &Compound Wall at New Mandi Yard Anantpura KUMS Kota(Grain)

24-04-2015 39.48 23.69 0.00 Estimate

114 Kota Kota (G) Yard KUMS Development of Parking Area Near ‘A’ Block at New MandiYard Anantpura KUMS Kota (Grain)

24-04-2015 35.28 21.17 0.00 Estimate

115 Kota Kota (G) Yard KUMS Special Repair of Drains in Various Blocks at Main MandiYard Anantpura, Under KUMS Kota (Grain)

24-04-2015 27.00 16.20 0.00 Estimate

116 Kota Kota (G) Yard KUMS Covering of Existing Auction Area at Sub Yard SultanpurUnder KUMS Kota (Grain)

24-04-2015 74.32 44.59 0.00 Estimate

117 Kota Kota (G) Yard KUMS Development of Park Near Dhaba No. 5 at Main Mandi YardAnantpura, Under KUMS Kota (Grain)

24-04-2015 13.14 7.88 0.00 Estimate

KUMS Kota 2217.68 618.58 110.32

118 Kota Ramganj Mandi

Yard Work KUMS Const. of Compoundwall at main mandi KUMS R.Mandi 07.01.13 44.70 37.77 19.12.13 25.72 Delay Due to Land Dispute.

119 Kota R. Mandi Yard Work KUMS Construction of C.C. Internal Road at Main Mandi YardRamganjmandi

19.07.2014 373.60 315.79 09.10.15 308.50 Work almost completed

120 Kota R. Mandi Yard Work KUMS Construction of Pavement by Interlocking Tiles BetweenCanteen Building & Retail Shop at Main Mandi YardRamganjmandi.

19.07.2014 6.98 4.19 09.10.15 4.19 Work almost completed

121 Kota R. Mandi Yard Work KUMS Extension of Existing Office Building, Mandi Yard KUMSRamganjmandi.

19.07.2014 17.10 10.26 09.10.15 4.53 Work in progress

KUMS : Ramganj Mandi

Page 9: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

122 Kota R. Mandi Yard Work KUMS Raising of Compound Wall at Main Mandi YardRamganjmandi,

19.07.2014 10.72 6.43 09.10.15 4.27 Work in progress

123 Kota R. Mandi Lk Rd. KUMS Construction of C.C. Pavement Works in Various VillagesPackage Ramganjmandi-01/2014-15, Under KUMSRamganjmandi (Village Borina)

23-12-2014 43.26 1.00 01.07.15 0.06 Work in progress

Ramganj Mandi Total 496.36 375.44 347.27

124 Kota Itawa Yard Work KUMS Construction of Office Building in Main Mandi Yard Itawa 09.07.14 74.83 29.07.14 35.20 Superstructure work in progress

125 Kota Itawa Yard Work KUMS Construction of Secretary Residential Building in Main MandiYard Itawa

15.07.13 27.83 29.07.14 21.24 Finishing work in progress

126 Kota Itawa Yard Work KUMS C.C. Pavement on Remaining Auction Platform Phase.III atMandi Yard Itawa.

30.06.2014 192.23 09.10.15 7.11 Work in progress

127 Kota Itawa Yard Work KUMS C.C. Pavement on Existing WBM Internal Road at Main MandiYard Itawa

30.06.2014 159.89 09.10.15 82.07 C.C. Work in progress

128 Kota Itawa Yard Work KUMS Construction of Boundary Arounding Office Buildig &Secretary Residence at Mandi Yard, Under KUMS Itawa.

30.06.2014 9.88 09.06.15 0.00 Work in progress

129 Kota Itawa Yard Work KUMS Construction of Canteen Building For Kisan Kaleva SchemeUnder KUMS Itawa

30.06.2014 28.86 09.06.15 17.35 Work in progress

130 Kota Itawa Yard Work KUMS Special Repair of Farmer’s Rest House at Mandi Yard, UnderKUMS Itawa.

30.06.2014 10.00 02.04.15 2.83 Work in progress

131 Kota Itawa Yard Work KUMS Special Repair of Bank Building at Mandi Yard, Under KUMSItawa.

30.06.2014 23.94 0.03 Estimate will prepare after decision of vacant Bank

Building 132 Kota Itawa Yard Work KUMS Construction of Tin Shed Front of Office Building at Sub Yard

Khatoli Under KUMS Itawa.30.06.2014 2.00 02.06.15 1.57 Completed Package work

133 Kota Itawa Yard Work KUMS Construction of Toilet Block at Sub Yard Khatoli UnderKUMS Itawa.

30.06.2014 3.00 02.06.15 0.59 Work in progress

134 Kota Itawa Yard Work KUMS Repair of Damaged Boundary Wall with Filling at Sub YardKhatoli, Under KUMS Itawa.

30.06.2014 15.10 02.06.15 6.32 Work in progress

135 Kota Itawa Yard Work KUMS Construction of Water Hut at Sub Yard Khatoli KUMS Itawa. 30.06.2014 4.50 02.06.15 1.27 Work in progress

KUMS Itawa 552.06 0.00 175.58

136 Kota Bundi Yard Work KUMS Construction of compound wall with check post & Gate atSpecial Matar Mandi Bara Naya gaon KUMS Bundi

22.02.11 41.00 13.10.11 15.07.14 21.32 On clear part work completed, Remaining work

to be withdrawBudget not received

KUMS : Bundi

KUMS : Itawa

Page 10: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

137 Kota Bundi Yard Work KUMS Construction of Farmer Rest house at sub yard Dei underKUMS Bundi

15.03.11 6.78 24.10.11 10.06.13 3.36 Completed, Ongoing budget not received, rectification in

progress138 Kota Bundi Yard Work KUMS Construction of Office Building at yard Dei under KUMS

Bundi15.03.11 6.82 24.10.11 10.06.13 4.15 Completed, Ongoing budget

not received, rectification in progress

139 Kota Bundi Yard Work KUMS Construction of Gravel Road From NH.12 to KunwaratiVillage

07.06.13 197.15 15.07.14 122.35 On clear part Earthwork, Gravel & C.D. work done. Remaining encroachment.

140 Kota Bundi Yard Work KUMS Construction of Main Gate at Sub yard Dei 25.09.13 8.00 21.08.14 0.07 Delay Due to Encroachment

141 Kota Bundi Yard Work KUMS Construction of Secretary Residential Building in New MandiYard Kunwarati

25.09.13 46.22 13.01.15 27.00 Finishing work in progress

142 Kota Bundi Yard Work KUMS Construction of Labour Shed in New Mandi Yard Kunwarati 25.09.13 23.78 13.01.15 21.19 Finishing Work in progress

143 Kota Bundi Yard Work KUMS Construction of Water Hut at New Mandi Yard Kunwarati 25.09.13 20.28 13.01.15 10.08 Superstructure & Finishing work in progress

144 Kota Bundi Yard Work KUMS Construction of Office Building in Sub Yard Bada Nayagaon(Matar Mandi)

25.09.13 16.38 11.09.14 11.29 Work almost completed

145 Kota Bundi Yard Work KUMS Construction of Cement Concrete Pavement Auction Area atSub Yard Bada Nayagaon (Matar Mandi)

25.09.13 46.15 11.09.14 45.39 Completed, Package Work

146 Kota Bundi Yard Work KUMS Construction of Labour Shed in Sub Yard Bada Nayagoan(Matar Mandi)

25.09.13 11.89 11.09.14 11.45 Completed, Package Work

147 Kota Bundi Yard Work KUMS Construction of Water Hut in Sub Yard Bada Nayagoan (MatarMandi)

25.09.13 3.38 11.09.14 2.80 Completed, Package Work

148 Kota Bundi Yard Work KUMS Construction of Main Gate at Special Matar MandiBadanayagaon

25.09.13 14.60 11.09.14 7.81 Finishing work in progress

149 Kota Bundi Yard Work KUMS W.S. Work with OHT (Cap. 3.0 Lac Ltr.) & GWR (Cap. 5.0Lac Ltr.) Pump Room for Phase.I New Mandi Kunwarati

25.09.13 133.08 13.03.15 13.03.15 91.82 Completed

150 Kota Bundi Yard Work KUMS W.S. Work with OHT (Cap. 1.0 Lac Ltr.) & GWR (Cap. 2.0Lac Ltr.) Pump Room at Sub Yard Badanayagaon

25.09.13 44.28 13.03.15 13.03.15 38.73 Completed

151 Kota Bundi Yard Work KUMS Renovation & Beautification of Main Gate with Check Post atSpecial Matar Mandi Badanayagaon

09.05.2014 18.00 0.00 Estimated to be prepared after mandi decision

152 Kota Bundi Yard Work KUMS Const. of Boundary Wall Parallel to along Canal for KunwaratiMandi

09.05.2014 33.00 09.04.15 17.61 Superstructure work in progress

Page 11: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

153 Kota Bundi Yard Work KUMS Const. of Gravel Road along shops in New Mandi YardKunwarati

09.05.2014 175.73 12.09.15 73.15 Earth work & Gravel work in Progress

154 Kota Bundi Yard Work KUMS Const. of 2 No. Toilet Block at New Mandi Yard Kunwarati 09.05.2014 43.46 09.04.15 17.12 Finishing work in progress

155 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Alkodiya from RajuDholi house to Gobrinath house side & Lodkaji Lodha house toBhilbasti side (Alkodiya ka Barada) GPS Gumanpura, P.S.Bundi (Distt. Bundi)

22-12-2014 29.40 0.04 Work in progress

156 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Bhanwarda fromDevnarayan Mandir to Shamshan side G.P.S. Ramganj P.S.Bundi (Distt. Bundi)

22-12-2014 14.00 0.02 Work in progress

157 Kota Bundi Lk Rd. KUMS CONSTRUCTION OF B.T. ROAD FROM B.T. ROAD TOBHIMPURA, VILLAGE BHIMPURA, CONSTITUENCYBUNDI (DISTT. BUNDI)

22-12-2014 44.00 0.06 Work in progress

158 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Gudha (Rajpura)from Ratan Jain house to Ambaraji house (Distt. Bundi)

22-12-2014 17.50 0.02 Work in progress

159 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Lodha Ke Jhopadiafrom Devprakash Gurjar House to Ganeshji Ka Isthan (Distt.Bundi)

22-12-2014 17.50 0.02 Work in progress

160 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Silore from NamanaB.T. Road to Secondary School, P.S. Bundi (Distt. Bundi)

22-12-2014 24.50 0.03 Tender under process

161 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Sutada(Dhaneshwar) from Khana ji house to Barada (Distt. Bundi)

22-12-2014 21.00 0.03 Tender under process

162 Kota Bundi Lk Rd. KUMS Construction of C.C. Pavement in Village Suwasa from DhannaLal Meena house to Khalunda Main Road, P.S. Talera (Distt.Bundi)

22-12-2014 31.50 0.04 Tender under process

KUMS Bundi 1089.38 0.00 526.95

163 Kota K.Patan Yard Work KUMS Const. of Office Building in Sub Yard Kapren 12.02.14 23.60 15.01.15 05.02.15 21.10 Completed164 Kota K.Patan Yard Work KUMS Const. of Secretary Residential Building in Mandi Yard KUMS

K.Patan09.09.2014 33.60 19.08.15 8.19 Work in Progress

165 Kota K.Patan Yard Work KUMS Const. of Farmer Rest House in Mandi Yard KUMS K.Patan. 09.09.2014 29.40 19.08.15 0.00 Work in Progress

166 Kota K.Patan Yard Work KUMS Const. of Kiosk in Mandi Yard KUMS K.Patan. 09.09.2014 2.40 19.08.15 0.89 Work in Progress167 Kota K.Patan Lk Rd. KUMS Construction of C.C. Pavement in Village Kodkya 23-12-2014 14.42 19.08.15 0.03 Work in progress

KUMS K.Patan 103.42 0.00 30.21

KUMS : K.Patan

Page 12: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

Total Yard Work Kota 4458.90 994.02 1190.33

168 Kota MDF MDF MDF Village Kothla Main Village Portion ConstituencyRamganjmandi.

01.03.2014 10.40 9.30 18.06.15 0.10 Work in progress

169 Kota MDF MDF MDF Village Nayagaon Main Village Portion Ranwatha NayagoanConstituency Ramganjmandi.

01.03.2014 15.60 3.86 18.06.15 10.23 Work in progress

170 Kota MDF MDF MDF Village Kalyakhedi on Main Road Constituency Ladpura 01.03.2014 10.40 2.19 18.06.15 7.20 C.C.Work Done171 Kota MDF MDF MDF Village Mandaliya From Sobhagyamal Jain House to Nirmal

Jain House Constituency Ladpura. 01.03.2014 5.20 3.04 18.06.15 1.66 C.C.Work Done

172 Kota MDF MDF MDF Village Arliya From Radhakrishna Mandir to Kailash SinghHouse Constituency Ladpura

01.03.2014 13.00 1.32 18.06.15 10.42 C.C. Work done

173 Kota MDF MDF MDF Village Arniya From Gobrilal Meena House to BhanwarlalMeena House Side Constituency Ladpura

01.03.2014 15.60 14.06 18.06.15 0.03 Work in progress

174 Kota MDF MDF MDF Village Ram Talai From Mandir To School Side ConstituencyLadpura

01.03.2014 7.80 7.03 18.06.15 0.01 C.C. Work done

175 Kota MDF MDF MDF Village Hanotilya From Main Road Mandir to Old MohallaSide Constituency Ladpura

01.03.2014 15.60 3.43 18.06.15 10.66 C.C. Work Done

176 Kota MDF MDF MDF Village Charanhedi From Sanwariya House to HanumanjiTemple Side Constituency Ladpura

01.03.2014 15.60 1.73 18.06.15 12.35 C.C. Work done

177 Kota MDF MDF MDF Village Jitya Ramnagar From Main Road to Hatai ConstituencyLadpura

01.03.2014 10.40 9.39 18.06.15 0.00 C.C. Work done

178 Kota MDF MDF MDF Village Brijnagar From Main Road to S.C. Basti SideConstituency Sangod.

01.03.2014 15.60 14.05 18.06.15 0.03 Work in progress

179 Kota MDF MDF MDF Village Urna From Main Road Kallaji Maharaj Place toChhotulal Kumhar House Side Constituency Sangod

01.03.2014 10.40 1.06 18.06.15 8.33 C.C. Work Completed

180 Kota MDF MDF MDF Village Pisaheda From Main Road to Amli Road SideConstituency Sangod

01.03.2014 15.60 14.05 18.06.15 0.03 Work in progress

181 Kota MDF MDF MDF Village Sawanbhado From Main Road Puliya to Gurjariyahediside upto Jugalpura Constituency Sangod.

01.03.2014 20.80 3.48 18.06.15 15.09 C.C. Work Completed

182 Kota MDF MDF MDF Village Anwa From Main Road Ghans Bhairu ChowkConstituency Sangod.

01.03.2014 13.00 5.27 18.06.15 6.34 C.C. Work Completed

183 Kota MDF MDF MDF Village Bachhiheda From Main Road Ghans Bhairuji toBabulal Kumar House side Constituency Sangod

01.03.2014 15.60 2.14 18.06.15 11.79 C.C. Work Completed

184 Kota MDF MDF MDF Village Dhulet From Main Road Devi Singh House to NandaBheel House Side Constituency Sangod.

01.03.2014 10.40 1.54 18.06.15 7.75 Work Completed

185 Kota MDF MDF MDF Village Rupaheda From Anganbadi Centre to S.C. Basti toVeeru Nagar House Side Constituency Sangod

01.03.2014 15.60 1.64 18.06.15 12.29 Work Completed

MDF Village C.C.

Page 13: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

186 Kota MDF MDF MDF Village Borinakhurd From Main Road to Govt. H.P. SchoolRoad to Bhairulal House Side Constituency Sangod.

01.03.2014 15.60 2.00 18.06.15 11.94 Work in progress

187 Kota MDF MDF MDF Village Amritkunwa From Govt. H.S. School to ShmashanSide Constituency Sangod

01.03.2014 15.60 13.90 18.06.15 0.02 Work in progress

188 Kota MDF MDF MDF Village Dillipura From Main Road to Hanumanji Temple SideConstituency Sangod

01.03.2014 10.40 1.69 18.06.15 7.60 C.C. Work Completed

189 Kota MDF MDF MDF Village Vinodkalan From Main Road to Shmashan SideConstituency Sangod

01.03.2014 13.00 11.61 18.06.15 0.00 Work in progress

190 Kota MDF MDF MDF Village Nayapura From Main Road to Piliya Kunwa SideConstituency Sangod

01.03.2014 10.40 1.68 18.06.15 7.61 C.C. Work done

191 Kota MDF MDF MDF Village Makadawad From Laxminath Temple to BhairulalDhobi House Side Constituency Sangod

01.03.2014 13.00 0.76 18.06.15 10.85 C.C. Work in progress

192 Kota MDF MDF MDF Village Chanawata From Main Road to Temple SideConstituency Sangod

01.03.2014 18.20 1.67 18.06.15 14.57 C.C. Work Completed

193 Kota Bundi MDF MDF Village Kyawada From Prabhulal Harijan House to S.C. BastiConstituency Bundi.

01-03-2014 10.40 0.55 18-06-2015 8.21 C.C. Work Completed

194 Kota Bundi MDF MDF Village Raithal From Abra Road to Mataji ConstituencyBundi.

01-03-2014 10.40 0.95 18-06-2015 7.81 C.C. Work Completed

195 Kota MDF MDF MDF Village Sutada From Barudhan to NH.76 Bhagwanpura SideConstituency Bundi.

01.03.2014 16.24 0.87 18.06.15 15.26 C.C. Work Completed

196 Kota MDF MDF MDF Village Jharbalapura From Ramswaroop Chandel to SchoolSide Constituency Bundi

01.03.2014 13.00 1.00 18.06.15 9.95 C.C. Work Completed

197 Kota MDF MDF MDF Village Delunda From Pachayat Bhawan to Masoom Ali HouseConstituency Bundi

01.03.2014 10.40 0.83 18.06.15 7.93 C.C. Work Completed

198 Kota MDF MDF MDF Village Bajed From K.Patan Road to Kalulal Meena HouseConstituency Bundi

01.03.2014 10.40 0.85 18.06.15 7.92 C.C. Work Completed

199 Kota MDF MDF MDF Village Gudhanathawat From Tirath Chaudhary House toNagdi Via Mahadev Chabutara Constituency Bundi

01.03.2014 10.40 1.53 18.06.15 7.23 C.C. Work Completed

200 Kota MDF MDF MDF Village Ballop From Main Road to Tejaji Side ConstituencyBundi.

01.03.2014 10.40 1.35 18.06.15 7.41 C.C. Work Completed

201 Kota MDF MDF MDF Village Daabi From Prabhuji Patel House to Meghwal MohallaOld Talav Side Constituency Bundi.

01.03.2014 10.40 1.12 18.06.15 7.64 C.C. Work Completed

202 Kota MDF MDF MDF Village Mandadi From Patel Trilokji House to Hardev HouseTALEDA Constituency Bundi.

01.03.2014 13.00 0.71 18.06.15 12.29 C.C. Work in progress

203 Kota MDF MDF MDF Village Thadi From Devilal Gurjar House to Mangilalji HouseTALEDA Constituency Bundi

01.03.2014 13.00 1.29 18.06.15 9.66 C.C. Work Completed

204 Kota MDF MDF MDF Village Gopalpura From Ramniwasji Gurjar House toNaagbawadi TALEDA Constituency Bundi

01.03.2014 13.00 0.93 18.06.15 10.02 C.C. Work Completed

Page 14: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

205 Kota MDF MDF MDF Village Bera Ka Dhana From Ratanji Bajaad House to DevNarayan Temple TALEDA Constituency Bundi

01.03.2014 13.00 0.80 18.06.15 10.15 C.C. Work Completed

206 Kota MDF MDF MDF Village Nayakheda From Main Road to Ganeshpal MandirSide Constituency Kota North

01.03.2014 20.80 18.06.15 0.00 Work done by UIT Kota

207 Kota MDF MDF MDF Village Bansi From Chhoga Balai House to Bundi RoadConstituency Hindoli.

01.03.2014 15.60 2.53 24.03.15 22.03.15 13.07 Completed

208 Kota MDF MDF MDF Village Jajawar From Laddu Carpenter House to SuwalalGurjar House Constituency Hindoli

01.03.2014 13.00 1.05 24.03.15 22.03.15 9.83 Completed

209 Kota MDF MDF MDF Village Basola From Bhagwan Singh House to Pannalal Bairwa House Constituency Hindoli.

01.03.2014 13.00 0.72 24.03.15 22.03.15 10.16 Completed

210 Kota MDF MDF MDF Village Rajlawata at Main Bazaar Road Constituency Hindoli. 01.03.2014 13.00 0.72 24.03.15 22.03.15 10.16 Completed

211 Kota MDF MDF MDF Village Manglikalan From School to Kushalji House SideConstituency Hindoli

01.03.2014 13.00 1.55 24.03.15 22.03.15 9.33 Completed

212 Kota MDF MDF MDF Village Gambhira From Gambhira to Jhopada SideConstituency Hindoli

01.03.2014 13.00 1.12 24.03.15 22.03.15 9.76 Completed

213 Kota MDF MDF MDF Village Cheta From Aklod.Cheta Road to Gurjaro ka BardaConstituency Hindoli

01.03.2014 13.00 0.99 24.03.15 22.03.15 9.89 Completed

Total MDF Village C.C. 601.24 153.35 360.58214 Kota MDF Other MDF Other MDF Other Repair & Maintenance of E.E. Office Building Kota 19.07.2014 8.58 8.58 02.04.15 0.78 Work in progress

Total MDF Village C.C. 8.58 8.58 0.78215 Kota R. Mandi MDF MDF-II Const. of C.C. Road in Village Amarpura Km 2/0 to 2/400 22-12-2014 26.00 19.43 04.02.16 0.00 Work in progress216 Kota R. Mandi MDF MDF-II Const. of C.C. Road in Village Chechat to Madanpura Km

0/750 to 0/95022-12-2014 13.00 9.73 04.02.16 0.00 Work in progress

217 Kota R. Mandi MDF MDF-II Const. of C.C. Road in Village Fanada Km o/600 to 0/900 22-12-2014 19.50 14.57 04.02.16 0.00 Work in progress218 Kota R. Mandi MDF MDF-II Construction of C.C. Road in Village Ishwarpura Km 0/100 to

0/50022-12-2014 26.00 19.43 04.02.16 0.00 Work in progress

219 Kota R. Mandi MDF MDF-II Const. of C.C. Road on L/R Kherabad to Richhadiya Km3/500 to 4/00 .

22-12-2014 32.50 24.28 04.02.16 0.00 Work in progress

220 Kota R. Mandi MDF MDF-II Construction of C.C. Road in Village Nimoda Km 0/850 to1/250

22-12-2014 26.00 19.43 04.02.16 0.00 Work in progress

221 Kota R. Mandi MDF MDF-II Const. of C.C. Road in Village Niyamatkhedi Km 2/750 to 3/00 22-12-2014 16.25 12.15 04.02.16 0.00 Work in progress

222 Kota R. Mandi MDF MDF-II Construction of C.C. Road From Suket to Salawad Khurd Km0/0 to 0/400

22-12-2014 22.75 17.00 04.02.16 0.00 Work in progress

223 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment villageBaluheda Teh.Kanwas Main road Mukut bihari sharma house to Ramgopalnagar house

22-12-2014 26.00 18.75 25.11.15 0.00 Work in progress

Page 15: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

224 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment villageDigod mainRoad Balika vidyalaya

22-12-2014 19.50 14.03 25.11.15 0.00 Work in progress

225 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment villageKalyanpuramain Road nahar to Sohan malav house &Radheyshyam malavhouse

22-12-2014 26.00 18.71 25.11.15 0.00 Work in progress

226 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment village Railgaon mainRoad to village

22-12-2014 19.50 14.05 25.11.15 0.00 Work in progress

227 Kota Kota (G) MDF MDF-II Construction of cementconcrete pavment villageSawanbhadonMainroad to Bairwa basti

22-12-2014 26.00 18.74 25.11.15 0.00 Work in progress

228 Kota Itawa MDF MDF-II Construction of C.C. Road in Village Banjari ka Thakur FromThakur ji ke mandir to Ramkaran House side

22-12-2014 26.00 21.51 04.02.16 0.00 Work in progress

229 Kota Itawa MDF MDF-II Construction of C.C. Road in Baranahali Devi Lal kushavah keHouse to Gothada road side

22-12-2014 22.75 18.83 04.02.16 0.00 Work in progress

230 Kota Itawa MDF MDF-II Construction of C.C. Road in Village Dadwada Jain Mandir toRadheshyam House side

22-12-2014 26.00 21.51 04.02.16 0.00 Work in progress

231 Kota Itawa MDF MDF-II Construction of C.C.Road in dorali From Nade ki Talai toCanal side Constituency Pipalada

22-12-2014 26.00 21.52 04.02.16 0.00 Work in progress

232 Kota Itawa MDF MDF-II Construction of C.C. Road in Village Durjanpura From HansRaj Meena House to River Side Constituency Pipalda

22-12-2014 29.25 24.15 04.02.16 0.00 Work in progress

233 Kota Itawa MDF MDF-II Construction of C.C.Road in Ganesh kheda Main road toPrahalad House side

22-12-2014 16.25 13.44 04.02.16 0.00 Work in progress

234 Kota Itawa MDF MDF-II Construction of C.C. Road in Village Jalauda-Khatiyan, GramPanchayat Jalauda Khatiyan Pachayat Samiti From Ram KalyanBairwa's House to Well Side Constituency Pipada

22-12-2014 29.25 24.20 04.02.16 0.00 Work in progress

235 Kota Itawa MDF MDF-II Construction Of C.c Road In Village kakavada from Mata ji kehand pump to Gujarau ka hohalla side Constituency pipalda

22-12-2014 22.75 18.84 04.02.16 0.00 Work in progress

236 Kota Itawa MDF MDF-II Construction of C.C. Road in Village Shivdanpura From Gopalkewat House to Govt. school site

22-12-2014 22.75 18.84 04.02.16 0.00 Work in progress

237 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment village Abhaya puraPuliya to Ranipura road

22-12-2014 19.50 14.05 09.02.16 0.00 Work in progress

238 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment village Bhiloddevnarayanmandir toRailway puliya SC Basti

22-12-2014 16.25 11.67 09.02.16 0.00 Work in progress

239 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment village Hanotiya mainRoad soorawat ji house

22-12-2014 19.50 14.05 09.02.16 0.00 Work in progress

240 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment villageHaripuraMainroad toBheel Basti

22-12-2014 13.00 9.36 09.02.16 0.00 Work in progress

Page 16: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

241 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment village RasoolpurDevji mandir to Tathed road

22-12-2014 26.00 18.74 09.02.16 0.00 Work in progress

242 Kota Kota (G) MDF MDF-II Constructin of cementconcrete pavment villageSinghpuraSchool to Hanuman mandir

22-12-2014 16.25 11.69 09.02.16 0.00 Work in progress

243 Kota Bundi MDF MDF-II CONSTRUCTION OF B.T. ROAD SITAPURA FACTORYTO MALIYO KA BARDA VILLAGE SITAPURA, P.S.TALERA (DISTT. BUNDI)

22-12-2014 38.90 28.03 09.02.16 0.00 Work in progress

244 Kota Bundi MDF MDF-II Construction of C.C. Pavement in Village Sutada, BarudhanNH-76 Road to Bhagwanpura side Ch 0/375 to 0/545 (Distt.Bundi)

22-12-2014 11.05 7.97 09.02.16 0.00 Work in progress

245 Kota Bundi MDF MDF-II Construction of C.C. Pavement in Village Thikariya Charnanfrom Talai Tiraha to Shyam sunder sharma house, P.S. Bundi(Distt. Bundi)

22-12-2014 26.00 18.74 09.02.16 0.00 Work in progress

246 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Ajanda from SawarnGurjar house to Main Road, GPS Ajanda, ConstituencyK.Patan (Distt. Bundi)

22-12-2014 26.00 18.68 09.02.16 0.00 Work in progress

247 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Anaghora fromHathai to Road Constituency K.Patan (Distt. Bundi)

22-12-2014 26.00 18.68 09.02.16 0.00 Work in progress

248 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Bajadali, Main RoadBajadali Ch. 0/500 to 0/925 P.S. K.Patan (Distt. Bundi)

22-12-2014 26.00 18.69 09.02.16 0.00 Work in progress

249 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Bawadi to Jakhodaroad G.P. Khajuri (Distt. Bundi)

22-12-2014 26.00 18.68 09.02.16 0.00 Work in progress

250 Kota Dei MDF MDF-II CONSTRUCTION OF B.T. ROAD FROM NEEMKHERAKEMLA MAIN ROAD TO HEERAPURA VILLAGE, G.P.TALWAS (DISTT. BUNDI)

22-12-2014 23.40 16.81 09.02.16 0.00 Work in progress

251 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Laban, Guhata Roadto Laban Ch. 0/500 to 0/950 P.S. K.Patan (Distt. Bundi)

22-12-2014 26.00 18.68 09.02.16 0.00 Work in progress

252 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Leserda from NayaKuan to Khatkhar Road side, Constituency K.Patan (Distt.Bundi)

22-12-2014 19.50 14.00 09.02.16 0.00 Work in progress

253 Kota K. Patan MDF MDF-II Construction of C.C. Pavement from Village Notada Road toRaghunathpura (Distt. Bundi)

22-12-2014 22.75 16.34 09.02.16 0.00 Work in progress

254 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Rangpuliya fromChhotulal Mehra house to Jeetmal Dhakad, G.P.S. Drachitawa(Distt. Bundi)

22-12-2014 11.38 8.02 09.02.16 0.00 Work in progress

Page 17: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

255 Kota K. Patan MDF MDF-II Construction of C.C. Pavement in Village Roteda fromLaxminath Mandir to Jain Mandir Constituency K.Patan (Distt.Bundi)

22-12-2014 13.00 9.33 04.12.16 0.00 Work in progress

256 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Shyopura (Gram-Sahan) Bairwa Basti to Galiya Kuan (Distt. Bundi)

22-12-2014 26.00 18.68 04.12.16 0.00 Work in progress

257 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Bhavpura fromBhairu Balai house to Upper Primary School, GPS Suwania(Distt. Bundi)

22-12-2014 13.00 8.72 04.12.16 0.00 Work in progress

258 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Dei from SubhashCircle to Ghas Bhairu Chowk (Distt. Bundi)

22-12-2014 17.88 11.99 04.12.16 0.00 Work in progress

259 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Dei from Dhakadoka Jhopada to Bansoli Road (Distt. Bundi)

22-12-2014 9.75 6.54 04.12.16 0.00 Work in progress

260 Kota Bundi MDF MDF-II CONSTRUCTION OF B.T. ROAD FROM TEHSIL ROAD(GIRDHAR KUMAR SEN) TO MANDOLI KA BARDA,HINDOLI (DISTT. BUNDI)

22-12-2014 34.00 22.80 04.12.16 0.00 Work in progress

261 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Khanpura fromRamkishan Gurjar house to Jagdish mali house (Distt. Bundi)

22-12-2014 13.00 8.71 04.12.16 0.00 Work in progress

262 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Maliyo Ke Khodifrom Tejaji to Ramcharan Gurjar house, GPS Jajawar (Distt.Bundi)

22-12-2014 19.50 13.08 04.12.16 0.00 Work in progress

263 Kota Bundi MDF MDF-II Construction of B.T. & CC Road in Village Mangali Kala fromBorkhera Road to Mohan lal Son of Moti lal house (Distt.Bundi)

22-12-2014 33.00 22.12 04.12.16 0.00 Work in progress

264 Kota Bundi MDF MDF-II Construction of C.C. Pavement in Village Pech Ke BawadiTokara Road from Lakadeshwar Mahadev Chouraha to KhanaMali house (Distt. Bundi)

22-12-2014 16.25 10.89 04.12.16 0.00 Work in progress

265 Kota Dei MDF MDF-II Construction of C.C. Pavement in Village Rethoda fromRamvilas Gurjar house to Ramkaran mali house upto Ghadoi,GPS Kolaheda (Distt. Bundi)

22-12-2014 19.25 12.91 04.12.16 0.00 Work in progress

266 Kota Bundi MDF MDF-II Construction of C.C. Pavement in Village Runija fromShamshan to Raiger Basti side (Distt. Bundi)

22-12-2014 26.00 17.36 04.12.16 0.00 Work in progress

267 Kota Bundi MDF MDF-II Construction of C.C. Pavement in Village Tokada fromRemaining C.C. Road to Kalaji Chowk P.S. Hindoli (Distt.Bundi)

22-12-2014 24.21 16.24 04.12.16 0.00 Work in progress

Total MDF Village C.C. 1178.32 865.39 0.00268 Kota Kota (G) Other MLA fund Construction of Boundary Wall of Public Park at Bhamashah

Mandi Kota13-08-2014 1.00 0.00 NIT

Grand Total of Kota Division 6823.35 2488.96 1632.65

Page 18: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

269 Baran Baran Yard work KUMS Const. of G.I. covered shade with C.C. pavement at Auctionarea Under KUMS Baran

04.06.13 532.00 0.00 13.01.15 15.12.14 505.27 Work comp. F.B. to be paid.

270 Baran Baran Yard work KUMS Const. of B.T. auction area near soyabeen auction area underKUMS Baran

04.06.13 198.41 0.00 01.01.15 179.82 Work almost comp.

271 Baran Baran Yard work KUMS Const. of parking place by B.T. Between grading unit & 34 No.shops under KUMS Baran

04.06.13 77.91 0.00 01.01.15 74.91 Work almost comp.

272 Baran Baran Yard work KUMS Const. of B.T. auction area infront of sabha bhawan underKUMS Baran

04.06.13 113.84 0.00 21.04.15 0.95 Work stopped by contractor, Case Sent to Circle Office

for 2 & 3 C 273 Baran Baran Yard work KUMS Const. of Modern Gate with check post at sub yard Siswali,

Under KUMS Baran03.02.14 17.00 5.51 15.11.14 11.49 Finishing work in progress.

Delay due to land dispute.

274 Baran Baran Yard work KUMS Const. of Water hut (1No.) and Kiosk (1 No.) at sub yardSiswalil, Under KUMS Baran

03.02.14 3.60 1.26 15.11.14 2.34 Finishing work in progress. Delay due to land dispute.

275 Baran Baran Yard work KUMS Const. of G.I. Covered Shade and C.C. Pavement work onauction area from of Sabha Bhawan at Main Mandi Yard Baran

12.05.14 637.00 0.00 08.01.16 327.51 Work in progress

276 Baran Baran Yard work KUMS Const. of C.C. Pavement behind 24 No. shops at Main MandiYard Baran

12.05.14 46.02 4.43 21.12.15 36.77 Work nearly comp.

277 Baran Baran Yard work KUMS Const. of Land Levelling work in Mandi Yard Uttam Colony &Sulabh complex prosecing Unit Kisan Bhawan Petrol pumparea at Mandi Yard Baran Under KUMS Baran

12.05.14 15.00 12.67 21.12.15 0.03 Work in progress

278 Baran Baran Yard work KUMS S/R of Internal Road with Const. of C.C. Remaining road andDrain at Mandi Yard Baran

12.05.14 426.08 0.00 21.12.15 346.16 Work in progress

279 Baran Baran Yard work KUMS Const. of R.C.C. Wall of Protection of green belt from Vehicleand installation of benches with covering near Kiosk atSoyabeen auction area at Main Mandi Yard Baran

12.05.14 22.23 2.83 24.09.15 19.40 Work in progress

280 Baran Baran Yard work KUMS Const. of Remaining C.C. Compound wall, at Main MandiYard Baran

12.05.14 131.44 0.00 24.09.15 47.26 Work in progress

281 Baran Baran Yard work KUMS S/R of Canteen Building and Development of open areaarround Canteen Building at Main Mandi Yard Baran, KUMSBaran

12.05.14 29.98 4.64 12.05.15 25.34 Finishing work in progress. Delay due to land dispute.

282 Baran Baran Yard work KUMS S/R of Bank Building Maing Mandi Yard, Baran 12.05.14 8.80 5.39 12.05.15 3.41 Work in progress283 Baran Baran Yard work KUMS S/R of Post Office Main Mandi Yard, Baran 12.05.14 4.40 0.18 12.05.15 4.22 Work in progress

KUMS : Baran

Page 19: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

284 Baran Baran Yard work KUMS S/R of Various Staff Quarter 1 to 14 at Main Mandi YardBaran

12.05.14 29.48 15.76 12.05.15 13.72 Work in progress

285 Baran Baran Yard work KUMS S/R of Extension of Farmer Rest House at Main Mandi YardBaran

12.05.14 7.00 1.76 12.05.15 4.98 Work in progress

286 Baran Baran Yard work KUMS S/R of Various Water Hut & Kiosk 15 Nos. at Main MandiYard, Baran

12.05.14 9.00 6.61 12.05.15 2.32 Work in progress

287 Baran Baran Yard work KUMS Const. of C.C. Pavement in village Bamuliya Jagir fromShamshan Ghaat main road to Devji Temple

22.12.2014 22.75 20.51 25.11.16 0.03 Work in progress

288 Baran Baran Yard work KUMS Const. of C.C. Pavement in village Siswali from Mataji Templeto Gulabpura (Mali Mohalla) Shamshan Ghaat

22.12.2014 26.00 23.43 25.11.16 0.03 Work in progress

289 Baran Baran Yard work KUMS Const. of C.C. Pavement in village Hingoniya from Kumharoki khal to Talab via Hanuman ji

22.12.2014 19.50 17.58 25.11.16 0.03 Work in progress

290 Baran Baran Yard work KUMS Const. of C.C. Pavement in village Fatehpur on main damagedrasta.

22.12.2014 16.25 14.65 25.11.16 0.02 Work in progress

291 Baran Baran Yard work KUMS Const. of patch work on various internal road and auction area,Under KUMS, Baran

18.03.15 20.67 20.67 25.11.2016 Nit Invited

Baran Total 2414.36 157.88 1606.01

292 Baran Atru Yard work KUMS Const. of Office Building in Sub Yard Kawai Under KUMSAtru

15.07.2014 11.60 0.00 20.07.15 0.08 Lintle Level comp.

293 Baran Atru Yard work KUMS Const. of Modern gate with check post at sub yard Kawain,KUMS Atru

15.07.2014 12.00 0.00 20.07.15 0.08 Column casted upto beam level, check post work to be

started. 294 Baran Atru Yard work KUMS Const. of Tube well with pump set at sub yard kawai Under

KUMS Atru15.07.2014 3.67 0.00 20.07.15 0.08 Boring comp.

295 Baran Atru Yard work KUMS Const. of B.T. Internal road at sub yard Kawai Under KUMSAtru

15.07.2014 135.93 0.00 08.08.15 129.20 Work nearly comp.

296 Baran Atru Yard work KUMS Const. of C.C. Pavement in village Khuri on Main damagedrasta

23.12.2014 19.50 0.00 21.06.15 0.01 Work in progress

Atru Total 182.70 0.00 129.45

297 Baran Chhabra Yard work KUMS Const. of Covered Shade with tubular trusses & G.I. Sheet 300'X 80' Sub Yard Chhipabraod (Garlic)

17.09.13 205.47 0.00 17.01.15 17.01.14 185.20 Work comp.

298 Baran Chhabra Yard work KUMS Covering of Existing open platform by tubler trusses & G.I.Sheet with C.C. Pavement Sub Yard Chhipabraod (Grain)

17.09.13 63.45 0.00 17.07.14 17.07.14 50.82 Work comp.

299 Baran Chhabra Yard work KUMS S/R of Canteen Building at Main Mandi Yard Chhabra UnderKUMS Chhabra

18.06.14 20.89 0.00 01.06.15 12.53 Finishing work in progress

KUMS : Atru

KUMS : Chhabra

Page 20: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

300 Baran Chhabra Yard work KUMS Const. of R.C.C. Boundary wall at Back side sub yardChhipabarod (Garlic) Under KUMS Chhabra.

07.10.2014 39.72 0.00 30.10.15 1.01 Work in progress

301 Baran Chhabra Yard work KUMS Const of R.C.C. Boundary wall from Farmere rest house uptoGayatri mandir Staff Quarter to petrol pump and back side uptograding unit no. 13 under KUMS Chhabra

07.10.2014 111.69 0.00 11.01.16 0.40 Work in progress

302 Baran Chhabra Yard work KUMS Const. of Office Building in mandi mandi yard Chhabra UnderKUMS Chhabra.

07.10.2014 77.40 0.00 01.12.15 0.09 Work in progress

303 Baran Chhabra Yard work KUMS Const. of C.C. Pavement in village Khurai from Puliya toLodha Mohalla via Seth ji ki dukan

22.12.2014 19.50 0.00 25.03.16 0.03 Work in progress

304 Baran Chhabra Yard work KUMS Const. of C.C. Pavement in village Kundi Nai Basti MalavMohalla

22.12.2014 19.50 0.00 25.03.16 0.03 Work in progress

305 Baran Chhabra Yard work KUMS Const. of C.C. Pavement in village Khakra from Main road toTowards Devilal Malav House.

22.12.2014 19.50 0.00 25.03.16 0.03 Work in progress

306 Baran Chhabra Yard work KUMS Const. of C.C. Pavement in village Ratanpura from Rai roadBheru ji ki Aamli to Aakhodiya Khaal

22.12.2014 19.50 0.00 25.03.16 0.02 Work in progress

307 Baran Chhabra Yard work KUMS Const. of C.C. Pavement in village Govindpura from MeghrajNagar House to Jhiri/Kuwan

22.12.2014 19.50 0.00 25.03.16 0.02 Work in progress

308 Baran Chhabra Yard work KUMS Const. of C.C. Pavement in village Paroliya in Gurjar BanjaraBasti,

22.12.2014 19.50 0.00 25.03.16 0.02 Work in progress

Chhabra Total 635.62 0.00 250.20

309 Baran Anta Yard work KUMS Extension of Widening of Internal Roads, Under KUMS Anta 15.01.13 69.58 0.00 30.01.14 31.03.15 67.30 Work comp. F.B. to be paid.

310 Baran Anta Yard work KUMS Const. of B.T. Auction Area at Main Mandi Yard Anta 12.05.14 19.93 0.00 01.04.15 6.76 W.B.M. Completed311 Baran Anta Yard work KUMS Const. of Land Leveling with Nalah for diversion of Water at

Main Mandi Yard Anta12.05.14 9.45 0.00 30.03.15 9.04 Work Completed

312 Baran Anta Yard work KUMS Const. of Cow Cathar at Main Mandi Yard Anta 12.05.14 1.80 0.00 01.04.15 0.01 Work in progress313 Baran Anta Yard work KUMS Const. of Damage Compound wall Main Mandi Yard Anta 12.05.14 28.60 0.00 30.03.15 19.32 Work in progress

314 Baran Anta Yard work KUMS Const. of C.C. Pavement with Drain in village Molkhi fromParmanand Malav House to Hariom Meghwal House and RoopNarayan Malav House to Govt.School

22.12.2014 19.50 0.00 0.03 Work in progress

Anta Total 148.86 0.00 102.46Total Yard Work Baran 3381.54 157.88 2088.12

315 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Baingni (from Infront of Mata Ji upto Kharanja

01.03.2014 15.00 15.00 30.06.15 31.12.14 13.80 Work Completed.

316 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Shyampura (fromMain road to Shyampura, Gram Shyampura road to Mandir

01.03.2014 22.00 22.00 30.06.15 31.12.14 19.43 Work Completed.

KUMS : Anta

Page 21: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

317 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Phoonsra (from BusStand to In front of Koishal Nagar

01.03.2014 18.00 18.00 30.06.15 31.12.14 16.27 work completed

318 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Tisaya (fromPanchayat to Mukut Gurjar Via, Near Sarkari Hand pump toShamshan Ghaat, Ramcharan Khalmaniya House to BaranRoad

01.03.2014 25.00 25.00 30.06.15 31.12.14 22.64 Work completed

319 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kherali (fromRajeev Gandhi Bhawan to Shamshan Ghaat

01.03.2014 15.00 15.00 30.06.15 31.12.14 13.83 Work Completed.

320 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Rajpura (fromBanshilal Meena House to Thamli Main road via villageportion

01.03.2014 15.00 15.00 30.06.15 31.01.15 12.80 Work Completed.

321 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Unda (fromChotulal Meena House to Bawdi

01.03.2014 21.00 21.00 30.06.15 31.12.14 17.21 Work completed.

322 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Jagannathpura(from Shakti Mata Chabutra to Kesarilal Ji Meena House

01.03.2014 15.00 15.00 30.06.15 31.12.15 13.37 work completed.

323 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Peeliya (from Mainroad to Meetha Gopal Ji to Jaswant Goswami to Babulal, infront of Mannalal House

01.03.2014 21.00 21.00 30.06.15 31.12.14 19.21 Work Completed.

324 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Thamli (fromChandraprakash House to Shamshan Ghaat and Hemraj JiHouse to Ghansilal Ji House

01.03.2014 15.00 15.00 30.06.15 22.02.15 13.73 Work Completed.

325 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Boredi (from Roadto Hanuman Ji Mandir, Hanuman Ji Mandir to RamcharanMeena House

01.03.2014 26.00 26.00 30.06.15 22.30 Work in progress

326 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Gram Tardikhera(from Mangliram Suman to Birdhilal Suman, Hanuman JiMandir to Devishankanr House.

01.03.2014 25.00 25.00 30.06.15 19.73 Work in progress

327 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Melkhedi (fromJaylal House to Ishaq House, Harishchandra Suman House toRameshwar Ji Baada.

01.03.2014 21.00 21.00 30.06.15 26.02.15 16.69 Work in progress

328 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bundi Bijora (fromMain road to Mohanlal Ji Sarpanch House.

01.03.2014 15.00 15.00 30.06.15 0.01 Case send for Circle in alignment

Package MDF Baran.01/2013.14 269.00 269.00 221.02329 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Sorsan (from Infront

of Girraj Sarpanch East Side via khada Infront of Ganesh JiMandir to Anta Sangod road.

01.03.2014 15.00 15.00 19.06.15 31.12.14 14.21 Work Completed.

330 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dugari (from PappuNagar House to Mata Ji Mandir.

01.03.2014 6.00 6.00 19.06.15 31.01.15 4.21 Work Completed.

Page 22: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

331 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dhakad Khedi 01.03.2014 21.00 21.00 19.06.15 31.01.15 15.92 Work Completed.

332 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bambuliya Kalan(from Ramdayal Rathor House to Maliyan Mandir

01.03.2014 21.00 21.00 19.06.15 31.12.14 18.34 Work Completed

333 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Niyana (fromShivalaya to Infront of Satnarayan House to Manoriya Talab

01.03.2014 15.00 15.00 19.06.15 31.01.15 13.12 Work Completed

334 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bambuliya Mata Ji(from Pushp Jain House to Shivraj House

01.03.2014 15.00 15.00 19.06.15 31.12.14 12.51 Work Completed

335 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Akhedi (fromShivraj House to Kailash House

01.03.2014 15.00 15.00 19.06.15 22.02.15 12.50 Work Completed

336 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Khajurna Kalan(from Ganesh Ji House to Dwarkilal Nagar House

01.03.2014 15.00 15.00 19.06.15 18.02.15 12.22 Work Completed

337 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Lisadi (fromRadheshyam Saini House to Motilal Saini House

01.03.2014 18.00 18.00 19.06.15 18.02.15 15.50 Work Completed

338 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Mirjapur (from Khelki Bawdi to Baag

01.03.2014 18.00 18.00 19.06.15 15.89 Work Completed

339 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kaachri (fromKishan Singh Ji House to Manmohan Maran House, BhanwarJi Meena House upto Main road, Harijan Raju House to Mainroad, Ramlal Bheel House to Rambilas Bheel House.

01.03.2014 24.00 24.00 19.06.15 31.01.15 20.39 Work Completed

340 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Taamkheda (fromMadanlal Meena House Badrilal Mali House

01.03.2014 6.00 6.00 19.06.15 31.01.15 4.51 Work Completed.

341 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Mundiya (fromMataji Chabutra to Gyarsiram Ji Potar House

01.03.2014 12.00 12.00 19.06.15 9.43 Work in progress

342 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Daabri (fromHaricharan Suman House to Dr. Giriraj Suman House, Infrontof Jai Shankar Gochar to Jailal Meghwal House

01.03.2014 27.00 27.00 19.06.15 28.02.15 24.11 Work Completed

343 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Sarkanya (fromHanuman Ji Mandir to Babulal Ji Potar House

01.03.2014 15.00 15.00 19.06.15 12.98 Work in progress

Package MDF Baran.02/2013.14 243.00 243.00 205.84344 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Dhaturiya (from

Rajendra Ji Sharma House upto Gadi Mohalla to Bageechi,Under M.D.F.

01.03.2014 21.00 21.00 19.06.15 24.12.14 17.34 Work Completed.

345 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bambuliya Jogiyan(from Chaturbhuj House upto Kamal Meena House, TolaramMeena House to Ram Kalyan Gurjar House

01.03.2014 15.00 15.00 19.06.15 24.12.14 13.08 Work Completed.

Page 23: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

346 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Roop pura (fromMain road to Prakash malav upto Hanuman Ji.

01.03.2014 15.00 15.00 19.06.15 24.12.14 13.28 Work completed

347 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Siswali (from KotaBus Stand Pratap Chowk to Sahkari Behind Sarkari Godamupto Mandi Gate Via Shyam Sain House and MasterBudhiprakash Sain Gali, Siswali Mangrol Road front of PetrolPump upto Gurjar Basti in Hanuman Ji, Kota road in front ofDinesh Ji Yadav House to Gurjar Basti via Radha Sharan viaHansraj Gurjar, Kalupura Omprakash Rainwal House toMorpal Gochar Bhatedi Road.

01.03.2014 64.00 64.00 19.06.15 24.12.14 58.08 Work completed

348 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Udpuriya (fromMain road to road via Gola Chabutra.

01.03.2014 18.00 18.00 19.06.15 24.12.14 16.48 Work completed

349 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Sonwa (from Grampanchayat main road to Kewat Basti via Gram Sonwa

01.03.2014 15.00 15.00 19.06.15 24.12.14 12.97 work completed

350 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Raythal (fromPeerulal meena house upto Nali puliya, Murlidhar Ji Mandir toSeth Ji Om Prakash Ji Khandelwal Shop on Tiraha

01.03.2014 24.00 24.00 19.06.15 24.12.14 21.99 Work completed

351 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Ratadiya (fromGhanshyam Agrawal house upto Prabhulal Dhakad House tomain road, Under M.D.F.

01.03.2014 24.00 24.00 19.06.15 24.12.14 22.51 Work completed

352 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Patunda (from Kalumehra house to Kaala Ji Chowk via Dhakdon Mandir, MangilalKewat House to Aanganbari

01.03.2014 15.00 15.00 19.06.15 24.12.14 12.95 Work completed

353 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Badgaon (fromMain road to Premchand Khandelwal House

01.03.2014 33.00 33.00 19.06.15 24.12.14 26.62 Work completed

Package MDF Baran.03/2013.14 244.00 244.00 215.30354 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Vijaypur (from

Village Vijaypur road via front of Mandir to Bairwa Basti01.03.2014 15.00 15.00 09.07.15 7.59 Work in progress

355 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Balunda (fromSurajmal House to Thekedar House

01.03.2014 23.00 23.00 09.07.15 31.01.15 20.36 Work Completed.

356 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Balapura (fromMandir to Main road

01.03.2014 24.00 24.00 09.07.15 22.26 Work Completed.

357 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Hingoniya (fromGodam to Chandra Prakash Mahavar and Nohra to MansinghHouse

01.03.2014 24.00 24.00 09.07.15 31.12.14 23.48 Work completed

Page 24: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

358 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Borda (from Mainroad to Mandir

01.03.2014 22.00 22.00 09.07.15 31.12.14 21.38 Work completed

359 Baran Anta MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Rakaspuriya (fromNahar puliya to Ramprasad Meena

01.03.2014 22.00 22.00 09.07.15 18.37 Work in Progress

360 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kundla (fromSchool to Hukumchand Meena House

01.03.2014 22.00 22.00 09.07.15 31.12.14 21.00 Work completed

361 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Rengarh (fromDabarilal Suman to Shamshan Ghaat

01.03.2014 24.00 24.00 09.07.15 31.01.15 23.07 Work completed

362 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Shokanda (fromRamswaroop Meena House to Hanuman Ji

01.03.2014 24.00 24.00 09.07.15 31.12.14 21.89 Work completed

363 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bambuliya (fromDevnarayan Mandir to New Basti

01.03.2014 21.00 21.00 09.07.15 31.01.15 20.12 Work completed

364 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Miyada (fromGhanshyam Kachawa to Dhanraj Suman House

01.03.2014 12.00 12.00 09.07.15 31.12.14 11.48 Work completed

365 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Motipura (fromMangilal Ji House to Pani ki Tanki

01.03.2014 9.00 9.00 09.07.15 30.03.15 0.02 Work completed

366 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bohat (from WardNo. 1 Parliya road to Ramkaran Suman and Hiralal Ji House toRamgopal House

01.03.2014 15.00 15.00 09.07.15 31.12.14 5.26 Work completed

367 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Shahpura (fromMain road upto Near Talab to Sarkari Bhawan main gate,Under M.D.F.House

01.03.2014 30.00 30.00 09.07.15 31.12.14 28.77 Work completed

368 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Pakal Kheda (fromHariballabh Nagar House to Pani ki Tanki

01.03.2014 15.00 15.00 09.07.15 31.12.14 14.70 Work completed

Package MDF Baran.04/2013-14 302.00 302.00 259.75369 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Bokda (from Shitla

Mata to Mangilal Meghwal House) 01.03.2014 22.00 22.00 30.06.15 19.01.15 21.97 work completed & F.B.

Paid370 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Musen Gujran (from

Ramdev Ji Mandir to Laxminarayan Ji Mandir)01.03.2014 21.00 21.00 30.06.15 19.01.15 20.46 work completed & F.B.

Paid371 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Diwali (from Hiralal

Yogi, Ramdev Mandir to Atru road) 01.03.2014 22.00 22.00 30.06.15 19.01.15 21.70 work completed & F.B.

Paid372 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Nanawta (from

Bhanwarlal Meena House to Pashu Oshdhalaya) 01.03.2014 21.00 21.00 30.06.15 19.01.15 20.83 work completed & F.B.

Paid373 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Khuri (from

Ramesh Meena House to Chitarlal Meena House)01.03.2014 21.00 21.00 30.06.15 19.01.15 20.46 work completed & F.B.

Paid374 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Raniheda (from

Mohanlal House to Ramswaroop House)01.03.2014 18.00 18.00 30.06.15 19.01.15 18.00 work completed & F.B.

Paid375 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Jeerod (from

Surajmal Meghwal to Panchayat Bhawan) 01.03.2014 21.00 21.00 30.06.15 19.01.15 20.66 work completed & F.B.

Paid

Page 25: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

376 Baran Atru MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Atru (fromRamchandra Suman to Amarchand Kumawat)

01.03.2014 21.00 21.00 30.06.15 19.01.15 20.71 work completed & F.B. Paid

377 Baran Atru MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kachra (from Mainroad to Nand Kishor House to Madanlal Goswami)

01.03.2014 18.00 18.00 30.06.15 19.01.15 17.76 work completed & F.B. Paid

Package MDF Baran.05/2013.14 185.00 185.00 182.55378 Baran Atru MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Kerwaliya (from

Patta padiya khal to Hanumanj Ji Ka Sthan) 01.03.2014 21.00 21.00 30.06.15 31.12.14 20.95 work completed & F.B.

Paid379 Baran Chhabra MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Khadiya (from Main

road to Village main road, Partly damaged portion)01.03.2014 15.00 15.00 30.06.15 31.12.14 14.98 work completed & F.B.

Paid380 Baran Chhabra MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Banjari (from Main

road to Village main road, Partly damaged portion) 01.03.2014 15.00 15.00 30.06.15 31.12.14 14.96 work completed & F.B.

Paid381 Baran Chhabra MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Kotra Bhagwan

(from Main road to Village main road, Partly damaged portion) 01.03.2014 15.00 15.00 30.06.15 31.12.14 15.00 work completed & F.B.

Paid

382 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Pachhar (from Mainroad to Village main road, Partly damaged portion)

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.75 work completed & F.B. Paid

383 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bambori Ghata(from Main road to Village main road, Partly damaged portion)

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.71 work completed & F.B. Paid

384 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Gopal Para (fromMain road to Village main road, Partly damaged portion)

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.85 work completed & F.B. Paid

385 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Jharkheri (fromMain road to Village main road, Partly damaged portion)

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.83 work completed & F.B. Paid

386 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kotri (from Mainroad to Village main road, Partly damaged portion) UnderM.D.F.

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.86 work completed & F.B. Paid

387 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion (from Main road toVillage main road, Partly damaged portion) Halesra

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.74 work completed & F.B. Paid

388 Baran Chhabra MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bherupura (fromMain road to Village main road, Partly damaged portion)

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.81 work completed & F.B. Paid

Package MDF Baran.06/2013-14 171.00 171.00 169.44389 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Jalwada (from Hada

House to in front of Koli Mandir, Police Chowki to KhatiyanMohalla, Hada House to Harijan Basti

01.03.2014 37.60 37.60 30.06.15 30.03.15 32.30 Work in progress

Page 26: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

390 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kundi (from Chatrito Lalpura Chouraha

01.03.2014 15.00 15.00 30.06.15 0.01 Work in progress

391 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Sakrawda (fromBamburi wali road to Mata Ji to Shobharam House to Sakrawda road

01.03.2014 12.00 12.00 30.06.15 31.12.14 10.27 Work in progress

392 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Aakodiya (fromMain road to Between Village upto Kamta road

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.07 Work completed

393 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Peejna (from UpSwasthya Kendra House to Hanuman Mandir

01.03.2014 15.00 15.00 30.06.15 31.12.14 14.13 Work completed

394 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Devri (from GadriyaHouse to Pokhra House

01.03.2014 22.00 22.00 30.06.15 31.12.14 19.83 Work completed

395 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Natai (from JagdishTailor House to Hanuman Mandir

01.03.2014 15.00 15.00 30.06.15 31.12.14 12.86 Work completed

396 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dikwani (fromSchool to Hanuman Mandir, Under MD

01.03.2014 15.00 15.00 30.06.15 31.12.14 12.75 Work completed

397 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Rajpura (from BusStand to Between Village to Ojha Mandir to Betha road

01.03.2014 15.00 15.00 30.06.15 11.42 Work in progress

398 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Gadreta (from Mainroad to Ramesh Ji House to Kohli Mohalla

01.03.2014 15.00 15.00 30.06.15 31.12.14 12.08 Work completed

399 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Fatehpur (fromBabulal Nagar House to Madhu Mantri House

01.03.2014 18.00 18.00 30.06.15 0.01 Work in progress

Package MDF Baran .07/13-14 194.60 194.60 139.73Total MDF Village Portion 13-14 1608.60 1608.60 1393.63

400 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Theekriya form HemrajChoudhry House to Khadi via Durga Shankar House.

22.12.2014 22.75 2.28 Work in Progress

401 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Dugari form Mangilal Khatito Jankilal Nagar House via Mangilal Suman House.

22.12.2014 22.75 2.28 Work in Progress

402 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Nagda ki Jhopadiya formKesarilal Suman House to Towards Main Road.

22.12.2014 22.75 2.28 Work in Progress

403 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Ratadiya form RamkaranDhakad House to Ramdhan House.

22.12.2014 19.50 1.95 Work in Progress

404 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Alipura from BridhilalNagar House to Rameshwar Nagar House and Bada Mandir toBawdi..

22.12.2014 29.25 2.93 Work in Progress

405 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Baldara from NemichandHouse to Ramswaroop Mehra House.

22.12.2014 19.50 1.95 Work in Progress

Page 27: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

406 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Tisaya P.S. Anta fromTalab to Harish chand meena house via Shamshan Ghhat.

22.12.2014 26.00 2.60 Work in Progress

407 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Barkheda from Anta BypassHanuman Mandir to Nayee Basti.

22.12.2014 26.00 2.60 Work in Progress

Total MDF II BRN.01/14.15 188.50 18.87 0.00408 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village Khajurna Kalan from Main

road to Bherulal Kumhar via Ballabh Ji Suman in Ward No. 1 22.12.2014 19.50 1.95 Work in Progress

409 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Lisadi from BheemrajMeena House to Pappu Suman House in Sati Mohalla.

22.12.2014 19.50 1.95 Work in Progress

410 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Badwa from Kila to Puliyavia Kewda Rasta Kalulal Ji and Rameshwar Ji Light wale.

22.12.2014 26.00 2.60 Work in Progress

411 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Kaachri from ManmohanYadav House to Palsawa road .

22.12.2014 19.50 1.95 Work in Progress

412 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Palsawa from Ram GopalGurjar to Ramswaroop Meena House via Secondary School andRameshwar Meena House.

22.12.2014 26.00 2.60 Work in Progress

413 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Pachelkhurd from Kaachripachel main road to Bharat Bhushan Meena House and Mainroad to Dhannalal Meena House.

22.12.2014 22.75 2.28 Work in Progress

414 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Devpura Banjara from Mainroad to Dev Narayan Ji Temple.

22.12.2014 19.50 1.95 Work in Progress

415 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Manpura from Kailash JiNandwana House to Talab ke Balaji

22.12.2014 19.50 1.95 Work in Progress

416 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Bawdi kheda from ChetanKumhar Meena to Shamshan Ghaat and Chitarlal Meena Houseto Shamshan Ghaat

22.12.2014 26.00 2.60 Work in Progress

417 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Kewda from Kewda toChhapar Nai Basti.

22.12.2014 26.00 2.60 Work in Progress

Total MDF II BRN.02/14-15 224.25 22.43 0.00418 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village Mundli from Mahadev ji

Temple to Main road via Lal Bai Mataji Temple G.P. Mahuwa 22.12.2014 22.75 2.28 Work in Progress

419 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Chenpuriya fromGovt. road to towards Kala Kheda road G.P. Simali

22.12.2014 19.50 1.95 Work in Progress

420 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Sankhli from BadeHanuman Ji Talab ki paal to Mali Mohalla via Govt. School.G.P. Simali

22.12.2014 29.25 2.93 Work in Progress

Page 28: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

421 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Shyampura from Temple toDaanmal House via Main road G.P. Hingoniya.

22.12.2014 29.25 2.93 Work in Progress

422 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Motipura Jhopdiya fromKuwan to Ramishan Suman House G.P. Bohat.

22.12.2014 29.25 2.93 Work in Progress

423 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Mahuwa from RajendraGurjar House to Shamshan Ghaat.

22.12.2014 22.75 2.28 Work in Progress

424 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Rebarpura fromMohanlal Mali House to toward Miyada river G.P. Miyada

22.12.2014 19.50 1.95 Work in Progress

Total MDF II BRN.03/14-15 172.25 17.25 0.00425 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village Koyla from Ramcharan

Suman House to Hajare Bhai House in Dwarika AamliMohalla.

22.12.2014 26.00 2.60 Work in Progress

426 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of Culvert on Cartrack bitween village Mau andSeemliya (Palala Puliya)

22.12.2014 10.00 1.00 Work in Progress

427 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Rampura Bhagtan fromSchool to New House of Prem Shankar Meena via DhakadTemple.

22.12.2014 26.00 2.60 Work in Progress

428 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Singola from Sahariya Bastito School G.P. Mahalpur.

22.12.2014 19.50 1.95 Work in Progress

429 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Khanpuriya from Balaji toMain road G.P. Mau

22.12.2014 26.00 2.60 Work in Progress

430 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Harsoli from Govt. Schoolto towards Thakur Ji Temple G.P. Hingoniya

22.12.2014 22.75 2.28 Work in Progress

431 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Padaliya from GhaasBheruji to Hanuman ji Temple via Galav Mohalla.

22.12.2014 26.00 2.60 Work in Progress

Total MDF II BRN.04/ 14-15 156.25 15.63 0.00432 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement with Drain in village Bamla from

Hemraj Nagar (Pandola) to Megha highway and ChothmalPareta to Prakash Chand Nagar Pattiwale

22.12.2014 19.50 1.90 Work in Progress

433 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Ratawad from Heeralal JiMeena House to Lalbai Mataji.

22.12.2014 13.00 1.30 Work in Progress

434 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Taardikheda BadahalaKuwan from Main road Kachchi puliya to Temple.

22.12.2014 19.50 1.95 Work in Progress

435 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Manpura fromRamniwas Gurjar house to Govt. road via Devnarayan Temple.G.P. Tisaya

22.12.2014 19.50 1.95 Work in Progress

436 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Chureliya from Nand kishorHouse to Thakur Ji Temple

22.12.2014 13.00 1.30 Work in Progress

Page 29: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

437 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village ChowkiBherupura from Bajranglal Mali House to Ramlal House,Nichla Pada Mataji Temple to Kunjed road Mataji andRamkishan Mali House to Shamshan Ghaat

22.12.2014 26.00 2.60 Work in Progress

438 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Mandola from SatyanarayanSharma to Gurjar Mohalla via Patel Harishankar Suman Houseand Mali Temple.

22.12.2014 26.00 2.60 Work in Progress

439 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Khedli Bhadoliya on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

440 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Kotri on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

Total MDF II BRN.05/14-15 175.50 17.50 0.00441 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village Ganesh Mohall Atru on

Main damaged rasta 22.12.2014 19.50 1.95 Work in Progress

442 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Merma Talab on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

443 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Khadila on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

444 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Badora on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

445 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Kishanpura Mashadaran onMain damaged rasta

22.12.2014 19.50 1.95 Work in Progress

446 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Ardand on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

447 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Khanpuriya on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

448 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Kishanpura (Bairwa Basti)on Main damaged rasta

22.12.2014 19.50 1.95 Work in Progress

449 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Gandoliya on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

450 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Patana on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

451 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Antana on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

Total MDF II BRN.06/ 14-15 214.50 21.45 0.00452 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village Devriman on Main

damaged rasta 22.12.2014 19.50 1.95 Work in Progress

453 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Dhamaniya Loda Basti onMain damaged rasta

22.12.2014 19.50 1.95 Work in Progress

Page 30: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

454 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Umariya on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

455 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Digod Jaagir on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

456 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Laxmipura on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

457 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Shripura on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

458 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Kohni on Main damagedrasta

22.12.2014 19.50 1.95 Work in Progress

459 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Dolatpura on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

460 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Munda Ghata on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

461 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Manak Chouk on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

462 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Niyamatpur on Maindamaged rasta

22.12.2014 19.50 1.95 Work in Progress

463 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village Peelitai Mohammadpur onMain damaged rasta

22.12.2014 19.50 1.95 Work in Progress

Total MDF II BRN.07/ 14-15 234.00 23.40 0.00464 Baran Baran MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement with Drain in village Ramgarh from

main road to Bhoya ji wali Basti22.12.2014 16.25 1.63 Work in Progress

465 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Pipalda fromSarkari Godam to Dev Narayan ji Chabutra.

22.12.2014 16.25 1.63 Work in Progress

466 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Thana fromThana ki Talai to Karwala.

22.12.2014 17.55 1.76 Work in Progress

467 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Pachlawda fromMadan Ji House to Biloda road

22.12.2014 16.90 1.69 Work in Progress

468 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Khyawda fromMain road to Durgalal House.

22.12.2014 16.90 1.69 Work in Progress

469 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Shahipura fromHanuman ji Mandi to Chouhan House.

22.12.2014 19.50 1.95 Work in Progress

470 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Dand Chatrapura from Manjit Bairwa House to Kalulal Bairwa House and UdalalGurjar House to Babulal Bairwa House.

22.12.2014 16.90 1.69 Work in Progress

471 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Khatka fromKhatka Bamla Hanuman Temple to Sahrane

22.12.2014 16.90 1.69 Work in Progress

Page 31: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

472 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Narayan khedafrom Barai (Ward Member) House to Mohan Mehta House.

22.12.2014 17.55 1.76 Work in Progress

473 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Majhola fromMahadev Ji Chabutra to Shri Krishan Mehta House and JatavMohalla to Kuwa via Sirnam Dhakad House.

22.12.2014 16.90 1.69 Work in Progress

474 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Mahodra fromHarlal Kirad House to Toward Thakurlal Kirad House viaChatri, Ramjan ki Temple

22.12.2014 16.25 1.63 Work in Progress

475 Baran Baran MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement with Drain in village Amrod fromMahendra Yadav House to Siddh Baba Chabutra.

22.12.2014 16.90 1.69 Work in Progress

Total MDF II BRN.08/ 14-15 204.75 20.50 0.00G. Total MDF II 14-15 1570.00 157.03 0.00Total C.C. Village Portion 3178.60 1765.63 1393.63Total Division Baran 6906.78 2244.91 3506.38

476 Jhalawar Jhalarapatan

Yard work KUMS Colour Wash & Minor Reparing of Kisan Bhawan at Sub YardJhalawar Under K.U.M.S. J.Patan

04.12.2014 1.75 29.06.15 0.00 W.O. Recently Issued

477 Jhalawar Jhalarapatan

Yard work KUMS Construction of Water Hut at Main Mandi Yard Jhalrapatan, 04.12.2014 4.50 0.00 Tender to be reinvited

478 Jhalawar Jhalarapatan

Yard work KUMS Construction of Water Hut with Water Tank at Sub YardAsnwar

04.12.2014 5.50 0.00 Tender to be reinvited

479 Jhalawar Jhalarapatan

Yard work KUMS Const. of Modern gate with check post at main mandi yard Jhalrapatan,

04.12.2014 29.00 0.00 Tender to be reinvited

480 Jhalawar Jhalarapatan

Yard work KUMS Const. of Auction Plateform at Sub Yard Bakani 23.12.2014 29.95 04.10.15 0.00 W.O. Recently Issued

Jhalarapatan Total 70.70 0.00 0.00

481 Jhalawar Aklera Yard work KUMS Const of Compound Wall (Front Side) 07.10.2014 38.10 0.00 Tender to be received on 05.05.15

482 Jhalawar Aklera Yard work KUMS Butification of Main Gate 07.10.2014 15.00 0.00 Tender to be received on 05.05.15

483 Jhalawar Aklera Yard work KUMS Check Post 07.10.2014 3.00 0.00 Tender to be received on 05.05.15

484 Jhalawar Aklera Yard work KUMS IIIrd Type Quatar 07.10.2014 28.00 0.00 Tender to be reinvited.

485 Jhalawar Aklera Yard work KUMS S/R & Extension of Office Building 07.10.2014 38.60 0.00 Tender to be reinvited.

KUMS : AKLERA

KUMS : Jhalrapatan

Page 32: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

Aklera Total 122.70 0.00 0.00

486 Jhalawar Bhawani Mandi

Yard work KUMS Const. of C.C. Internal road at main mandi yard B.Mandi 09.09.2014 202.42 02.04.16 61.23 Work in Progress

487 Jhalawar Bhawani Mandi

Yard work KUMS Const. of Water Hut (2Nos) at main mandi yard B.Mandi 09.09.2014 10.00 02.04.16 0.00 Work in Progress

488 Jhalawar Bhawani Mandi

Yard work KUMS Const. of Urinal Block (4Nos) at main mandi yard B.Mandi 09.09.2014 4.00 02.04.16 0.00 Work in Progress

489 Jhalawar Bhawani Mandi

Yard work KUMS S/R of & Const. of Compound wall around office & Bankbuilding at main mandi yard B.Mandi

09.09.2014 15.00 02.04.16 0.00 Work in Progress

490 Jhalawar Bhawani Mandi

Yard work KUMS Const. of C.C. Internal road at Sub Yard Sunel under KUMSB.Mandi

09.09.2014 55.15 17.42 02.04.16 43.37 C.C. Work Comp. ( Package work)

Bhawani Mandi Total 286.57 17.42 104.60

491 Jhalawar Chaumehla Yard work KUMS Const of C.C. Internal Roads at main mandi yard Chaumehla 09.09.2014 160.88 02.04.16 48.33 C.C. Work in progress

492 Jhalawar Chaumehla Yard work KUMS Const of under ground water tank (Capacity 12000 Ltr) at mainmandi yard KUMS Chaumehla

09.09.2014 2.00 02.04.16 0.00 Work in progress

493 Jhalawar Chaumehla Yard work KUMS Const. Urinal Blocks (2Nos) at main mandi yard KUMSChaumehla

09.09.2014 2.00 02.04.16 0.00 Work in progress

494 Jhalawar Chaumehla Yard work KUMS S/R of Bank Building at main mandi yard KUMS Chaumehla 09.09.2014 11.00 02.04.16 0.00 Work in progress

495 Jhalawar Chaumehla Yard work KUMS S/R of Office Building at main mandi yard KUMS Chaumehla 09.09.2014 6.00 02.04.16 0.00 Work in progress

496 Jhalawar Chaumehla Yard work KUMS S/R of Godown (250MT) at main mandi yard KUMSChaumehla

09.09.2014 6.50 02.04.16 0.00 Work in progress

Chaumehla Total 188.38 0.00 48.33Total Yard Work Jhalawar 1578.61 519.77 531.41

497 Jhalawar R.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion L/R Amjhar toPipalda K.M. 0/0 to 0/300

01.03.2014 14.40 3.58 10.07.15 8.91 C.C. Work Comp. ( Package work)

498 Jhalawar R.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion L/R Rawli to MandaK.M. 2/700 to 3/00

01.03.2014 14.40 1.98 10.07.15 10.51 CC Work Comp (Package work)

499 Jhalawar R.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion L/R Budhkhan toSarlakalanK.M. 0/0 to 0/300

01.03.2014 14.40 2.13 10.07.15 10.36 CC Work Comp (Package work)

500 Jhalawar R.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion L/R Goyanda toBheempura K.M. 1/200 to 1/500

01.03.2014 14.40 1.76 10.07.15 10.73 CC Work Comp (Package work)

501 Jhalawar R.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion L/R Julmi road toLakhariyar Gadiya K.M. 0/500 to 0/800

01.03.2014 14.40 2.59 10.07.15 9.89 CC Work Comp (Package work)

KUMS : Chaumehla

KUMS : Bhawani Mandi

Page 33: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

502 Jhalawar J.PATAN MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion L/R Durgpura GramSewa Sahkari Samiti to Main Chouraha

01.03.2014 20.90 2.85 10.07.15 15.28 CC Work Comp (Package work)

503 Jhalawar J.PATAN MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kanwada Main road 01.03.2014 15.68 6.20 10.07.15 7.39 CC Work Comp (Package work)

504 Jhalawar J.PATAN MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Titarwasa Sunelroad to Primary School

01.03.2014 15.68 1.69 10.07.15 11.90 CC Work Comp (Package work)

505 Jhalawar J.PATAN MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion GirdharpuraHarisingh Ji House to Balaji Chabutra, Nandram Ki Chhakki

01.03.2014 15.68 4.40 10.07.15 9.19 CC Work Comp (Package work)

506 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dubaliya Variousmain road

01.03.2014 13.04 3.05 10.07.15 8.27 CC Work Comp (Package work)

507 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portionSirpai Handpump toMain Market

01.03.2014 13.04 0.88 10.07.15 10.44 CC Work Comp (Package work)

508 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Boliya GanpatiMandir Chouraha to Nalah

01.03.2014 5.22 0.43 10.07.15 4.10 CC Work Comp (Package work)

509 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Boliya Balikamiddle school to Patidar panchayat bhawan

01.03.2014 4.70 0.66 10.07.15 3.42 CC Work Comp (Package work)

510 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Boliya HemrajHouse to Kanheyalal House

01.03.2014 3.14 0.41 10.07.15 2.31 CC Work Comp (Package work)

511 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Banor RamnarayanDangi House to Balchand House

01.03.2014 13.06 11.31 10.07.15 0.01 Work in progress

512 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Rampuriya StateHigh way to Pani ki Tanki

01.03.2014 13.06 1.29 10.07.15 10.03 Work in progress

513 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dewal kheda,Dewal kheda main road

01.03.2014 20.90 18.12 10.07.15 0.01 Work in progress

514 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion ChachlawaMeghwal basti to Dhakd Basti

01.03.2014 13.06 3.37 10.07.15 7.95 Work in progress

515 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Suhasa Pani kiTanki to Shamshan

01.03.2014 13.06 1.56 10.07.15 9.76 Work in progress

516 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Hemda, RamprasadPatidar House to Jinkilal Luhar House

01.03.2014 18.29 15.85 10.07.15 0.01 Work in progress

517 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kotdi, Various mainroad

01.03.2014 13.06 1.05 10.07.15 10.27 CC Work Comp (Package work)

518 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Magishpur,Setkhedi road to Kalulal Ji House

01.03.2014 13.06 3.96 10.07.15 7.36 Work in progress

Package Jhalawar .01/13.14 296.63 89.12 168.10519 Jhalawar AKLERA MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Uncha kheda,

Uncha kheda to Tanwar Ghati01.03.2014 13.06 1.96 19.06.15 18.03.15 9.62 Work Comp FB. Yet to be

paid

Page 34: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

520 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bhalta, MaliMohalla to Bus Stand

01.03.2014 13.06 1.93 19.06.15 18.03.15 9.65 Work Comp FB. Yet to be paid

521 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion RanipuriyaGajanand House to Badrilal Bada

01.03.2014 13.06 0.33 19.06.15 18.03.15 11.24 Work Comp FB. Yet to be paid

522 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dhama kheda,Purani Ghati Kharanje to Ram kishan House

01.03.2014 13.06 5.17 19.06.15 18.03.15 6.41 Work Comp FB. Yet to be paid

523 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Dewli, Gaun toShamshan

01.03.2014 13.06 1.01 19.06.15 18.03.15 10.57 Work Comp FB. Yet to be paid

524 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Devri ChanchalRamvilas House to Pipliya Walon

01.03.2014 13.06 0.37 19.06.15 18.03.15 11.20 Work Comp FB. Yet to be paid

525 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kaliya khedi,Mandir to Aara Machine

01.03.2014 13.06 2.69 19.06.15 18.03.15 8.89 Work Comp FB. Yet to be paid

526 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Khata khedi, BadPed to Aara Machine

01.03.2014 13.06 0.53 19.06.15 18.03.15 11.05 Work Comp FB. Yet to be paid

527 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Ghadawli, RamjankiMandir to Hanuman Mandir

01.03.2014 13.06 0.28 19.06.15 18.03.15 11.59 Work Comp FB. Yet to be paid

528 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kawariya Khedi,School to Gaun Chowk

01.03.2014 13.06 1.06 19.06.15 18.03.15 10.52 Work Comp FB. Yet to be paid

529 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Jawri, BheelMohalla to Mata Sthan

01.03.2014 13.06 0.00 19.06.15 18.03.15 11.95 Work Comp FB. Yet to be paid

530 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Tharol, HanumanMandir to Brahaman House

01.03.2014 13.06 0.50 19.06.15 18.03.15 11.08 Work Comp FB. Yet to be paid

531 Jhalawar AKLERA MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kukalwada Bawdito Neem Ped

01.03.2014 13.06 1.00 19.06.15 18.03.15 10.57 Work Comp FB. Yet to be paid

Package Jhalawar .03/13.14 169.78 16.83 134.34532 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Aaroliya,

Devnarayan Mandir to Nehrawat road01.03.2014 13.06 1.36 21.06.15 9.47 Work Comp FB. Yet to be

paid533 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Nehrawat, Main

road to Kaniram Sarpanch House01.03.2014 13.06 0.74 21.06.15 10.09 Work Comp FB. Yet to be

paid534 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Khoriya, Kanwarlal

Ji ka bada to Bhati Takdi01.03.2014 13.06 0.41 21.06.15 10.42 Work Comp FB. Yet to be

paid535 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Tisai, Ram mandir

to Up swasthya Kendra01.03.2014 13.06 0.39 21.06.15 10.44 Work Comp FB. Yet to be

paid536 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Kyasra, Shankarlal

Bairagi House to Talai Handpump01.03.2014 13.06 0.56 21.06.15 10.27 Work Comp FB. Yet to be

paid537 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Dokarkhedi, Gaun

nala to main road01.03.2014 13.06 1.60 21.06.15 9.23 Work Comp FB. Yet to be

paid538 Jhalawar B.MANDI MDF (Vill.

C.C.)RSAMB Const. of C.C. Pavement in village portion Kolwi, Bisniya

road to Karan Singh House01.03.2014 13.06 1.56 21.06.15 9.27 Work Comp FB. Yet to be

paid

Page 35: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

539 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Kolwi, Station roadto Sardar Singh House

01.03.2014 13.06 2.30 21.06.15 8.53 Work Comp FB. Yet to be paid

540 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Aamli kalan,Ramkaran patel house to Shamlal Meghwal House

01.03.2014 13.06 0.98 21.06.15 9.85 Work Comp FB. Yet to be paid

541 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Bakani Khurd,Fateh Singh Aanjana House to Pani Tanki

01.03.2014 13.06 0.19 21.06.15 10.64 Work Comp FB. Yet to be paid

542 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Titiya, Kuan toMandir

01.03.2014 13.06 1.29 21.06.15 9.54 Work Comp FB. Yet to be paid

543 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Pipliya khurd,Pipliya khurd to Patlay

01.03.2014 13.06 0.54 21.06.15 10.28 Work Comp FB. Yet to be paid

544 Jhalawar B.MANDI MDF (Vill. C.C.)

RSAMB Const. of C.C. Pavement in village portion Suliya ChotaMandir to Baba Ramdev Mandir

01.03.2014 13.06 0.98 21.06.15 9.85 Work Comp FB. Yet to be paid

Package Jhalawar -04/13-14 169.78 12.90 127.88545 Jhalawar MDF (Vill.

C.C.)RSAMB Construction of C.C. Pavement in Village Bhilwara Under

Package MDF.II / Jhalawar/01/2014-1522.12.2014 16.50 15.14 11.10.15 Work in progress

546 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Choki UnderPackage MDF.II / Jhalawar/01/2014-15

22.12.2014 16.50 15.16 11.10.15 12.68 C.C. Work Comp ( Package Work)

547 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Sitafal UnderPackage MDF.II / Jhalawar/01/2014.15

22.12.2014 26.40 24.25 11.10.15 Work in progress

548 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement/ BT Work in Village JagpuraUnder Package MDF.II / Jhalawar/01/2014-15

22.12.2014 31.12 28.63 11.10.15 Work in progress

549 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Brahmpura UnderPackage MDF.II / Jhalawar/01/2014-15

22.12.2014 17.20 15.81 11.10.15 Work in progress

Total Package MDF.II / Jhalawar/01/2014-15 107.72 98.99 12.68550 Jhalawar MDF (Vill.

C.C.)RSAMB Construction of C.C. Pavement in Village Silori Under

Package MDF.II / Jhalawar/02/2014-1522.12.2014 17.50 14.90 04.02.16 Work in progress

551 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Garwara UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 21.00 17.87 04.02.16 Work in progress

552 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Kadarnagar UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 21.00 17.89 04.02.16 Work in progress

553 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Guradiya UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 14.00 11.92 04.02.16 Work in progress

554 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Narana UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 21.70 18.48 04.02.16 Work in progress

555 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Kolikheda UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 17.50 14.83 04.02.16 C.C. Work Comp. ( Package work)

556 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Kachrakhedi Under Package MDF.II / Jhalawar/02/2014-15

22.12.2014 21.00 17.89 04.02.16 Work in progress

Page 36: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

557 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village RaghunathpuraUnder Package MDF.II / Jhalawar/02/2014-15

22.12.2014 21.00 17.89 04.02.16 Work in progress

558 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Mapakhedi UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 21.00 17.89 04.02.16 Work in progress

559 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Chodi UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 30.26 25.78 04.02.16 C.C. Work Comp ( Package Work)

560 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Kalotia UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 24.50 20.87 04.02.16 Work in progress

561 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village NarayankhedaUnder Package MDF.II / Jhalawar/02/2014-15

22.12.2014 26.70 22.71 04.02.16 Work in progress

562 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Ratanpura UnderPackage MDF.II / Jhalawar/02/2014-15

22.12.2014 21.00 17.89 04.02.16 Work in progress

Total Package MDF.II / Jhalawar/02/2014-15 278.16 236.81 0.00563 Jhalawar MDF (Vill.

C.C.)RSAMB Construction of C.C. Pavement in Village Rampuria Under

Package MDF.II / Jhalawar/03/2014-1522.12.2014 16.50 14.00 09.02.16 Work in progress

564 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Bhulankhedi Under Package MDF.II / Jhalawar/03/2014-15

22.12.2014 16.50 14.00 09.02.16 Work in progress

565 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Mohanpura UnderPackage MDF.II / Jhalawar/03/2014.15

22.12.2014 19.80 16.79 09.02.16 Work in progress

566 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Chodliya UnderPackage MDF.II / Jhalawar/03/2014.15

22.12.2014 13.50 11.43 09.02.16 Work in progress

567 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Tajpuria UnderPackage MDF.II / Jhalawar/03/2014-15

22.12.2014 26.20 22.22 09.02.16 Work in progress

568 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Ganeshpura UnderPackage MDF.II / Jhalawar/03/2014-15

22.12.2014 26.20 22.23 09.02.16 Work in progress

569 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Padliya UnderPackage MDF.II / Jhalawar/03/2014-15

22.12.2014 21.50 18.20 09.02.16 Work in progress

570 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Kajliya UnderPackage MDF.II / Jhalawar/03/2014-15

22.12.2014 18.50 15.69 09.02.16 Work in progress

571 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Bamlaveh UnderPackage MDF.II / Jhalawar/03/2014-15

22.12.2014 25.70 21.80 09.02.16 Work in progress

Total Package MDF.II / Jhalawar/03/2014-15 184.40 156.36 0.00572 Jhalawar MDF (Vill.

C.C.)RSAMB Construction of C.C. Pavement in Village Parapipli Under

Package MDF.II / Jhalawar/04/2014-1522.12.2014 31.36 26.28 04.02.16 Work Order issued recently

573 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Banjaro Ka KhedaUnder Package MDF.II / Jhalawar/04/2014.15

22.12.2014 16.50 13.81 04.02.16 Work Order issued recently

574 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Dokarkhedi UnderPackage MDF.II / Jhalawar/04/2014-15

22.12.2014 24.50 20.53 04.02.16 Work Order issued recently

Page 37: Circle Kota April 2015 - Mandi online by Rajasthan ... : KOTA S. No. Division Name of Work F.S. 2014.15 Funded by (KUMS/ MDF/ NABARD/ PROJECT/ OTHER) Actual Date of compl. Stp. Date

Date AmountS.

No.Division Name of Work F.S.

2014.15Funded by (KUMS/

MDF/ NABARD/ PROJECT/ OTHER)

Actual Date of compl.

Stp. Date of compl.

Exp. upto date

Adm. SanctionKUMS Head State of work/ remarks

575 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Harnikheda UnderPackage MDF.II / Jhalawar/04/2014-15

22.12.2014 21.00 17.60 04.02.16 Work Order issued recently

576 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Guradiya DevraUnder Package MDF.II / Jhalawar/04/2014-15

22.12.2014 18.50 15.50 04.02.16 Work Order issued recently

577 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Bhatkhedi UnderPackage MDF.II / Jhalawar/04/2014-15

22.12.2014 24.40 20.45 04.02.16 Work Order issued recently

578 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Rojhana UnderPackage MDF.II / Jhalawar/04/2014-15

22.12.2014 24.40 20.45 04.02.16 Work Order issued recently

579 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Bedla UnderPackage MDF.II / Jhalawar/04/2014-15

22.12.2014 16.50 13.82 04.02.16 Work Order issued recently

580 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Maksi UnderPackage MDF.II / Jhalawar/04/2014-15

22.12.2014 21.10 17.68 04.02.16 Work Order issued recently

Total Package MDF.II / Jhalawar/04/2014-15 198.26 166.12 0.00581 Jhalawar MDF (Vill.

C.C.)RSAMB Construction of C.C. Pavement in Village Bhanwara Under

Package MDF.II / Jhalawar/05/2014-1522.12.2014 21.50 17.60 04.02.16 Work Order issued recently

582 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Chapakhur UnderPackage MDF.II / Jhalawar/05/2014-15

22.12.2014 16.11 13.78 04.02.16 Work Order issued recently

583 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Banskheda UnderPackage MDF.II / Jhalawar/05/2014-15

22.12.2014 19.50 15.97 04.02.16 Work Order issued recently

584 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Chosla(Ganeshpura) Under Package MDF.II / Jhalawar/05/2014-15

22.12.2014 22.30 18.27 04.02.16 Work Order issued recently

585 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Bagod UnderPackage MDF.II / Jhalawar/05/2014-15

22.12.2014 28.10 23.00 04.02.16 Work Order issued recently

586 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Nayagav DevpuraUnder Package MDF.II / Jhalawar/05/2014-15

22.12.2014 24.50 20.06 04.02.16 Work Order issued recently

587 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Dediya UnderPackage MDF.II / Jhalawar/05/2014-15

22.12.2014 17.50 14.29 04.02.16 Work Order issued recently

588 Jhalawar MDF (Vill. C.C.)

RSAMB Construction of C.C. Pavement in Village Jhathana UnderPackage MDF.II / Jhalawar/05/2014-15

22.12.2014 23.50 19.22 04.02.16 Work Order issued recently

Total Package MDF.II / Jhalawar/05/2014.15 173.01 142.19 0.00Total C.C. Village Portion Jhalawar 1577.74 919.32 443.00Grand Total of Jhalawar Division 3156.35 1439.09 974.41Grand Total of Kota Circle 16886.48 6172.96 6113.44

Superintending EngineerRSAMB Circle Kota