Page 1: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 2: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 3: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 4: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 5: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 6: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 7: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 8: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 9: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 10: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 11: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 12: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 13: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 14: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 15: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 16: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 17: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 18: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 19: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 20: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 21: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 22: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 23: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 24: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 25: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 26: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 27: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 28: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 29: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 30: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 31: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load
Page 32: Cintec Engineering REV2€¦ · were also tested after 40 vetting/ drying cycles. The pull-out testing vas carried out on a standard Universal Testing machine with a maximum load