CII – 19th National Energy Conservation Award 2018
Raymond UCO 2017-18
UCO
Presented By –Akshay Admane
(Sr. Manager Elect & Inst)
Energy Manager
Way of Raymond UCO
Raymond Group starter at 1925 and is a front runner in the Indian textiles market. Denim plant of Yavatmal started at 1996 is one of the largest quality Denim fabric producer in India. Plant is located at Yavatmal Maharashtra, having production capacity of 44 million meters per annum.
We have ISO 9001:2015, SA – 8000, GOTS, Oeko tex 100, Accredit by NABL, Leave's & GAP Lab, Organic exchange.
ISO – 50001 with TUV. ( Audit Completed)
We believe energy conservation is the way of life and thus for the last three years we have Invested Lacs Rs.1349 /- for ENCON & achieved Saving of Lacs Rs.641 /- .
With this way we have surpass the PAT Cycle -I Target By Double.Vision-
Our aim is to become a role model to all the Denim manufacturing units in terms of Quality, Quantity and Efficient Utilization of ENERGY.
Raymond UCO 2017-18
SEC & Energy Saving Summery UCO
SEC Consumption Of Plant -Years Toe/ ton2013-14 2.1812014-15 1.8372015-16 1.8052016-17 1.7922017-18 1.770
Electrical & Thermal Energy Saved by Encon Projects -Years Electrical Energy (Lacs KWH) Thermal Energy (Million Kcal)2013-14 9.6 45002014-15 14.76 162102015-16 22.6 24802016-17 34.6 60722017-18 15.38 13651
Investment & Saving Achieved-Years Investment made (Rs. Lacs) Saving achieved (Rs. Lacs)2013-14 220 1182014-15 151 1042015-16 394 1382016-17 360 276
2017-18 595 226
Raymond UCO 2017-18
Specific Energy Consumption
SEC UCO
45 41 38 33 33 27
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
Ltr/Mtr
2.1811.837 1.805 1.79 1.77
2013 - 14 2014 - 15 2015-16 2016-17 2017-18
TOE/Ton
Raymond UCO 2017-18
Water Consumption
We have 2015-16 consumption figure of Arvind
Mills(Sustainability Report2014-16)
* Arvind Mills Denim Division is – 34.45 Ltr / Mtr.
* Raymond UCO Denim Pvt. Ltd. fresh water
consumption for FY 2017-18 is – 27 Ltr / Mtr.
PAT -2 Cycle Targets
Also we have BEE PAT cycle -II obligations, in which
we have target of 5.9% reduction in our SEC till 31st
March, 2019.
PAT cycle -1 Target was – TOE – 2139.77. We have
achieved 3327.50 ESCerts.
National & Global
Benchmarking UCO
Raymond UCO 2017-18
Raymond UCO Denim Pvt. Ltd. Use to conduct regular Energy Audit by internal and External Auditor. We have implemented almost all the recommendation of External Auditor. We have increased our SEC reduction targets from 1% to 2% with reference to previous year for next five year.
National Benchmarking - As per national benchmarking is concern we have considered –
1. CII Shakti Textile Book–Technology compendium on Energy Saving Opportunities, Textile sector(P.no 27).
2. Presentation of Arvind Mills at CII award – 2017.
Name of the Plant Process Electrical SEC Thermal SCE
National Benchmarking ( Shakti
Foundation)
Spinning 3 – 3.5 Kwh/Kg Not applicable
National Benchmarking ( Shakti
Foundation)
Dyeing 0.04 – 0.15 Kwh / Kg 4 - 9 kg steam / Kg
Arvind Mills( CII Award – 2017) Complete plant 5.63 Kwh /kg 14255 K Cal/Kg
Raymond UCO Denim Pvt. Ltd. Spinning 2.59 Kwh /Kg Not applicable
Raymond UCO Denim Pvt. Ltd. Dyeing 0.15 Kwh /kg 5 Kg steam / Kg
Raymond UCO Denim Pvt. Ltd. Complete Plant 4.19 Kwh /kg 9998.27 K Cal/Kg
Table of comparison
Global Benchmarking- As per global benchmarking is concern, we have not found any
authentic data to consider. It is varying region to region and continent to continent. So we
have not considered this data.
2015-16
Project Implemented in Last Three Years UCO
Sl.
NoTitle of Energy Saving project implemented
Annual Electrical
Savings achieved
Annual thermal
savings
Total Annual
Savings
(Rs. Millions)
Investment
Million Rs
Units
(Lac Kwh)
Million
Rs
Fuel
(MT)
Million
RsMillion Rs Million Rs.
1Centrifugal compressor installation 2 No.
capacity 4300 CFM each14.11 9.16 0 0 9.16 30.00
2 Waste Heat recovery at HT compressor 0 0.00 600 0.3 0.30 2.50
2 Fogging System in Spg- 1 and Spg- 2 1.55 0.10 0 0 0.10 2.50
3Installation of PNLD to 1 no. Centac
Compressor 0.06 0.04 0 0 0.04 0.05
4 Installation of turbo ventilator -95 nos. 4.1 2.45 0 0 2.45 1.01
5 Installation of transparent sheet.- 25 nos. 0.009 0.01 0 0 0.01 0.05
6Installation of 1300 LED tube light in Place of
FTL2.24 1.34 0 0 1.34 0.78
8LPG saving through optimization of machine
setting0 0.00 19.9 0.09 0.09 0.00
9 Installation of 40 KW solar power plant 0.59 0.35 0 0 0.35 2.50
Total 22.62 13.45 619.9 0.39 13.84 39.39
Raymond UCO 2017-18
2016-17
Project Implemented in Last Three Years UCO
Sl
No
Title of Energy Saving project
implemented
Annual Electrical
Savings achieved
Annual
thermal
savings
Total Annual
Savings
(Million Rs)
Investment
made
Units
(Lac Kwh)
Million
Rs
Fuel
(MT)
Million
RsMillion Rs Million Rs.
1
Back pressure turbine to recover energy
from steam energy at the time of pressure
regulation ( capacity 132 KWH)
3.58 2.15 0 0 2.15 4.00
2LED light in place of conventional
light ( 12000 no)23.70 14.23 0 0 14.23 6.00
3Installation HT 4300 CFM HT compressor
and stop the small LT comp.6.87 4.13 1500 6 10.13 20.00
4Installation of Bio gas plant for LPG
substitutes in canteen.0 0 17.9 0.88 0.88 2.00
5Installation of turbo ventilator, light pipe
and transparent sheet.0.45 0.27 0 0 0.27 2.00
6
Thermal energy saving through RO water
for boiler feed. Maintenance of thermal
Insulation, Condensate recovery, coal
additive at boiler.
0 0 1500 6.0 6.0 2.00
Total 34.60 20.77 3018 6.88 27.65 36.00
Raymond UCO 2017-18
2017-18
Project Implemented in Last Three Years UCO
Raymond UCO 2017-18
Sl No Title of Energy Saving project implemented
Annual Electrical Savings achieved
Annual thermal savings
Total Annual Savings
Investment
Lac KWH
Million Rs.Tons of
FuelMillion Rs. Million Rs. Million Rs.
1 Installation of 20 TPH Boiler and stop small boilers 0 0.00 3580 14.32 14.32 30
2Reduction of compressed air pressure at generation from 8.o Kg/Cm Sq to 7.7 Kg/Cm Sq. And Segregation of pressure. 10.74 5.37 0 0 5.37 2.5
390Watt High bay LED lamp in place of 250 Watt HPSV lamp. 65nos
0.344 0.17 0 0 0.17 4.25
4 Air leak detection and arresting 0.52 0.26 0 0 0.26 1.5
5 Converted double tubelight into single tube light ( 500 nos) 0.64 0.32 0 0 0.32 0
6 Installation of 37 KW VFD at ETP on aeration tank. 2.35 1.17 0 0 1.17 0.25
7Installation of 91 no. of turbo ventilator, transparent sheet, light pipe at various locations. 0.20 0.10 0 0 0.10 20
9Biogas generation by mixing sizing chemical in food waste increase generation from 40 Kg/day to 75 kg/day 0.00 0.00 13 1 1 0.5
10 Reduction in CPP Lighting Comsumption @ 100 Kwh/ day 0.33 0.17 0 0 0.17 0.2
11 CPP Compressor power Reduction by AHP Air optimisation 0.099 0.05 0 0 0.05 0
12 CHP optimisation with higher loading 0.07 0.03 0 0 0.03 0
13 Replace 18.5 Kw DM Plant HP pump by 15Kw. 0.10 0.05 0 0 0.05 0.3
15.38 7.69 3593 14.95 22.64 59.50
2018-19
List Of Encon Project Planned UCO
Raymond UCO 2017-18
Sl No Title of Energy Saving project implemented
Expected Electrical Savings
Expected Thermal Savings
Lac KWH Tons of Fuel
1Conversion of push in tying to locking type punmatic
fitting.1.03 NA
2Maintenance of thermal insulation
0.00 150
3 VFD at sludge dryer fan 0.43 NA
4 Interlocking of waste recovery at Blow room 0.20 NA
5Stopping of conveyer belt of winding machine in idle
condition 0.13 NA
6 Stopping of 37 KW oxidation fan motor at dyeing 1.15 NA
7Boiler feed pump up-gradation
0.50 NA
8RO plant up-gradation
0.30 NA
9 Boiler feed pump discharge pressure optimization 0.40 NA
10 VFD installation in PA fan motor 0.45 NA
11 Energy Efficient soft starter for crusher motor 0.11 NA
12 Replacement of 250Watt HPSV with 90 Watt LED 0.007 NA
TOTAL 4.71 150
Utilization of Size Chemical Waste In Biogas
Innovative Project -1 UCO
Raymond UCO 2017-18
Raymond UCO always keep trying to find out new way of energy conservation.We have Biogas plant of 500 KG waste. Innovative Project -1
We were using canteen, Guest house andcolony food waste to feed this plant.After brain storming and research we observed that, we have Sizing machines wherein sizing chemical used which is composition of mainly starch and binding agentwhich has high COD value and 100 % bio degradable. We started mixing this chemical into the feed of biogas and our biogas output increased from 40 Kg/day to 75 kg/day.
Advantages –
1.ETP COD and BOD load reduces.2.Increased in generation of Gas output.3.Approximate saving of 35 Kg/ day LPG gas.4.Reduction in CO2 emission.
Size Chemical
Canteen
Colony
Canteen Kitchen
Dining Hall
Bio gas
Plant
40 Kg /Day75 Kg/Day
Waste Generation and Feeding
Innovative Project -1 UCO
Raymond UCO 2017-18
Light Pipe At Loom Shed
Innovative Project -2 UCO
Raymond UCO 2017-18
Raymond UCO always promote the use of Renewable Energy sources.
In context of that we have installed the Light Pipe at our loom shed which
is 1st in the Textile Weaving application.
Light Diffuser
Light Reflector
Light Collector
Light Pipe At Loom Shed
Innovative Project -2 UCO
Raymond UCO 2017-18
Existing System is equipped with 60 no. of double Tube light fitting.
And 18 no. of Light Pipe.
We did the interlocking of these lights with LDR.
When daylight is available and Lux level reaches to 100. All Tube
lights automatically OFF.
By implementing this project
we have saved = 8500 Unit/year.
Investment Rs. = 30000 / Light Pipe
= 5.4 Lac
Payback is Appx. – 15 years.
With this high payback period our management sanction this project.
It shows the commitment of our TOP MANAGEMENT toward Energy
Conservation.
Segregation Of Compressor Line Network
Innovative Project -3 UCO
Raymond UCO 2017-18
Reduction of generation air pressure from 8 kg/cm2 to 7.5 kg/cm2 and separation of High
pressure compressed Air Network into(7.5 Kg/cm2) and (6.5 Kg/cm2).
Total Saving per year = 10.7 Lac kWh.
Total Saving in Rs per year= Rs 53.7 Lacs
Compressor 7.5 kg Air Receiver
Air ReceiverMachine shop
Machine shop
Compressor 7.5 kg
Compressor 6.5 kg
Installation of 500Kg/Day Biogas Plant
Use OF Renewable Energy UCO
By implementing this project we have achieved the saving of LPG 17900 Kg/year. With investment of Rs. 20 Lac pay back of 28 months.
Raymond UCO 2017-18
Use OF Renewable Energy
Installation OF Light Pipe, Transparent sheet & Turbo ventilator
UCO
Installation of transparent sheet,
Light Pipe & Turbo ventilator.
Saving of 45000 units / year.
Investment Rs. 20 Lac
1St Time in Weaving Textile Mills
Raymond UCO 2017-18
Use Of Renewable Energy
Go Green
Solar Power Generation- 155 Kw
Use of Day light ( Light Pipe)
UCO
Solar Water Heater Turbo Ventilator
Raymond UCO 2017-18
Use Of Renewable Energy
Utilization of Waste Material As Fuel
Spinning Dust
UCO
Pellet Making Machine
Pellet
Utilization as fuel in
Thermic Fluid Heater
Our process of spinning and weaving
generate nearly 3.5 MT of micro dust
as a waste. We have convert it into
pellet and directly feed to Thermopac
with coal.
Raymond UCO 2017-18
Process Flow –
Waste of Spinning and Weaving – (Cotton Dust)
Pallet making machine -
Conversation of Dust to Pallet –
Process Boiler -
Process Flow –
Waste of Spinning and Weaving – (Cotton Dust)
Pallet making machine -
Conversation of Dust to Pallet –
Process Boiler -
Process Flow –
Waste of Spinning and Weaving – (Cotton Dust)
Pallet making machine -
Conversation of Dust to Pallet –
Process Boiler -
Process Flow –
Waste of Spinning and Weaving – (Cotton Dust)
Pallet making machine -
Conversation of Dust to Pallet –
Process Boiler -
Carbon Footprint Activity
GHG Emission UCO
We are committed to reduce the CO2 emission for green
environment by taking continuous measures without affecting our
product Quality & Productivity.
Raymond UCO 2017-18
Description Mitigation
Year
Scope 1 Emission CO2e(MT
) Grid Power
Scope 2 Emission CO2e(MT) Thermal
Scope 3 Emission CO2e(MT
) Transport
Total reduction in emission since
baseline year studyKG CO2/Mtr.
2013-14 28614 219741.4 408.41 6.93
2014-15 30186 206948.7 451.47 6.39 7.71
2015-16 30590 193891.6 403.68 6.05 5.36
2016-17 39468 196116.9 406.21 5.98 1.19
2017-18 46853 198161 510 5.91 1.13
Green Supply Chain _ its replications UCO
PCW Denim garments are deconstructed into scraps and shredded into raw cotton
again. This cotton fiber is then blended with virgin cotton to ensure good tensile strength
and woven into new denim fabric and & processing it with natural Colors like bio-indigo
& vegetables dyes.
This innovative technology not only converts consumer waste into renewable fiber, it
also uses 98 percent less water than virgin cotton products.
Raymond UCO 2017-18
Use Of Post Consumer Cotton Waste (PCW) in denim fabric manufacturing
Shredding Cotton Recovery
Yarn PreparationDenim Fabric
Blending with Virgin Cotton
Final Product
Green Supply Chain _ its replications UCO
Tangible Benefits1. No wet process is involved in the production of PCW cotton fiber.2. Huge Water saving as compared to virgin cotton production.3. No pesticides used in PCW cotton production.4. Saving of agricultural land that would have been otherwise required to produce cotton.
Intangible Benefits
1. Employment generation for unskilled labours.2. Recycling textile waste reduces burden on nature.3. Mostly garment wastes are being land filled, by this project it would be Saved
Reduction in carbon footprintGHG emission for conventionally grown cotton is around 1.81 MT of CO2 equivalent per 1 MT of cotton fiber produced. Thus for 171 MT of PCW cotton total 310 MT of CO2 emission from have been reduced.
Reduction in Water FootprintGlobal average total of water consumed while producing 1000 kg of cotton conventionally is around 2120 m3 for irrigation. Thus for 171 MT of PCW cotton total 363 KL of water footprint will be reduced.
Monetary SavingFor production of 1322381 meters of PCW denim fabric, total 171470 kg of PCW cotton is used. The
average buying cost of cotton per kg is Rs 106.50. Total Rs 1.8 crore has been saved in FY -17-18 against purchase of fresh cotton.
Raymond UCO 2017-18
Green Supply Chain _ its replications UCOApart from these major projects we are regularly doing the following activity-1. We send the note with every enquiry to vender that we will give first preference to
energy efficient product. 2. Distribution of LED Lights to employee. 3. Distribution of Energy conservation awareness broachers at society. 4. Conducted training at school, colleges and vender’s plants. 5. Give technical help to our vendor to find out energy efficient products and services.
We have purchase strategy to procure only Energy efficient motors & 5 star rated equipments. We also ask our supplier to follow the energy conservation practices for sustainable development.
Recently we have implemented LED lighting project at our supplier M/s, Rana Denim Pvt. Ltd. Yavatmal. We have extended our full techno commercial support to implement Encon measure. People get self motivated and come up with different innovative ideas for energy conservation and process improvement. Our vender gets benefited by reduction in manufacturing cost. Achieved overall saving of Rs. 3 Lac Kwh /Annum by this project.
Raymond UCO 2017-18
Involvement of TOP to Bottom
Team Work UCO
Description Project - 1 Project - 2 Project – 3 Project - 4 Project - 5 Project – 6 Project – 7
Source of En-Con
IdeaMiddle Management
Middle
Management
Senior
Management
Middle
ManagementWorker Lower management Worker
Name of the
Project
Back pressure turbine to recover energy from steam energy at the time of pressure regulation (Capacity 132 KWH)
ELD light in place of conventional light (12000 no)
Installation HT 4300 CFM HT compressor and stop the small LT comp.
Installation of Bio gas plant for LPG substitutes in canteen.
Installation of turbo ventilator, light pipe and transparent sheet.
Thermal energy saving through RO water to boiler feed , Maintenance of thermal Insulation, Condensate recovery, coal additive at boiler.
Conversation of double tube light into single tube light
Idea Originated in
the Year2015 2016 2015 2015 2016 2016 2017
Whether Idea
ImplementedYes Yes Yes Yes Yes Yes Yes
Details of
Members in the
Implementation
Team / Core
Group (Nos, &
Designation)
Utility Engineer,
Manager
Electrical
Engineering
team
GM, DGM,
Manager
Engineers &
Managers
Worker,
supervisor Foreman, worker
Worker,
Foreman
Actual Status Running Running Running Running Running Running Running
Raymond UCO 2017-18
Management of Energy Conservation Programs
Monitoring and reporting
Constitution Of Energy Conservation Cell:
A full flesh group of 20 members has been formed which includes one or two member fromeach department and headed by Energy Manager. This group known as EnergyConservation Cell (ECC), meets once in every month to review progress on matter of EnergyConservation measures implementation and follow-up.
Technical Committee:
Technical committee is formed which comprises of Engineers from all Faculties viz.,Mechanical, Electrical, Electronics and Textile, headed by Head Engineering. Thiscommittee evaluates suggestions and recommendations of Energy Conservation Cell for itstechnical and financial aspects. Then a proposal is prepared and submitted to topmanagement for its approval.
UCO
Finance Availability :
Projects having recommendation of Energy Conservation Cell and are having investment Upto Rs. 10.0 Lacs are approved by unit head At Plant Level itself.
Projects having investment more than Rs. 10.0 Lacs are send for approval to corporateoffice, Thane for Capital Expenditure Budgeting.
Raymond UCO 2017-18
Monthly Monitoring And Reporting Format
Monitoring and reporting UCO
Raymond UCO 2017-18
Sr. no.
Section UnitSpecific Energy Consumption
1 Spinning - 1,2,3 Kwh/Kg 2.48
2 Spinning - 4 Kwh/Kg 1.35
3 Spinning - 5 Kwh/Kg 2.59
4 Old Weaving Kwh/mtr 0.82
5 New Weaving Kwh/mtr 0.85
6 Dyeing Kwh/mtr 0.15
7 Process & Finishing Kwh/mtr 0.38 Thermal Energy K Cal /Kg 9998.27
Heart of Energy Monitoring & Auditing UCO
Load Manager 1735
Thermal Imager T10
Air Leak Detector
Temperature GUN
SPM ( Shock Pulse measurement)
LUX meter
Energy Auditing Equipments
Raymond UCO 2017-18
Energy Conservation - Awareness
Social Awareness UCO
Participate in CII Surat as a faculty
Audit at Nearby Schools Seminar at Engineering College
LED Light Distribution to Workers
Seminar at Engineering College
Raymond UCO 2017-18
Energy Conservation - Awareness
Displays at Various Locations:
UCOSocial Awareness
Raymond UCO 2017-18
Energy Conservation - Awareness
Social Awareness
Program Conducted in Raymond UCO Denim Private Limited
Celebration of Energy conservation week
UCO
Raymond UCO 2017-18
Training program attended by Cell Member
These programs are the part of Employee Motivation and Awareness
Sr.no. Program name & Details Organized byNo Of
ParticipantDuration
Days
1Celebration Of energy
Conservation WeekRaymond UCO
250 1 Hr/ Day
2Theory-Cum –Practical Oriented
Training ProgramMEDA at Nagpur
2 2
3Hands-On Practical Training on
Energy EfficiencyMEDA & NPC, Chennai
2 2
4PCRA Seminar At Nagpur PCRA
Nagpur1 1
5
Energy conservation in Textiles Industries
SEE Tech solution Nagpur 1 2
6
Implementation of energy conservation Act-2001
MEDAPUNE 1 1
UCO
Raymond UCO 2017-18
Major Project Implemented By Kaizens
In House Preparation of Insulation & Removable Insulation
UCO
Raymond UCO 2017-18
1st External Audit Completed By TUV
ISO 50001 UCO
Energy Management Policy
Raymond UCO 2017-18
Encon Cell Structure
UCO
Raymond UCO 2017-18
Sr. Manager-
Spinning
Works Director
Sr. Manager -
Weaving
Sr. Manager
-Dyeing DGM- Process
/Finishing
DGM -
Engineering DGM- Captive
Power Plant
General Manager
Production Services
Sr. Manager -
HR / IR DGM -
Purchase
Sr. Manager
Mechanical
Engg
Manager Civil Engg
& Safety
Sr. Mgr -Elect & Inst. Engg.
(Energy Manager – MR EnMS)
Energy Team Dy. – MR
EnMS
ISO 50001
Energy cost against Manufacturing Cost
Investment On Encon Project UCO
Raymond UCO 2017-18
Rs. ( Million) % Of Manufacturing Cost
Total Turnover (FY 2017-18) 8143. 2 NA
Thermal Cost 388.6 17.70
Electrical Cost 299.0 13.62
Total Energy 687.6 31.32
% Investment On Encon project against Turnover ofFY 2017-18 is = 0.73 %
% Investment against Manufacturing cost for FY 2017-18 = 2.71%.
Manufacturing cost -2195 million.
State And National Level Awards
AWARDS UCO
❑ State level Energy Conservation Award by MEDA -2009-10,2012-13, 14,15,16.
❑ National Level Award for Energy management by – CII – 2012,14,15,16,17.
❑ TEXPROCIL Award ( Textiles Export Promotion Council) –By Government of India. 7th
Year in continuation.❑ Fort and Sullivan’s Green Manufacturing Award -2014.
❑ Golden Peacock Award for Environment managemant-2014,15,17.
❑ Earth Care Award for Excellence In climate change Mitigation & Adaptation – 2015.
❑ Green Tech Award ( Gold Category) for Environment – 2014-15
❑ National Energy Conservation Award by BEE -2016.
❑ National Level Award for Energy management by – SEEM - 2016.
❑ Asia Subcontinent Region Corporate Energy Management Award –
Washington DC (U.S) -2015..
❑ Grow care India Occupational Health & Safety Award -2016,17,18
❑ Vasundhara Award for Environment management By Govt. of Maharashtra -2017
Raymond UCO 2017-18
❑ CII Most Innovative Environment Project Award – 2017.
State And National Level Awards
AWARDS UCO
Raymond UCO 2017-18
Environment Projects & Waste Utilization
Refuse ~Reduce ~Recycle ~Reuse UCO
➢ We have installed state of art, zero Liquid Discharge , Activated sludge process based Biological ETP costing to Rs. 40 Crores, to ensure chemical free process treatment & generation of sludge in biological form.
➢ We are the only company in Textile field to have a categorization of sludge in Non Hazardous category by state pollution board.
➢ We have developed the process of using recovered salt from MEE for regeneration of softener plant.
➢ We are the only company in textile field, who is doing complete recycling of sludge with help of sludge air dryer.
➢ We have a tie up with local vendors for fly ash to manufacture bricks. We are using fly ash bricks in our constructions on regular basis.
➢ RO plant & CRP plant to recover and reuse the Caustic & water.
MEE – Multiple Effective Evaporative plantRaymond UCO 2017-18
Thermal Imaging For Thermal & Electrical Energy Saving
Thermal Imaging
To detect Thermal Insulation Leakages.
UCO
To detect Electrical losses due to heating.
Raymond UCO 2017-18
Water Conservation Projects
Go Green UCO
Requirement of plant 1. Total water requirement for plant – 6200 KLD2. Water from MIDC Source – 2800 KLD3. Water from recycling – 3400 KLD
Sources of Recovered/saved water
1. Caustic recovery plant (CRP)2. Four stage Reverse osmosis ( RO)3. Multiple effect Evaporator 4. Indirect Cooling of equipments5. Sewage treatment plant (STP)6. Rain Water harvesting7. Fogging system at Humidification plant ( AWT)
Raymond UCO 2017-18
Water Conservation Projects
UCO
Cooling Water recovery
Water Recovery at CRP Effluent treatment plant
Savage treatment plant
Caustic Recovery Plant
Raymond UCO 2017-18
Environment projects
Zero Discharge 100 % Biological ETP UCO
Sludge Mineralization
Benefits1) Reduction in COD & Color2) Elimination of Chemical COST3) Saving in Power4) Reduction in Sludge Quantity
Raymond UCO 2017-18
Tree Plantation & GHG Emission
Go Green UCO
Raymond UCO 2017-18
Online stack monitoring
Environment Project UCO
➢ Installation of Online stack monitoring system in Boiler section.
Limit -150 PPM & We are running with 70 to 90 PPM.
Raymond UCO 2017-18
Save Energy
Save Future !