A1-Intake access from district road A2-Access to proposed
Yard/Storage area
Drawing CCT01
A3-Backfilling at right hand side waterway A4-Disposal area 4
B1- soil at river areaB2- Piling needed at left
side waterway
B3-Outcrop Rock in main river D1-Access to proposed site office
Figure 1:Airport location, Jakarta and site at Cimanggu
D2-CIBURUG the nearest facilitated town D3-Yard storage area
D4-Proposed laydown area
D5- Existing waterways to be widen
D6-Electricity supply for construction tap point
E1-Adidas factory at Cikembar
E2-Kampong residential area near proposed site E3-CUBURUG town
E4-Jakarta to Ciawi tol hiway
F1-possssible landslide in rainy season
F2-Possible shear at headpond area
F3-Bad rock at waterway
F4-Hydrological condition, rainfall2 ,800mm per year
F5-Rainfall 2,800mm per year
Figure2- Indonesia hydro consult
I1-Feed in point to PLN I2-Site is nearby to
village resident having access to electric power
Figure J1-Hydrology regime
J1-Rock in river
J2-Existing weir to be upgrade
J3-waterway to be upgrade
J4- sandtrap area near to main river for ease of silt disposal
J5-Headpond area 26m above powerhouse J6- Existing Waterway to be
widen to 9 m
J7-water discharge channel
J8-Penstock location at high level 26m above powerhouse downstream
Feed in point to PLN 1.2km from powerhouse