Cheshire Oaks Redesigned Live Final Presentation
description
Transcript of Cheshire Oaks Redesigned Live Final Presentation
cheshire oaksREDESIGNED
Brief
cheshire oaksREDESIGNED
End of life scenario
2072
Community aspirations and needs
Residential, leisure, commercial
Reuse of components
Environmentally friendly
cheshire oaksREDESIGNED
Project Appraisals
cheshire oaksREDESIGNED
Professional Practice
cheshire oaksREDESIGNED
Site Visits
cheshire oaksREDESIGNED
Group Proposals
cheshire oaksREDESIGNED
Green Globe Construction
Marks and SpencerRedevelopment
Project
G.G.CDevelopments
Introduction to the Team
• Ben Davies – Construction Manager
• Chris Boswell – Environmental Champion
• Gary Sandford – Architect
• Ozgur Horuz – Estimator
G.G.C
• Refurbishment for 60 years time.• Keeping it green and sustainable• Location considerations• Local community considerations
G.G.C
Location
• Surrounding area is Industrial, Residential and Retail
• Site restriction• 5,000 square foot of space
G.G.C
Proposed Idea
Low to high cost Apartments
G.G.C
DesignG.G.C
Costing• Land Cost : £9.9milion for 99 year lease• Construction Cost per Apartment: £90,750• Construction Cost per Penthouse: £135,000• Total Construction Costs : 15,892,500• Total Project Costs: £27,474560• Average Selling Price of Apartments: £145,000• Penthouse Prices: £250,000• Gross: £31,600,000• Net Profit: £4,125,440• 15.02% Profit
G.G.C
Environmental
• Re-use materials• Earth-duct and
Solar chimney for natural ventilation
• Capturing and recycle rainwater
• Enhanced day lighting
• Solar panelled glazing
• Geothermal heating.
G.G.C
Reusable Materials Modular hemp lime walling
panels
Precast concrete panels and planks
Precast lift shafts
Glulam beams and joists
Steel frame
Ultralam flooring planks
Timber curtain walling
Roof sheeting
Roof lights
Sheet piling
G.G.C
Environmental
• Re-use materials• Earth-duct and
Solar chimney for natural ventilation
• Capturing and recycle rainwater
• Enhanced day lighting
• Solar panelled glazing
• Geothermal heating.
G.G.C
Geothermal Exchange
Environmentally friendly Cost efficient Electrically powered
heating and cooling system
Heat transfers from high temperatures to low.
G.G.C
Health and Safety
• P.P.E• Deliveries to site• Designated
walkways• Competent
workforce• Clear signage• Tidy work area
G.G.C
Thank you for your timeAny Question?
G.G.C
cheshire oaksREDESIGNED
Judges Comment
cheshire oaksREDESIGNED
MCCL
MMCL ProjectCalum Byrne – Project Manager
Murat Fidan – Estimator
Mike Knowles – Architect
Liam Butler – Environmental Champion
Introduction
• (why are we doing this project?) Future refurbishment (60 years)
• Residential, commercial or leisure use.• Futuristic, environmental and sustainable
minimal impact ideas
MMCL Project
SUSTAINABILITY
MMCL Project
Sustainable focuses
- Lighting - Recycling Red Cedar For interior- Segregated waste- Air Pollution
HEALTH AND SAFETY
MMCL Project
During the refurbishment on the M&S building changing into a 4 star Hotel We will be focusing on :- Deliveries to site- Working at Height- PPE - Pedestrian footpaths- Safe Zones
WHY MMCL CHOSEN A HOTEL ?
• We have produced an innovative and sustainable design, to captivate and accommodate our establishment to the futuristic lodgers.
• Regarding the location of the area, and what we are proposing to re-establish, we have considered; firstly, and essentially, the demand and or requirements in the area, with the in mind, other competing establishments
• Other considerationsMMCL Project
COST
• Total construction build = £4,700,950 – with inflation at 7% - £5,030,017
• Total income per year - £2,709,000• Total outgoing per year - £1,856,000• Profit per year after rate of return -
£853,000• Years until rate of return - 5 years 11
months
MMCL Project
DESIGN• Inspiration –
we were inspired to produce our ideas and design, by striving to remain different, and unique. We were also inspired by the lack of quality the area possessed in terms of prestige and luxury establishments. We concluded with the demand of the area, our project would be re-established into a hotel.
MMCL Project
OUR AIM
• To produce a luxury 4 star hotel, (achieving AA standards) to accommodate all disposal incomes, with innovative and futuristic ideas.
• Our project will give; symbolic establishment to the area.
MMCL Project
IMPACTS OF MMCL
• Minimal carbon foot print, minimal harmful emissions
• Negatively; noise, traffic, deliveries
• Positively; improve sales of local businesses , bringing more jobs,
MMCL Project
GREEN DESIGN
• Grid connected• Off grid• Hybrid system
MMCL Project
GREEN DESIGN CONTINUED
• Advantages and disadvantages;• The fuel is free, which is sunlight• No noise pollution• No pollution • Long life time service• Energy independence and environmental
compatible• But there are disadvantages• It is expensive• Limitations on surface for panels.
MMCL Project
GREEN DESIGN
Building suitability;
Future technologies
MMCL Project
MMCL PROJECT TEAM WOULD LIKE TO THANK YOU FOR YOUR TIME
ANY QUESTIONS?
MMCL Project
cheshire oaksREDESIGNED
Judges Comment
cheshire oaksREDESIGNED
LCD Construction
cheshire oaksREDESIGNED
Judges Comment
cheshire oaksREDESIGNED
Titan Construction
Artic Oaks Construction
By Jack Mort,
Lewis Dale
& Callum Taylor
Introduction Titan construction we specialize in • refurbishment • Building leisure schemesWe pride our self on our safety and suitability on site.
• Lewis Dale our environmental champion • Callum Taylor our architect• Jack Mort finical manager
Before we go discuses any more, we want to discuss the process, of how we came up with our design.
• Size of the plot
• Sustainability
• The local area
• Local economy
Green Plan
We had to think about this when producing the project, and make our building more insulated.
• Green roof
• Insulation
Sustainability
Here are the sustainability techniquesBear in mind that some of the techniques used wont be available for the next few years. • hydrogen fuel cells • Recycling most waste on site. • wind turbines
COSTINGS
Artic Oaks costing's Prices
Construction Cost £16,188,991
Prelims £1,636,229.10
Site Works £40,000
Sales £200,000
Total £18,025,220.10
Breakdown of the costs
Construction Costs • Frames
• Walls • Material• labour cost
• scaffolding• Floors • Insulation • Roofing • Joinery
• Plumbing • Windows • Plastering• W/C• Kitchen • Internal mastic • Tiling • Painting • Cleaning • Fire Alarm • Security Alarm• Boundary fence • Foundations GREEN = most expensive
Breakdown of the costs
Prelims • Set up • Site removal • Site labourer• Site management • Compound Running cost • Temp boundary fencing• Plant/hire repairs • Road cleaning • Skip hire • Forklift trucks • Security• Maintenance
Site Works • Bulk earthworks • Landscaping
Sales • T.V advert • Billboards • Website • Celebrity to open • Signs • Open Day
That was brilliant guys!!
cheshire oaksREDESIGNED
Judges Comment
cheshire oaksREDESIGNED
Dynamic Construction
Future & Sustainable Living
End of Life Scenario 67
End of Life Solution
Introduction
Project area and beneficiaries
• Small district large population• Large greenbelt areas• Local leisure and commercial facilities • Realistic needs of the community
End of Life Scenario 68
Design and Rational
• End of life scenario for Marks and Spencer retail unit Cheshire Oaks
• How do we propose to achieve our goals?
End of Life Scenario 69
Mini Villages
What is a mini village?
• Unique concept • Secure environment for families• Sustainable living
End of Life Scenario 70
Plan of Action
End of Life Scenario 71
2072
Hou
sin
g Mar
ket
Flou
ris
hing
Housing
Market
Sufferi
ng
Plan A Affordable Housing
Plan BPlush living
Sustainability
The three main features that will make this project sustainable include:
• Code for sustainable homes • Environmental impact• Bio Diversity
End of Life Scenario 72
Further Sustainability
Some additional features that will aid us in going the extra mile for sustainability include:
• Ground Source Heat Pumps• Solar Tubing • Additional rain water harvesting tank and
bio mass boilers
End of Life Scenario 73
End of Life Scenario 74
75
End of Life Scenario 76
View of grounds around the structure
77
Reuse of Existing Components
End of Life Scenario 78
Reuse RecycleLift Shaft x1 Remaining Lift Shafts
Rain Water Harvesting Tank Concrete
Biomass Boiler Construction Waste
Earth Ducts
Ventilation System
Glulam Roof
Hemp Wall
Natural Insulation Earth Mounds
End of Life Scenario 79
TOTAL COSTS and REVENUE
Costs Summarised
Land rental cost for 99 years £ 9,900,000.00 Construction Cost £ 7,886,692.00 Prelims £ 457,920.00 Siteworks £ 486,292.00 Roads and sewers £ 150,000.00 Selling expenses £ 134,300.00 Fees and services £ 46,700.00
TOTAL £ 19,061,904.00 Total plus inflation at 7% £ 20,396,237.28
End of Life Scenario 80
REVENUECost per dwelling £ 250,814.53 Plus inflation at 7% £ 268,371.54 Revenue per dwelling £ 295,961.14
Plus inflation at 7% £ 316,678.42
Gross £ 22,493,046.72
Plus inflation at 7% £ 24,067,559.99
Percentage profit 18%
Gross profit £ 3,431,142.72
PROFIT plus 7% inflation £ 3,671,322.71
Summary
• Unique Concept • High Level of Sustainability • Meeting Requirements of the Initial Brief• Meeting the Perceived Needs of the Local
Community
End of Life Scenario 81
cheshire oaksREDESIGNED
Judges Comment
cheshire oaksREDESIGNED
End of Presentations
cheshire oaksREDESIGNED
Runner UpSponsored by...
cheshire oaksREDESIGNED
WinnerSponsored by...