Cherry Creek South Drive – Phase 3
February 24, 20155:30 - 7:00 p.m.
Welcome
• Charlie Brown, Council Member• Dennis Ohlrogge, Project Manager CCD
Agenda
• Welcome • Background and context for Cherry Creek
South Drive • Overview of this project - Phase 3• Construction information• Other planning considerations
Background and Context for Cherry Creek S. Drive• Pat Noyes, Pat Noyes & Assoc.• Dennis Ohlrogge, CCD
Cherry Creek South Drive CONCEPTUAL DESIGN
Master Plan Purpose + Vision• Do not encroach into Cherry
Creek• Cherry Creek South Drive will
remain a two-lane road • New sidewalk should be
detached • Provide additional on-street
parking• Raised Landscape medians
should be minimized• Road must be designed to meet
minimum lane widths and clearance requirements of fire department and emergency vehicles.
• Provide a signal at Alameda Avenue
Cherry Creek South Drive CONCEPTUAL DESIGN
Cherry Creek South Drive History
• Master Plan– 2002-2003
• Phase 1 – Construction Completed 2009
• Phase 2 – Construction Completed 2011
• Phase 3 – Construction 2015 - 2016
Detached Sidewalk
Railing
Stamped ConcretePlanted Median/Traffic Calming
Brick Details
Cherry Creek South DrivePHASE 1 DESIGN FEATURES
On-Street Parking
Detached Sidewalk (North)
Detached Sidewalk with Parking
Pedestrian Crossing/Traffic Calming
Planted Median/Traffic Calming
Detached Sidewalk (South)
Left Turn Lane
Cherry Creek South DrivePHASE 2 DESIGN FEATURES
This Project – Phase 3
• Rick Coldsnow, SEH Inc.• Billy Gregg, Studio CPG
1 - Lane Termination
2– Alameda Intersection
4– North Side Unfinished
5– North Side Pedestrian
Bridge1
2
34
5
Cherry Creek South Drive EXISTING CONDITIONS
3 - Pedestrian Crossing
• Authorization to Proceed with 80% Design June 2013• Meet with adjacent residents and stakeholders July -
October 2013• Alternative Analysis and Preliminary Design Oct 2013 -
February 2014• Environmental Investigation and 85% Design• February 2014 – June 2014• Begin Final Design – Nov 2014• Complete Construction Documents – March 2015
Phase 3 - Design Process
Phase 3 – DesignCROSS SECTIONS CONSISTENT WITH PRIOR PHASES
Phase 3 – DesignSTREET DESIGN ELEMENTS
Landscaped median for traffic calming
Pedestrian crossings
On street parking
Traffic signal at Alameda Avenue
• 33 new on-street parking spaces• New spaces on northeast side of street• Spaces on southwest side of street in front of
the Citadel Building will remain
Phase 3 - Design PARKING
Phase 3 – DesignURBAN DESIGN ELEMENTS
Phase 3 - Design PEDESTRIAN CROSSING
Analysis• Maximize plaza width
to accommodate bike/pedestrian interaction
Design Strategies• Direct bike/pedestrian
traffic to crossings at traffic calming medians
• Prevent ‘shortcuts’ at plaza
Design Concept• Plaza crossings at
traffic calming medians
Section A Plaza Crossing at Traffic Calming Median
Typical Cherry Creek Greenway Rail
Phase 3 - Design INTERSECTION AT SOUTH STEELE STREET
Phase 3 - Design PEDESTRIAN CROSSING
Phase 3 Construction
• John LaSala, CCD
Phase 3 Construction
• Schedule• Funding• Public Information during Construction
Other Planning Considerations
• Cindy Patton, CCD
Other Planning Considerations
• Future Planning
.
Questions?