1. During Commissioning of HP Separator first fill up the HP Separator(V-116001) with water. 2. After filling up the HP Separator drain out this water. 3. Again fill up the separator with water and pressurized it with nitrogen up to 7 bar(kg-f/cm 2 ). 4. Check the functioning, opening & closing of control valves and all instruments properly. 5. Do loop check of instruments.
-
Upload
naved-ahmed -
Category
Documents
-
view
217 -
download
1
description
hasgdfsdfkdghfhgdhjbka
Transcript of Chemical Injection
![Page 1: Chemical Injection](https://reader036.fdocuments.net/reader036/viewer/2022082815/563db82e550346aa9a914e28/html5/thumbnails/1.jpg)
1. During Commissioning of HP Separator first fill up the HP Separator(V-116001) with water.2. After filling up the HP Separator drain out this water.3. Again fill up the separator with water and pressurized it with nitrogen up to 7 bar(kg-f/cm2).4. Check the functioning, opening & closing of control valves and all instruments properly.5. Do loop check of instruments.