watch your step
05.2
018
Michelle Goland Highway 7 WestCommunity Liaison Specialist
cell: 416.797.5653email: [email protected]
vivanext.com Follow us on Twitter. Like us on Facebook. Read our blog. Go to vivanext.com.
Diana Kakamousias Bathurst & CentreCommunity Liaison Specialist
cell: 905.251.7587email: [email protected]
checks and balance for safety
On each project, an engineering firm monitors and reports on the safety and environmental measures in place on work sites.
Every week, the team meets to discuss all aspects of upcoming construction activity.
Emergency services —police, fire and ambulance—are informed about impactful work activity so alternative route options can be considered.
On occasion, night work is scheduled on busy roads to avoid traffic congestion during the higher-traffic daytime hours.
The Community Liaisons proactively notify businesses and residents directly impacted by work activity.
There are many checks and balances in place on each of the vivaNext projects to ensure safety and compliance on the part of everyone on the project team.
Who can I contact if I have a question? Keeping the public informed and engaged with our project is key. Our Community Liaisons work with property owners, tenants, local businesses and the general public.
Construction bulletins are emailed regularly to people who have subscribed to updates, typically those who live, work and commute through the project areas. This is to ensure that the public is aware of major construction activities such as lane closures. You can sign-up for email updates for the project you’re most interested in at vivanext.com/subscribe.
getting more information
Follow us on twitter. Like us on facebook.
Read our blog. Go to vivanext.com.
this week >> overnight storm sewer installations and median
removals on Hwy 7 West
To accommodate storm sewer installations, crews will be working nights to cross Pine
Valley Drive at Highway 7 West. This work will be completed in stages and will require a
traffic shift on Wednesday night and Thursday night. In addition, there will be eastbound
and westbound curb lane closures on Highway 7 over the Highway 400 bridge for median
removals. Please see below for details.
storm sewer installations at Pine Valley:
work dates*: Wednesday, April 4 to
Friday, April 6
work hours*: 7pm–6:30am [overnight]
• As crews work to install storm sewers
across Pine Valley, there will be two traffic
shifts.
• On the first night, traffic will be shifted
toward to east side of Pine Valley to
accommodate work in the west lanes.
• On the second night, traffic will be
shifted to the west side of the road to
accommodate work in the east lanes.
• To accommodate this work, northbound
and southbound traffic on Pine Valley
[within the work area] will be reduced to
one lane in each direction.
• Traffic control staff and paid duty police
officers will be on site to direct traffic as required.
overnight median removals on the Hwy 400 bridge:
work dates*: Wednesday, April 4 to Wednesday, April 18
work hours*: 8pm–6am [overnight]
• To accommodate median removals on Hwy 7 W in the area of the Highway 400 bridge,
eastbound and westbound curb lanes will be closed overnight.
general impacts:
• Sidewalks and bus stops will remain open wherever possible. If a sidewalk or bus stop is
temporarily closed, directional signs will guide pedestrians to the nearest open sidewalk
or bus stop.
• Please give yourself enough time to get to your destination, and remember to reduce
your speed through construction zones.
• Cross at the designated crosswalk. It can be tempting to cross in the middle of the road,
but this can be very dangerous. Instead, cross at a designated crosswalk. Look both ways
and be aware of your surroundings.
April 3, 2018
» highway 7 westconstruction bulletin
your community liaison
Michelle Goland
cell: 416.797.5653
email: [email protected]
how to subscribe
for email updates
1. Visit vivanext.com
2. Click on ‘subscribe’
on left side
3. Under ‘email notices’ select
the ‘Highway 7 West/ Vaughan’
box and any others of interest
4. Provide your contact info
5. Click on ‘Submit’Maps not to scale
Cos
ta R
d
Portage Pkwy
McCleary CtApple Mill Road
Mill
way
Ave
Com
merce St
Doughton Rd
Colossus Dr
Co
loss
us D
r
Hillside Ave
Portage Pkwy
Interchange Way
Chrislea Rd
evA lli
mettuB
Pennsylvania Ave Maclntosh Blvd
doowel pp
A
Hig
hway
400
Map
lecr
ete
Rd
Barnes Ct
Kee
le S
t
Centre St
Cre
dits
tone
Rd
Jane
Str
eet
Highway 7
Highway 407 ETRHighway 407 ETR
Hig
hway
407
ETR
Highway 7
Bat
hurs
t St
Bat
hurs
t St
Atkinson Ave
Yong
e St
reet
Duf
feri
n St
Beverley Glen Blvd
CN Bridge
7777Keele St
2220Hwy 7
2180Hwy 7
2160Hwy 7
2006Hwy 7 1970
Hwy 7
1950Hwy 7
2104Hwy 7
2030Hwy 7
7733Keele St
N R
iver
med
e R
d
Ray
ette
Rd
Oster Lane
Highway 7
Rivermede Rd
Bowes R
d
21371983 1965 1931
Flamingo Rd
Worth Blvd
Westmount Blvd
North Park Rd
Beverley Glen Blvd
N
ew W
estm
inst
er D
r
Dis
era
Dr
Bat
hurs
t St
Con
cord
Rd
Vaug
han
Blv
dC
arl
Ten
nen
St
Wad
e G
ate
VMCWorkArea
Edgeley Blvd
no left turns
no north-south
N
NN
Hwy 7 Connector Ramp
Hwy 7 Connector Ramp
Hwy 7 connector road
Highway 7
Highway 7 evA ni
wdlaB
Aberdeen A
ve
Nova Star D
r
Ansley Grove Rd
Whi
tmor
e R
d
Marycroft A
ve
t S nel eH
rD sso
wgiW
t S ecurB
Wes
ton
Rd
Walmart
784Centre
1137Centre
1470
PetroCanada
1450 1438 1416
HomeOutfitters
WalmartLowe’s
3300Hwy 7
2800Hwy 7
7810Keele St
7700Keele St
Walmart
ChabadFlamingo
WestmountCollegiate
531Atkinson
PromenadeTerminal
PromenadeVillage Shoppes
Promenade Cir
1200Centre
lanes slightlynarrowed
N. P
rom
enad
eCentre St
Centre St
work area
driveways willremain openFam
ous
Ave
Highway 7
weivhtroN
dvlB
Pin
e Va
lley
Dr
Highway 7
N
N
Cos
ta R
d
Portage Pkwy
McCleary CtApple Mill Road
Mill
way
Ave
Com
merce St
Doughton Rd
Colossus Dr
Co
loss
us D
r
Hillside Ave
Portage Pkwy
Interchange Way
Chrislea Rd
evA lli
mettuB
Pennsylvania Ave Maclntosh Blvd
doowel pp
A
Hig
hway
400
Map
lecr
ete
Rd
Barnes Ct
Kee
le S
t
Centre St
Cre
dits
tone
Rd
Jane
Str
eet
Highway 7
Highway 407 ETRHighway 407 ETR
Hig
hway
407
ETR
Highway 7
Bat
hurs
t St
Bat
hurs
t St
Atkinson Ave
Yong
e St
reet
Duf
feri
n St
Beverley Glen Blvd
CN Bridge
7777Keele St
2220Hwy 7
2180Hwy 7
2160Hwy 7
2006Hwy 7 1970
Hwy 7
1950Hwy 7
2104Hwy 7
2030Hwy 7
7733Keele St
N R
iver
med
e R
d
Ray
ette
Rd
Oster Lane
Highway 7
Rivermede Rd
Bowes R
d
21371983 1965 1931
Flamingo Rd
Worth Blvd
Westmount Blvd
North Park Rd
Beverley Glen Blvd
N
ew W
estm
inst
er D
r
Dis
era
Dr
Bat
hurs
t St
Con
cord
Rd
Vaug
han
Blv
dC
arl
Ten
nen
St
Wad
e G
ate
VMCWorkArea
Edgeley Blvd
no left turns
no north-south
N
NN
Hwy 7 Connector Ramp
Hwy 7 Connector Ramp
Hwy 7 connector road
Highway 7
Highway 7 evA ni
wdlaB
Aberdeen A
ve
Nova Star D
r
Ansley Grove Rd
Whi
tmor
e R
d
Marycroft A
ve
t S nel eH
rD sso
wgiW
t S ecurB
Wes
ton
Rd
Walmart
784Centre
1137Centre
1470
PetroCanada
1450 1438 1416
HomeOutfitters
WalmartLowe’s
3300Hwy 7
2800Hwy 7
7810Keele St
7700Keele St
Walmart
ChabadFlamingo
WestmountCollegiate
531Atkinson
PromenadeTerminal
PromenadeVillage Shoppes
Promenade Cir
1200Centre
lanes slightlynarrowed
N. P
rom
enad
eCentre St
Centre St
work area
driveways willremain openFam
ous
Ave
Highway 7
weivhtroN
dvlB
Pin
e Va
lley
Dr
N
Highway 7
NIGHT 1NIGHT 2
Follow us on twitter. Like us on facebook. Read our blog. Go to vivanext.com.
night work >> storm sewer installations on Hwy 7 West from
Aberdeen to Pine Valley To accommodate storm sewer installations, crews will be working nights to cross the south
side of Pine Valley Drive and Highway 7 West. During the day the westbound curb lane will
be closed from Aberdeen Avenue to west of Pine Valley. In addition, the westbound curb
lane on Highway 7 over the Highway 400 bridge will be closed Thursday night for light pole
removals. Please see below for details.
storm sewer installations at Pine Valley: work dates*: Thursday, March 22 to Friday, March 23, and Monday, March 26 to Wednesday, March 28
work hours*: 8pm–6:30am [overnight]• As crews cross the south side of Pine Valley and Hwy 7 W intersection starting from west
to east for storm sewer work, Pine Valley southbound [at Hwy 7] will be closed. storm sewer installations at Aberdeen:work dates*: Thursday, March 22 to end of April
work hours*: 7am–5pm• To accommodate storm sewer work on Hwy7 W, the westbound curb lane will be closed
from Aberdeen to just west of Pine Valley.
March 22, 2018
» highway 7 west
construction bulletin
your community liaisonMichelle Goland cell: 416.797.5653 email: [email protected]
how to subscribe for email updates
1. Visit vivanext.com2. Click on ‘subscribe’ on left side
3. Under ‘email notices’ select the ‘Highway 7 West/ Vaughan’ box and any others of interest4. Provide your contact info 5. Click on ‘Submit’
Cos
ta R
d
Portage Pkwy
rD yellaV eni
Pr
D yellaV
eniP
McCleary Ct
Apple Mill Road
Mill
way
Ave
Commerce St
Doughton Rd
Colossus Dr
Col
ossu
s D
r
Hillside Ave
Portage Pkwy
Interchange Way
Chrislea Rd
evA lli
mettuB
Pennsylvania Ave
Maclntosh Blvd
doowelpp
A
Hig
hway
400
Map
lecr
ete
Rd
Barnes Ct
Kee
le S
t
Centre St
Cre
dits
tone
Rd
Jane
Str
eet
Highway 7
Highway 407 ETR
Highway 407 ETR
Hig
hway
407
ETR
Highway 7
Bat
hurs
t St
Bat
hurs
t St
Atkinson Ave
Yong
e St
reet
Duf
feri
n St
Beverley Glen BlvdCN Bridge7777
Keele St2220
Hwy 72180
Hwy 72160
Hwy 7
2006Hwy 7
1970Hwy 7
1950Hwy 7
2104Hwy 7
2030Hwy 7
7733Keele St
N R
iver
med
e Rd
Ray
ette
Rd
Oster Lane
Highway 7
Rivermede Rd
Bow
es Rd
21371983 1965 1931
Flamingo RdWorth Blvd
Westmount Blvd
North Park Rd
Beverley Glen Blvd
New
Wes
tmin
ster
Dr
Dis
era
Dr
Bat
hurs
t St
Con
cord
Rd
Vaug
han
Blv
d
Car
l T
enne
n St
Wad
e G
ate
VMCWorkArea
Edgeley Blvd
no left turnsno north-south
N
N
N
Hwy 7 Connector Ramp
Hwy 7 Connector Ramp
Hwy 7 connector road
Highway 7
Highway 7
evA ni
wdlaB
Aberdeen A
ve
Nova Star D
r
Ansley Grove Rd
Whi
tmor
e R
d
Marycroft A
ve
tS neleH
rD sso
wgiW
tS ecurB Wes
ton
Rd
Walmart784
Centre
1137Centre
1470
PetroCanada
1450 1438 1416
HomeOutfitters
Walmart
Lowe’s
3300Hwy 7
2800Hwy 7
7810Keele St
7700Keele St
Walmart
ChabadFlamingo
WestmountCollegiate531
Atkinson
PromenadeTerminal PromenadeVillage Shoppes
Promenade Cir
1200Centre
lanes slightlynarrowed
N. P
rom
enad
e
Centre St
Centre St
work area driveways willremain open
Famous Ave
N
Highway 7Highway 7Highway 7
weivhtroN
dvlB
N
Map not to scale
Pay attention to posted signs in and around construction zones. Because construction zones change as work progresses, it’s especially important for everyone – pedestrians, cyclists and drivers – to pay attention to posted signs. Watch for signs and traffic barrels that indicate lane closures and shifts, as well as relocated sidewalks and bus stops.
In addition to existing legislation and local bylaws, our contractors receive certification from industry associations, and have their own safety and quality assurance processes, including:
• Daily safety meetings before work starts, including a Pre-Safety Assessment—contractor and subcontractor crews each receive a list of tasks for the day, potential hazards, and safety measures are reviewed and then put in place.
• Traffic Control Plans and Traffic Protection Plans, which adhere to lane closures and safety measures outlined in the Ontario Traffic Manual – Book 7, such as using signs and barrier placement to protect workers, motorists, pedestrians and others in the area.
• Pedestrian Control Plans to protect and direct pedestrians when the work impacts sidewalks, crosswalks and bus stops.
• Health and safety manuals outlining safety policies, plans and procedures, and codes of practice which crews operate under.
• Daily site inspections, for which reports are filled out and recorded by supervisors.
Cross at the designated crosswalk. It can be tempting to cross in the middle of the road, but this can be very dangerous. Instead, cross at a designated crosswalk. Look both ways and be aware of your surroundings.
Obey the posted speed limit in construction zones. Active construction zones often have reduced speed limits for good reason. To protect construction workers and pedestrians, it’s crucial for drivers to slow down and follow the posted speed limit, and pay close attention to construction signs and road markings.
safety during rapidway construction is crucial
40km/h
SAFETYFIRST
Patience
40km/h
SAFETYFIRST
Patience
40km/h
SAFETYFIRST
Patience
The value of patience. While construction can often be messy and look chaotic, we’re working hard to transform the corridor to a complete street with sidewalks, bike lanes and rapid transit. Your patience is appreciated.
40km/h
SAFETYFIRST
Patience
Safety is a shared responsibility. Safety of the site and the construction workers is very important on any job to make sure at the end of every day, everyone gets home to their families.
40km/h
SAFETYFIRST
Patience
watch your step safe contractors and crews
We follow current legislation, provincial guidelines and strict safety practices to ensure everyone stays safe
When setting up work sites, our contractors abide by legislation, safety guidelines and local bylaws, including:
• Ontario Ministry of Labour, Occupational Health and Safety Act
• Ontario Regulations for Construction Projects, Ontario Regulations 213/91
• Ontario Traffic Council, Ontario Traffic Manual – Book 7
• Bylaws of York Region and local municipalities
safety legislation and local bylaws