Lodge a FREE Dial Before You Dig enquiry online at www.1100.com.au or by calling 1100 during business hours. Receive the Dial Before You Dig Confirmation Sheet which lists the registered asset owners that may be affected by your project. Receive information and plans from all registered asset owners listed on the Enquiry Confirmation Sheet. Review plans and conditions sent by registered asset owners. Obtain any required permits and approvals required by asset owners. Visit the site and inspect for any other underground or overhead assets that may not be registered with Dial Before You Dig. Look for evidence of underground or overhead services that may be connected to any property but not recorded on the plans received from registered asset owners. It is recommended, unless advised otherwise by an asset owner, to engage a DBYD Certified Locator. Ensure that the plans are current, if not resubmit the enquiry with Dial Before You Dig in case there are new assets registered since the last enquiry was made. Record the information gained from other asset owners or other parties with areas of interest not registered with Dial Before You Dig. Establish a digital and/or hard copy of all the documents received from Dial Before You Dig and asset owners, so that the excavator and other affected contractors can use them on site. If any doubt remains, the contractor/subcontractor should contact the asset owner and seek clarification BEFORE starting work. Pre-Excavation Checklist The Essenal First Step. The Essenal First Step. Download the FREE Checklist Today!

Transcript of Checklist Today! Pre-Excavation Checklist - DBYD...Pre-Excavation Checklist The Essential First...

Page 1: Checklist Today! Pre-Excavation Checklist - DBYD...Pre-Excavation Checklist The Essential First Step. The Essential First Step. Download the FREE Checklist Today! Created Date 8/14/2018

Lodge a FREE Dial Before You Dig enquiry online at www.1100.com.au or by calling 1100 during business hours.

Receive the Dial Before You Dig Confirmation Sheet which lists the registered asset owners that may be affected by your project.

Receive information and plans from all registered asset owners listed on the Enquiry Confirmation Sheet.

Review plans and conditions sent by registered asset owners.

Obtain any required permits and approvals required by asset owners.

Visit the site and inspect for any other underground or overhead assets that may not be registered with Dial Before You Dig.

Look for evidence of underground or overhead services that may be connected to any property but not recorded on the plans received from registered asset owners.

It is recommended, unless advised otherwise by an asset owner, to engage a DBYD Certified Locator.

Ensure that the plans are current, if not resubmit the enquiry with Dial Before You Dig in case there are new assets registered since the last enquiry was made.

Record the information gained from other asset owners or other parties with areas of interest not registered with Dial Before You Dig.

Establish a digital and/or hard copy of all the documents received from Dial Before You Dig and asset owners, so that the excavator and other affected contractors can use them on site.

If any doubt remains, the contractor/subcontractor should contact the asset owner and seek clarification BEFORE starting work.