  • Check List to accompany Building Permit Application Name of Local Body:- Occupancy Type: Plinth Area: File No: Carpet Area: Name of Applicant: Floor Area: Survey No & Village: Document Nos: Name of Owner/owners per Document: Land Area in Sq.m: Type of Land: Dry Land/Wet Land (Nilam): Any Town Planning Scheme/Schemes applicable: CRZ Clearance required: Sl.

    No. Specification Rule No Required

    as per rule Provided

    in plan Actual

    provided on completion

    1 Distance between different blocks

    24(2),54(3) 55(3),57(4),58(3),59(3),117

    2 Front Yard 24(3),54(1),55(1i,2i,3i),56(3a&3d),57(4),58(3ai)62(1, 1a),75(2),82,88(4),117

    3 Rear Yard 24(4),54(3iii),55(1iii,2iii,3iii),56(2),57(4),58(3aiii),59(3),62(3),75(4),82,88(5),117

    4 Side Yard 24(5),24(6), 54(3ii),55(1ii,2ii,3ii),56(1a), 57(4),,58(3aii), 59(3),62(2),75(4),82,88(5),117

    5 Open spaces for basement floor 24(12) 6 Weather shade 24(11),62(3a) 7 Distance between central line

    of street and building 25(1), 25(2),68,70,75(1)

    8 F A R 31(1),56(3g),63,70,76,78E,81(2),89 9 Coverage 31(2),63,70,76,81(1) 10 Height of Building 32,56(3h),63,70,76 11 Access 33,55(5),63,70,76,78F,116 12 Parking

    a Car parking 34(2),63,84 b Two wheeler Parking 34(4) c Visitors Parking 34(5) d Loading and unloading 34(6) e Parking for Persons with

    disabilities 40(5)

    13 Mezzanine floor area 35(1)

  • 14 Mezzanine head room 35(2) not less than 2.2 m

    15 Height of Room 36 16 Size of Bathroom & Toilet 38 17 Staircases 39112(1) 18 Ramp 40, 40 A 3 19 Facilities for persons with

    disabilities 40A

    a Ramp 40(a)1 b lift or separate approach to

    each floor 40(a) 2

    c Toilets 40A 4 a to g d Walks and paths 40A6 e Room set apart for disables 40A7 f Other special treatments 40A 8 a,b,c

    20 Corridor, verandah, Passageways

    41 Not less than 1m

    21 Fire Escape stair 42(1),47,114 a width 42(2),114(4) b Tread and Rise 42(2),114(4)

    22 Travel Distance to emergency exit

    43 not exceed 30m for every occupant

    23 Exit width 45 24 Doorways 46 25 Lift 48,118 26 Lighting and Ventilation 49,63,70,76 27 Recreation space 50 28 DTP/CTP approval 53(1,)53(1a),54(1),54(1a),55(1),56(

    1),57(2),58(2),59(1)

    29 Two doorways 53(1b) 30 Fire NOC 53(3),54(4a),55(8a),56(3j),57(11a),

    58(4a),59(5a)

    31 Authorization from KSPCB,KWA 54(4),57(10), 57(11),59(5) 32 Sanitation facilities 54(6),56(3c),56(7),57(13),58(6),59(

    7) and Table 9 ,Table 9A

    a Water closet 54(6) and Table 9 ,Table 9A b Urinals 54(6) and Table 9 ,Table 9A c Wash Basin 54(6) and Table 9 ,Table 9A d Bath 54(6) and Table 9 ,Table 9A

    33 Special Provisions for Assembly buildings

    a Height of Room 55(3) minimum 4m and 3 m for A/C

  • b Head room for mezzanine or balcony

    55(4) not less than 3m

    c Head room for A/C Rooms,store room, toilets, lumber, cellar room etc

    55(5),6 not less than 2.4m

    d Balconies and galleries ( slope and area)

    55(8)

    e Ventilation 55(8) 34 Sanitation Facility 55(11) and 55(12) 35 Open space for parking

    Plaza/tower 56(3a) all round 5m

    36 Area limit for shop/hotel/office etc in parking plaza

    56(3b),56(3f)

    37 Set backs for appurtenant buildings

    56(3d)

    38 Location of any industry 57(1) a Area of work room 57(6) b Minimum height of work room 57(7) c Height of office, lab, canteen,

    entrance hall, clock room etc. 57(8) not less than

    3m

    d Height of store, toilets 57(9) not less than 2.4m

    39 Specials provisions for Petrol filling stations, crematorium, bus terminals

    a Approval from collector/CTP 59(8),59(14),59(12) b Open spaces all round 59(10), 59(13) 7.5 m at any

    point

    c Open space for kiosk or sales office

    59(11) 1m other than from street

    40 Rain water harvesting 109A, 109B 41 Solar Assisted systems 109 C 43 Hand rail, Guard rail/parapets 112(2),113,114(5),119 44 Structural design 120 45 Environmental Clearance 8(4a) if built up

    area exceeds 20000 sq.m

    Building Inspector Assistant Engineer/Asst.Exe.Engineer Exe.Engineer Supt. Engineer