CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code...

87
Part 9 deals with all single family dwellings as well as multi family up to 600 m2. 1

Transcript of CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code...

Page 1: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Part 9 deals with all single family dwellings as well as multi family up to 600 m2. 

1

Page 2: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

2

Page 3: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

3

Page 4: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

4

Page 5: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The National Research Council develops the national building codes in Canada. The codes are put together based on reviews and recommendations from various standing committees. These committees are made up of professionals in various fields who are invited to participate. 

5

Page 6: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Model National Codes are revised on a 5 year cycle. On November 1, 2015 the 2015 National building code and National Energy code for buildings ( over 3 stories) is released. These codes are not legislated in each province until the local provincial government adopts them. This can be with or without  changes. Typically the provincial codes are adopted 2 years after the release of eth national codes. There are many disciplines including fire, plumbing, electrical, building and others. Once the code is enacted, there is usually a 6 month grace period to adopt the new code requirements.

6

Page 7: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The Building Technical Council is the Alberta provincial committee that takes the national codes and make recommendations for adoption in Alberta. They do a public consultation and ask fro input from stakeholders such as builders, associations, manufacturers and others. They make a final recommendation to Alberta Municipal Affairs who are the provincial department responsible for codes. These changes are then adopted under the Safety Codes Act to become law. The National Research Council then prints and makes  copies available for purchase.

7

Page 8: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending November 1, 2015. The entire document is enacted, except the new energy efficiency portion of Part 9.36, which is enforceable May 1 2016 and the grace period ends November 1, 2016.

8

Page 9: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

9

Page 10: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The Safety Codes Act is the legislation that makes the actual code law. It list all stakeholders and their responsibilities regarding codes and compliance with these codes.

10

Page 11: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The Safety Codes Act  lists the parties responsible for meeting code compliance. These include the builder/designer, manufacturers, vendors, contractors and others who do actual work on the building. They are all tasked with equal responsibility to enurecompliance. Therefore the liabilty cannot be transferred to others to comply to code requirements. That means the entire group must work as a team to ensure compliance.

11

Page 12: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The building code is made up of 11 parts. Parts 1&2 cover definitions and clarify compliance options. Part 7 is health and Part 8 is demolition. These 4 parts apply to all buildings. Part 9 is less than 600 m2 in area including mulit family and single family dwellings. It can also apply to Part 3 buildings in some cases. Part 3 refers to large buildings and deals with fire and accessibility.  Part 4 is structural, part 5 is environmental seperations and art 6 is HVAC. Some of tehse can also apply to Part 9 in cases where the occupancy and special circumstances relates to these specific aspects beyond Part 9 items. 

12

Page 13: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

13

Page 14: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

14

Page 15: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Termite protection is only applicable to the SE corner of Alberta. The map is unclear as to the exact boundaries so contact your AHJ ( Authority Having Jurisdiction) if you are in these areas. ( Medicine Hat & Lethbridge). 

15

Page 16: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Termite protection includes wood in contact with the ground, retaining walls, structural lumber etc. These must be treated with a termite resistant treatment. Inspection access is also required to visually inspect the foundation and under crawlspaces to assess potential for termite infestations. We recommend contacting your AHJ ( Authority Having Jurisdiction) to verify compliance options.

16

Page 17: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

17

Page 18: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The exiting requirement for smoke alarm and carbon monoxide detectors remains, with one addition. All bedrooms must contain smoke alarms ( detectors). Smoke alarms must have battery backup and nusance button to silence in event of non‐ fire smoke ( burnt toast)

18

Page 19: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

19

Page 20: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The appendix of Part 9 provides great graphics explain the location of smoke alarms. 

20

Page 21: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

21

Page 22: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Split levels would be leveled to look like 2 story buildings. Rather than treating eth structure as a 6 storey building. 

22

Page 23: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

No change in the current Carbon Monoxide detector other than when a secondary suite is added. The requirement is to alarm the main dwelling and secondary suite together at the same time throughout the building.

23

Page 24: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

24

Page 25: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

25

Page 26: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

26

Page 27: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Spatial Separations is separated in Part 9 buildings and houses – Houses meaning single family and side by townhouses

27

Page 28: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Existing fire protection definitions have not changed

28

Page 29: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Added definitions explain what a FIRESTOP and a FIREBLOCK  is and where these are required 

29

Page 30: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Limiting distances have not changed. The HIRF ( High Intensity Residential Fires) requirements remain. The clarification relates to the sentence discussing limiting distance if the fire department takes longer than 10 minutes to arrive and set up to begin fire fighting more than 10% of the time they are called. This should be discussed with your local AHJ ( Authority Having Jurisdiction)

30

Page 31: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The effect of the 10 minute rule is the reduction in the limiting distance to half. In other words, the fire protection requirements will increase. This should be discussed with your local AHJ ( Authority Having Jurisdiction)

31

Page 32: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

32

Page 33: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

33

Page 34: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

34

Page 35: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Graph from Appendix 9.10.15 detailing spatial separation and where measurements are taken from.

35

Page 36: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

New compliance options for fire rated assembly components – Walls and floors

36

Page 37: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Commissioning of any portion of the fire protections systems ( alarms, sprinklers, etc) must be done as a system, rather than as individual components.

37

Page 38: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Current exit sign requirements do not change – what changes is the type of signage. The new signage is green and in pictogram format. They can be either electrical or self illuminating. This applies to all exit signage both in part 9 and part 3 buildings.

38

Page 39: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Egress notes – some just moved location some are updated.

39

Page 40: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Window wells must be a minimum of 760 mm deep from the egress point. If the window open’s outward you must add the window width when fully open to the 760 mm window well depth.

CITY OF CALGARY Bi‐Law – The current bylaw limiting window wells to 600mm is currently under review. This should be discussed with your local AHJ ( Authority Having Jurisdiction)

40

Page 41: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Resistance to Lateral window loads has been added to part 9.23 ( framing) section of the code. If your area is below the .80 kPa, this will not impact current construction if you continue to apply sheathing ( OSB, Plywood, Exterior Gypsum) to the exterior surface of walls and sheathing ( drywall) to interior surfaces of the walls. This is the most common construction.

If you are between .80 and 1.2 Kpa – you will have to apply the requirements noted in the next few slides. The main ones being  diagonal roof sheathing, increase nailing pattern and Braced Wall Band. This is a direct connection form foundation to roof trusses. There only appears to be 2 areas are affected by this – PINCHER CREEK & COWLEY 

Above 1.2 kPa must be Part 4 designed 

41

Page 42: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

2 main requirements for areas of high wind loads

42

Page 43: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

43

Page 44: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

44

Page 45: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

45

Page 46: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

46

Page 47: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

47

Page 48: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

48

Page 49: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Seconday suites are a new definition.

They must meet the bylaw requirements for the municipality – i.e.  likely falling under R‐2 zoning.

They apply to a suite that is added to a residence where the suite remains under the same title as the main residence. 

The new definition will allow smaller and tighter spaces to be used for secondary suites without having to meet the code requirements of the main dwelling

49

Page 50: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

50

Page 51: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

51

Page 52: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

52

Page 53: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Where a fire separation extends above the roof, there is a potential fro drifting of snow, similar to the effect of a snow fence. Hence there is an increased potential for heavier snow loads on either side of these separation walls. This must be taken into consideration when doing snow load calculations.

53

Page 54: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

54

Page 55: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

55

Page 56: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

56

Page 57: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

57

Page 58: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

58

Page 59: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

59

Page 60: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

60

Page 61: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

61

Page 62: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

62

Page 63: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

63

Page 64: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

64

Page 65: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

This should be discussed with your local AHJ ( Authority Having Jurisdiction)

What is their definition of a storage garage

65

Page 66: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

66

Page 67: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Carbon monoxide detector  locations when building Part 3 buildings is in Part 6.

Mechanical ventilation definition updated – no longer allowed to used unsealed or aspirating ventilation appliances. 

67

Page 68: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

Verify with your local AHJ ( Authority Having Jurisdiction). Old standard for plumbing was minimum 45C to maximum  60 C

No longer require window screens to meet occupancy ( final inspection) requirements.

68

Page 69: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

No change fro multi family – multiple dwelling single attic access buildings.

Single family can be reduce as shown

69

Page 70: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

The first portion of part 9.25 contains minimum insulation levels up until May 1, 2016 ( enforceable after November 1, 2016)

70

Page 71: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

71

Page 72: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

72

Page 73: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

73

Page 74: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

74

Page 75: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

75

Page 76: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

76

Page 77: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

77

Page 78: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

78

Page 79: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

This garage has a level floor, therefore potential fro gases to move into lower level of dwelling ( living space)  at stairs. Under new code, a curb would be required to prevent air from going down these stairs, or the entire floor must be sloped to the front main overhead door

79

Page 80: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

80

Page 81: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

81

Page 82: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

82

Page 83: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

83

Page 84: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

84

Page 85: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

85

Page 86: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

86

Page 87: CHBA - AB 2014 ABC Session 1 Part 9 - bildalberta.ca AB Codes... · The 2014 Alberta Building Code became enforceable May 1, 2015 with the grace period ending ... The building code

87