  • SYMBOLS

    MOULDING = 61.19

  • OPERATION DESCRIPTION

    MOULDING = 61.19

    Jogging the machine around

    Press the start button 0.02

    The dryer gets rid of any residual humidity

    The granulate moves down the injection cylinder

    The hot plastic is injected into the mould

    Mould remains closed while the liquid cools and hardens

    Get the molded chair from the machine

    Place then wait to cool 7.4

    Inspect and transfer to aseembly section 2.3

    STD. ELEMENTAL TIME (min)

    5.30

    The granule goes through a tube into a hopper which feeds it into a dryer 0.26

    0.24

    0.22

    1.30

    40

    4.15

  • SYMBOLS

    ASSEMBLY = 29.38

  • OPERATION DESCRIPTION

    ASSEMBLY = 29.38

    Installing threaded brass inserts into the component 8.2

    Place base on table with caster hole facing up

    Firmly push on caster into each hole then turn chair upright

    Inspect and transfer to finishing section

    STD. ELEMENTAL TIME (min)

    1.05

    3.15

    Align mounting holes to fix the seat onto to the base and tighten with screws 6.30

    Align mounting holes on chair back with mounting holes on seat bottom and tighten with screws 5.47

    Slide the arm into the arm mount brackets then place a cable clip screw over swing arm 4.21

    1

  • SYMBOLS

    FINISHING = 4.58

  • OPERATION DESCRIPTION

    FINISHING = 4.58

    Molded components are individually hand routed 1.35

    Operator removes the risidue of the injection point 0.3

    Create smooth edges

    Inspect and transfer to packing section 0.75

    STD. ELEMENTAL TIME (min)

    2.18

  • SYMBOLS

    PACKING = 9.22

  • OPERATION DESCRIPTION

    PACKING = 9.22

    Get the assembled chair

    Get carton and used paper

    Get and add tape to seal the box

    Inspect and transfer to storage section

    STD. ELEMENTAL TIME (min)

    1.17

    1.66

    Place the final product to the carton and add crumples paper to fully occupy the space 3.20

    2.56

    0.63

  • ELEMENT

    A

    A1

    A2

    A3

    A4

    A5

    A6

    A7

    A8

    A9

    A10

  • OPERATION DESCRIPTION

    MOULDING

    Jogging the machine around

    Press the start button

    The dryer gets rid of any residual humidity

    The granulate moves down the injection cylinder

    The hot plastic is injected into the mould

    Mould remains closed while the liquid cools and hardens

    Get the molded chair from the machine

    Place then wait to cool

    Inspect and transfer to aseembly section

    The granule goes through a tube into a hopper which feeds it into a dryer

  • PREDECESSOR ELEMENT

    - B

    - B1

    A1 0.02 B2

    A2 B3

    A3 B4

    A4 B5

    A5 B6

    A6 B7

    A7

    A8 7.4

    A9 2.3

    DURATION (min)

    61.19

    5.30

    0.26

    0.24

    0.22

    1.30

    40

    4.15

  • OPERATION DESCRIPTION

    ASSEMBLY

    Installing threaded brass inserts into the component

    Place base on table with caster hole facing up

    Firmly push on caster into each hole then turn chair upright

    Inspect and transfer to finishing section

    Align mounting holes to fix the seat onto to the base and tighten with screwsAlign mounting holes on chair back with mounting holes on seat bottom and tighten with screwsSlide the arm into the arm mount brackets then place a cable clip screw over swing arm

  • PREDECESSOR

    -ELEMENT

    - 8.2

    B1 C

    B2 C1

    B3 C2

    B4 C3

    B5 C4

    B6

    DURATION (min)

    29.38

    1.05

    3.15

    6.30

    5.47

    4.21

    1

  • OPERATION DESCRIPTION

    FINISHING

    Molded components are individually hand routed

    Operator removes the risidue of the injection point

    Create smooth edges

    Inspect and transfer to packing section

  • PREDECESSOR ELEMENT

    - D

    - 1.35 D1

    C1 0.3 D2

    C2 D3

    C3 0.75 D4

    D5

    DURATION (min)

    4.58

    2.18

  • OPERATION DESCRIPTION

    PACKING

    Get the assembled chair

    Get carton and used paper

    Get and add tape to seal the box

    Inspect and transfer to storage section

    Place the final product to the carton and add crumples paper to fully occupy the space

  • PREDECESSOR

    -

    -

    D1

    D2

    D3

    D4

    DURATION (min)

    9.22

    1.17

    1.66

    3.20

    2.56

    0.63

  • MOULDING

  • MOULDING

  • ASSEMBLY

  • ASSEMBLY

  • FINISHING

  • PACKING

  • PACKING

  • LEAD TIME VARIABLES

    Queue Time

    Set up Time

    Operation Time

    Move time

    Wait Time

    TOTAL LEAD TIME

  • DESCRIPTION

    Time the item is in transit to reach the customer.

    Amount of time the item is in queue waiting for production.

    TOTAL LEAD TIME

    The time a job is made to wait before processing.

    Time required to prepare a device, machine, process, or system for it to be ready to function or accept a job.

    The standard time in producing the product or the total task time in every process.

  • LEAD TIME (min)

    0.5

    4

    17

    3.08

  • FROM TO

    Raw Materials Storage Moulding Section

    Moulding Section Cooling Area

    Cooling Area Assembly Section

    Assembly Section Finishing Section

    Finishing Section Inspection Section

    Inspection Section Packing

    Packing Finished Goods Storage

    Finished Goods Storage -

  • ESTIMATED TIME (min) 0.25min:1m

    ESTIMATED DISTANCE (m)

  • General Process Standard Elemental Time (min)

    Moulding 61.19

    Assembly 29.38

    Finishing 4.58

    Packing 9.22

    Total Number of Workstation =

  • Number of Workstations

    2.49

    Total Number of Workstation = 43

    Cycle Time (min)

    24.57 25

    11.8 12

    1.84 2

    3.7 4