Transcript of Charts and Table
-
SYMBOLS
MOULDING = 61.19
-
OPERATION DESCRIPTION
MOULDING = 61.19
Jogging the machine around
Press the start button 0.02
The dryer gets rid of any residual humidity
The granulate moves down the injection cylinder
The hot plastic is injected into the mould
Mould remains closed while the liquid cools and hardens
Get the molded chair from the machine
Place then wait to cool 7.4
Inspect and transfer to aseembly section 2.3
STD. ELEMENTAL TIME (min)
5.30
The granule goes through a tube into a hopper which feeds it into a dryer 0.26
0.24
0.22
1.30
40
4.15
-
SYMBOLS
ASSEMBLY = 29.38
-
OPERATION DESCRIPTION
ASSEMBLY = 29.38
Installing threaded brass inserts into the component 8.2
Place base on table with caster hole facing up
Firmly push on caster into each hole then turn chair upright
Inspect and transfer to finishing section
STD. ELEMENTAL TIME (min)
1.05
3.15
Align mounting holes to fix the seat onto to the base and tighten with screws 6.30
Align mounting holes on chair back with mounting holes on seat bottom and tighten with screws 5.47
Slide the arm into the arm mount brackets then place a cable clip screw over swing arm 4.21
1
-
SYMBOLS
FINISHING = 4.58
-
OPERATION DESCRIPTION
FINISHING = 4.58
Molded components are individually hand routed 1.35
Operator removes the risidue of the injection point 0.3
Create smooth edges
Inspect and transfer to packing section 0.75
STD. ELEMENTAL TIME (min)
2.18
-
SYMBOLS
PACKING = 9.22
-
OPERATION DESCRIPTION
PACKING = 9.22
Get the assembled chair
Get carton and used paper
Get and add tape to seal the box
Inspect and transfer to storage section
STD. ELEMENTAL TIME (min)
1.17
1.66
Place the final product to the carton and add crumples paper to fully occupy the space 3.20
2.56
0.63
-
ELEMENT
A
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
-
OPERATION DESCRIPTION
MOULDING
Jogging the machine around
Press the start button
The dryer gets rid of any residual humidity
The granulate moves down the injection cylinder
The hot plastic is injected into the mould
Mould remains closed while the liquid cools and hardens
Get the molded chair from the machine
Place then wait to cool
Inspect and transfer to aseembly section
The granule goes through a tube into a hopper which feeds it into a dryer
-
PREDECESSOR ELEMENT
- B
- B1
A1 0.02 B2
A2 B3
A3 B4
A4 B5
A5 B6
A6 B7
A7
A8 7.4
A9 2.3
DURATION (min)
61.19
5.30
0.26
0.24
0.22
1.30
40
4.15
-
OPERATION DESCRIPTION
ASSEMBLY
Installing threaded brass inserts into the component
Place base on table with caster hole facing up
Firmly push on caster into each hole then turn chair upright
Inspect and transfer to finishing section
Align mounting holes to fix the seat onto to the base and tighten with screwsAlign mounting holes on chair back with mounting holes on seat bottom and tighten with screwsSlide the arm into the arm mount brackets then place a cable clip screw over swing arm
-
PREDECESSOR
-ELEMENT
- 8.2
B1 C
B2 C1
B3 C2
B4 C3
B5 C4
B6
DURATION (min)
29.38
1.05
3.15
6.30
5.47
4.21
1
-
OPERATION DESCRIPTION
FINISHING
Molded components are individually hand routed
Operator removes the risidue of the injection point
Create smooth edges
Inspect and transfer to packing section
-
PREDECESSOR ELEMENT
- D
- 1.35 D1
C1 0.3 D2
C2 D3
C3 0.75 D4
D5
DURATION (min)
4.58
2.18
-
OPERATION DESCRIPTION
PACKING
Get the assembled chair
Get carton and used paper
Get and add tape to seal the box
Inspect and transfer to storage section
Place the final product to the carton and add crumples paper to fully occupy the space
-
PREDECESSOR
-
-
D1
D2
D3
D4
DURATION (min)
9.22
1.17
1.66
3.20
2.56
0.63
-
MOULDING
-
MOULDING
-
ASSEMBLY
-
ASSEMBLY
-
FINISHING
-
PACKING
-
PACKING
-
LEAD TIME VARIABLES
Queue Time
Set up Time
Operation Time
Move time
Wait Time
TOTAL LEAD TIME
-
DESCRIPTION
Time the item is in transit to reach the customer.
Amount of time the item is in queue waiting for production.
TOTAL LEAD TIME
The time a job is made to wait before processing.
Time required to prepare a device, machine, process, or system for it to be ready to function or accept a job.
The standard time in producing the product or the total task time in every process.
-
LEAD TIME (min)
0.5
4
17
3.08
-
FROM TO
Raw Materials Storage Moulding Section
Moulding Section Cooling Area
Cooling Area Assembly Section
Assembly Section Finishing Section
Finishing Section Inspection Section
Inspection Section Packing
Packing Finished Goods Storage
Finished Goods Storage -
-
ESTIMATED TIME (min) 0.25min:1m
ESTIMATED DISTANCE (m)
-
General Process Standard Elemental Time (min)
Moulding 61.19
Assembly 29.38
Finishing 4.58
Packing 9.22
Total Number of Workstation =
-
Number of Workstations
2.49
Total Number of Workstation = 43
Cycle Time (min)
24.57 25
11.8 12
1.84 2
3.7 4
General Process Flow ChartPrecedence TableNetwork DiagramOperation TimeLead TimeMove TimeWorkstations