Charlotte County Contract No. 2009000180 Midway Boulevard ... Works... · 11/6/2014 · Midway...
Transcript of Charlotte County Contract No. 2009000180 Midway Boulevard ... Works... · 11/6/2014 · Midway...
For Reference Only
Plans Prepared For:
Index of Sheets
Plans Prepared By:
Date: 11/3/2014
R
CenturyLink Preliminary Conflict Identification Plans
ONLY AND SHOULD BE VERIFIED PRIOR TO CONSTRUCTION.
PROPOSED DESIGN MODIFICATIONS ARE RECOMMENDATIONS
CONSTRUCTION.
DEPTHS AND ELEVATIONS SHOULD BE FIELD VERIFIED PRIOR TO
PLANS PROVIDED BY OUTSIDE PARTIES. FACILITY LOCATIONS,
RESPONSIBLE FOR THE ACCURACY OF INFORMATION AND/OR
INFORMATION PROVIDED BY OTHERS. CENTURYLINK CANNOT BE
ALL EXISTING AND PROPOSED CONDITIONS ARE BASED ON
NOTES:
WWW.TERRATECHLLC.NET
Terra Technologies LLC.
displayed without the express written permission of
LLC, and may not be copied, reproduced, distributed, or
material are the intellectual property of Terra Technologies
All methods, materials, content and form contained in this
Midway Boulevard to Harbor Boulevard
Charlotte County Contract No. 2009000180
Edgewater Drive Phase II Design
Project Location
Location Map
Not To Scale
630.267.6711
Danny McKeon, E.I.T.
C.28
C.27
C.26
C.25
C.24
C.23
C.22
C.21
C.20
C.19
C.18
C.17
C.16
C.15
C.14
C.13
C.12
C.11
C.10
C.9
C.8
C.7
C.6
C.5
C.4
C.3
C.2
C.1
G.2 - G.7
G.1
Port Charlotte Boulevard - Sta. 701+00 to Sta. 705+50
Tarpon Boulevard - Sta. 501+00 to Sta. 505+00
Midway Boulevard - Sta. 304+50 to Sta. 308+00
Midway Boulevard - Sta. 300+00 to Sta. 304+50
Edgewater Drive - Sta. 198+00 to Sta. 202+50
Edgewater Drive - Sta. 193+50 to Sta. 198+00
Edgewater Drive - Sta. 189+00 to Sta. 193+50
Edgewater Drive - Sta. 184+50 to Sta. 189+00
Edgewater Drive - Sta. 180+00 to Sta. 184+50
Edgewater Drive - Sta. 176+00 to Sta. 180+00
Edgewater Drive - Sta. 172+50 to Sta. 176+00
Edgewater Drive - Sta. 168+00 to Sta. 172+50
Edgewater Drive - Sta. 163+50 to Sta. 168+00
Edgewater Drive - Sta. 159+00 to Sta. 163+50
Edgewater Drive - Sta. 154+50 to Sta. 159+00
Edgewater Drive - Sta. 150+00 to Sta. 154+50
Edgewater Drive - Sta. 145+50 to Sta. 150+00
Edgewater Drive - Sta. 141+00 to Sta. 145+50
Edgewater Drive - Sta. 136+50 to Sta. 141+00
Edgewater Drive - Sta. 132+00 to Sta. 136+50
Edgewater Drive - Sta. 127+50 to Sta. 132+00
Edgewater Drive - Sta. 123+00 to Sta. 127+50
Edgewater Drive - Sta. 118+50 to Sta. 123+00
Edgewater Drive - Sta. 114+00 to Sta. 118+50
Edgewater Drive - Sta. 109+50 to Sta. 114+00
Edgewater Drive - Sta. 105+00 to Sta. 109+50
Edgewater Drive - Sta. 100+50 to Sta. 105+00
Edgewater Drive - Sta. 96+00 to Sta. 100+50
Conflict Tabulation
Legend
Cover Sheet
T
T
XXX
T
T
XXX
XXX
XXX
XXX
Legend
Existing Proposed Existing Proposed
ProposedExisting
Existing Proposed
Alignment, Boundary and Right of Way
Utilities
Pavement
Conflicts
CenturyLink Facilities
CENTERLINE
RIGHT OF WAY LINE
STORM SEWER
OVERHEAD POWER
SANITARY SEWER
WATERMAIN
(PAVEMENT, CURB, SIDEWALK, ETC.)
ABOVE GROUND FEATURES
BURIED FIBER OPTIC CABLE
BURIED TELEPHONE CABLE
BURIED TELEPHONE CONDUIT
BURIED TELEPHONE DUCT
OVERHEAD TELECOMMUNICATIONS CABLE
HANDHOLE
PEDESTAL
POLE
VAULT / MANHOLE
UTILITY CONFLICT LOCATION & NUMBER
NO CONFLICT - NO ACTION REQUIRED
UTILITY CROSSING LOCATION & NUMBER
PAVEMENT CONFLICT LOCATION & NUMBER
GRADING CONFLICT LOCATION & NUMBER
EXISTING FACILITIES TO BE REMOVED
LegendG.1
FORCEMAIN
UNDERGROUND CABLE
PAVEMENT
IRRIGATION
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.1.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
Conflict TabulationG.2
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.2.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
Conflict TabulationG.3
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.3.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
Conflict TabulationG.4
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.4.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
Conflict TabulationG.5
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.5.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
Conflict TabulationG.6
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.6.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
Conflict TabulationG.7
Notes Sheet Legend
CenturyLink Preliminary Conflict Identification Plans
G.7.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II Design
PWR
BOX
PV
PV
EDGEWATER DR
19250EDGEWATER DR
19266MIDWAY BLVD
19484
MIDWAY BLVD
19478MCINTIRE ST
4010
WMWM
14"
14"
12"14"
18"
16"
16"16"
20"
FLAG-POLE
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL #28768
200 PAIR400 PAIR
200 PAIR
400 PAIR
SEE SHEET C.25
PEDESTAL #4227
XXX
XXX
XXX
FO
T
T
OHW
T
T
1
2 3
4 5
6
7
8
9 10 11
12 13 14
15
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.1.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
96+00 97+00 98+00 99+00 100+00
304
+00
305
+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 100+
50 See S
heet
C.2
Edgewood Drive - Sta. 96+00 to Sta. 100+50
Edgewater Drive
Match Line See Sheet C.25
Match Line See Sheet C.26
dvl
B
ya
wdi
M
dvl
B
ya
wdi
M
C.1
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PWR
BOX
MIDWAY BLVD
19483
EDGEWATER DR
19306
EDGEWATER DR
19310
EDGEWATER DR
19318
EDGEWATER DR
19326
EDGEWATER DR
19334
EDGEWATER DR
19301
EDGEWATER DR
19307
EDGEWATER DR
19313
EDGEWATER DR
19319
EDGEWATER DR
19327
WM
WMWM
WMWM WM
WM
5"
12"
6"
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL
1800 PAIR
1200 PAIR
HANDHOLE
60 FIBER
MANHOLE #4680
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
T
15
16
17
18
19
20 21
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.2.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
101+00 102+00 103+00 104+00 105+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 105+
00 See S
heet
C.3
Edgewater Drive
Matc
h Lin
e Sta. 100+
50 See S
heet
C.1
C.2Edgewood Drive - Sta. 100+50 to Sta. 105+00
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
19334
EDGEWATER DR
19342
EDGEWATER DR
19350
EDGEWATER DR
19358
EDGEWATER DR
19366
EDGEWATER DR
19374
EDGEWATER DR
19335
EDGEWATER DR
19343
EDGEWATER DR
19351
EDGEWATER DR
19359EDGEWATER DR
19367
EDGEWATER DR
19375
WM
WMWM
WMWM
WM
WM
WM
4"
6"
4"
6"
10"
12"
FO
T
T
OHW
XXX
60 FIBER
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
22 23
2425
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.3.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
105+00 106+00 107+00 108+00 109+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 109+
50 See S
heet
C.4
Edgewater Drive
Matc
h Lin
e Sta. 105+
00 See S
heet
C.2
C.3Edgewood Drive - Sta. 105+00 to Sta. 109+50
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
19382EDGEWATER DR
19390
ALTOONA ST
100
EDGEWATER DR
19412
EDGEWATER DR
19420
EDGEWATER DR
19423
EDGEWATER DR
19415EDGEWATER DR
19399
EDGEWATER DR
19391
EDGEWATER DR
19383
#139LIFT STATION
PROPOSED
WM
WM
WM
10"
FO
T
T
OHW
XXX
60 FIBER
60 FIBER
600 PAIR
1200 PAIR
1800 PAIR
1800 PAIR
600 PAIR
1200 PAIR
600 PAIR
XXX
XXX
XXX
FO
T
T
OHW
22 23
25
26
28 29
30 31
27
32 33
34
3635
37
38
39
40
41
42
43
44 45 46
47 48
49 50 51
52
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.4.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
110+00 111+00 112+00 113+00 114+00
13
+00
14
+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 114+
00 See S
heet
C.5
Edgewater Drive
Matc
h Lin
e Sta. 109+
50 See S
heet
C.3
C.4Edgewood Drive - Sta. 109+50 to Sta. 114+00
Altoona Street
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
19428EDGEWATER DR
19436
EDGEWATER DR
19444
EDGEWATER DR
19452EDGEWATER DR
19460
EDGEWATER DR
19468
EDGEWATER DR
19463
SHEELEY ST
4010
EDGEWATER DR
19441
EDGEWATER DR
19441
EDGEWATER DR
19423
WM
WM
WM
6"
12"
24"
FO
T
T
OHW
XXX
60 FIBER
REPEATER #48511
SPLICE CABINET #48509
600 PAIR
1200 PAIR
1800 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
52
53
55
56
54
57
58
59
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.5.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
114+00 115+00 116+00 117+00 118+00
23
+00
24
+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 118+
50 See S
heet
C.6
Edgewater Drive
Matc
h Lin
e Sta. 114+
00 See S
heet
C.4
C.5Edgewood Drive - Sta. 114+00 to Sta. 118+50
Sheele
y R
oad
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
19468
EDGEWATER DR
19476EDGEWATER DR
19484
EDGEWATER DR
19492
EDGEWATER DR
19500
EDGEWATER DR
19508
EDGEWATER DR
19471
EDGEWATER DR
19479
EDGEWATER DR
19487
EDGEWATER DR
19495
EDGEWATER DR
19503
EDGEWATER DR
19511
(SMA-2)
WET POND
WMWMWM
FO
T
T
OHW
XXX
60 FIBER
PEDESTALPEDESTAL
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
59 60 61
62 63 6564
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.6.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
119+00 120+00 121+00 122+00 123+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 123+
00 See S
heet
C.7
Matc
h Lin
e Sta. 118+
50 See S
heet
C.5
C.6Edgewood Drive - Sta. 118+50 to Sta. 123+00
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
Edgewater Drive
PV
PV PV
PV
EDGEWATER DR
19521
EDGEWATER DR
19516
Spring Lake Park
(SMA-2)
WET POND
WM
CABLE
BFP6" 4"
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL1800 PAIR
1200 PAIR
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
63 6463 64
66
67
68 69
70 7172 73
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.7.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
123+00 124+00 125+00 126+00 127+00
403
+00
404
+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 127+
50 See S
heet
C.8
Edgewater Drive
Matc
h Lin
e Sta. 123+
00 See S
heet
C.6
C.7Edgewood Drive - Sta. 123+00 to Sta. 127+50
dvl
B
wei
ve
ka
L
dvl
B
wei
ve
ka
L
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
Spring Lake Park
6" 8"4" 4" 5" 5"6" 5" 4"6" 4"12" 4"
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL
1200 PAIR
1800 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
64 65
74
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.8.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
128+00 129+00 130+00 131+00 132+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 132+
00 See S
heet
C.9
Edgewater Drive
Matc
h Lin
e Sta. 127+
50 See S
heet
C.7
C.8Edgewood Drive - Sta. 127+50 to Sta. 132+00
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
LakeWest Spring
Lake
West SpringSpring Lake Park
C.O.
8" 4"5"
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL #4884
PEDESTAL #4885
1800 PAIR
1200 PAIR
1200 PAIR
1800 PAIR
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
64 65
75
76
77
78 79
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.9.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
132+00 133+00 134+00 135+00 136+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Edgewater Drive
Matc
h Lin
e Sta. 132+
00 See S
heet
C.8
C.9Edgewood Drive - Sta. 132+00 to Sta. 136+50
Matc
h Lin
e Sta. 136+
50 See S
heet
C.1
0
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PV
PV
LakeWest Spring
Lake
West Spring
SPRING LAKE BLVD
100
SPRING LAKE BLVD
107
EDGEWATER DR
20177
WM
18"
18"
FO
T
T
OHW
XXX
60 FIBER
60 FIBER
25 PAIR
#4892
PEDESTAL
1200 PAIR
1800 PAIR
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
78 79
8180
82
84
83
86
85
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.10.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
137+00 138+00 139+00 140+00 141+00
30
+00
31+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
Edgewater Drive
Matc
h Lin
e Sta. 136+
50 See S
heet
C.9
C.10Edgewood Drive - Sta. 136+50 to Sta. 141+00
Matc
h Lin
e Sta. 141+
00 See S
heet
C.1
1
Sprin
g L
ake Blv
d
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PV
EDGEWATER DR
20177
EDGEWATER DR
20168
EDGEWATER DR
20176
EDGEWATER DR
20184
EDGEWATER DR
20190
EDGEWATER DR
20194
#77
LIFT STATION
EXISTING
(SMA-3)
WET POND
WM
WM
WMWM
48"
FO
T
T
OHW
XXX
60 FIBER
50 PAIR#80694
PEDESTAL#80694
PEDESTAL
1200 PAIR
1800 PAIR
50 PAIR
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
80 81
87 88
89
91
969495
90
92 93
97 98
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.11.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
141+00 142+00
143+00
144+00
145+00
500
+00
501+00
502
+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.11Edgewood Drive - Sta. 141+00 to Sta. 145+50
Matc
h Lin
e Sta. 145+
50 See S
heet
C.1
2
Matc
h Lin
e Sta. 141+
00 See S
heet
C.1
0Match Line See Sheet C.27
evirD retawegdE
Lea M
arie Island Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PV
PV
East Spring Lake
East Spring Lake
WEST TARPON BLVD
101
LEA MARIE ISLAND DR
4000
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL #4882
PEDESTAL #4897
50 PAIR
1200 PAIR
1800 PAIR1800 PAIR
1200 PAIR
1200 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
97 98
100
99
102101
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.12.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
146+00
147+00
148+00 149+00 150+00
602
+00
602
+50
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.12Edgewood Drive - Sta. 145+50 to Sta. 150+00
Matc
h Lin
e Sta. 150+
00 See S
heet
C.1
3
Matc
h Lin
e Sta. 145+
50 See S
heet
C.1
1Match Line See Sheet C.27
Edgewater Drive
truo
C
no
pra
T
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PV
East Spring Lake
East Spring Lake
CABLE
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL #4874
1200 PAIR
1800 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
104
101 102
103
105 106
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.13.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
150+00 151+00 152+00 153+00 154+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.13Edgewood Drive - Sta. 150+00 to Sta. 154+50
Matc
h Lin
e Sta. 154+
50 See S
heet
C.1
4
Matc
h Lin
e Sta. 150+
00 See S
heet
C.1
2
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
East Spring Lake
East Spring Lake
Sunrise Park
EDGEWATER DR
20499
FO
T
T
OHW
XXX
60 FIBER
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
107
109
110
108
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.14.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
155+00 156+00157+00
158+00 159+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.14Edgewood Drive - Sta. 154+50 to Sta. 159+00
Matc
h Lin
e Sta. 159+
00 See S
heet
C.1
5
Matc
h Lin
e Sta. 154+
50 See S
heet
C.1
3
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
Sunrise Park
Sunrise Park
EDGEWATER DR
20352
EDGEWATER DR
20362
EDGEWATER DR
20370
EDGEWATER DR
20390
EDGEWATER DR
20499
EDGEWATER DR
20499
WM WM
CABLE
FO
T
T
OHW
XXX
PEDESTAL #30968
12 PAIR
60 FIBER
60 FIBER
12 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
111112
108
114113
117
116115
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.15.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
159+00 160+00 161+00 162+00 163+00
50
+00
51+00
52
+00
52+31.8
3
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.15Edgewood Drive - Sta. 159+00 to Sta. 163+50
Matc
h Lin
e Sta. 163+
50 See S
heet
C.1
6
Matc
h Lin
e Sta. 159+
00 See S
heet
C.1
4
Edgewater Drive
evi
rD
ya
wr
eta
WEntrace
Sunrise P
ark
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
20499
Sunrise Park
EDGEWATER DR
20406
EDGEWATER DR
20410 EDGEWATER DR
20414EDGEWATER DR
20422 EDGEWATER DR
20430
WMWM
WM
16"
12"
FO
T
T
OHW
XXX
60 FIBER
SPLICE CABINET #4864
1800 PAIR
1200 PAIR
SPLICE CABINET #5254
REPEATER #48508
1200 PAIR
1800 PAIR
50 PAIR
XXX
XXX
XXX
FO
T
T
OHW
117
118
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.16.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
164+00 165+00 166+00 167+00 168+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.16Edgewood Drive - Sta. 163+50 to Sta. 168+00
Matc
h Lin
e Sta. 168+
00 See S
heet
C.1
7
Matc
h Lin
e Sta. 163+
50 See S
heet
C.1
5
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
20499
Sunrise Park
EDGEWATER DR
20442
CHELSEA CT
190
EDGEWATER DR
20458 WM
TUNK
10"
8"8"
6"
12"
8"
10"4"
6"
8"
6"4"
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL #30819
50 PAIR
50 PAIR
60 FIBER
50 PAIR
100 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
119
121
120
125
124
123
122
128127
130
129
126
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.17.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
168+00 169+00 170+00171+00
172+00
60
+00
61+00
70
+00
71+00
72
+00
NORTH
0'
SCALE: 1 " = 30''
15' 30'
C.17Edgewood Drive - Sta. 168+00 to Sta. 172+50
Matc
h Lin
e Sta. 172+
50 See S
heet
C.1
8
Matc
h Lin
e Sta. 168+
00 See S
heet
C.1
6
Edgewater Drive
Waterway Drive
Chelsea C
ourt
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
CHELSEA CT
187
SUNNYSIDE ST
112
SUNNYSIDE ST
107
EDGEWATER DR
20499
Sunrise Park
#130
LIFT STATION
PROPOSED
16"
10"
FO
T
T
OHW
XXX
12 PAIR
PEDESTAL #30818
60 FIBER
100 PAIR
60 FIBER
SPLICE CABINET #5196
600 PAIR
300 PAIR
1800 PAIR
1200 PAIR
100 PAIR
XXX
XXX
XXX
FO
T
T
OHW
127 128
134133
136135
138
137139
140
143
144
141 142
146
145
131 132
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.18.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
173+00
174+00175+00
176+00
80
+00
81+00
82
+00
NORTH
Edgewood Drive - Sta. 172+50 to Sta. 176+00C.18
0'
SCALE: 1 " = 30''
15' 30'
Match Lin
e Sta. 172+
50 See S
heet
C.1
7
Match Lin
e Sta. 176+
00 See S
heet
C.1
9
evirD retawegdE
te
ert
S
edis
yn
nu
S
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
Sunrise Park
EDGEWATER DR
20499
EDGEWATER DR
20526
PORT CHARLOTTE BLVD
3590
EDGEWATER DR
20550
Sunrise Park
EDGEWATER DR
20499
WM
20"
FO
T
T
OHW
XXX
25 PAIR
CROSS BOX #1004
60 FIBER
60 FIBER
600 PAIR
300 PAIR
100 PAIR
100 PAIR
50 PAIR
50 PAIR
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
147 148
149 150
151 152
153 154
155
156
158
157
159
160
162161
166165
168
167173
170169
171 172
175174
177176
164163
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.19.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
176+00
177+00 178+00
179+00
180+00
702
+00
703+00
NO
RT
H C.19
Matc
h Lin
e Sta. 180+
00 See S
heet
C.2
0
Edgewood Drive - Sta. 176+00 to Sta. 180+00
Match Lin
e Sta. 176+
00 See S
heet
C.1
8
0'
SCALE: 1 " = 30''
15' 30'
Match Line See Sheet C.28
dvl
B
ettolr
ah
C t
ro
P
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PV
WaterwaySunrise
WaterwaySunrise
EDGEWATER DR
20560
EDGEWATER DR
21052
CARLISLE AVE
101
CARLISLE AVE
110
Sunrise Park
EDGEWATER DR
20499
(SMA-5)
DRY POND
GARDEN
LID-RAIN
(SMA-6)
WET POND
SV
FO
T
T
OHW
XXX
60 FIBER
PEDESTAL #5279
PEDESTAL #5289
1200 PAIR
1800 PAIR1800 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
182
181
178 179
180
183 184
185186
189
191
192
193194
195
187
188
190
196
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.20.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
180+00181+00
182+00183+00
184+00
90
+00
91+00
92+00
NO
RT
H
C.20
Matc
h Lin
e Sta. 180+
00 See S
heet
C.1
9
0'
SCALE: 1 " = 30''
15' 30'
Matc
h Lin
e Sta. 184+
50 See S
heet
C.2
1
Edgewood Drive - Sta. 180+00 to Sta. 184+50
Edgewater Drive
eu
nev
A
elsilr
aC
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PV
WaterwaySunrise
EDGEWATER DR
21052
EDGEWATER DR
21062
EDGEWATER DR
21070
EDGEWATER DR
21078 EDGEWATER DR
21088
EDGEWATER DR
21094
EDGEWATER DR
21061EDGEWATER DR
21073
EDGEWATER DR
21089
EDGEWATER DR
21081
WM
WM W
M WM
WM
WM WM
FO
T
T
OHW
XXX
60 FIBER
#5280
PEDESTAL
1200 PAIR
1800 PAIR50 PAIR
60 FIBER#149224
PEDESTAL
25 PAIR
1200 PAIR
1800 PAIR
#149225
PEDESTAL
XXX
XXX
XXX
FO
T
T
OHW
197
198203
204
209
200199
202201 205
207 208
206
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.21.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
185+00186+00
187+00188+00
189+00
NO
RTH
0'
SCALE: 1 " = 30''
15' 30'
C.21
Matc
h Lin
e Sta. 184+
50 See S
heet
C.2
0
Matc
h Lin
e Sta. 189+
00 See S
heet
C.2
2
Edgewood Drive - Sta. 184+50 to Sta. 189+00
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
21094
EDGEWATER DR
21104
EDGEWATER DR
21112
EDGEWATER DR
21120EDGEWATER DR
21126
EDGEWATER DR
21136
EDGEWATER DR
21097 EDGEWATER DR
21107
EDGEWATER DR
21113 EDGEWATER DR
21121 EDGEWATER DR
21129
EDGEWATER DR
21135
WM
WM
WM
WM
WM W
M
WM
36"
45"
4"
16"
BFP
FO
T
T
OHW
XXX
#149464
PEDESTAL#149222
PEDESTAL
#149223
PEDESTAL
25 PAIR
60 FIBER
25 PAIR25 PAIR
1800 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
210 211
212
213
214
215
216
217
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.22.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
189+00190+00 191+00 192+00
193+00
NO
RTH
0'
SCALE: 1 " = 30''
15' 30'
C.22
Matc
h Lin
e Sta. 189+
00 See S
heet
C.2
1
Matc
h Lin
e Sta. 193+
50 See S
heet
C.2
3
Edgewood Drive - Sta. 189+00 to Sta. 193+50
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
EDGEWATER DR
21144
EDGEWATER DR
21152
EDGEWATER DR
21160EDGEWATER DR
21168EDGEWATER DR
21176
EDGEWATER DR
21184
EDGEWATER DR
21145
EDGEWATER DR
21153
EDGEWATER DR
21161
EDGEWATER DR
21169EDGEWATER DR
21177
DR
EDGEWATER
21185
WM
WM
WM
WM
WM W
M
WM W
M WM
FO
T
T
OHW
XXX
#149465
PEDESTAL 60 FIBER
25 PAIR
25 PAIR
#149221
PEDESTAL
SPLICE CABINET #5159
SPLICE CABINET #140342 SPLICE CABINET #21153
1800 PAIR
1200 PAIR
1800 PAIR
1800 PAIR
1200 PAIR
1200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
221
219
220
218
222 226225
224
223
227 228
229 230 232231
237236
233234
235
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.23.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
194+00195+00 196+00 197+00
198+00
NO
RTH C.23
Edgewood Drive - Sta. 193+50 to Sta. 198+00
Matc
h Lin
e Sta. 198+
00 See S
heet
C.2
4
Matc
h Lin
e Sta. 193+
50 See S
heet
C.2
2
Edgewater Drive
0'
SCALE: 1 " = 30''
15' 30'
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
SC
PV
PV
PV
PV
PV
PV
DR
EDGEWATER
21184EDGEWATER DR
21194
HARBOR BLVD
4168 EDGEWATER DR
21224
DR
EDGEWATER
21232
DR
EDGEWATER
21185
HARBOR BLVD
4195
HARBOR BLVD
4194
EDGEWATER DR
21221EDGEWATER DR
21229
WM
WM
WM
12"
4"6"
FO
T
T
OHW
XXX
PEDESTAL #149220
PEDESTAL #5151
PEDESTAL10'x5'x6'
MANHOLE #5155
60 FIBER
50 PAIR
60 FIBER
25 PAIR
PEDESTAL #21185
PEDESTAL #41262PEDESTAL #41261
PEDESTAL #47606
50 PAIR
1800 PAIR
1200 PAIR
50 PAIR
50 PAIR
200 PAIR
200 PAIR
50 PAIR
50 PAIR
600 PAIR
(8) 4" CONDUIT
1800 PAIR
50 PAIR
XXX
XXX
XXX
FO
T
T
OHW
238
239245
240
241
244243242
246
248247
249
250
251 252 253
254 255 256
257 258 259
260 261 262
263
267
266
264
268
269
265
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.24.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
198+00199+00 200+00 201+00
202+00
802
+00
803
+00
NO
RTH
0'
SCALE: 1 " = 30''
15' 30'
C.24Edgewater Drive - Sta. 198+00 to Sta. 202+50
Matc
h Lin
e Sta. 198+
00 See S
heet
C.2
3
Harbor Blv
d
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
PW
R
BO
X
SIG
N
PV
PV
MIDWAY BLVD
19472
MIDWAY BLVD
19478
MIDWAY BLVD
19467 EDGEWATER DR
19301
WM
WM
6"
12"
14"
FO
T
T
OHW
XXX
PEDESTAL
PEDESTAL #28767
PEDESTAL #28768
1200 PAIR
300 PAIR
SPLICE CABINET #48543
CROSS BOX #6001
50 PAIR
400 PAIR
200 PAIR
1200 PAIR50 PAIR
100 PAIR
1800 PAIR
1200 PAIR
60 FIBER
MANHOLE #4680
1800 PAIR
50 PAIR
(2) 25 PAIR
60 FIBER
1200 PAIR
1800 PAIR
XXX
XXX
XXX
FO
T
T
OHW
T
T
15
20 21
16
1
2 3
272271270
275274273
277
280279278
276
281 282
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.25.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
101+00
300+00 301+00 302+00 303+00 304+00
NO
RT
H
0'
SCALE: 1 " = 30''
15' 30'
C.25Midway Boulevard - Sta. 300+00 to Sta. 304+50
Matc
h Lin
e Sta. 304+
50 See S
heet
C.2
6
Match Line See Sheet C.1
Match Line See Sheet C.2
Midway Boulevard
evi
rD r
eta
we
gd
E
Lauzon A
venue
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
MIDWAY BLVD
19484 WEBSTER AVE
1003
MIDWAY BLVD
19483
AVE
WEBSTER
999
12"
16"
10"
12"
12"
24"
FL
AG-P
OLE
FO
T
T
OHW
XXX
PEDESTAL
PEDESTAL #4227
60 FIBER
60 FIBER
60 FIBER
400 PAIR
200 PAIR
400 PAIR
200 PAIR
XXX
XXX
XXX
FO
T
T
OHW
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.26.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
99
+00
100
+00
101+00
305+00 306+00 307+00 308+00
NO
RT
H
0'
SCALE: 1 " = 30''
15' 30'
C.26
Match Line See Sheet C.1
Match Line See Sheet C.2
Midway Boulevard
Matc
h Lin
e Sta. 304+
50 See S
heet
C.2
6
Midway Boulevard - Sta. 304+50 to 308+00
evi
rD r
eta
we
gd
E
Webster A
venue
Edgewater Drive
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
SEE SHEET C.1 AND C.2 FOR CONFLICTS
PV
EDGEWATER DR
20194
FENTON AVE
503
TARPON BLVD
109 WEST
TARPON BLVD
117 WEST
TARPON BLVD
101 WEST
(SMA-3)
WET POND
(SMA-4)
WET POND
WM
WM
WM
FO
T
T
OHW
XXX
60 FIBER
NOT SHOWN ON RGB PLANS
NOT SHOWN ON RGB PLANS
XXX
XXX
XXX
FO
T
T
OHW
96
95
94
100
99
284
285
287
286
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.27.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
145
+00
146
+00
501+00 502+00
503+00
504+00
505+00
600+00
601+00
602+00
602+50
NO
RT
H
Match Line See Sheet C.11
Match Line See Sheet C.12
0'
SCALE: 1 " = 30''
15' 30'
C.27
draveluoB
nopr
aT
Edgewater Drive
Tarpon C
ourt
Fento
n A
venue
Tarpon Boulevard - Sta 501+00 to Sta. 505+00
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
BLVD
PORT CHARLOTTE
3578
BLVD
PORT CHARLOTTE
3584
BLVD
PORT CHARLOTTE
3590
EDGEWATER DR
20526
BLVD
PORT CHARLOTTE
3581
Sunrise Park
EDGEWATER DR
20499
Sunrise Park
EDGEWATER DR
20499
WM
WM
WM
20"
10"
FO
T
T
OHW
XXX
60 FIBER
1800 PAIR
1200 PAIR
PEDESTAL #27591
60 FIBER
100 PAIR
50 PAIR
50 PAIR
100 PAIR
XXX
XXX
XXX
FO
T
T
OHW
157
158
156
170169
172171
175174
173
159
160
161 162
163 164 165 166
167
168
288
289
287
290
291
Notes Sheet Legend
UTILITY CROSSING CONFLICT
XXX
REMOVE / ABANDON EXISTING
GRADING CONFLICT
PAVEMENT CONFLICT
NO ACTION REQUIRED
UTILITY CROSSING LOCATION
FIBER OPTIC CABLE
OVERHEAD CABLE
EXISTING PROPOSED CONFLICTS
TELEPHONE CABLE CenturyLink Preliminary Conflict Identification Plans
C.28.dgn11/3/2014
THIS DOCUMENT IS CONCEPTUAL AND IS NOT INTENDED FOR DESIGN OR CONSTRUCTION PURPOSES.1.
Project No. TML066
Edgewater Drive Phase II DesignTELEPHONE DUCT
177
+00
178
+00
179
+00
701+00 702+00
703+00
704+
00
705+00
705+74.7
3
NO
RTH
0'
SCALE: 1 " = 30''
15' 30'
Match Line See Sheet C.19
Match Line See Sheet C.19
Port Charlotte Boulevard - Sta. 701+00 to Sta. 705+50
Edgewater Drive
C.32
HAVE NOT BEEN INCLUDED AS CONFLICTS
WATER & SEWER SERVICE CROSSINGS
dvlB ettolrahC troP