CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND...

26
1 CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

Transcript of CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND...

Page 1: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

1

CHARLOTTE COUNTY 10-YEAR BEACH AND INLET

MANAGEMENT PLAN

ALTERNATIVES ANALYSIS

BEACHES AND SHORES COMMITEE May 2, 2013

Page 2: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

2

• Goals & Objectives • Structural Desktop

Summary • Alternatives

Development • Evaluation Parameters • Program

Recommendations

May 2, 2013

OUTLINE

Page 3: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

3

PROGRAM GOALS

May 2, 2013

• Restore & maintain critically eroding beaches using high quality sand

• Provide storm damage reduction benefits along developed shoreline through “engineered beach design”

• Provide for improved navigation through Stump Pass

• Enhance recreational opportunities • Provide environmental protection and

enhancement for T&E species Goals and Objectives

Page 4: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

4

PROGRAM OBJECTIVES

May 2, 2013

• Stabilize Inlet Shorelines – Improve Project performance – Address eroding updrift shoreline adjacent to inlet – Minimize “advanced mitigation” – Address dynamic downdrift shoreline adjacent to inlet

• Address Sand Needs via Offshore Sand Resources – Reduce reliance upon inlet for long-term sand needs – Reduce erosion rate immediately updrift of inlet – Minimize or eliminate “advanced mitigation”

Goals and Objectives

Page 5: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

5

Stabilize Inlet Shorelines

May 2, 2013 Goals and Objectives

Page 6: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

6

STRUCTURAL DESKTOP SUMMARY • Continue / Modify Beach Renourishment &

Maintenance Dredging • Terminal Groin (North of Inlet) • Terminal Groins (North and South of Inlet) • Groin Field (North and / or South of Inlet) • Ebb Shoal Restoration • Throat Armoring ~ Screened Out • Seawalls / Revetment ~ Screened Out • Breakwaters ~ Screened Out • Innovative Technologies ~ Screened Out • Interior Channel Dredging ~ Screened Out

May 2, 2013 Structural Desktop Summary

Page 8: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

8

Example: T-Groins Along Inlet Shoreline

May 2, 2013 Structural Desktop Summary

Page 9: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

9

ALTERNATIVES DEVELOPMENT

May 2, 2013

• Delft3D Model Calibration • Conceptual Plans

– Beach Fills • Updrift (180,000 CY) • North (45,000 CY) • South (195,000 CY)

– Structural Compliments • Terminal Groin (MK) • Permeable Groin Field (MK) • T-groin Field (PI)

• Modeling Alternatives Alternatives Development

Page 10: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

10 May 2, 2013

Parameter Range

Number of Vertical Layers 1, 4, 8, 10

Sediment Size (mm) 0.1 – 0.43

Chezy Bottom Roughness 25 – 145

Stress Formulation due to Waves Fredsoe, Grant, Van Rijn Minimum Depth for Sediment

Calculation (m) 0.1 – 0.5

Wave Related Transport Factor 0.05 – 1.0

Current Related Transport Factor 0.05 – 1.0

Delft3D Model Calibration

Alternatives Development

Page 11: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

11 May 2, 2013

2012

Elev

atio

n(ft

,NAV

D88

)

-3

-2

-1

0

1

2

ModeledMeasured

Water Elevation - Stump Pass

Jul-30 Aug-4 Aug-9

2012

Elev

atio

n(ft

,NAV

D88

)

-3

-2

-1

0

1

2

ModeledMeasured

Aug-11 Aug-16 Aug-21

2012

Elev

atio

n(ft

,NAV

D88

)

-3

-2

-1

0

1

2

ModeledMeasured

Aug-23 Aug-28 Sep-2

2012

Cur

rent

Velo

city

(ft/s

)

-8

-6

-4

-2

0

2

4

6

8

ModeledMeasured

Current Velocity - Stump Pass

Jul-30 Aug-4 Aug-9

2012

Cur

rent

Velo

city

(ft/s

)

-8

-6

-4

-2

0

2

4

6

8 ModeledMeasured

Aug-11 Aug-16 Aug-21

2012

Cur

rent

Velo

city

(ft/s

)

-8

-6

-4

-2

0

2

4

6

8 ModeledMeasured

Aug-23 Aug-28 Sep-2

Alternatives Development

Calibration Results: Water Elevations/Flow

Page 12: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

12 May 2, 2013

Julian Day (2012)

Wav

eHe

ight

(ft)

215 220 225 230 235 240 245 2500

1

2

3

4

5

6

7

ModeledMeasured

Wave Height - Stump Pass

Julian Day (2012)

Wav

eHe

ight

(ft)

215 220 225 230 235 240 245 2500

1

2

3

4

5

6

7

ModeledMeasured

Wave Height - Offshore

Julian Day (2012)

Wav

ePe

riod

(sec

)

215 220 225 230 235 240 245 2500

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

ModeledMeasured

Wave Period - Offshore

Julian Day (2012)

Wav

ePe

riod

(sec

)

215 220 225 230 235 240 245 2500

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

ModeledMeasured

Wave Period - Stump Pass

Alternatives Development

Calibration Results: Waves

Page 13: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

13 May 2, 2013 Alternatives Development

Calibration Results: Waves

Page 14: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

14 May 2, 2013

Cell # Measured Volume Change to DOC (CY)

Modeled Volume Change to DOC (CY)

1: R-8 – R-14 2,120 2,777 2: R-14 – R-20 -3,360 -2,275 3: R-20 – PBA (north) -2,837 -2,140 4: PBA 9,861 2,097 5: PBA (south) – R26 -346 -468 6: R-26 – R-29 14,769 9,503 7: R-29 – R-39 -15,040 -3,902 8: R-39 – R-47 -7,534 -5,108 Positive values denote accretion and negative values denote erosion

Alternatives Development

Calibration Results: Morphology

Page 15: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

15

Conceptual Plan for Beach Fills (Updrift/ North) and Terminal Structure (Updrift)

Conceptual Plans May 2, 2013

Page 16: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

16

Beach Fill Conceptual Template for Updrift Beach Fill (Manasota Key)

May 2, 2013 Conceptual Plans

Page 17: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

17

Beach Fill Conceptual Template for North Beach Fill (Palm Island)

May 2, 2013 Conceptual Plans

Page 18: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

18

Conceptual Plan for South Beach Fill (Knight Island – Don Pedro Island)

Conceptual Plans May 2, 2013

Page 19: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

19

Beach Fill Conceptual Template for South Beach Fill (Knight / Don Pedro Islands)

May 2, 2013 Conceptual Plans

Page 20: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

20

Conceptual Plan for Beach Fill (Updrift /North) and Permeable Groin Field (Updrift)

Conceptual Plans May 2, 2013

Page 21: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

21

Conceptual Plan for Beach Fills, Terminal Structure (Updrift) & T-Groin Field (North)

Conceptual Plans May 2, 2013

Page 22: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

22

EVALUATION PARAMETERS

• Acres Remaining / Acres Created • Volumes Remaining / Volumes Placed • Downdrift Impacts / Benefits • Reduction in Shoaling Rate • Preservation of Tidal Prism • Preservation of Navigation

Controlling Depth • Construction Budgets

May 2, 2013

Page 23: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

23

Preliminary Construction Budgets 25-Year Time Frame

May 2, 2013

Alternative in Combination with Beach Fill Placement

Present Value * Avg. Annual

Cost *

0: Beach Fill Placement Only $31.5 Million $1.26 Million

1: Terminal Groin-Manasota Key $22.2 Million $887,000

2: Pile Cluster Groin Field- Manasota Key

$22.1 Million $885,000

3: Terminal Groin-Manasota Key & T-Groin Field-Palm Island

$23.5 Million $940,000

Evaluation Parameters

* Prime Interest Rate = 3.25% Inflation Rate = 2.20% 20% Contingency

Page 24: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

24

Evaluation Matrix (Preliminary Results)

May 2, 2013 Evaluation Parameters

ALT ACRES VOLUME DOWN-DRIFT

SHOAL RATE

TIDAL PRISM

CONTROL DEPTH

CONST BUDGET*

1 0.56 0.95 0.67 0.90 1.00 1.00 1.00

2 0.57 0.96 0.67 1.00 1.00 1.00 1.00

3 0.61 0.98 0.33 0.91 0.98 1.00 0.94

* Prime Interest Rate = 3.25% Inflation Rate = 2.20% 20% Contingency

Page 25: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

25

PROGRAM RECOMMENDATIONS • Conduct routine beach restoration utilizing offshore sand

sources (storm damage reduction) • Maintain program for engineered beaches (FEMA eligibility) • Conduct routine inlet channel maintenance dredging &

marking plan with bypassing to adjacent downdrift beach (improved navigation / storm damage reduction)

• Improve Project performance through installation of stabilizing structure(s) on south end of Manasota Key

• Implement Adaptive Management Plan • Permit additional stabilizing structures for inlet shoreline

• Continue robust environmental monitoring & protection • Continue current base funding program but… aggressively

pursue post-storm recovery projects (FEMA) & State funding May 2, 2013

Page 26: CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN · CHARLOTTE COUNTY 10-YEAR BEACH AND INLET MANAGEMENT PLAN ALTERNATIVES ANALYSIS BEACHES AND SHORES COMMITEE May 2, 2013

26

ACKNOWLEDGEMENTS

• Charlotte County BCC & Staff • Advisory Committees • Residents & Boating Community • Bureau of Beaches and Coastal Systems • FL State Park Staff • FFWCC & Aquatic Preserves • Federal Agencies • Shorebird and Sea Turtle Monitors • Coastal Tech & Coastal Engineering

May 2, 2013