GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
CD COVER SHEETLOCATION & SITE PLAN
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-100
PART 5 ASSESSMENT
MS 1 18/8/20 MSREF PACKAGE
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
SVP
1.781
1.890
1.980
1.4
1.4
1.61.82
2.22.4
2.62.833.2
3.43.6
3.844.2
4.4
4.4
4.6
4.8
5
5.2
5.4
5.6
5.8
6
6.2
6.2
6.4
6.4
6.6
6.6
6.8
6.8
7
7.2
7.4
3.0
4.0
5.0
2.0
7.8
7.6
F
3.0
5.0
6.0
6.5
7.0
4.0
5.5
4.5
4.0
3.5
4.0
2.5
3.5
4.0
4.5
5.5
5.5
6.0
6.5
6.6
5.4
5.2
5.1
5.3
5.6
2.5
3.0
3.5
4.0
4.6
4.8
5.0
5.04.5
7.6
7.7
5.0
5.2
5.3
5.4
5.5
4.9
94 Phillip Street
P H IL LI P ST
CH
AR
LE
S S
T
To George St >
bus
< Riverfront path
Parramatta Wharf
F
< Existing arcade to Charles St >
180 George St 180 George St
P A R R A M A T T A R I V E R
Ch
arle
s S
tree
t Wei
r
1
3
RIVERFRONTPROMENADE
GARDENTERRACE
RIVERAMPHITHEATRE
UPPER SQUARE
2
444
5
5
55
6
6
6
6
6
7
8
8
9
9
10
10
10
10
10
10
11
11
11
11 12
12
12
13
14
1516
16
17
17
1819
A
B
C
DE
F
36 Charles Street
'The Port Bar'
34 Charles Street
KEYRiverfront promenade1 Wharf shelter2 New public artwork–
sculpture component3 New public artwork–
projection component4 Ramped walkways5 Stairs
River Amphitheatre6 Floral garden 7 Terraced seating8 Existing trees9 Proposed tree removal10 New trees
P A R R A M A T T A R I V E R
Garden Terrace11 Bench seating12 Drinking fountain13 Bike parking14 Ferry office15 Store room (under)
Public Square16 Feature tree & seating17 Rain garden18 Public toilets
(existing, relocated)19 Existing driveway
LotsA 38 Charles Street
Lot 2, DP 869816B 36A Charles Street
Lot 2, DP 869820C Charles St road reserveD 340A Church Street
Lot 1, DP 1172250E 21 Charles Street
Lot 2, DP 532539F 182C George Street
Lot 1, DP 506760(CBD Foreshore Reserve)
Riverfront path >
LOCATION ANDSITE PLAN
0 5 10 15 20 m
G
H
G Lot 1, DP 532539(Parramatta River)
H Lot 22, DP 1346(Stewart St Reserve)
13
7
CHARLES STREET SQUARE UPGRADEREVIEW OF ENVIRONMENTAL FACTORS
DRAWING LIST
LANDSCAPE ARCHITECTRAL DRAWINGSL-REF-100 COVER SHEET + LOCATION & SITE PLANL-REF-101 DEMOLITION PLANL-REF-102 GENERAL ARRANGEMENT PLANL-REF-103 PLANTING PLANL-REF-201 MATERIALS & PLANTING PALETTEL-REF-301 LANDSCAPE SECTION AL-REF-302 LANDSCAPE SECTION BL-REF-303 LANDSCAPE SECTION CL-REF-304 LANDSCAPE SECTION DL-REF-305 LANDSCAPE SECTION EL-REF-401 ARTIST IMPRESSIONL-REF-402 ARTIST IMPRESSIONL-REF-403 ARTIST IMPRESSIONL-REF-404 ARTIST IMPRESSIONL-REF-405 ARTIST IMPRESSIONL-REF-406 ARTIST IMPRESSION
ARCHITECTRAL DRAWINGSA-REF-01 SITE LOCATION/KEY PLANA-REF-02 WEATHERED STEEL BALUSTRADE WALLA-REF-03 SHADE STRUCTUREA-REF-04 FERRY SHED A-REF-05 STORE ROOM
GARDEN
CONCRETE PATH
CONCRETE SLAB
PHILLIP STTEL
TEL
ET
C
STEPS
BIN
TILESGABION
GABION
CONC SLAB
RAMP
CONC PATH
SEAT
SEATSEAT
TILESPAVERS
PAVERS
PAVERS
PAVERS
CONCRERTE
CONCRERTE
CONCRERTE
STEPS
PAVERS
STEPSEATING AREA
EATING AREA
EATING AREA
PAVERS
TILES
PALM
NEW CONC PATH
ART
GRASS
CONCRETEDRIVEWAY
ART
CONCRETE
CONCRETE SEAT
CONCRETE SEAT
LEVEL MARKER
CONC PATH
FIR
E D
OO
R
GARDEN & TREES
CONCRETE EDGE
CONCRETE EDGE
NO 94
PHILLIP ST
FH
WB
U
WST
MH
WB
U
WM
WST
EPLMH
SVP
EPL
EPL
EPL
EPL
EPL
EPL
MH
EPL
EPL
WB
U
OPT
MH
G
WU
TO
PT
G
GG
SV
SV
MH
SVP
SMH
SMH
SMH
SMH
SMH
SMH
FH
1.61.82
2.22.4
2.62.833.2
3.43.63.8
4
4
4.2
4.2
4.4
4.4
4.4
4.6
4.8
5
5.2
5.4
5.6
5.8
5.8
6
6
6.2
6.2
6.4
6.4
6.6
6.6
6.8
6.8
7
7.2
7.4
6.6
3.0
4.0
5.0
2.0
7.8
7.6
right of carriageway
easement
0 2 4 6 8 10 m
94 Phillip Street
36 Charles Street
'The Port Bar'
P H I L L I P S T R E E T
CH
AR
LE
S S
TR
EE
T
34 Charles Street
P A R R A M A T T A R I V E R
garage door
fire exit
fire exit
To George St >
bus
< Riverfront path
Riverfront path >
Parramatta Wharf
F
existing
driveway
'Story Walls'existing artwork
< Existing arcade to Charles St
180 George St 180 George St
existing
fire hydrant
P A R R A M A T T A R I V E R
Demolition PlanScale: 1:2001
LEGEND
All paving, structures, furniture and landscape withinthis area to be demolished unless otherwise noted
Relocated
Retained
1 Existing automated toilets to be relocated2 Existing trees to be retained3 Existing driveway to be retained4 Existing balustrade to be retained5 Existing awning to be retained6 Existing artwork to be salvaged and relocated or stored
TREES
Existing tree retained
Existing tree removed
BOUNDARIESProject boundaryProperty boundaryEasement / Right of carriageway
1
2
2
3
4
4
4
5
6
2
111 Phillip Street
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH DEMOLITION PLAN
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-101
PART 5 ASSESSMENT
MS 1:200 @ A11 18/8/20 MSREF PACKAGE
Charles St Sq - DD-REF PLAN.vwx
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
6.50
SVP
MHNOT LOCATED
SMH
4.66
4.72
FL 4.72
4.77
4.76
FL 4.76
4.77
4.75
DOOR
DOOR
DOOR
DOO
R
4.764.61INV.
PIT
DO
OR
4.00
3.56
2.97
2.27
1.86
TAP
1.781
1.890
1.980
5.46
SMH
SMH
SMH
SMH
SMH
FH
1.75
1.91
1.962.27
1.72
1.88
1.82
2.22.4
2.62.833.2
3.43.63.844.2
4.4
4.4
4.6
4.8
5
5.2
5.4
5.6
5.8
6
6.2
6.2
6.4
6.4
6.6
6.6
6.8
6.8
7
7.2
7.4
3.0
4.0
5.0
2.0
7.8
7.6
5.46
5.12
4.91
5.23
15 HIGH
15 HIGH
15 HIGH
20 HIGH
6.676.505 HIGH 5 HIGH
5.82
4.62
5.11
5.23
15 HIGHGUM
10 HIGH
15 HIGHGUM
8 HIGHGUM
F
6.5
4.7
5.5
85
1:20
5.6
15
1:20
4.69
4.66
4.724.76
RL 6.6
3.84.25
ex 7.9
4.70
ex 1.89
ex 7.63
ex 6.48
RL 7.5
4.62+
4.7
5.6
6.05
6.5
2.0
RL 6.5
5.15
2.9
3.353.84.25
4.7
5.15
5.6
5.6
4.7
4.25
5.15
6.05
2.02.452.93.35
3.8
6.5
2.45
7.55
4.6
TW 5.175
RL 2.0
RL 4.4
RL 3.44
RL 3.44
4.68+
ex R
=16
9
ex 4.79
TW 5.1
TW 5.4
4.5+
1.31
6.05
RL 4.7
DF
TW 5.2
3.35
2.9
2.45
TW 4.4+4.6
4.5+
DF
TW 5.1
4.6+
4.5+
SIG
N
Overlow queueing area for ferry wharf
(indicative only)25m x 3m
FH
SMH
SMH
SMH
SMH
SMH
SMH
right of carriageway
BIN
DF
BO
BOBO
BOBOBO
ex 4.76
TW 7.5 +
TW 7.46 +
BO
BO
BW 7.3+
RL 7.5
RL 7.5
6.6
7.5
1:20
RL 2.0
RL 3.35
RL 4.7
RL 3.35
RL 4.4
RL 4.0
RL 4.03
RL3.5
9RL
3.62
RL3.
19RL
3.22
RL2
.79
RL
2.81
RL2
.38
RL
2.41
1:14
1:14
1:14
1:14
1:14
1:14
RL
2.0
TK 4.55+
+7.687
TW 7.687+
BW 7.568
OT
BIN
BO
BO
BO
BOBO
BOBO
BOBO
BO
BIN
ELP
ELP
LP
LP
LP
LP
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
3.0
5.0
6.0
6.5
7.0
4.0
5.5
4.5
4.0
3.5
4.0
2.5
3.5
4.0
4.5
5.5
5.5
6.0
6.5
6.6
5.4
5.2
5.1
5.3
5.6
2.5
3.0
3.5
4.0
4.6
4.8
5.0
5.0
4.5
7.6
7.7
5.0
5.2
5.3
5.4
5.5
4.9
0 2 4 6 8 10 m
94 Phillip Street
36 Charles Street
'The Port Bar'
P H I L L I P S T R E E T
CH
AR
LE
S
ST
RE
ET
34 Charles Street
P A R R A M A T T A R I V E R
garage door
fire exit
fire exit
To George St >
bus
< Riverfront path
Riverfront path >
Parramatta Wharf
F
P1
P1
P1
P1P1
P1
P3
P3
P3
S1
S1
S1
S2
GB
GB
GB
GB
GB
LEGEND
PAVING FINISHP1 Exposed aggregate concrete P2 Not usedP3 Granite pavers
STAIRSS1 Solid precast concrete stepsS2 Solid granite stepsHR Stainless steel double handrailTI Tactile ground surface indicatorsNote: All steps to include 50mm insert safety stair bar
RAMPSR1 1:14 ramp (to DSAPT/AS1428.2 standard)
Exposed aggregate concrete finishStainless steel handrails both sides
R2 1:20 walkway (to DSAPT/AS1428.2 standard)Exposed aggregate concrete finishStainless steel handrail one side
R3 1:20 walkway (to DSAPT/AS1428.2 standard)Granite paversStainless steel handrail one side
TERRACEST1 Precast concrete terracesT2 Timber terraces
Recycled class 1 Australian hardwoodT3 Concrete deck
Exposed aggregate concrete finishTG Tree grate
STRUCTURESEO Exeloo 'Orbit'
relocated existing automated toiletswith new graphic 'skin'
FO Ferry site office and artwork projectorsto architect's detail
SS Shade structure to architect's detailincludes CCTV and PA system (relocated)
BALUSTRADESB1 Weathering steel pleated balustrade
with integrated SS handrailB2 Flat steel balustrade, painted finish
with integrated stainless steel handrailsB3 Flat steel balustrade, painted finish
WALLSW1 Cast in situ concrete retaining wallW2 Cast in situ concrete retaining/seat wallW3 Cast in situ concrete terrace wallsW4 Reinforced blockwork wall, stone cladW5 Reinforced blockwork wall, granite cladWE Precast concrete wedge block
SEATINGSE1 Timber seat insert to precast terrace
Recycled class 1 Australian hardwoodSE2 Timber seat on steel frame
Recycled class 1 Australian hardwoodSE3 Precast concrete seat/low wall
with timber seat insertRecycled class 1 Australian hardwood
SE4 Precast concrete seat/low wall
ARTWORKPA New public artwork (by others)
Static sculptural component(not part of current REF)
BIKE PARKINGBE Bike rack - existing relocated
Stainless steel bike hoopsBH Bike hire (by others)BL Bike lockers (single, front opening)
Powder coated finishBN Bike rack - new
Stainless steel bike hoops
FURNITURE & FIXTURESBIN Rubbish binBO BollardDF Drinking fountainELP Existing light poleFH Fire hydrantLP Light Pole – proposedOT Opal Top Up machineSIGN Plan Your Trip signSMH Sewer manhole
levels to be adjusted
PLANTINGGB Garden bed with mass planting
TREES
New tree
Existing tree retained
Existing tree removed
CONTOURSExisting contours @200mmProposed contours @500mmProposed contours @100mm
BOUNDARIESProject boundaryProperty boundary
P1
S1
HR
HR
HR
HR
P1
R1R2
R3
GB
T1
T1T3
T2
HR
HR
B1
B2
B2
GB
GB
existing
driveway
W1
W4W2
W3
W3
W3
W3
W3
W2
SE1
SE2
SE2
SE3
SE3
'Story Walls'existing artwork
SE4
< Existing arcade to Charles St
180 George St 180 George St
BL
BH
BE
TG
TG
TG
NOTES1 Sewer vent pipe to be relocated2 Existing fire hydrant relocated
existing
fire hydrant
SS
FO
EO
2
1
PA
P A R R A M A T T A R I V E R
1.2
2.5
3.1
W4
P1
S1
S1
BN
SE2
GB
P3
B3
B3
B3
S2
W5
Site PlanScale: 1:2001
TI
TI
TI
TI
TI
TI
TI
TITI
TI
TI
TI
T2
T2
WE
WE
W3
W3WE
WE
WE
WE
B3
TI
GB
1301
130
2
130
3
13
04
130
5
111 Phillip Street
New storeroomunder
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
CD GENERAL ARRANGEMENT PLAN
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-102
PART 5 ASSESSMENT
MS 1:200 @ A11 18/8/20 MSREF PACKAGE
Charles St Sq - DD-REF PLAN.vwx
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
SVP
SMH
1.781
1.890
1.980
SMH
SMH
SMH
SMH
SMH
F
1:20
1:20
DF
DF SIG
N
Overlow queueing area for ferry wharf
(indicative only)25m x 3m
FH
SMH
SMH
SMH
SMH
SMH
SMH
BIN
DF
BO
BOBO
BOBOBO
BO
BO
1:20
OT
BIN
BO
BO
BO
BOBO
BOBO
BOBO
BO
BIN
ELP
ELP
LP
LP
LP
LP
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
1 x FR
3 x CA
1 x LC
1 x FR
6 x ET
1 x PC
3 x CA
1 x LC
2 x CA
5 x CM
Existing treesAngophora costata
4 x AC
0 2 4 6 8 10 m
94 Phillip Street
36 Charles Street
'The Port Bar'
P H I L L I P S T R E E T
CH
AR
LE
S
ST
RE
ET
34 Charles Street
P A R R A M A T T A R I V E R
garage door
fire exit
fire exit
To George St >
bus
< Riverfront path
Riverfront path >
Parramatta Wharf
F
existing
driveway
'Story Walls'existing artwork
< Existing arcade to Charles St
180 George St 180 George St
existing
fire hydrant
1
P A R R A M A T T A R I V E R
Planting DesignScale: 1:2001
INDICATIVE PLANT SPECIES
TREESAC Angophora costata
CM Corymbia maculata
CA Cupaniopsis anacardioides
ET Eucalyptus tereticornis
FR Ficus rubiginosa
LC Lophostemon confertus
PC Pyrus calleryana 'Bradford'
SHRUBSAcacia decurrensBanksia spinulosaBursaria spinosaCallistemon 'Great Balls of Fire'Callistemon 'Little John'Cordyline fruticosa 'Rubra'Doryanthes excelsaGrevillea 'Robyn Gordon'Grevillea 'Scarlet Sprite'Leptospermum 'White Waves'Melaleuca decoraMelaleuca nodosaPhilodendron 'Xanadu'Pittosporum 'Miss Muffet'Strelitzia reginaeSyzygium 'Cascade'
GROUNDCOVERSAlpinia purpurataAnigozanthos 'Ruby Velvet'Asplenium australasicumCarpobrotus glaucescensClematis glycinoides var. glycinoidesClivia miniataDichondra repensGazania hybridsLiriope 'Evergreen Giant'Liriope spicataMyoporum parvifoliumScaevola albida 'Mauve Clusters'
NATIVE GRASSESDianella caerulea 'Little Jess'Ficinia nodosaImperata cylindricaLomandra longifolia 'Tanika'Microlaena stipoides var. stipoidesPennisetum alopecuroides 'PA300'Poa labillardieri 'Eskdale'Themeda australis
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
TC
TC PLANTING PLAN
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-103
PART 5 ASSESSMENT
MS 1:200 @ A11 18/8/20 MSREF PACKAGE
Charles St Sq - DD-REF PLAN.vwx
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
TACTILE GROUND SURFACE INDICATORS
MULTI FUNCTION LIGHT POLE
STAINLESS STEEL BOLLARDSDRINKING FOUNTAIN STAINLESS STEEL BIKE HOOP
EXISTING STAINLESS STEEL BIKE HOOPS BIKE LOCKER
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD/TC
BH/TC/CD MATERIALS & PLANTING PALETTE
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-201
PART 5 ASSESSMENT
MS 1:1001 18/8/20 MSREF PACKAGE
TREES
Angophora costata Corymbia maculata Cupaniopsis anacardioides Ficus rubiginosa Lophostemon confertus Pyrus calleryana 'Bradford'Eucalyptus tereticornis
SHRUBS
Banksia spinulosa Callistemon 'Great Balls of Fire' Callistemon viminalis 'Little John' Cordyline fruticosa 'Rubra' Doryanthes excelsa Grevillea 'Robyn Gordon' Grevillea rosmarinifolia 'Scarlet Sprite'
Leptospermum laevigatum ‘White Wave’
Philodendron 'Xanadu' Pittosporum tobira 'Miss Muffet'
Strelitzia reginae Syzygium luehmannii x wilsonii ‘Cascade’
Bursaria spinosa
GROUNDCOVERS
Alpinia purpurata Anigozanthos 'Ruby Velvet' Asplenium australasicum Carpobrotus glaucescens Clivia miniata Gazania hybrids Liriope muscari 'Evergreen Giant' Liriope spicata Myoporum parvifolium Scaevola albida ‘Mauve Clusters’
NATIVE GRASSES
Dianella caerulea ‘Little Jess’ Ficinia nodosa Imperata cylindrica Lomandra longifolia 'LM300' Tanika
Microleana stipoides Pennisetum alopecuroides 'PA300' Nafray
Poa labillardieri 'Eskdale' Themeda australis
Austral Verde Bruce Rock(Austral Juparana)
Adelaide Black(Austral Black)
GRANITE PAVERS WEATHERING STEEL BALUSTRADE WALL PAINTED STEELIN SITU CONCRETE PAVING
Exposed aggregate finish
RECYCLED AUSTRALIAN HARDWOOD DECKING TIMBER CLADDINGPRECAST CONCRETE
Honed/polished finish Dark bronze-grey
BIN
PMF RL 11.0
1% AEP RL5.5
20% AEP RL4.93
HISTORICAL (2015, 2016) EVENT RL4.4
RIVERFRONT (NOMINALLY) RL2.0
Upper square
LP LPEO BIN LP LP LP
94 Phillip Street
SE3
▲ Phillip Street
LEGEND
STRUCTURESEO Exeloo 'Orbit'
relocated existing automated toiletswith new graphic 'skin'
SEATINGSE3 Precast concrete seat/low wall
with timber seat insertRecycled class 1 Australian hardwood
FURNITURE & FIXTURESBO BollardBIN Rubbish binDF Drinking fountainLP Light Pole
Existing ground line
BO
New trees
Charles Street Weir
PARRAMATTA RIVER
Charles Street Stairs Riverfront promenade
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH LANDSCAPE SITE SECTIONS A
August 2020
18/8/20
xx/xx/xx
xx/xx/xx L-REF-301
PART 5 ASSESSMENT
MS 1:1001 18/8/20 MSREF PACKAGE
Charles St Sq - REF LANDSCAPE SECTIONS.vwx
PMF RL 11.0
1% AEP RL5.5
20% AEP RL4.93
HISTORICAL (2015, 2016) EVENT RL4.4
Existing tree retained
LP
RIVERFRONT (NOMINALLY) RL2.0
Upper square Steps River amphitheatre Riverfront promenadePhillip Street Existing driveway
EO
94 Phillip Street
New trees
LPPA
Charles Street Weir
PARRAMATTA RIVER
LEGEND
STRUCTURESEO Exeloo 'Orbit'
relocated existing automated toiletswith new graphic 'skin'
ARTWORKPA New public artowork (by others)
Static sculptural component
FURNITURE & FIXTURESLP Light Pole
Existing ground line
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH LANDSCAPE SITE SECTIONS B
August 2020
18/8/20
xx/xx/xx
xx/xx/xx L-REF-302
PART 5 ASSESSMENT
MS 1:1001 18/8/20 MSREF PACKAGE
Charles St Sq - REF LANDSCAPE SECTIONS.vwx
PMF RL 11.0
1% AEP RL5.5
20% AEP RL4.93
HISTORICAL (2015, 2016) EVENT RL4.4
LEGEND
STRUCTURESEO Exeloo 'Orbit'
relocated existing automated toiletswith new graphic 'skin'
SS Shade structure to architect's detailincludes CCTV and PA system (relocated)
BALUSTRADESB2 Flat steel balustrade, painted finish
with integrated stainless steel handrail
SEATINGSE2 Timber seat on steel frame
Recycled class 1 Australian hardwood
FURNITURE & FIXTURESLP Light Pole
Existing ground line
RIVERFRONT (NOMINALLY) RL2.0
EO
94 Phillip Street
New trees
PARRAMATTA RIVER
Upper square Ramped walkways River amphitheatre Riverfront promenade
34 Charles Street
SSSE2 B2 B2LP LP
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH LANDSCAPE SITE SECTIONS C
August 2020
18/8/20
xx/xx/xx
xx/xx/xx L-REF-303
PART 5 ASSESSMENT
MS 1:1001 18/8/20 MSREF PACKAGE
Charles St Sq - REF LANDSCAPE SECTIONS.vwx
PMF RL 11.0
1% AEP RL5.5
20% AEP RL4.93
HISTORICAL (2015, 2016) EVENT RL4.4
LEGEND
STRUCTURESSS Shade structure to architect's detail
includes CCTV and PA system (relocated)
BALUSTRADESB1 Weathering steel pleated balustrade
with integrated SS handrailB2 Flat steel balustrade, painted finish
with integrated stainless steel handrailB3 Flat steel balustrade, painted finish
SEATINGSE2 Timber seat on steel frame
Recycled class 1 Australian hardwood
FURNITURE & FIXTURESLP Light Pole
Existing ground line
RIVERFRONT (NOMINALLY) RL2.0
94 Phillip Street
New trees
PARRAMATTA RIVER
34 Charles Street
LP
Garden Terrace Ramped walkways Riverfront promenade
36 Charles StreetThe Port Bar
B2 B2 SS B1B3
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH LANDSCAPE SITE SECTIONS D
August 2020
18/8/20
xx/xx/xx
xx/xx/xx L-REF-304
PART 5 ASSESSMENT
MS 1:1001 18/8/20 MSREF PACKAGE
Charles St Sq - REF LANDSCAPE SECTIONS.vwx
PMF RL 11.0
1% AEP RL5.5
20% AEP RL4.93
HISTORICAL (2015, 2016) EVENT RL4.4
LEGEND
STRUCTURESSS Shade structure to architect's detail
includes CCTV and PA system (relocated)
BALUSTRADESB1 Weathering steel pleated balustrade
with integrated SS handrailB2 Flat steel balustrade, painted finish
with integrated stainless steel handrail
SEATINGSE2 Timber seat on steel frame
Recycled class 1 Australian hardwood
BIKE PARKINGBE Bike rack - existing relocated
Stainless steel bike hoopsBL Bike lockers (single, front opening)
Powder coated finish
FURNITURE & FIXTURESLP Light Pole
Existing ground line
RIVERFRONT (NOMINALLY) RL2.0
94 Phillip Street
New trees
Parramatta Wharf pontoon(existing)
PARRAMATTA RIVER
34 Charles Street
LP
36 Charles StreetThe Port Bar
B2 B2 SSB1
Garden Terrace garden planting Riverfront promenade
180 George Street
LP LP LPBL
BE
SE2
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A1Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
Architect
LANDSCAPE ARCHITECT | HEAD CONSULTANT
0 10 20 30 40 50mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH LANDSCAPE SITE SECTIONS E
August 2020
18/8/20
xx/xx/xx
xx/xx/xx L-REF-305
PART 5 ASSESSMENT
MS 1:1001 18/8/20 MSREF PACKAGE
Charles St Sq - REF LANDSCAPE SECTIONS.vwx
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A3Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
ArchitectLANDSCAPE ARCHITECT | HEAD CONSULTANT
0 5 10 15 20 25mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH ARTIST IMPRESSION
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-402
PART 5 ASSESSMENT
MS 1 18/8/20 MSREF PACKAGE
File
nam
e: C
har
les
St
Sq
- R
EF
3D
VIE
WS
.vw
x
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A3Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
ArchitectLANDSCAPE ARCHITECT | HEAD CONSULTANT
0 5 10 15 20 25mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH ARTIST IMPRESSION
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-403
PART 5 ASSESSMENT
MS 1 18/8/20 MSREF PACKAGE
File
nam
e: C
har
les
St
Sq
- R
EF
3D
VIE
WS
.vw
x
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A3Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
ArchitectLANDSCAPE ARCHITECT | HEAD CONSULTANT
0 5 10 15 20 25mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH ARTIST IMPRESSION
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-404
PART 5 ASSESSMENT
MS 1 18/8/20 MSREF PACKAGE
File
nam
e: C
har
les
St
Sq
- R
EF
3D
VIE
WS
.vw
x
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A3Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
ArchitectLANDSCAPE ARCHITECT | HEAD CONSULTANT
0 5 10 15 20 25mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
BH ARTIST IMPRESSION
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-405
PART 5 ASSESSMENT
MS 1 18/8/20 MSREF PACKAGE
File
nam
e: C
har
les
St
Sq
- R
EF
3D
VIE
WS
.vw
x
ORIGINAL IN COLOURNOT FOR CONSTRUCTION
Drawing number
Drawing name
PROJECT
CHARLES STREET SQUARECHARLES STREET, PARRAMATTA
DRAWING STATUS
Designed
Drawn
Checked
RevSheet size
A3Size on original
Scale
North
GENERAL NOTES
1. Do not scale from this drawing. Use figured dimensions only.2. Verify all dimensions on site. Refer any discrepencies to the
Principal's Representative for resolution before proceeding.3. If this drawing is unclear, ask for direction from the
Principal's Representative.4. Site check the location of utilities and services prior to the
commencement of works. Refer any discrepencies to the Principal's Representative for resolution.
Spackman Mossop Michaels Pty Ltd115 Flinders Street Surry Hills NSW 2010 www.sm2group.com.au [email protected] | T 02 9361 4549
DESIGN TEAM
© This drawing is Copyright and may not be used, reproduced or copied wholly or in part without written permission from Spackman Mossop Michaels Pty Ltd. This drawing may only be used for the express purpose and project for which it has been created and delivered.
ArchitectLANDSCAPE ARCHITECT | HEAD CONSULTANT
0 5 10 15 20 25mm
DESCRIPTIONREV DATE APPROVED
REVISION HISTORY
Drawing date
Plot date
SURVEY
YSCO GEOMATICSSuite 4, 114 Hampden RoadArtarmon NSW 2064www.yscogeomatics.com.auT 9419 8222
CLIENT
City of Parramatta126 Church StreetParramatta NSW 2150PO Box 3Parramatta NSW 2124
Approval
Tender
Construction
Director Date
SMM Project no: 18074
Survey drawing date Grid Datum
07/05/2019 MGA AHD
DIMENSION STANDARD
Unless noted otherwise:• All levels are shown in metres• All dimensions are computer generated
to 1mm
LAHZNIMMO ARCHITECTSSuite 404, Flourmill Studios3 Gladstone St, Newtown NSW 2042T 02 9550 5200
EngineersNORTHROP CONSULTING ENGINEERSwww.northrop.com.auCivil & structuralNorthrop Wollongong | T 02 4226 3333Lighting & electrical • HydraulicNorthrop Parramatta | T 02 9241 4188 FloodNorthrop Newcastle | T 02 4943 1777TrafficNorthrop Canberra | T 02 6285 1822
Filename:
1
CD
PL ARTIST IMPRESSION
August 2020
31/8/20
xx/xx/xx
xx/xx/xx L-REF-406
PART 5 ASSESSMENT
MS 1 18/8/20 MSREF PACKAGE
File
nam
e: C
har
les
St
Sq
- R
EF
3D
VIE
WS
.vw
x
ORIGINAL IN COLOURNOT FOR CONSTRUCTION