CHAPTER # 8

15

description

DRILLING ENGINEERING. CHAPTER # 8. Directional Drilling and Deviation Control. 7.2Build and Hold Trajectory. Circumference = 2p r S=r q q i n radians max. inclination angle 1 radian = 180 o / p = 57.29578 o 1 o = p /180 radians q = degrees per unit length = q /L - PowerPoint PPT Presentation

Transcript of CHAPTER # 8

Page 1: CHAPTER # 8
Page 2: CHAPTER # 8

CHAPTER # 8CHAPTER # 8

Directional Drilling and Directional Drilling and Deviation ControlDeviation Control

DRILLING ENGINEERINGDRILLING ENGINEERING

Page 3: CHAPTER # 8

7.27.2 Build and Hold TrajectoryBuild and Hold Trajectory

• Circumference = Circumference = rr

• S=rS=r n radians max. inclination anglen radians max. inclination angle

• 1 radian = 1801 radian = 180 o o// = 57.29578 = 57.29578 o o

• 11oo = = /180 radians/180 radians

• q = degrees per unit length = q = degrees per unit length = /L/L

= inclination angle build up rate= inclination angle build up rate

• q = 1q = 1oo/100ft /100ft

r = S /r = S /• r = radius of curvaturer = radius of curvature

Page 4: CHAPTER # 8

S =

qlength

rees

S

deg1

rees

length

q deg

1

180

deg

1

rees

length

q

11

1801180qor

q(8.1)(8.1)

Page 5: CHAPTER # 8

= T

• To find angle T look at triangle OBA

13

31tanDD

X

AO

BAT

13

31arctanDD

XT

To find angle consider triangle OBC

BO

COSin

(8.2)(8.2)

(8.3a)(8.3a)

(8.3b)(8.3b)

(8.4)(8.4)

Page 6: CHAPTER # 8

CO = CO =

22 )()( BAOABO

231

213 )()( XDDBO

213

231

1

)()( DDXSin

213

231

1

)()(arcsin

DDX

= T

(8.5)(8.5)

Page 7: CHAPTER # 8

13

31

213

231

1 arctan)()(

arcsinDD

X

DDX

Length of the arc section DC (buildup section)Length of the arc section DC (buildup section)

(8.6)(8.6)

1801

rDC

qDC

qr

1

1801

(8.7)(8.7)

Page 8: CHAPTER # 8

Length of CB (Trajectory Path)Straight at constant inclination angle can be determined from BCO

tan

tan

1

1

rCB

CB

r

CB

CO

Total measured depth DM for TVD of D3 is

tan1

1

r

qDDm

(8.8)(8.8)

Page 9: CHAPTER # 8

Horizontal departure at end of build up

)cos1(cos 1112

2

rrrX

OCDconsiderECX

(8.9)(8.9)

True Vertical depth at end of build up section

sin112 rDD (8.12)(8.12)

Page 10: CHAPTER # 8

Geometry for the build sectionGeometry for the build section

Page 11: CHAPTER # 8

Measure depth and Horizontal departure before reaching maximum angle along any part of build up.

Consider intermediate inclination angle

XN=Horizontal Departure at C

DN=Vertical depth

Consider DOC

)cos1(

cos

sin

11

11

11

rX

rrX

rDD

N

N

N

(8.11)(8.11)

(8.10)(8.10)

Page 12: CHAPTER # 8

New measured depth for any part of the New measured depth for any part of the build upbuild up

qDDMN

1

New measured depth at TVD of (DNew measured depth at TVD of (D**< D< D33)(D)(D22<D<D**< D< D33))

cos

sin111

rDD

qDDMP

(8.13)(8.13)

(8.16)(8.16)

Horizontal Departure XHorizontal Departure X** (X (X22<X<X**< X< X33))

tan)sin()cos1( 11 rDDrX (8.18)(8.18)

Page 13: CHAPTER # 8

For r1 < X3

)(sin

)()(180

13

13

13

1

13

13

rX

DDarcTan

DD

rarcCos

rX

DDarcTan

(8.20)(8.20)

Page 14: CHAPTER # 8

Build-hold-and-drop and hold (modified-S)Build-hold-and-drop and hold (modified-S)

Page 15: CHAPTER # 8

Directional quadrants and compass measurementsDirectional quadrants and compass measurements