M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 231 CHAPTER - 6 ___________________________________________________________________________ RISK ASSESSMENT & DISASTER MANAGEMENT PLAN In order to support the environment impact assessment and environment management plan, following additional studies have been included in the report. Risk assessment Disaster Management Plan On site and off site emergency action plan Occupational Health and Safety Management System 6.1 RISK ASSESSMENT 6.1.1 INTRODUCTION Hazard analysis involves the identification and quantification of the various hazards (unsafe conditions). On the other hand, risk assessment deals with recognition and computation of risks, the equipment in the plant and personnel are prone to, due to accidents resulting from the hazards present in the plant. Risk assessment follows an extensive hazard analysis. It involves the identification and assessment of risks the neighboring populations are exposed to as a result of hazards present. This requires a thorough knowledge of failure probability, credible accident scenario, vulnerability of population etc. Much of this information is difficult to get or generate. Consequently, the risk assessment is often confined to maximum credible accident studies. It provides basis for what should be type and capacity of its on-site and off- site emergency plan also what types of safety measures shall be required. 6.1.2 APPROACH TO THE STUDY Risk involves the occurrence or potential occurrence of some accidents consisting of an event or sequence of events. The risk assessment study covers the following: Identification of potential hazard area; Identification of representative failure cases; Visualization of the resulting scenarios in terms of fire and explosion;

Transcript of CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT...

Page 1: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 231

CHAPTER - 6

___________________________________________________________________________

RISK ASSESSMENT & DISASTER MANAGEMENT PLAN

In order to support the environment impact assessment and environment management

plan, following additional studies have been included in the report.

Risk assessment

Disaster Management Plan

On site and off site emergency action plan

Occupational Health and Safety Management System

6.1 RISK ASSESSMENT

6.1.1 INTRODUCTION

Hazard analysis involves the identification and quantification of the various hazards (unsafe

conditions). On the other hand, risk assessment deals with recognition and computation of

risks, the equipment in the plant and personnel are prone to, due to accidents resulting

from the hazards present in the plant.

Risk assessment follows an extensive hazard analysis. It involves the identification and

assessment of risks the neighboring populations are exposed to as a result of hazards

present. This requires a thorough knowledge of failure probability, credible accident

scenario, vulnerability of population etc. Much of this information is difficult to get or

generate. Consequently, the risk assessment is often confined to maximum credible

accident studies. It provides basis for what should be type and capacity of its on-site and off-

site emergency plan also what types of safety measures shall be required.

6.1.2 APPROACH TO THE STUDY

Risk involves the occurrence or potential occurrence of some accidents consisting of an

event or sequence of events. The risk assessment study covers the following:

Identification of potential hazard area;

Identification of representative failure cases;

Visualization of the resulting scenarios in terms of fire and explosion;

Page 2: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 232

Assess the overall damage potential of the identified hazardous events and the

impact zones form the accidental scenarios;

Furnish the recommendations on the minimization of the worst accident possibilities

Preparation of Disaster Management Plan;

Emergency Plan, which includes Occupational and Health Safety Plan;

6.1.3 METHODOLOGY

Quantitative risk assessment (QRA) is a means of making a systematic assessment of the

risks from hazardous activities, and forming a rational evaluation of their significance, in

order to provide input to a decision-making process. The term ‘quantitative risk assessment’

is widely used, but strictly this refers to the purely numerical assessment of risks without

any evaluation of their significance. The study has been conducted based on the premises of

a traditional Quantitative Risk Assessment. The key components of a QRA are explained

below, and illustrated in Figure-6.1 and Figure-6.2.

FIGURE – 6.1

QRA METHODOLOGY

Page 3: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 233

FIGURE–6.2

FLOW CHART FOR QUANTITATIVE RISK ASSESSMENT

Start Identify Risk Areas

Select a Risk Area

Identify Failure Cases

Select a Failure Cases

Identify Consequence Outcomes

Select Consequence Outcomes

Determine Frequency

Estimate Consequence

Record Frequency and Consequence in a summary Table

Have all Consequence outcomes been studied?

Have all failure cases been studied?

Have all risk areas been studied?

Draw Risk Contours Finish

Yes

Next Next

Page 4: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 234

6.1.4 HAZARD IDENTIFICATION

Identification of hazards in the proposed project activity is of primary significance of the

analysis, and quantification. Hazard states the characteristics of system/plant/process that

presents potential for an accident. All the components of a system/plant/process need to be

thoroughly examined to assess their potential for initiating or propagating an unplanned

event/sequence of events, which can be termed as an accident.

6.1.4.1 IDENTIFICATION OF HAZARDOUS AREAS

The procedure for QRA starts with identification of major risk areas in the installation.

Operation carried out in specialty and agrochemical Industries usually come under certain

board, general categories. At M/s. Paushak Ltd., major risk areas are as follows:

Bulk storage area for Raw Materials at ambient temperature and atmospheric

pressure.

Process Plant involving pumping, transportation, reactors, distillation, heating, cooling,

etc.

Bulk loading and unloading from storage tanks to road takers and vice versa.

6.1.4.2 IDENTIFICATION OF FAILURE CASES FOR HAZARDOUS AREAS

Release due to catastrophic failure of storage tanks or process vessels.

Rupture of connected pipe with storage tank or process vessels.

Continuous release at significant rates for long durations transfer pipelines caused by

sudden, major break of the pipeline.

Continuous release at low rate through small holes or cracks in piping and vessels, flange

leaks, and leakage from pump glands and similar seals.

It is to be noted that for Quantitative Risk Assessment, worst case scenarios has been

considered, though their frequency of occurrence is much lower than the cases of small

leaks.

Page 5: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 235

6.1.4.3 MAJOR HAZARDOUS AREAS

The hazardous chemical storage area is shown in Figure-6.3. The major Hazardous chemicals

to be stored, transported, handled and utilized within the plot area are summarized in the

Table-6.1. Other hazards and control measures are summarized in Table-6.2. Facilities /

System for process safety, transportation, fire fighting system and emergency capabilities to

be adopted are stated below.

FIGURE-6.3

HAZARDOUS CHEMICAL STORAGE AREA

Page 6: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 236

FIGURE-6.3 CONTD.

PLANT LAYOUT

Em e rg e nc y

C o ntro l

C e nte r (EC C )

A s s e m bly

P o int - 1 A s s e m bly

P o int - 2

F ire P um p

Ho us e

OHC

Page 7: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 237

TABLE-6.1

STORAGE AND HANDLING DETAILS OF HAZARDOUS CHEMICALS

Quantity Name of the

Hazardous

Substance

(Mention

concentration

if any)

Maximum

that can

be stored

Actually

stored

(including

process &

handling)

Place of

its storage

State & Operating

Pressure &

Temperature

Type of Hazard

Possible (fire,

explosion, toxic

release etc.)

Control measure provided

Chlorine 45 MT 35 MT Phosgene

Plant

Liquefied

@ RT 10 kg/cm2

Toxic Release Online Gas Sensors, Pressure Gauge,

Emergency Kit, Caustic Scrubbing

System, SCBA Set

Phosgene <750 Kgs <750 Kgs Phosgene

Plant

Gas, NTP Toxic Release Water Sprinkler, Pressure gauge,

Temperature gauge, Scrubbers,

Sensors, Safety Valves

Di – Methyl

Amine

17 KL 10 KL DMA

Storage

Area

Liquefied

2 kg/cm2 @ 40

0C

Fire, Toxic Control Measures has been taken as

per license approved by Dept. of

Explosives. Flameproof area, static

Earthing, Water Sprinklers, Safety

Valve, Scrubber, fenced area.

Toluene 138 KL 69 KL Solvent

Yard

Liquid Fire Control Measures has been taken as

per license approved by Dept. of

Explosives. Flameproof area, static

Earthing, fire fighting facility, flame

arrester, fenced area.

Methanol 69 KL 10 KL Solvent

Yard

Liquid Fire Control Measures has been taken as

per license approved by Dept. of

Explosives. Flameproof area, static

Earthing, fire fighting facility, flame

arrester, fenced area.

Di – Ethyl

Amine

10 KL 5 KL ISO Plant Liquid Fire Bund wall, fire fighting facility, flam

arrester, etc.

Hydrochloric

Acid

20 KL 10 KL ISO Plant Liquid Spillage/leakage Bund Wall, scrubbers

Light Diesel Oil 69 KL 40 KL LDO

Storage

Yard

Liquid Fire Bund wall, Earthing – bonding, fire

fighting facility, fencing.

2 Ethyl Hexanol 40 KL 20 KL ISO – 2

Plant

Liquid Fire Bund wall, Earthing – bonding, fire

fighting facility, fencing.

Benzyl Alcohol 40 KL 20 KL ISO – 2

Plant

Liquid Fire Bund wall, Earthing – bonding, fire

fighting facility, fencing.

Isopropyl

Alcohol

20 KL 10 KL TCC Plant Liquid Fire Bund wall, Earthing – bonding, fire

fighting facility, fencing.

Phenol 20 KL 15 KL TCC Plant Solid Fire Bund wall, Earthing – bonding, fire

fighting facility, fencing.

Page 8: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 238

TABLE 6.2

OTHER HAZARDS AND CONTROL

In charge person Sr.

No.

Name of the

possible hazard

or emergency

Its sources & reasons

Its effects on

persons, property

& environment

Place of its

effect Control measures provided Name and

designation

Telephone

Number

1 2 3 4 5 6 7 8

1 BOILER

(1) Burning

(2) Physical

injury

(3) Explosion

Over pressure in the

boiler if safety valve not

working. Water level

indicator not working.

Low water level indicator

fail. High temp. System

fails.

Minor/Major Injury

Loss of human life

Loss of property

(Loss of Man /

Machine Material)

Utility Block Lower & Upper Level Indication System

provision. Safety valves for pressure

control fixed temp. & pressure indicator

provided. Blow down & blowing system

provided for cleaning tube and shell. Soft

water used. Inter locking provided on

pumps, FD fan, ID fan. Periodical checking

& inspection maintenance done. Yearly

inspection done by Boiler Inspector

Mr. Praful

Kanzariya ,

Engineering

Services

4447

2 ELECTRICITY

(1) Burning

(2). Fire

(3). Shock

Loose Contacts, Weak

earthing Short Circuit

Improper Insulation

Burning, Shock,

Death

Surrounding

the accident

area

Proper Earthing, Periodical Checking of

joints, proper insulations of Equipments,

etc. Flame proof fitting in solvent storage

area, bounding and jumpers to all solvent

barrier lines provided.

Mr. Praful

Kanzariya, Dy.

Manager - Ele

Mr. R. Kukarni ,

ENG

4447, 4444

3 HOUSE KEEPING

(1). Physical

(2). Burning

(3) Fire

(4) Chemical

Exposure

Bad House keeping Physical / Chemical

Thermal Burn

Injury (Major /

Minor)

All Plant Proper Handling, regular cleaning, Proper

placement of material (RIGHT THING AT

THE RIGHT PLACE)

Mr. Chintan

Kansara

4415, 4446

4 PIPE LINE

LEAKAGES

Spillages etc.

(1) Corrosion

(2) Toxic gas

release

Leaking of pipe line due to

corrosion, Loose contact

etc.

Physical / Chemical

Thermal Burn

Injury (Major /

Minor)/Chemical

Exposure

Plant area Proper maintenance, Proper Selection of

Material for pipe lines, Immediate

attention, NO SMOKING Boards

displayed.

Concerned Plant

In Charge

4443, 4417

Page 9: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 239

TABLE 6.3

HAZARDOUS PROPERTIES OF THE CHEMICALS, COMPATIBILITIES, SPECIAL HAZARD AND ANTIDOTES

SR. NAME OF

CHEMICAL

HAZARD FLASH

POINT 0

C

BP 0

C

LEL % UEL % SP.GR.

20 0

C

VD SOLUBILITY

WITH

WATER at

20 0 C

NFPA

H F R

HAZARDOUS

COMBUSTION

PRODUCT

TLV

/

TWA

IDLH

LC50

LD50

1. Chlorine

CAS # 7782-50-5

T - -34.6 - - - 2.5 Reacts 4 0 0 When heated, it emits

highly toxic fumes

0.5 ppm 10 ppm 293 ppm (Rat)

1 Hr

-

2. Phosgene

CAS # 75-44-5

C/T - 8.2 - - - 3.41 Slightly

soluble

4 0 1 When heated to

decomposition or on

contact with water or

steam, it will react to

produce toxic and

corrosive fumes.

0.1 ppm 2 ppm 800 ppm

(Human)

-

3. Di – Methyl Amine

CAS # 124-40-3

F -50 6.9 2.8 14.4 0.93 1.6 23.7 g/100ml 3 4 0 Toxic gases and vapors

(such as oxides of

nitrogen and carbon

monoxide) may be

released in a fire

10 ppm 500 ppm 4540 ppm

(Rat) 4 Hr

698 mg/kg

(Rat)

4. Toluene

CAS # 108-88-3

F 4 110.6 1.2 8 0.863 3.2 700 mg/L 2 3 0 Moderately dangerous;

when heated, emits

toxic fumes which can

react vigorously with

oxidizing materials

50 ppm 500 ppm 49 gm/m3

(Rat) 4 Hr

636 mg/kg

(Rat)

5. Mono Chloro

Benzene

CAS # 108-90-7

F 27 130 1.3 11 1.1058 3.88 0.02 g/100ml 3 3 0 Burning in open flame

can form toxic

phosgene and hydrogen

chloride gases

10 ppm 1000

ppm

- 1110 mg/kg

(Rat)

6. Di – Ethyl Amine

CAS # 109-89-7

F -23 55.5 1.8 10.1 0.81 2.5 Soluble 3 3 0 Vapors are irritating

Vapors are heavier

than air and may travel

considerable distance

to a source of ignition

and flash back.

25 ppm 200 ppm 4000 ppm

(Rat) 4 Hr

540 mg/kg

(Rat)

7. Hydrochloric Acid

CAS # 7647-01-0

C 11 -85.06 - - 1.19 1.25 Soluble 3 0 1 Non-combustible,

substance itself does

not burn but may

5 ppm 50 ppm 4701 ppm

0.5 Hr [Rat]

-

Page 10: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 240

decompose upon

heating to produce

corrosive and/or toxic

fumes

8. Light Diesel Oil

CAS # 68476-30-2

F 32 376 0.6 6 0.90 - Insoluble 1 2 0 On fire it will liberate

some amount of

carbon monoxide,

Sulphur dioxide

Nitrogen oxide. and

other aromatic

hydrocarbons

800 ppm - 5 gm/m3

(Rat) 4 Hr

> 5g/kg

(Oral-Rat)

9. 2 Ethyl Hexanol CAS # 104-76-7

F 73 185 0.88 9.7 1.83 4.49 0.14 % 2 2 0 Thermal

decomposition

products may include

toxic oxides of carbon

- - 1.2 mg/l

(Rat) 6 Hr

3290 mg/kg

(Rat)

10. Benzyl Alcohol

CAS # 100-51-6

F 93 205.3 - - 1.04 3.72 35,000 mg/l

@ 20 deg. C

2 2 0 These products are

carbon oxides

(CO, CO2)

44.2

mg/m3

- - 1230 mg/kg

[Rat]

11. Isopropyl Alcohol

CAS # 67-63-0

F 12 82.4 2 12.7 0.785 2.1 Soluble 1 3 0 Fire may produce

irritating, corrosive

and/or toxic gases

400 ppm 2000

ppm

100000 mg/l

96 Hr

5045 mg/kg

[Rat]

F = FIRE T = TOXIC

E = Explosive R = REACTIVE

BP = BOILING POINT LEL = LOWER EXPLOSIVE LIMIT

UEL = UPPER EXPLOSIVE LIMIT SP.GR = SPECIFIC GRAVITY

VD = VAPOUR DENSITY ER = EVAPORATION RATE

H = HEALTH HAZARD CLASS F = FIRE HAZARD CLASS

R = REACTIVE HAZARD BR = BURNING RATE

TLV = THRESHOLD LIMIT VALUE PPM = PARTS PER MILLION

STEL = SHORT TERM EXPOSURE LIMIT NFPA = NATIONAL FIRE PROTECTION ASSOCIATION-USA

C = CORROSIVE

Page 11: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 241

6.1.4.4 PRECAUTIONS DURING STORAGE AND TRANSPORTATION OF HAZARDOUS CHEMICALS

LIQUIDS

Always use the road tankers having authorization for transporting the said liquids.

Vendor will be asked to provide MSDS to Tanker Driver.

Tankers will have clearly marked identification of material being contained with mentioning

Safety Card.

Driver to have concerned Safety Officer’s contact details to contact him in case of

emergency.

Provide muffler on exhaust while entering tanker within premises.

Ensure Earthing Boss connection before starting any transferring.

SOP to cover routine checking of Tank farm area to be carried out for checking any spillage /

leakage.

Tanks will be inspected physically daily for having any visual abnormality.

Readings of Temperature & Pressure will be noted, recorded & reported immediately for

abnormality.

Safety instruments like rupture disc, safety valves will be checked at defined duration for

intakeness.

Scheduled testing of tanks to be done for thickness testing.

Tanks to be painted on regular interval defined as per laws to protect them from

atmospheric corrosion.

Barrels to be checked for proper fixing of bungs before sending it outside the premises.

Barrels to be monitored physically daily for developing any pressure or vacuum within it on

long storage.

Concerned persons will be trained properly to use spill kit in case of observing any spillage

inside warehouse.

Page 12: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 242

SOLIDS

Vendor will be asked to provide MSDS to Truck Driver.

Driver to have concerned Safety Officer’s contact details to contact him in case of

emergency.

Provide muffler on exhaust while entering truck within premises.

SOP to cover routine checking of Bags & Containers for checking any damage.

Containers to be tested for safe racking & transportation.

Proper PPE to be used while handling the material & concerned persons to be trained for

usage of the same.

Concerned persons will be trained properly to use spill kit in case of observing any spillage

inside warehouse.

The major hazards in the M/s. Paushak Ltd. are described below.

Toxic hazard due to leakage of hazardous chemicals from storage tank.

Corrosive hazard due to leakage of chemicals from Carboys.

Electrical hazards due to the electrical major equipment/ machinery, operations, welding,

motors, and heavy lift devices, cabling, human intervention (short circuit possibility),

maintenance work (due to machinery breakdown etc.), plant lighting related electrical

hazards.

Possibility of human injury due to working with mechanical machines, manual handling etc.

Possibility of injury during chemicals handled, during operations and due to intoxication.

Major dropped objects hazard due to large number of physical handling steps / operations

involved with crane/ overhead lifting/ hoisting equipment.

Fires in any part of the plant working areas – there is a possibility of rapid escalation if it is

not brought under control quickly.

Possibilities of fire hazards at transformers, switchgear and other electrical equipment etc.

Page 13: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 243

6.1.4.4.1 TRANSPORTATION, UNLOADING AND HANDLING PROCEDURE FOR HAZARDOUS

CHEMICALS

Transportation, Unloading and Handling Procedure for Solvents

SR.

NO.

ACTIVITY TYPE OF POSSIBLE

HAZARD

MITIGATION MEASURES

Leakage& Spillage

Check the source of leakage point.

Do not touch damaged containers or spilled material

unless wearing appropriate protective clothing.

Stop leak if you can do it without risk.

Fire & explosion Use water spray to reduce vapors; do not put water

directly on leak, spill area or inside container.

Keep combustibles (wood, paper, oil, etc.) away from

spilled material.

1 Transportation of Solvents by

road tanker

Toxic release Isolate the area

Isolate the container

Training will be provided to driver and cleaner

regarding the safe driving, hazard of Flammable

chemicals, emergency handling.

TREM card will kept with TL.

Fire extinguishers will be kept with TL.

Flame arrestor will be provided to TL exhaust.

Instructions will be given not to stop road tanker in

populated area.

Clear Hazard Identification symbol and emergency

telephone number will be displayed as per HAZCHEM

CODE.

Appropriate PPEs will be kept with TL.

2 Road tanker unloading at

project site.

Leakage& Spillage

Check the source of leakage point.

Do not touch damaged containers or spilled material

unless wearing appropriate protective clothing.

Stop leak if you can do it without risk.

Fire & explosion Use water spray to reduce vapors; do not put water

directly on leak, spill area or inside container.

Keep combustibles (wood, paper, oil, etc.) away from

spilled material.

Toxic release Isolate the area

Isolate the container

Check the source of leakage point.

Isolate the area

Isolate the container

Spray the water on leakage

Priority will be given to Tanker to immediately enter

the storage premises at site and will not be kept

waiting near the gate or the main road.

Security person will check License, TREM CARD, Fire

extinguisher condition; Antidote Kit, required PPEs as

per SOP laid down.

Page 14: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 244

Store officer will take sample as per sampling SOP from

sampling point.

After approval of QC department unloading procedure

will be allowed be started.

Following precautions will be adopted during unloading

Wheel stopper will be provided to TL at unloading

platform.

Static earthing will be provided to road tanker.

Tanker unloading procedure will be followed according

to check list and implemented.

Flexible SS hose connection will be done at TL outlet

line.

The quantity remaining in the hose pipeline will be

drained to a small underground storage tank.

All TL valves will be closed in TL.

Finally earthing connection and wheel stopper will be

removed.

Only day time unloading will be permitted.

Leakage& Spillage Check the source of leakage point.

Do not touch damaged containers or spilled material

unless wearing appropriate protective clothing.

Stop leak if you can do it without risk.

Fire, Explosion Use water spray to reduce vapors; do not put water

directly on leak, spill area or inside container.

Keep combustibles (wood, paper, oil, etc.) away from

spilled material.

3 Storage tank safety

Toxic release. Isolate the area

Isolate the container

Check the source of leakage point.

Isolate the area

Isolate the container

Spray the water on leakage

SS storage tank will be provided as per IS code.

Dyke wall will be provided to storage tank.

Level transmitter will be provided with low level high

level auto cut-off provision.

Vent will be connected to water trap and vent of water

trap will be provided with flame arrestor.

Water sprinkler system will be provided to storage

tank.

Fire hydrant monitor with foam attachment facility will

be provided.

Dumping / Drain vessel/alternate vessel will be

provided to collect dyke wall spillage material.

FLP type pump will be provided.

Nitrogen blanketing will be provided to storage tank.

Double static earthing will be provided to storage tank.

Double Jumper clip will be provided to all Solvent

handling pipeline flanges.

Page 15: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 245

4 Transfer from storage tank to

Day tank

Leakage& Spillage due to

Line rupture, Flange

Gasket failure, Fire,

Explosion, Toxic release.

Double mechanical seal type FLP type pump will be

provided.

Double on / off switch will provided at tank farm and

process area near day tank. Pump auto cut off with day

tank high level will be provided.

Flame arrestor will be provided on day tank vent.

Over flow will be provided for additional safety and it

will be connected to main storage tank.

NRV will be provided on pump discharge line.

Double Jumper clip will be provided to all solvent

handling pipeline.

Double static earthing will be provided to day tank.

5 Transfer from Day tank to

reactor.

Leakage, Spillage due to

Line rupture, Flange

Gasket failure, Fire,

Explosion, Toxic release.

Gravity transfer.

Total quantity of day tank material will be charged in to

reactor at a time.

NRV will be provided on day tank outlet line.

Static earthing will be provided to storage tank.

Double Jumpers will be provided to pipeline flanges.

6.1.4.4.2 DETAIL NOTE OF HANDLING AND SPILLAGES OF PHOSGENE

OPERATING INSTRUCTION

Mainly Phosgene is Manufactured by two methods and supplied to Paushak Ltd. and United

Phosphorous Limited

1. Liquid Method.

A. Only For Paushak Limited

2. Direct Gas Supply Method

A. To Paushak Ltd.

B. To United Phosphorous Limited

TRANSPORTATION DETAILS

M/s. Paushak Ltd. has taken the following safety precautions for supplying of Phosgene for

internal use;

1. Ensure the system pressure of the line to which the phosgene gas is transferred must be

between 0 to 2 kg/cm2.

2. Close the brine valve of phosgene condenser and phosgene receiver.

3. Calculate the flow rate of CO and Cl2 as per material balance of phosgene, required by

plant.

Page 16: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 246

4. Keep the phosgene system at a pressure of 0 to 2.0 kg/cm2.

5. If the System pressure exceeds more then 2.0 kg/cm2 then immediately follow the plant

shutdown procedure and shutdown the plant.

6. At Every hour take Chlorine Tonner weight reading and based on that calculate

phosgene quantity as per material balance.

7. Record all details in log sheet.

8. Every 48 to 50-hours interval the CO.M. Sieve tower change after completion of

phosgene Production.

9. The used CO.M. Sieve tower is switch to regeneration.

M/s. Paushak Ltd. has taken the following safety precaution for supplying of Phosgene to

United Phosphorous Limited;

1. Ensure the system pressure of the line to which the phosgene gas is transferred must be

between 0 to 0.5 kg/cm2.

2. Close the valve going toward phosgene condenser and open all valves in the main

supply in of UPL.

3. Calculate the flow rate of CO and Cl2 as per material balance of phosgene, required by

UPL.

4. Start flow of CO at calculated rate through CO Rota meter.

5. Keep the phosgene system at a pressure of 0 to 0.5 kg/cm2.

6. If the System pressure exceeds more then 0.5 kg/cm2 then immediately follow the plant

shutdown procedure and shutdown the plant.

7. At Every hour take Chlorine Tonner weight reading and based on that calculate

phosgene quantity as per material balance

8. Record all details in log sheet.

9. Every 48 to 50-hours interval the CO.M. Sieve tower change after completion of

Phosgene Production.

10. The used CO.M. Sieve tower is switch to regeneration.

Page 17: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 247

CRITICAL PARAMETER OF PHOSGENE

For Liquid Method:

1. Brine temp. range : < -2 °C

2. Hot water temperature : 50 °C to 55 °C

3. CO system pressure : 3.2 kg/cm2 to 3.5 kg/cm

2

4. Chlorine system pressure : 3.2 kg/cm2 to 3.5 kg/cm

2

5. Phosgene system pressure : 2.5 kg to 3.0 kg

6. Rate of chlorine : 130 kg/hr to 145 kg/hr

7. Rate of CO : 50 kg/hr to 54 kg/hr

8. After production of 450 to 500 MT Phosgene changes to activated carbon.

9. In order to keep moisture free CO tower change the tower after 48 to 50 hrs of use.

10. Caustic solution : 3.5 % to 8.0 %

11. Phosgene out put : 150 kg to 175 kg

For Direct Gas Supply Method:

1. Hot water temperature : 50 °C to 55 °C

2. CO system pressure : 3.2 kg/cm2 to 3.5 kg/cm

2

3. Chlorine system pressure : 3.2 kg/cm2 to 3.5 kg/cm

2

4. Phosgene system pressure : For UPL consumption: 0.0 to 0.5 kg/cm2

5. For Paushak limited : 0.0 to 2.0 Kg/cm2

6. Ratio Of flow rate of chlorine to CO : 2.50 to 2.53

7. After production of 450 to 500 MT Phosgene. The activated carbon is changed.

8. In order to keep moisture free CO tower change the tower after 48 to 50 hrs of use.

9. Phosgene out put : chlorine flow rate * 1.394.

START UP AND SHUT DOWN

Before start up the plant given below utilities must be available

1. Brine Temp : < 2 0C

2. Steam Pressure : > 2 Kg/cm2

3. Hot water temperature : must be in the range of 50 0C to 55

0C

Page 18: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 248

After conforming these utilities, start instrument air compressor for chlorine vaporizer panel.

Start and check hot water circulation pump for water circulation in the jacket of the reactor.

Open gas out let valve of all CO holders and start CO compressor. Maintain pressure of 3.5

kg/cm2. Start Cl2 vaporizer and maintain the steam pressure of 1.0 kg/cm

2 and then open

Chlorine Tonner and maintain 3.5 kg/cm2

on the chlorine header. After doing all the above

things, follow the operating instruction of the plant. To shut down the plant following

instructions are to be followed. Turn off the Chlorine Tonner valve and run the plant to the Cl2

and CO rate down below 50 – 22, then stop Cl2 and CO rate by closing the in and out valve of Cl2

and CO Rota meter. After that switch off the chlorine panel and CO compressor. Then stop the

hot water circulation pump, HCl and phosgene main pump. Close the suction and discharge

valve of brine of phosgene condenser and phosgene receiver. After that release the CO

pressure by opening of bypass valve and after releasing it closer the gas outlet valve of CO

holder.

Emergency shut down:

1. When any abnormality observes in Phosgene plant like gas leakage so plant is

immediately stop as per above instruction.

2. System pressure is released in caustic scrubber (Phosgene main tank).

3. And leakage testing check by Ammonia solution.

4. Flush the system by N2 flushing.

5. After the flushing the systems give the written job receipt in maintenance. And leakage

equipment is taken to maintenance.

6. After complete the all the job work, check the system by N2 pressure and soap solution.

7. Leakage testing is done then plant is start as per above instruction.

Page 19: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 249

SAFETY PROVISION

In Phosgene Plant various safety provisions has been taken by M/s. Paushak Ltd. which are as

below;

SAFETY PROVISION IN PHOSGENE PLANT

SR. NO. EQUIPMENT NAME QUANTITY OPERATION

1. Sprinkle system 1 SOP available

2. Scrubbing System 2 SOP available

3. SCBA Set 6 SOP available

4. Airline mask 6 Continue air supply in plant.

5. Chlorine Kit 3 Training given every month.

6. Online Sensors 5 Online Sensors attached with computer and calibration

done by external agency at every six months.

7. Potable detector 03 Portable detectors are also available

8. Safety valve 4 Connect with scrubbing system

9. Stand by D.G. Set 1 Trial taken by every month.

10. PPEs - Provided to all employees and workers of the plant

11. Stability certificate - Available in plant, done by third party.

12. Health monitoring - Once in a six month.

13. Fire Hydrant System Auto mode from Fire Pump House

14. Emergency Chlorine

Scrubber

1 SOP available

Page 20: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 250

PIPELINE EQUIPMENT SAFETY

EQUIPMENT SAFETY

ENVIRONMENT SAFETY

SR.

NO.

DESCRIPTION REMARKS

1. Ambient monitoring done by third party. Once in a month.

2. Daily ambient monitoring by online sensors/portable detectors. Record in form No. 37

3. Scrubbing system concentration Once in a week or when require.

4. Plant effluent goes to ETP for further treatment. -

5. Environment audit done by SHE dept. through GPCB authorized agencies. Quarterly/yearly

6. Noise monitoring. Once in a month by external agency.

7. Generated hazardous waste from plant shift to ETP hazard waste yard. Disposed to GPCB approved waste site.

SR.

NO.

EQUIPMENT NAME THICKNESS TEST HYDRO TEST REMARKS

1. Pressure gauge - - Calibration done at every six

months internally.

2. Safety valve - - Buffer tank safety valve done

by external agency once in a

year.

Other safety valve done by

internally once in a year.

3. Pressure vessel Every six months by third

party

Internally once in a

year, externally

once in a two year.

Reports are available.

4. Operation valves - Before installation. Operation valves have been

provided as per need.

SR.

NO.

PIPE LINES OPERATION

1. Phosgene pipeline. Pipeline jacketed & connected to caustic scrubber system,

Minimum joints, thickness test to be done in every six month.

Page 21: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 251

Diagram of Safety System in Phosgene Plant is as follows;

6.1.5 CONSEQUENCE ANALYSIS

In a plant handling hazardous chemicals, the main hazard arises due to storage, handling & use

of these chemicals. If these chemicals are released into the atmosphere, they may cause

damage due to resulting fires or vapour clouds. Blast Overpressures depend upon the reactivity

class of material between two explosive limits.

Operating Parameters

Potential vapour release for the same material depends significantly on the operating

conditions. Especially for any liquefied gas, the operating conditions are very critical to assess

the damage potential. If we take up an example of ammonia, if it is stored at ambient

temperature, say 30oC, and then the vapour release potential of the inventory is much higher as

compared to the case if it is stored at 0oC.

Safety System In

Phosgene Plant

Individual

Safety

Plant

Safety

Sensors Sprinkler

System

Scrubbing

System

DG

Set

Fire

Extinguisher

SBA

Set

Online Air

Breathing Sys.

PPEs Water Shower

System

Page 22: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 252

Inventory

Inventory Analysis is commonly used in understanding the relative hazards and short listing of

release scenarios. Inventory plays an important role in regard to the potential hazard. Larger

the inventory of a vessel or a system, larger the quantity of potential release. The potential

vapour release (source strength) depends upon the quantity of liquid release, the properties of

the materials and the operating conditions (pressure, temperature). If all these influencing

parameters are combined into a matrix and vapour source strength estimated for each release

case, a ranking should become a credible exercise.

Loss of Containment

Plant inventory can get discharged to Environment due to Loss of Containment. Certain

features of materials to be handled at the plant need to the clearly understood to firstly list out

all significant release cases and then to short list release scenarios for a detailed examination.

Liquid release can be either instantaneous or continuous. Failure of a vessel leading to an

instantaneous outflow assumes the sudden appearance of such a major crack that practically all

of the contents above the crack shall be released in a very short time. The more likely event is

the case of liquid release from a hole in a pipe connected to the vessel. The flow rate is

depending on the size of the hole as well as on the pressure, which was present, in front of the

hole, prior to the accident. Such pressure is basically dependent on the pressure in the vessel.

The vaporisation of released liquid depends on the vapour pressure and weather conditions.

Such consideration and others have been kept in mind both during the initial listing as well as

during the short listing procedure. In the study, Maximum Credible Loss accident methodology

is to be used, therefore, the largest potential hazard inventories have been considered for

consequence estimation.

6.1.5.1 DAMAGE CRITERIA

In consequence analysis, use is made of a number of calculation models to estimate the

physical effects of an accident (spill of hazardous material) and to predict the damage (lethality,

Page 23: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 253

injury, material destruction) of the effects. The calculations can roughly be divided in three

major groups:

a) Determination of the source strength parameters;

b) Determination of the consequential effects;

c) Determination of the damage or damage distances.

The basic physical effect models consist of the following.

Source strength parameters

* Calculation of the outflow of liquid, vapour or gas out of a vessel or a pipe, in case of

rupture. Also two-phase outflow can be calculated.

* Calculation, in case of liquid outflow, of the instantaneous flash evaporation and of the

dimensions of the remaining liquid pool.

* Calculation of the evaporation rate, as a function of volatility of the material, pool

dimensions and wind velocity.

* Source strength equals pump capacities, etc. in some cases.

Consequential effects

* Dispersion of gaseous material in the atmosphere as a function of source strength,

relative density of the gas, weather conditions and topographical situation of the

surrounding area.

* Intensity of heat radiation [in kW/ m2] due to a fire or a BLEVE, as a function of the

distance to the source.

* Energy of vapour cloud explosions [in N/m2], as a function of the distance to the

distance of the exploding cloud.

* Concentration of gaseous material in the atmosphere, due to the dispersion of

evaporated chemical. The latter can be either explosive or toxic.

It may be obvious, that the types of models that must be used in a specific risk study strongly

depend upon the type of material involved:

- Gas, vapour, liquid, solid

Page 24: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 254

- Inflammable, explosive, toxic, toxic combustion products

- Stored at high/low temperatures or pressure

- Controlled outflow (pump capacity) or catastrophic failure?

Selection of Damage Criteria

The damage criteria give the relation between extent of the physical effects (exposure) and the

percentage of the people that will be killed or injured due to those effects. The knowledge

about these relations depends strongly on the nature of the exposure. For instance, much more

is known about the damage caused by heat radiation, than about the damage due to toxic

exposure, and for these toxic effects, the knowledge differs strongly between different

materials.

In Consequence Analysis studies, in principle three types of exposure to hazardous effects are

distinguished:

1. Heat radiation, from a jet, pool fire, a flash fire or a BLEVE.

2. Explosion

3. Toxic effects, from toxic materials or toxic combustion products.

In the next three paragraphs, the chosen damage criteria are given and explained.

Heat Radiation

The consequence caused by exposure to heat radiation is a function of:

The radiation energy onto the human body [kW/m2];

The exposure duration [sec];

The protection of the skin tissue (clothed or naked body).

The limits for 1% of the exposed people to be killed due to heat radiation, and for second-

degree burns are given in the table herein:

Page 25: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 255

Damages to Human Life Due to Heat Radiation

Exposure

Duration

Radiation for

1% lethality

(KW/m2)

Radiation for 2nd

degree burns

(KW/m2)

Radiation for

first degree

burns (KW/m2)

10 Sec 21.2 16 12.5

30 Sec 9.3 7.0 4.0

Since in practical situations, only the own employees will be exposed to heat radiation in case

of a fire, it is reasonable to assume the protection by clothing. It can be assumed that people

would be able to find a cover or a shield against thermal radiation in 10 sec. time. Furthermore,

100% lethality may be assumed for all people suffering from direct contact with flames, such as

the pool fire, a flash fire or a jet flame. The effects due to relatively lesser incident radiation

intensity are given below.

Effects Due To Incident Radiation Intensity

INCIDENT

RADIATION

KW/m2

TYPE OF DAMAGE

0.7 Equivalent to Solar Radiation

1.6 No discomfort for long exposure

4.0 Sufficient to cause pain within 20 sec. Blistering of skin (first degree burns are likely)

9.5 Pain threshold reached after 8 sec. second degree burns after 20 sec.

12.5 Minimum energy required for piloted ignition of wood, melting plastic tubing etc.

Explosion

In case of vapour cloud explosion, two physical effects may occur:

* a flash fire over the whole length of the explosive gas cloud;

* a blast wave, with typical peak overpressures circular around ignition source.

Page 26: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 256

As explained above, 100% lethality is assumed for all people who are present within the cloud

proper.

For the blast wave, the lethality criterion is based on:

* A peak overpressure of 0.1 bar will cause serious damage to 10% of the

housing/structures.

* Falling fragments will kill one of each eight persons in the destroyed buildings.

The following damage criteria may be distinguished with respect to the peak overpressures

resulting from a blast wave:

Damage Due To Overpressures

Peak Overpressure Damage Type

0.83 bar Total Destruction

0.30 bar Heavy Damage

0.10 bar

0.03 bar

Moderate Damage

Significant Damage

0.01 bar Minor Damage

From this it may be concluded that p = 0.17 E+5 pa corresponds approximately with 1%

lethality. Furthermore it is assumed that everyone inside an area in which the peak

overpressure is greater than 0.17 E+ 5 pa will be wounded by mechanical damage. For the gas

cloud explosion this will be inside a circle with the ignition source as its centre.

Intoxication

The consequences from inhalation of a toxic vapour/gas are determined by the toxic dose.

This dose D is basically determined by:

- Concentration of the vapour in air;

- Exposure duration.

Page 27: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 257

Furthermore, of course, the breathing rates of the victim, as well as the specific toxic

mechanism unto the metabolism play an important role.

The dose is defined as D = Cn.t, with:

C = concentration of the toxic vapour, in [ppm] or [mg/m3];

t = exposure duration, in [sec] or [min];

n = exponent, mostly > 1.0; this exponent takes into account the fact that a high

concentration over a short period results in more serious injury than a low

concentration over a relatively longer period of exposure. The value of n should

be greater than zero but less than 5.

The given definition for D only holds if the concentration is more or less constant over the

exposure time; this may be the case for a (semi) continuous source. In case of an

instantaneous source, the concentration varies with time; the dose D must be calculated with

an integral equation:

D = Cn.dt

For a number of toxic materials, so-called Vulnerability Models (V.M.) has been developed. The

general equation for a V.M. (probit function) is:

Pr = a + b.ln (Cn.t), with

Pr = probit number, being a representation of the percentage of people suffering a

certain kind of damage, for instance lethality

Pr = 2.67 means 1% of the population;

Pr = 5.00 means 50% of the population;

a and b material dependent numbers;

Cn.t = dose D, as explained above.

The values for a and b are mostly derived from experiments with animals; occasionally,

however, also human toxicity factors have been derived from accidents in past. In case only

animal experiments are available, the inhalation experiments with rats seem to be best

Page 28: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 258

applicable for predicting the damage to people from acute intoxication. Although much

research in this field have been done over the past decades, only for a limited number of toxic

materials consequence models have been developed. Often only quite scarce information is

available to predict the damage from an acute toxic exposition. Data transformation from oral

intoxication data to inhalation toxicity criteria is sometimes necessary. Generally, in safety

evaluations pessimistic assumptions are applied in these transformation calculations. The

calculated damage (distance) may be regarded as a maximum. For the purposes of a response

to a major incident, the IDLH value level has been chosen for the ‘wounded‘criteria. This type of

injury will require medical attention.

6.1.5.2 MAXIMUM CREDIBLE LOSS ACCIDENT SCENARIOS

A Maximum Credible Accident (MCA) can be characterised as the worst credible accident. In

other words: an accident in an activity, resulting in the maximum consequence distance that is

still believed to be possible. A MCA-analysis does not include a quantification of the probability

of occurrence of the accident. Another aspect, in which the pessimistic approach of MCA

studies appears, is the atmospheric condition that is used for dispersion calculations. As per the

reference of the study, weather conditions having an average wind speed of 2.21 m/s have

been chosen.

The Maximum Credible Loss (MCL) scenarios have been developed for the Facility. The MCL

cases considered, attempt to include the worst “Credible” incidents- what constitutes a credible

incident is always subjective. Nevertheless, guidelines have evolved over the years and based

on basic engineering judgement, the cases have been found to be credible and modelling for

assessing vulnerability zones is prepared accordingly. Only catastrophic cases have been

considered and not partial or small failures (as is the case in Quantitative Risk Assessment

where contributions from low frequency - high outcome effect as well as high frequency - low

outcome events are distinguished). The objective of the study is emergency planning, hence

only holistic & conservative assumptions are used for obvious reasons. Hence though the

Page 29: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 259

outcomes may look pessimistic, the planning for emergency concept should be borne in mind

whilst interpreting the results.

6.1.5.2.1 CONSEQUENCE ANALYSIS CALCULATIONS

The Consequence Analysis has been done for selected scenarios. This has been done for

weather conditions having wind speed 2.21 m/s. In Consequence Analysis, geographical

location of the source of potential release plays an important role. Consideration of a large

number of scenarios in the same geographical location serves little purpose if the dominant

scenario has been identified and duly considered.

6.1.5.2.2 SOFTWARE USED FOR CALCULATIONS

PHAST MICRO: Phast is the most comprehensive software available for performing Process

Hazard Analysis (PHA), Quantitative Risk Assessment (QRA) and Financial Risk Analysis (FRA).

Our extensively validated software for consequence and risk assessment is used by

governments and industry helping them to comply with local safety regulation and their own

corporate best practice. Phast contains all the discharge, dispersion, effects and risk models you

will need to accurately assess all your major hazards and associated risks. Phast Consequence

provides you with comprehensive hazard analysis facilities to examine the progress of a

potential incident from the initial release to its far-field effects.

TOXIC AND FLAMMABLE IMPACT

It calculates the initial discharge, as the material expands from its storage conditions to

atmospheric, through dispersion, as the material mixes with air and dilutes, and the

subsequent toxic or flammable effects. Phast includes a wide range of models for discharge

and dispersion as well as flammable, explosive and toxic effects.

DISCHARGE

Phast requires basic information about storage or process conditions and material

properties in order to perform discharge calculations

Page 30: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 260

The software comes with an integrated material property database containing more

than 1,600 pre-defined pure component chemicals

Various discharge scenario options have been implemented to represent common

process failures, and model their behaviour. These include:

Leaks and line ruptures from long & short pipelines

Catastrophic ruptures

Relief valve and disc ruptures

Tank roof collapse

Vent from vapour spaces

In building release effects

DISPERSION

The dispersion models within Phast are able to model the following phenomena

Dispersion of gas, liquid and two-phase releases

Liquid droplet thermo dynamics calculations and liquid droplet rainout

Pool spreading and vaporization

Building wake dispersion effects for vapour releases

FLAMMABLE EFFECTS

For releases of flammable material Phast calculates

Radiation profiles and contours from a range of fire scenarios including pool fires, flash

fires, jet fires and fire balls, including cross-wind effects on a jet fire

Vapour Cloud Explosion modeling using industry standards models including the TNO

Multi-energy, Baker Strehlow Tang and TNT Equivalence models

Overpressure contours from Boiling Liquid Expanding Vapour Explosions

TOXIC EFFECTS

Graphs of toxic concentration profile

Indoor and outdoor toxic dose prediction

Page 31: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 261

Reporting of distance to specific dose and concentration

Calculated exposure time and use as “averaging time” for passive dispersion effects

PHAST RISK

Phast Risk allows you to combine the flammable and toxic consequences from each scenario in

your QRA model with their likelihood to quantify the risk of fatalities. Phast Risk allows you to

take account of local population distribution, sources of ignition, land usage and local

prevailing weather conditions. It is designed to perform all the analysis, data handling and

results presentation elements of a QRA within a structured framework.

Phast Risk allows you to quickly identify major risk contributors so that time and efforts can be

directed to mitigating these highest risk activities. Based on effects calculations and population

vulnerabilities, Phast Risk can integrate over all scenarios and weather conditions to estimate

the total risk. The established individual and societal risk indicators are predicted by Phast Risk

across your facility and surrounding area using the classical QRA methodology. Risk ranking

reports can be produced at points of strategic importance to show the relative influence of the

various failure scenarios and their contribution to both the individual and societal risk metrics.

A key benefit of Phast Risk is the ability to identify major risk contributors and differentiate

these from incidents with worst case consequences which might otherwise dominate the

safety reviews. Whilst medium scale incidents have lesser consequences, they may have a

higher frequency, which, when combined with their hazardous effects, generate a higher level

of risk. Time and effort directed to mitigating high consequence but often low frequency

events may not be well spent. Phast Risk helps you direct this effort more effectively. Phast

Risk also provides facilities to help you manage large quantities of input data, including

scenarios, parameters, wind roses, ignition and population, and combine these in many ways.

This is critical when looking at sensitivity analyses and assessing the merits of a range of risk

reduction measures.

Page 32: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 262

Benefits

Facilitates cost reduction in terms of losses and insurance

Allows optimization of plant and process design

Assist in compliance with safety regulators

Enables quicker response to hazardous incidents

Improve engineer’s understanding of potential hazards

Regular software upgrades incorporate industry experience and expertise, and

advances in consequence modeling technology

6.1.5.2.3 SCENARIOS

TABLE – 6.4

POSSIBLE ACCIDENT SCENARIOS

Scenario MCL Scenario Pressure & Temp. Quantity

1 Release of Chlorine Liquefied

@ RT 10 kg/cm2

900 Kg

2 Release of Phosgene NTP 300 Kg

3 Release of Di-Methyl Amine Liquefied

2 kg/cm2 @ 40

0C

10 KL

4 Release of Toluene NTP 69 KL

5 Release of Methanol NTP 10 KL

6 Release of Hydrochloric Acid NTP 10 KL

7 Release of 2 Ethyl Hexanol NTP 20 KL

8 Release of Benzyl Alcohol NTP 20 KL

9 Release of Iso Propyl Alcohol NTP 10 KL

10 Release of Light Diesel Oil NTP 40 KL

11 Unconfined Pool Fire Simulations for Drum Storage

Area

NTP 200 Lit

Page 33: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 263

Scenario – 1 Release of Chlorine

This scenario considers release of Chlorine from Storage Tank:

Results indicate:

Puff Isopleth Simulation for Chlorine Tonner Catastrophic Failure

Scenario : PUFF DISPERSION

In put Data

Stored quantity 900 Kgs.

Instantaneous Puff Release quantity 900 Kgs.

Molecular weight 70.9

Density ( Air) 2.49kg/m3

Hazard Level Concentration (PPM) Ground level distance (Meter)

Lc50 1017 211

IDLH 10 856

Page 34: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 264

Point source plume release for Chlorine toner liquid/ gas phase valve failure

Scenario : POINT SOURCE PLUME RELEASE

In put Data

Stored quantity 900 Kgs

Rate of release 1000 g/s

Molecular weight 70.9

Density ( Air) 2.49kg/m3

Hazard Level Concentration (PPM) Ground level distance (Meter)

Lc50 1017 166

IDLH 10 555

TWA/ TLV 1.00 1045

Page 35: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 265

Measures to control and mitigate Emergency of Chlorine:

Evacuate the area in down wind direction:

For Chlorine evacuate area in down wind direction up to 0.4 km (400 meter) in small spillage and in case of large

spillage, evacuate the area in down wind direction 3.5 kms (3500 meters).

SOP will be prepared for safe handling of Chlorine tonners.

Tonner handling EOT crane will be installed in Chlorine shed area for safe tonner handling.

Safety Valve will be provided on chlorine header line and it will be connected to caustic scrubber.

Safety valve will be provided on vaporizer header and outlet of safety valve connected to scrubber.

Flow and temperature controllers will be provided on process line.

Chlorine Gas detectors will be provided in Chlorine shed and near Header.

Scenario base On Site emergency Plan will be prepared.

Mitigation measures to control Emergency:

Chlorine Emergency Kit will be procured and kept ready at chlorine shed.

Chlorine Hood with blower will be provided with scrubbing arrangement.

SCBA sets will be kept ready at chlorine handling area.

Safety Shower and eye wash will be provided in Chlorine shed area.

Chlorine absorption system will be provided. In case of chlorine leakage in chlorine shed it will be suck

through blower and it will be scrubbed in Caustic scrubber.

Emergency siren and wind sock will be provided.

Tele Communication system and mobile phone will be used in case of emergency situations for

communication.

First Aid Boxes and Occupational health centre will be made at site.

Emergency organization and team will be prepared as per on site-Off site emergency planning.

Full body protection suite and other PPEs will be kept ready in ECC at site.

Emergency team will be prepared and trained for scenario base emergency. Like Toxic control team, Fire

control team, First aid team, Communication and general administration team, Medical team etc.

EMERGENCY RESPONSE

EMERGENCY RESPONSE

SPILL OR LEAK

· Fully encapsulating, vapor protective clothing should be worn for spills and leaks with no fire.

· Do not touch or walk through spilled material.

· Keep combustibles (wood, paper, oil, etc.) away from spilled material.

· Stop leak if you can do it without risk.

· Use water spray to reduce vapors or divert vapor cloud drift. Avoid allowing water runoff to contact spilled

material.

Page 36: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 266

Scenario - 2: Release of Phosgene

Quantity - 300 Kg

Results indicate:

Dispersion starts as elevated instantaneous cloud

Maximum Pool radius 0.82723 m

Preventative / Mitigation Measures:

Storage Store at in cool ventilated area.

Handling All chemicals should be considered hazardous. Avoid direct physical contact. Use appropriate, approved

safety equipment. Untrained individuals should not handle this chemical or its container. Handling should occur in

a chemical fume hood.

Protection Wear appropriate protective gloves, clothing and goggles.

Respirators Wear positive pressure self-contained breathing apparatus (SCBA).

Small spills/leaks Keep sparks, flames, and other sources of ignition away. Keep material out of water sources and

sewers. Attempt to stop leak if without undue personnel hazard. Use water spray to knock-down vapors. Land spill:

Dig a pit, pond, lagoon, holding area to contain liquid or solid material. Dike surface flow using soil, sand bags,

foamed polyurethane, or foamed concrete. Neutralize with agricultural lime (CaO), crushed limestone (CaCO3) or

sodium bicarbonate (NaHCO3). Dilute slowly with water. Water spill: Neutralize with agricultural lime (CaO),

crushed limestone (CaCO3), or sodium bicarbonate (NaHCO3).

Fire fighting If necessary to stop flow of gas, use water spray to protect the personnel effecting shutoff. Sodium

hydroxide or anhydrous ammonia have been used to neutralize phosgene. Non-flammable. For small fires, use dry

chemical or carbon dioxide. Use water spray, fog, or foam for larger fires. Do not get water inside containers. Move

container from fire area if you can do so without risk. Stay away from the ends of tanks, and cool exposed

containers with water until well after the fire is out. Isolate the area until gas has dispersed.

Page 37: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 267

Cloud Footprint

Maximum Concentration

Page 38: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 268

Page 39: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 269

Scenario - 3: Release of Di-Methyl Amine

This scenario considers release of Di-Methyl Amine from Storage Tank:

Results indicate:

Catastrophic Rupture

Input Data

Stored quantity - 10 KL

Wind speed - 2.21 m/s

Results indicate

Pool Fire Scenario

Radiation

Level (KW/m2)

Distance in

meter

Effect if IHR at Height of simulation

4 42.04 This level is sufficient to cause personnel if unable to reach cover within

20s; however blistering of the skin (second degree burn) is likely;

0: lethality

12.5 15.19 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure

37.5 Not Reached This level of radiation is assumed to give 100% fatality as outlined above

Page 40: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 270

Cloud Footprint

Maximum Concentration

Page 41: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 271

Page 42: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 272

Pool Fire

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Page 43: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 273

Scenario – 4 Release of Toluene This scenario considers release of Toluene from Storage Tank:

Results indicate:

Catastrophic Rupture

Input Data

Stored quantity - 69 KL

Molecular weight -92.14

Wind speed - 2.21 m/s

Density ( Air) – 860 kg/m3

Results indicate

Pool Fire Scenario

Radiation Level

(KW/m2)

Distance in meter Effect if IHR at Height of simulation

4 12.0 This level is sufficient to cause personnel if unable to

reach cover within 20s; however blistering of the skin

(second degree burn) is likely; 0: lethality

12.5 6.0 This level will cause extreme pain within 20 seconds and movement to

a safer place is instinctive. This level indicates around 6% fatality for

20 seconds exposure.

37.5 2.5 This level of radiation is assumed to give 100% fatality as outlined

above.

Vapor Cloud Explosion

Radial

Distance (m)

Over Pressure

(psi)

Fatality lung

Rupture (%)

Eardrum

Rupture (%)

Structure

Damage (%)

Glass Rupture

(%)

4.7 36.2 100.0 100.0 100.0 100.0

5.1 8.9 0.0 77.0 100.0 100.0

8.7 2.0 0.0 3.1 14.5 100.0

Fireball Scenario

Fireball Radius: 8.13656 m

Radiation Level

(KW/m2)

Distance in meter Injury Type

37.50 6.5 100% Fatal

12.5 11.5 1st

Degree burn

4 18.5 Pain after 20secs.

Flash Fire

Radiation Level

(KW/m2)

Distance in meter Injury Type

37.5 7.0 100% Fatal

12.5 12.0 Pain after 20secs.

4 20.0 Pain after 20secs.

SAFETY PRECUASION:

- Flame proof pumping and other equipments will be provided.

- Transfer will be done in close process,

- Double Static earthling and Jumper clips will be provided on flanges,

- Hydrant system and Fire extinguishers will be provided.

- Automatic Sprinklers will be provided.

- Tanker unloading procedure will be made and followed.

- Dyke around the tank will be provided.

Page 44: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 274

Pool Fire

Fire Ball

Page 45: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 275

Flash Fire

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Red – 37.5 KW/m2

Page 46: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 276

Scenario – 5 Release of Methanol

Results indicate:

Catastrophic Rupture

Input Data

Stored quantity - 10 KL

Molecular weight -32.04

Wind speed – 2.21 m/s

Density ( Air) – 790 kg/m3

Results indicate

Pool Fire Scenario

Radiation Level

(KW/m2)

Distance in meter

Effect if IHR at Height of simulation

4 24.0 This level is sufficient to cause personnel if unable to reach cover within

20s; however blistering of the skin (second degree burn) is likely; 0: lethality

12.5 18.0 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure.

37.5 10.0 This level of radiation is assumed to give 100% fatality as outlined above.

Vapor Cloud Explosion

Radial Distance

(m)

Over Pressure

(psi)

Fatality lung

Rupture (%)

Eardrum

Rupture (%)

Structure

Damage (%)

Glass Rupture (%)

6.62 35.1 100.0 100.0 100.0 100.0

6.90 9.7 0.1 81.3 100.0 100.0

10.21 1.8 0.0 2.7 11.9 100.0

In case of Unconfined Vapor Cloud Explosion up to 6.62 meter is considered as 100% fatality and 100% ear drum

rupture radius.

In case of Unconfined Vapor Cloud Explosion up to 6.90 meter is considered as 100% structure damage and up to 10.21

meter 100% glass rupture area.

Results

37.5 KW/m2 IHR - In the 10.0 meter radius area is considered as 100% fatality in 1 min.

12.5 KW/m2 IHR - In the 18.0 meter radius first degree burn in 10 sec.

4 KW/m2 IHR - In the 24.0 meter radius area will give pain after 20 seconds. Blistering unlikely.

Fireball Scenario

Fireball Radius: 6.36 m

Fireball intensity of Heat Radiation (KW/m2) – 137.107

Fireball rate of Energy release (KJ/Sec)-69882.2

Fireball total energy released (KJ)- 98997.5

Fireball duration (Sec) – 1.40

Radiation Level

(KW/m2)

Distance in meter Injury Type

37.50 8 100% Fatal

12.5 14 1st

degree Burn

4 20 Pain after 20secs.

1.6 34 No Injury

Results

37.5 KW/m2 IHR - In the 8.0 meter radius area is considered as 100% fatality in 1 min.

12.5 KW/m2 IHR - In the 14.0 meter radius first degree burn in 10 sec.

4 KW/m2 IHR - In the 20.0 meter radius area will give pain after 20 seconds. Blistering unlikely.

Page 47: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 277

Pool Fire

Flash Fire

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Red – 37.5 KW/m2

Page 48: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 278

Scenario – 6 Release of HCl

This scenario considers release of HCl from Storage Tank:

Results indicate:

Spill Pool evaporation modules for HCl Storage Tank catastrophic failure Input Data

Stored quantity - 10 KL

Molecular weight -36.46

Wind speed - 2.21 m/s

Density ( Air) – 1180 kg/m3

Results indicate

LC50 – 149 ppm 44.69 meter

IDLH – 5 ppm 1532.66 meter

TLV –0.75 ppm 2943.00 meter

Results

LC50 HUMAN (149 ppm) area up to 44.69 meter, Immediate danger to life and health (5 ppm )

concentration area up to 1532.66 meter and TWA (0.75 ppm ) area up to 2943 meter. Therefore 1532.66

meter area in wind direction is considered as evacuation area.

Page 49: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 279

Measures to control and mitigate Emergency:

Measures to be taken to prevent such accident:

Priority will be given to Tanker to immediately enter the storage premises at site and will not be kept

waiting near the gate or the main road.

Security person will check License, TREM CARD, Fire extinguisher condition, required PPEs as per SOP laid

down.

Store officer will take sample as per sampling SOP from sampling point.

After approval of QC department unloading procedure will be allowed be started.

Following precautions will be adopted during unloading

Wheel stopper will be provided to TL at unloading platform.

Tanker unloading procedure will be followed according to check list and implemented.

Flexible hose connection will be done at TL outlet line and checked for no leakage.

Every time gasket will be changed.

The quantity remaining in the hose pipeline will be drained to a small container, which will be subsequently

transferred to the main storage tank thus ensuring complete closed conditions for transfer from road

tanker.

All TL valves will be closed.

Following precautions will be adopted Storage of such chemicals

Storage tank will be stored away from the process plant.

Tanker unloading procedure will be prepared and implemented.

Caution note and emergency handling procedure will be displayed at unloading area and trained all

operators.

NFPA label will be provided.

Required PPEs like full body protection PVC apron, Hand gloves, gumboot, Respiratory mask etc. will be

provided to operator.

Neutralizing agent will be kept ready for tackle any emergency spillage.

Safety shower, eye wash with quenching unit will be provided in acid storage area.

Material will be handled in close condition in pipe line.

Dyke wall will be provided to all storage tanks, collection pit with valve provision.

Double drain valve will provided.

Level gauge will be provided on all storage tanks.

Safety permit for loading unloading of hazardous material will be prepared and implemented.

TREM CARD will be provided to all transporters and will be trained for transportation Emergency of

Hazardous chemicals.

Fire hydrant system with jockey pump as per TAC norms will be installed.

Mitigation measures to control Emergency:

Safety Shower and eye wash will be provided away from the tank and unloading station.

Sand bags/ buckets will be provided near tank area.

Neutralizing medium (Lime and dry sand) will be kept ready near tank farm.

Emergency siren and wind sock will be provided.

Tele Communication system and mobile phone will be used in case of emergency situations for

communication.

First Aid Boxes and Occupational health centre will be made at site.

Emergency organization and team will be prepared.

Full body protection suite and other PPEs will be kept ready in ECC at site.

Emergency team will be prepared and trained for scenario base emergency. Like Toxic control team, Fire

control team, First aid team, communication and general administration team, Medical team etc.

Page 50: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 280

EMERGENCY RESPONSE

SPILL OR LEAK

· Do not touch damaged containers or spilled material unless wearing appropriate protective clothing.

· Stop leak if you can do it without risk.

· Use water spray to reduce vapors; do not put water directly on leak, spill area or inside container.

· Keep combustibles (wood, paper, oil, etc.) away from spilled material.

Small Spill

· Cover with DRY earth, DRY sand or other non-combustible material followed with plastic sheet to minimize

spreading or contact with rain.

· Use clean non-sparking tools to collect material and place it into loosely covered plastic containers for later

disposal.

· Prevent entry into waterways, sewers, basements or confined areas.

Page 51: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 281

Scenario - 7: Release of 2-Ethyl Hexanol

This scenario considers release of 2-Ethyl Hexanol from Storage Tank:

Results indicate:

Catastrophic Rupture

Input Data

Stored quantity - 20 KL

Wind speed - 2.21 m/s

Results indicate

Pool Fire Scenario

Radiation

Level (KW/m2)

Distance in

Meter

Effect if IHR at Height of simulation

4 77.53 This level is sufficient to cause personnel if unable to reach cover within

20s; however blistering of the skin (second degree burn) is likely;

0: lethality

12.5 36.70 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure

37.5 Not Reached This level of radiation is assumed to give 100% fatality as outlined above

Maximum Pool Radius 35.5299 m

Page 52: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 282

Cloud Footprint

Maximum Concentration

Page 53: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 283

Page 54: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 284

Pool Fire

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Page 55: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 285

Scenario - 8 Release of Benzyl Alcohol

This scenario considers release of Benzyl Alcohol from Storage Tank:

Results indicate:

Catastrophic Rupture

Input Data

Stored quantity - 20 KL

Wind speed - 2.21 m/s

Results indicate

Pool Fire Scenario

Radiation

Level (KW/m2)

Distance in

Meter

Effect if IHR at Height of simulation

4 76.38 This level is sufficient to cause personnel if unable to reach cover within

20s; however blistering of the skin (second degree burn) is likely;

0: lethality

12.5 36.77 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure

37.5 Not Reached This level of radiation is assumed to give 100% fatality as outlined above

Maximum Pool Radius 35.5623 m

Page 56: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 286

Cloud Footprint

Maximum Concentration

Page 57: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 287

Page 58: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 288

Pool Fire

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Page 59: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 289

Scenario - 9 Release of IPA

This scenario considers release of IPA from Storage Tank:

Results indicate:

Catastrophic Rupture

Input Data

Stored quantity - 10 KL

Molecular weight -32.04

Wind speed – 2.21 m/s

Density ( Air) – 785 kg/m3

Results indicate

Pool Fire Scenario

Radiation

Level (KW/m2)

Distance in meter

Effect if IHR at Height of simulation

4 62.0 This level is sufficient to cause personnel if unable to reach cover within 20s;

however blistering of the skin (second degree burn) is likely; 0: lethality

12.5 40.0 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure.

37.5 22.5 This level of radiation is assumed to give 100% fatality as outlined above.

Vapor Cloud Explosion

Radial

Distance (m)

Over Pressure

(psi)

Fatality lung

Rupture (%)

Eardrum

Rupture (%)

Structure

Damage (%)

Glass Rupture (%)

6.50 36.7 100.0 100.0 100.0 100.0

6.83 8.4 0.0 73.3 100.0 100.0

10.02 1.9 0.0 2.8 12.8 100.0

In case of Unconfined Vapor Cloud Explosion up to 6.50 meter is considered as 100% fatality and 100% ear drum

rupture radius.

In case of Unconfined Vapor Cloud Explosion up to 6.83 meter is considered as 100% structure damage and up to

10.02 meter 100% glass rupture area.

Results

37.5 KW/m2 IHR - In the 22.5 meter radius area is considered as 100% fatality in 1 min.

12.5 KW/m2 IHR -In the 40.0 meter radius first degree burn in 10 sec.

4 KW/m2 IHR -In the 62.0 meter radius area will give pain after 20 seconds. Blistering unlikely.

Page 60: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 290

Fireball Scenario

Fireball Radius: 6.36m

Fireball intensity of Heat Radiation (KW/m2) – 134.186

Fireball rate of Energy release (KJ/Sec)- 68393.6

Fireball total energy released (KJ)- 96888.6

Fireball duration (Sec) – 1.40

Radiation Level

(KW/m2)

Distance in meter Injury Type

100.20 7.0 100% Fatal

42.09 11.0 100% Fatal

12.5 19.0 1st

degree Burn

9.96 23.0 Pain after 20secs.

4.0 35.0 Pain after 20secs.

1.54 59.0 No Injury

Results

37.5 KW/m2 IHR - In the 12.0 meter radius area is considered as 100% fatality in 1 min.

12.5 KW/m2 IHR - In the 19.0 meter radius first degree burn in 10 sec.

4 KW/m2 IHR - In the 35.0 meter radius area will give pain after 20 seconds. Blistering unlikely.

Page 61: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 291

Cloud Footprint

Maximum Concentration

Page 62: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 292

Pool Fire

Fire Ball

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Red – 37.5 KW/m2

Page 63: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 293

Scenario-10 Release of LDO (50 mm Leak)

Catastrophic Rupture

Input Data

Stored quantity - 40 KL

Physical state: Liquid.

Results indicate

Pool Fire Scenario

Radiation

Level (KW/m2)

Distance in meter

Effect if IHR at Height of simulation

4 42.0 This level is sufficient to cause personnel if unable to reach cover within

20s; however blistering of the skin (second degree burn) is likely; 0:

lethality

12.5 20.1 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure.

37.5 8.7 This level of radiation is assumed to give 100% fatality as outlined above.

Fire Ball Scenario

Radiation Level (KW/m2) Distance in meter Injury Type

4 69.5 Pain after 20secs.

12.5 24.5 1st

degree Burn

37.50 10.4 100% Fatal

Jet Fire Scenario

Radiation Level (KW/m2) Distance in meter Injury Type

4 55.8 Pain after 20secs.

12.5 45.5 1st

degree Burn

37.50 14.6 100% Fatal

Flash Fire Scenario

UFL 3.3 Pain after 20secs.

LFL 12.4 1st

degree Burn

LFL Fraction 18.9 100% Fatal

Page 64: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 294

Pool Fire

Fire Ball

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Red – 37.5 KW/m2

Page 65: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 295

Jet Fire

Flash Fire

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Red – 37.5 KW/m2

Page 66: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 296

Scenario - 11 Unconfined Pool Fire Simulations for Drum Storage Area

Catastrophic Rupture

Input Data

Stored quantity - 200 Lit

Wind speed – 2.21 m/s

Density ( Air) – 0.867 g/cm3

Results indicate

Pool Fire Scenario

Radiation Level

(KW/m2)

Distance in meter

Effect if IHR at Height of simulation

4 50.5 This level is sufficient to cause personnel if unable to reach cover within 20s;

however blistering of the skin (second degree burn) is likely; 0: lethality

12.5 37.6 This level will cause extreme pain within 20 seconds and movement to a

safer place is instinctive. This level indicates around 6% fatality for 20

seconds exposure.

37.5 19.80 This level of radiation is assumed to give 100% fatality as outlined above.

Fire Ball Scenario

Radiation Level

(KW/m2)

Distance in meter Injury Type

4 65.0 Pain after 20secs.

12.5 42.5 1st

degree Burn

37.50 25.0 100% Fatal

MITIGATION MEASURES:

Isolate the source if possible without risk.

If leakage is small, dilute with water and mop up, or absorb with an inert dry material and place in an

appropriate waste disposal container. If necessary: Neutralize the residue with a dilute solution of

sodium carbonate.

Absorb with DRY earth, sand or other non-combustible material.

Do not get water inside container. Do not touch spilled material. Use water spray curtain to divert

vapor drift.

Use water spray to reduce vapors.

Prevent entry into sewers, basements or confined areas.

Neutralize the residue with a dilute solution of sodium carbonate.

PREVENTIVE MEASURES:

A dyke will be provided to accommodate the full quantity stored in all the drums.

Drums will be stored in designated area.

Provide exhaust ventilation or other engineering controls to keep the airborne concentrations of

vapors below their respective TLVs.

Never add water to this product.

In case of insufficient ventilation, wear suitable respiratory equipment. If ingested, seek medical

advice immediately and show the container or the label.

Avoid contact with skin and eyes. Keep away from incompatibles such as oxidizing agents, organic

materials, metals, alkalis, moisture.

Storage: Keep container tightly closed. Keep container in a cool, well-ventilated area.

While handling always use face shield. Full suit. Vapor respirator. Be sure to use an approved/certified

respirator or equivalent.

Ensure that eyewash stations and safety showers are proximal to the work-station location.

Page 67: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 297

Pool Fire

Fire Ball

Green – 4 KW/m2

Yellow – 12.5 KW/m2

Red – 37.5 KW/m2

Page 68: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 298

6.1.6 RISK ASSESSMENT SUMMARY

From the Risk Assessment studies conducted, it would be observed that by and

large, the risks are confined within the factory boundary walls.

Based on these studies company has been proposed to plan its facility sitting as well

as location of operator cabin, open area, etc.

Company has to increase awareness programme in the surrounding vicinity and

educate people for safe evacuation at the time of toxic release.

A HAZOP study to be carried out for all product plant and storage facilities.

Induction safety course to be prepared and trained all new employees before

starting duties in plant.

6.1.6.1 PROCESS SAFETY

Safety measures are adopted & will be adopted from the design stage.

Safety Valve and pressure gauge are provided on reactor and its jacket (if jacket is

provided).

Utility like Chilling, cooling, vacuum, steaming and its alternative is provided to control

reaction parameters in a safe manner.

Free Fall of any flammable material in the vessel is being avoided.

Static earthing provision is made at design stage to all solvent handling equipments,

reactors, vessels & powder handling equipments.

Any reaction upsets will be confined to the reaction vessel itself.

All emergency valves and switches and emergency handling facilities are easily

assessable.

Further all the vessels are examined & will be examined periodically by a recognized

competent person under the Gujarat Factory Rules.

All the vessels and equipments are earthed appropriately and protected against Static

Electricity. Also for draining in drums proper earthing facilities is provided.

Materials are transferred by pumping through pipeline or by vacuum from drums.

All solvents and flammable material storage tanks are stored away from the process

plant and required quantity of material is charged in reactor by pump.

Jumpers are provided on all solvent handling pipeline flanges.

Page 69: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 299

Caution note, safety posters, stickers, periodic training & Updation in safety and

emergency preparedness plan is displayed and conducted.

Flame proof light fittings are and will be installed in the plant.

All the Plant Personnel are provided with Personal Protection

Equipments to protect against any adverse health effect during operations, leakage,

spillages or splash. PPE like Helmets, Safety Shoes, Safety Glasses, Acid-Alkali Proof

Gloves etc. are provided to the employees.

All employees are given and updated in Safety aspects through periodic training in

safety.

Material Safety Data Sheets of Raw Materials & Products is readily available that the

shop floor.

6.1.6.2 FOR HAZARDOUS STORAGE TANK FARM

Tank farm is constructed as per explosive department requirement and separation

distance will be maintained.

Tanks are located and marked in designated area of hazardous chemical storage.

Static earthing provision is made for road tanker as well as storage tank.

Tanks of proper MOC are selected.

Flame arrestor with breather valve is provided on vent line.

Road tanker unloading procedure is prepared and implemented.

Fire load calculation is done and as per fire load Hydrant System will be provided as per

NFPA std. and Fire extinguishers are provided as per fire load calculation.

Spark arrestor is provided to all vehicles in side premises.

Flame proof type equipments and lighting is provided.

Lightening arrestor is provided on the top of chimney.

Trained and experience operator is employed for tank farm area.

NFPA label (hazard identification) capacity and content is displayed on storage tank.

Solvents are transferred by pump only in plant area and day tank is provided. Overflow

line returns to the storage tank or Pump On-Off switch is provided near day tank in plant.

Jumpers are provided on solvent handling pipe line flanges.

Page 70: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 300

Flexible SS hose is used for road tanker unloading purpose and other temperature

connection.

All tanks are & shall be uniformly tagged.

Level indicator is provided in tanks.

Dyke is provided.

Industrial type electric fittings are provided.

Adequate fire fighting equipments is provided.

Anti corrosive paint is done.

Safety instruction board is displayed.

6.1.6.2 FOR DRUM/CARBOY STORAGE AREA

Some chemicals are received at plant in drums/Carboys by road truck and stored in a

drum/Carboy storage area.

FLP type light fittings are provided.

Proper ventilation is provided in godown.

Proper label and identification board /stickers are provided in the storage area.

Conductive drum pallets are provided.

Drum handling trolley /stackers/fork lift is used for drum handling.

Separate dispensing room with local exhaust and static earthing provision is made.

Materials are stored as per its compatibility study and separate area will be made for

flammable, corrosive and toxic chemical drums storage.

Smoking and other spark, flame generating item is banned from the Gate.

6.1.6.3 TRANSPORTATION

Road tanker unloading procedure is in place and is implemented for safe unloading of

road tanker.

Static earthing provision is made for tanker unloading.

Earthed Flexible Steel hose is used for solvent unloading from the road tanker.

Fixed pipelines with pumps are provided for solvent transfer up to Day tanks/reactors.

Double mechanical seal type pumps are installed.

NRV provision is made on all pump discharge line.

Page 71: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 301

6.1.7 OTHER RISK REDUCTION OPPORTUNITIES

The following opportunities are considered as a potential means of reducing identified risks

during the detailed design phase:

Buildings and plants structures are designed for cyclone floods and seismic events to

prevent structural collapse and integrity of weather (water) proofing for storage of

goods;

Provision for adequate water capacity to supply fire protection systems and critical

process water;

Isolate people from load carrying/mechanical handling systems, vehicle traffic and

storage and stacks locations;

6.1.8 RECOMMENDATIONS FOR ALARP

The following actions are particularly recommended to be implemented in order to ensure

ALARP (As Low As reasonably practical) performance in the operation: Maintain and ensure

effectiveness of all the safety measures, among others through the following actions:

Raw Material Storage Area

- The raw material storage area should be declared as a prohibited area and should be

provided having at least two exits, “No Smoking” and “Prohibited Area” display

boards, as applicable should be provided at site.

- Regular inspection of tanks/drums/carboys containing raw material to be done to

take care.

- Periodic site inspection should be carried out to ensure that there is no leakage from

any of the drums in the ware house.

- Fire hydrant system needs to be provided in storage area as per TAC standards.

- Smoke detector and fire alarm systems need to be provided.

- Provision of fire doors in ware house area.

Fire access for Tank Farm area and Ware Houses

- Fire access roads should be provided to storage area. The storage tanks/area should

have suitable fire protection and fire fighting facility.

Page 72: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 302

The following features are also important for the project by taking the layout into

consideration:-

Hinged doors swing outward in an explosion.

Window panes (if installed) are shatterproof or plastic in frame.

Floors, walls and ceilings are designed and installed to limit the generation and

accumulation of static electricity.

All doors must be fire resistant. Floors, walls and ceilings are designed for at least 2 h

of fire resistance.

Walls or partitions are continuous from floor to ceiling, and securely anchored.

Integrity of the wall should be ensured i.e. blast wall not to be broken or drilled as

that can leads to weak spots.

The building is constructed of non-combustible materials, on a substantial frame.

Restrained deflagration vent panels are present.

There is adequate ventilation, and any heating in rooms is limited to steam, hot

water, or other indirect means.

Electrical Safety for Whole Facility

Electrical Safety: All cables and electric fittings shall be constructed, installed,

protected, operated and maintained in such a manner so as to prevent risk of open

sparking.

6.1.9 FIRE FIGHTING SYSTEM

M/s. Paushak Ltd., Management has taken into consideration fire prevention measures at

the project planning and during plant commissioning stage to avoid any outbreak of fire. But

looking to the hazardous nature of process and the chemicals that are handled and

processed, the chances of outbreak of fire cannot be totally ignored. Hence to tackle such a

situation a good well laid fire protection system will be provided in the factory. Details of

fire fighting are given in Table 6.5.

Page 73: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 303

TABLE 6.5

FACILITIES FOR FIRE FIGHTING

Fire Extinguisher Type Fire Fire Hydrant Valve Branch Mech Sprinkler Wind First

DCP (Kgs) Foam CO2 (Kgs) Sand

Safety

SCBA ELBA Hose FEH Single Foam system Sock Aid

Plant/Location

5 6 10 9ltr 2 4.5 22.5 Bucket Shower SET SET Reel Hydrant

Fire

Hose Short TP FB

5x

Water

cum

Foam

Monitor ltr Box

Fire Pump

House 1 1 2 4 1 2 1800

Pilot Plant-1 1 2 1 2

Solvent Yard 1 4 2 8 4 7 2 1 1 200

Phosgene 1 1 1 1 1 4 1 4 3 2 1 2 1 1

ETP 6 1 3 2 4 1

SP Chem 1 3 4 1 1 1 1 1 1 5 1

R&D Lab

(Phosgene ) 1 1 1

R&D 1 1 1 1 2 2 2 1

QC Lab 1 1 2 2 1 2 1 1 1 1 1

QC UPS Room 1 1

ISO-I 1 3 5 4 3 2 1 1 4 2 10 2 1 1

Pilot Plant-2 2 1

Utility 1 3 4 4 8 1 1

Finished

product Area 3 2 4 2

Compressor

room 1

Panel

room(nr.toilet) 1 1 1 2 1

ISO-II 1 1 1 2 4 2 1 1 2 2 4 1 1

ISO Tank

Filling Station 2 1 1 2

Old

Production

Office

1 1 1 2

TCC 4 1 2 4 1 1 1 3 4 2 8 2 1

Page 74: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 304

Fire Extinguisher Type Fire Fire Hydrant Valve Branch Mech Sprinkler Wind First

DCP (Kgs) Foam CO2 (Kgs) Sand

Safety

SCBA ELBA Hose FEH Single Foam system Sock Aid

Plant/Location

5 6 10 9ltr 2 4.5 22.5 Bucket Shower SET SET Reel Hydrant

Fire

Hose Short TP FB

5x

Water

cum

Foam

Monitor ltr Box

Jet mill 2 1 1 1

Civil Office 1 1

LFR 1

Canteen 1

ADM 1 1 1 2 1 1

Main Gate

(Security) 1 4

1

Ambulance 2 1

Store 8 3 4 4 2 4 1 2 4 1 1

OHC 1 2 1

LDO Storage

Tank 1 2 2 1

Power House 1 1 3 1 2

R&M

Workshop 1

1

DMA Tank 1 2 4 1 1 200 1

Fabrication

workshop 2

Stand by Fire

Pump House 1 1 1 2 2

11 35 15 4 8 36 15

61 4 59 12 38 4 23 3

Total 124 31 11 13 7 8 50 87 30 4 2200 3 4 15

Main and Alternative water storage cap. : 500 KL + 200 KL

Single Hydrant Point (Jet Type) : 32 No.

Water Monitor fixed : 02 No.

Water Monitor Trolley Mounted : 02 No.

Water Monitor lifting height : Water/Foam throws 45 to 60 meters at an angle of 30’ in still air. Water/Foam flow

1750 to 2600 LPM.

No. of Fire Sand Storage : 34 No. Fire sand bucket

Page 75: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 305

DETAILS OF FIRE HYDRANT PUMPS

SR.

NO.

NAME OF EQUIPMENT CAPACITY/

QUANTITY

DISCHARGE TAG.NO. LOCATION MAKE

Water Reserve Tank 500 KL Fire Pump House FWS/01 Fire Pump house RCC 1

Stand by Water reserve

overhead tank

200 KL Gravity WS/02 Nr Fire Pump House RCC

2 Jockey Pump 12.5 HP 10.8 m3/hr JP-01 Fire Pump house Kirloskar

3 Main Pump 75 HP 171 m3/hr MP-01 Fire Pump house Kirloskar

4 Diesel Pump 92 HP 171 m3/hr DP-01 Fire Pump house Kirloskar

5 D-watering pump 12.5 HP - DWP-01 Fire Pump house -

6 Diesel Tank 200 Liter - - Fire Pump House -

Other fire fighting facilities proposed to be installed at site:

Fire load calculation is carried out and Fire Extinguishers at different locations is

provided (as mentioned in above table) as per the TAC guidelines.

Working staff is given training to operate DCP and CO2 extinguishers.

Fire Hydrant Network is installed as per the calculated requirement for fire fighting.

A main fire pump with a capacity of 50 m3/hr @ 10 Bar/cm2 is to be installed.

A stand-by diesel pump with equal capacity (50 M3/Hr @ 10 Bar/cm2) is to be

installed. This pump will be used for fire fighting in case of power failure.

A fire water reservoir with holding capacity of 300 m3 of water shall be provided.

First Aid Training is & will be imparted to employees by designated first aid trainers.

6.2 DISASTER MANAGEMENT PLAN

M/s. Paushak Ltd. has developed the emergency management system to tackle the

emergency situation, apart from its emergency management system. The detail of disaster

management system is discussed in the following section.

6.2.1 DEFINING THE NATURE OF EMERGENCY

6.2.1.1 LEVEL OF EMERGENCY CAN BE CLASSIFIED IN THREE CATEGORIES.

LEVEL - 1:

The leakage or emergency, which is confinable within the plant, premises. It may be due to -

a) Small fire in the plant

b) Low toxic gas release for short duration.

Page 76: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 306

c) Collapsing of equipment that do not affect out side premises.

LEVEL - 2:

The emergency, which is confinable within the factory premises. It may arise due to -

a) Major fire inside the factory premises.

b) Medium scale explosion confined to the factory premises.

c) Heavy toxic / flammable gas leakage for short duration.

LEVEL - 3:

The emergency, which is not confinable within the factory premises and general public in

the vicinity likely to be affected. It may arise due to -

a) Explosion of high magnitude affecting the adjacent area

b) Heavy / Profuse leakage of toxic / flammable gases for a long duration.

6.2.2 OBJECTIVES OF EMERGENCY MANAGEMENT SYSTEM

The objectives of the emergency management system are summarized as under.

To identify and assess types of emergencies due to different types of hazards.

To work out plan with all provisions to handle emergencies and safeguard employees

and people in the vicinity of the factory.

To provide for emergency preparedness and the periodical rehearsal of the plan.

To plan mode of proper communication and actions to be followed in the event of

emergency.

To keep all necessary information with respect to hazard/accident control and

emergency contacts in one document for easy and speedy reference.

To inform employees, general public and the authorities about the hazards/risk if any

and the role to be played by them in the event of emergency.

To control and contain the accident.

To effect rescue and treatment of casualties.

To inform and help relatives of casualties.

To secure rehabilitation of affected area and restore normalcy.

To provide information to media and government agencies.

To preserve record, equipment etc. for investigating cause of emergency.

To be ready for “mutual aid” if need arises to help neighboring units.

Page 77: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 307

6.2.3 STRUCTURE OF EMERGENCY MANAGEMENT SYSTEM

M/s. Paushak Ltd. has developed an emergency management team. The management

structure includes the following personnel’s;

Incident Controllers and Deputy Incident Controllers

Site Main Controllers

Key Personnel’s

Essential Workers

Assembly points

Emergency control center

Fire control arrangements

Medical arrangements

Other arrangements

6.2.3.1 INCIDENT CONTROLLER AND DEPUTY INCIDENT CONTROLLER

His primary duty is to take charge at the scene of the incident. In the initial stages he may be

required to take decision involving the operation of the other plants or to stop or continue

any process and operation of the other plants or to stop or continue any process and to take

technical decision to control the incident. Therefore he should be fully knowledgeable for

this purpose. He is a factory Manager. Appointed such person for all shifts including

holidays. Any one incident controller must be available at any time. Fixed their duties that

way. The duty is appointed to take the charge of incident controller if he is not available due

to any reason. He is equally competent. The incident controllers have adequate means of

communicating with the emergency control center by telephone or runner.

His responsibilities/duties are as follows:

1. Immediately being aware of the emergency and its location, he will proceed to the

scene. On arrival he wills.

2. Assess the scale of emergency and decide if a major emergency exist or is likely. On

his decision, he will activate the on site plan and if necessary the off site emergency

plan.

Page 78: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 308

3. Assume the duties of the site Main Controller pending the latter’s arrival for this

purpose he will depute his Deputy Incident Controller on the scene and he will go to

the control center. Particularly he will:

3.1. Direct the spitting down and evacuation of plant and areas likely to be

affected the emergency.

3.2. Ensure that the outside emergency services, including mutual aid, have been

called in.

3.3. Ensure that key personnel have been called in.

4. Direct all operations with in the affected area with the following properties.

4.1. Secure the safety of personnel.

4.2. Minimize damage to plant, property and the environment.

4.3. Minimize loss of material.

5. Direct rescue and fire fighting operations until the arrival of the outside fire bridged,

when he will relinquish control to the head of the Fire Bridged.

6. Search for casualties.

7. Evacuate non-essential workers to the assembly points.

8. Set up a communications point and establish/telephone/messenger contact as

appropriates with the emergency control center.

9. Give advice and information as required to the head of the Fire Bridged and other

emergency services.

10. Brief the site main controller and keep informed of developments.

11. Preserve evidences that will be necessary for subsequent inquiry in to the cause of

the emergency and concluding preventive measures.

6.2.3.2 SITE MAIN CONTROLLER

He has overall responsibilities for directing operations and calling outside help form

Emergency Control center .As he is required to take decisions by collaboration between the

senior manager at the site (works) and the senior officers of the outside services, he is the

senior manager or top execute.

His responsibilities / duties are as follows:

Immediately being aware of the emergency, he will go to the Emergency Control Room. On

arrival he will-

Page 79: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 309

Relieve the Incident Controller of responsibility for overall main control.

On consultation with the Incident Controller decide whether major emergency exist

and on declaration of a major emergency, ensure that the outside emergency

services and mutual help are called, the off-site plan activated and if necessary,

nearby factories and population are informed.

Ensure that the key personnel are called in.

Exercise direct operational control of those parts of the works outside the affected

area.

Continually review and assess possible developments to determine the most

probable course of events.

Direst the safe close down and evacuation of plants in consultation with the Indirect

Controller and key personnel. If necessary, arrange for evacuation of neighboring

population.

Ensure that consulates are receiving adequate attention. Arrange for hospitalization

of victims and additional help if required. Ensure that the relatives are advised.

Inform and liaise with the Chief Officer of the Fire and Police Services, District

Emergency Authority and with the Factory Inspectorate and experts on health and

safety. Provide advice on possible effects on areas outside the factory.

In the case of prolonged emergencies involving risk to outside areas by wind blown

materials, contact the local meteorological office to receive early notification of

impending changes in weather conditions.

Ensure the accounting for personnel and rescue of missing persons.

Control traffic movement within the factory.

Arrange for a chronological record of the emergency to be maintained.

Where the emergency is prolonged, arrange for the relief of personnel and the

provision of catering facilities.

Issue authorized statements to the news media. Where necessary, inform Head

office.

Ensure that proper consideration is given to the preservation of evidence. Arrange

for photographs / video.

Page 80: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 310

Control rehabilitation of affected areas and victims on causation of the emergency.

Do not restart the plant unless. It is ensured safe to start and cleared by the

authorities.

Page 81: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 311

Incident Controllers Incident Controller’s Runner’s

Place of availability Phone No.

Shifts Sr. No.

(Any one

shall be

available in

each shift

& on

holiday on

call)

Name Designation Qualification

In the

Factory

Residence

Address

In the

Factory

Residence

Name &

Designation

Place of

availability

Phone

No.

1 2 3 4 5 6 7 8 9 10 11 12

1 Mr. Mustak

Tunia

Manager M Sc, Chem. Management

Office

23/B

Ashiyana

Duplex, Near

Taifnagar

Society,

Tandalja,

Vadodara.

4443 9825524925 Plant Asst. Plant

office

4406,

27, 23

& 19

First

&

General

2 Mr. M C

Patel

Mgr HSC Phosgene

plant

B/29,

Kedardham

Society ,

Manjalpur,

Baroda

4417 9879423192 Plant Asst Phosgene

plant

4417

Second, 3 Shift In

charge

Shift In

charge

-- Plant office Paushak Ltd 4417 -- Shift Asst Phosgene 4417

Third 4 Shift In

charge

Shift In

charge

-- Plant office Paushak Ltd 4419 -- Shift Asst Sp. Chem. 4423

& 5 Shift In

charge

Shift In

charge

-- Plant office Paushak Ltd 4406 -- Shift Asst ISO - I 4406

Holidays 6 Shift In

charge

Shift In

charge

-- Plant office Paushak Ltd 4423 -- Shift Asst ISO – II 4427

7 Shift In

charge

Shift In

charge

-- Plant office Paushak Ltd 4427 -- Shift Asst TCC 4427

First & General shifts: 7:00 to 17:00 hrs.

Second Shifts : 15:00 to 23:00 hrs

Third Shifts: 23:00 to 07:00 hrs.

Page 82: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 312

Deputy Incident Controllers

Deputy Incident Controller’s Runner’s

Place of availability Phone No.

Shifts

Sr. No. (Any

one shall

be

available in

each shift &

on holiday

on call)

Name Designation Qualification In the

Factory

Residence

Address

In the

Factory Residence

Name &

Designation

Place of

availability

Phone

No.

1 2 3 4 5 6 7 8 9 10 11 12

1 Mr. Rupen

Shah

Dy.

Manager

M.Sc. TCC Plant 14, Gunatit

Park Soc., Sun

Pharma Rd,

Atladra,

Vadodara

4427 9558804695 Shift Asst TCC Plant 4427

2 Mr. B R

Mishra

Asst.

Manager

B.Sc. ISO-I &

Sp.

Chem.

Alembic

Colony Baroda

4419 9979476848 Shift Asst SP Chem.

Plant

4419

3 Mr. U A

Sheikh

Dy.

Manager

B.Sc. ISO - II Alembic

Colony Baroda

4423 9979988411 Shift Asst ISO Plant 4406

First

&

General

4 Shift In

Charge

Executive -- Phosgene

plant

Paushak

Colony

4417 Plant

Operator

Phosgene

plant

4417

Second, 5 Shift In

Charge

-- -- Plant

office

-- 4417 Shift Asst Phosgene 4417

Third 6 Shift In

Charge

-- -- Plant

office

-- 4419 Shift Asst Sp. Chem. 4419

& 7 Shift In

Charge

-- -- Plant

office

-- 4406 Shift Asst ISO 4406

Holiday 8 Shift In

Charge

-- -- Plant

office

-- 4427 Shift Asst TCC 4427

First & General shift : 7.00 hrs to 17.00 hrs

Second shift : 15:00 hrs to 23:00 hrs

Third shift : 23:00 hrs to 7:00 hrs

Page 83: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 313

Site Main Controllers

Site Main Controller’s Runner’s

Place of availability Phone No.

Shifts

Sr. No.

(Any one

shall be

available

in each

shift &

on

holiday

on call)

Name Designation Qualification In the

Factory

Residence

Address

In the

Factory Residence

Name &

Designation

Place of

availability

Phone

No.

1 2 3 4 5 6 7 8 9 10 11 12

1 Mr.

Debangshu

Bhattacharya

Associate

V.P.

M. Tech. Management

Office

39,

Muktanand

Society,

Kareli baug,

Vadodara.

4441 9825483161 Mr.

Chimanbhai

Parmar -

Asst

Nr. Office 4443

OR

General

Shift

2 Mr. Sudhir

Chougule

AGM –

Production

B. Sc.(Chem)

& B. Tech.

Management

Office

B 13, Anand

Vatika, Nr.

Gokul

Township,

B/h. Gotri

GEB

Substation,

Gotri Road,

Vadodara.

4408 9898506122 Mr.

Chimanbhai

Parmar -

Asst

Nr. Office 4443

Page 84: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 314

6.2.3.3 KEY PERSONNELS

Other key personnel are required to provide to and implement the decisions made by the

Site Main Controller in the light of information received on the developing situation at the

emergency.

Such key personnel will include the senior managers responsible for safety, security, gas and

spill control, pollution control, Communication system including telephone, wireless,

messengers etc, medical services, transport, engineering, production, technical services

(including utilities, laboratories) stores and personnel (including welfare, canteen, shelters

etc).

As necessary, they will decide the actions needed to shutdown plants, evacuate personnel,

carry out emergency engineering work, arrange for supplies of equipment, utilities ( fuel

water, power etc ) carry out atmospheric tests, provide catering facilities, liaise with police,

fire brigade, emergency planning authority, factory Inspectorate, hospitals, neighboring

industries and population, assembly points, outside shelters, mutual aid centers, relatives of

casualties, press and so on, under the direction of the Site Main Controller.

At the declaration of a major emergency, all key personnel and others called in to assist shall

report to the Emergency Control Center. They shall be available at any time on duty or on

call on off – duty or holiday.

Page 85: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 315

KEY PERSON’S

Key Personnel N E X T P E R S O N' S

Place Availability Phone Number Place of availability Phone No.

Sr.

No. DEPARTMENT Name

(He may

be called

at

anytime

for this

plan)

DESIGNATION QUALIFICATION

In the

factory

Residence

address

In

factory

Residence

NAME &

DESIGNATION In the

factory

Residence

address

In the

factory

Residence

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 TCC Mr.

Rupen

Shah

Dy. Manager M.Sc. TCC Plant 14, Gunatit

Park Soc.,

Sun Pharma

Rd, Atladra,

Vadodara

4427 9558804695 Shift Asst TCC

Plant

4427 -- --

2 ISO – I Shift In charge 4419 -- --

3 Sp. Chem.

Mr. B R

Mishra

Asst. Manager B.Sc. Production

Office

Alembic

Colony,

Vadodara.

4419 /

43

9919476848

Shift In charge 4406 -- --

4 ISO – II Mr. U A

Sheikh

Deputy

Manager

B. Sc. Production

Office

Alembic

Colony,

Vadodara.

4423 /

43

9979988411 Shift In charge 4423 -- --

5 Phosgene

plant

Mr. A B

Patil

Executive B.Sc. Phosgene

plant

Alembic

Colony,

Vadodara.

4417 -- Shift In charge 4417 -- --

6 Admin &

Transportation

Mr.

Chintan

Kansara

Executive M.B.A (HR) Admin office E 61,

Shrijidham

Soc., Nr.

Deep

Chamber,

Manjalpur,

Vadodara

4414 9510516144 Mr. V H Patel 4446 -- --

Page 86: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 316

Key Personnel N E X T P E R S O N' S

Place Availability Phone Number Place of availability Phone No.

Sr.

No. DEPARTMENT Name

(He may

be called

at

anytime

for this

plan)

DESIGNATION QUALIFICATION

In the

factory

Residence

address

In

factory

Residence

NAME &

DESIGNATION In the

factory

Residence

address

In the

factory

Residence

7 QA Mr.

Bimal

Gandhi

Sr. Manager M. Sc. (Chem.) QA Office B – 103,

Mangalam

Flat, Vidhya

Vihar School

Street,

Subhanpura,

Vadodara

4424 9909408982 Mr. Shukla 4421 -- --

8 QC Mr. N C

Padalia

Asst. Manager M.Sc. QC office 4437 9909919932 Mr. G R Soni 4429 -- --

9 R & D Mr. Nitin

Gajjar

Deputy

Manager

M.Sc. R & D Alembic

colony -

Baroda

4418 9898239418 Mr. Gaurang

Pandya

4431 -- --

10 Engg / Utility Mr.

Praful

Kanzariya

Asst. Manager Diploma Ele. Engineering

Office

B – 92,

Gokul

Township,

Nr.

Rameshwar

Vidhyalaya,

Gotri Road,

Gotri,

Vadodara

4447/

4438

9727775085 Mr. Bhavesh

Patel

4438 -- --

11 Store Mr.

Jayesh

Bhatt

Manager B.com. Store Nandanvan,

pramanand

kavinipole,

baroda-17

4411 9825682682 Mr. Kirit

Suthar

4426 -- --

Page 87: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 317

Key Personnel N E X T P E R S O N' S

Place Availability Phone Number Place of availability Phone No.

Sr.

No. DEPARTMENT Name

(He may

be called

at

anytime

for this

plan)

DESIGNATION QUALIFICATION

In the

factory

Residence

address

In

factory

Residence

NAME &

DESIGNATION In the

factory

Residence

address

In the

factory

Residence

12 Safety Mr.

Nikunj

Bhatt

Asst. Manager B.Sc., PDIS Environment,

Health &

Safety

B-403,

Laabh

Residency –

2, Gorwa

Karodia

Road,

Gorwa,

Vadodara.

4442 9712921968 Mr. Prashant

Vansadia

4440 -- --

Page 88: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 318

6.2.3.4 ESSENTIAL WORKERS

A taskforce of essential trained workers (expert teams) will be available to get the work

done by the incident control and the site main controller. Such work will include:

Fire righting, gas leak and spill control till a fire Brigade takes the charge.

To help to the Fire brigade and mutual aid teams. It is so required.

Shutting down plant and making it safe.

Emergency engineering work e.g. Isolating equipment, materials, process, providing

temporary by-pass lines, safe transfer of material, urgent repairing or replacement,

electrical work etc.

Provision of emergency power, water, lighting, instruments, equipments, materials

etc.

Movement of equipment, special vehicle and transport to or from the scene of the

incident.

Search, evacuation, rescue and welfare.

First-aid and medical help.

Moving tankers or other vehicles from area of risk.

Carrying out atmospheric test and pollution control.

Assistance at casualty’s reception areas to record details of casualties.

Assistance at communication center to handle out going and incoming calls and to

act as messengers if necessary.

Manning of works entrances in liaison with the police to direct emergence vehicles

entering the work, to control traffic leaving the works and turn away or make

alternative safe arrangements for visitors, contractors and other traffic arriving at

the works.

Informing surrounding factories and the public risk directed by the Site Main

Controller.

Any special help required.

Page 89: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 319

6.2.3.5 ASSEMABLY POINT

In affected and vulnerable plants, all non-essential workers (who are not assigned any

emergency duty) shall evacuate the area and report to a specified assembly point.

Each assembly point will be clearly marked by a conspicuous notice and provided with an

identification number e.g. ASSEMBLY POINT -1. Mark such points permanently for the notice

of people.

Each assembly point is sited in a safe place, well away from areas of risk and least affected

by the down wind direction.

More than one assembly point is needed (1) to ensure that employees do not have to

approach the affected area to reach the point. (2) In case any assembly point lies in the path

of wind-blown harmful materials, e.g. toxic gas.

Each assembly point is manned by a nominated person(s) to record the names and

departments of those reporting there.

Page 90: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 320

SAFE ASSEMBLY POINTS

AT THE TIME OF EMERGENCY

PERSON IN CHARGE

PLACE OF AVAILABILITY PHONE NUMBER

IDENTIFICATION

Sr.No. OF THE

ASSEMBLY

POINT

LOCATION ACCOMMODATION

CAPACITY

NAME &

DESIGNATION IN THE

FACTORY

RESIDENCE IN THE

FACTORY

RESIDENCE

NEAREST

PHONE

NUMBER

PPE THAT MAY

BE REQUIRED

1 Nr HR /

ADMN

Garden

Approx 200 People Mr. Chintan

Kansara

ADM Office 10, Prajapati

Park So.,

Sindhvay

Mata Road,

Opp. VMSS –

4,

Pratapnagar,

Vadodara

4414 9510516144 4446

2 Nr Fire Pump

House

Approx 200 People Mr. V H Patel Time Office Alembic

Colony -

Baroda

4446 4420

SCBA Set,

Medical Oxygen

cylinder , First

Aid Medicine ,

PPE's

Page 91: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 321

6.2.3.6 EMERGENCY CONTROL CENTER

The Emergency Control Center (or Room) is the place from which the operations to handle

the emergency are directed and co-ordinate. It will be attended by the site Main Controller,

key personnel and senior officers of the Fire, police, factory Inspectorate, and district

authorities and emergency services. The Center is equipped to receive and transmit

information and directions from and to the incident controller and areas of the works as

well as outside. Have equipment for logging the development of the incident of the assist

the controllers to determine any necessary action. In addition to the means of

communication, the center is equipped with relevant data and equipment, which will assist

those meaning the center to be conversant with the developing situation and enable them

to plan accordingly. It is sited in an area of minimum risk and close to a road to allow for

ready access by a radio-equipped vehicle for use it other systems fails or extra

communication facilities are needed.

The center is therefore containing:

1. An adequate number of external telephones.

2. An adequate number of external telephones.

3. Wireless Set.

4. Plans of the factory to show :

(a) Areas of large inventories of hazardous materials including tanks, reactors, drums

and compressed gas cylinders.

(b) Sources of sirens and safety equipments including fire, expansion, spill and gas

controls.

(c) Stocks of other fire extinguishing materials.

(d) The firewater system and additional sources of water.

(e) Site entrances and road system, updated at the time of the emergency to indicate

any road that is impassable.

(f) Assembly points, shelters, lunchroom and canteen.

(g) Casualty treatment centers first aid centers.

(h) Location of the factory in relation to the surrounding community (Annexure-2).

Page 92: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 322

5. Nominal roll of employees, work permits, gate entries and documents for head count or

access to this information. Employee’s blood group information and address is

prepared and kept on Record.

Note pads, pens, pencils, rubbers, and stationary to record all messages received

and sent by whatsoever means.

More copies of this on –site and off- Site Emergency plan i.e. updated full text

including all Annexure. From this, some vehicle and messengers (runners) will be

kept ready at the center.

Troche, umbrella, rain – coats, and some extra sets of gas detectors explosive

meters and personal protective equipments.

Fire and Toxicity Control Arrangements:

Medical Arrangements:

A good organization should have, depending on size of the factory, its own ambulance room

or occupational health center or dispensary or hospital for medical. Names of surrounding

factories for mutual aid, list also the names and address of the surrounding hospital, nursing

homes, dispensaries etc. and give their details

6. Transport and Evacuation Arrangements:

In Major emergency, it will be necessary to evacuate personnel from affected areas and, as

a precautionary measure, to further evacuate non essential workers from areas likely to be

affected should the emergency escalate.

We have separate evacuation alarm, which can be beard in 3 km radius. So that the people

be ready for evacuation. On evacuation, employee will be directed to predetermine

assembly points already explained earlier. If they are required to be evacuated outside the

factory and it a remote place, their transportation will be necessary which vehicles will be

required. At remote shelters their care and welfare will also be required. The safe

authorized passages / routes for escape is decided and marked by arrow in the plans as

explained in the details of emergency control Center.

Page 93: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 323

Emergency Control Centre

Location of the centre: (1) Main ADM - Office ( 8.30 am to 5.00 pm ) (2). Main Gate Office after 5.00 pm

Telephone Nos. of the Centre Internal 4414 / 4446 Internal 4412 / 4403

External : 2676 : 247028 /

247283/247161

External : 2676 :247283/247161,

326606

Its period of operation Sr. No. Item kept in the centre see

(1) to (10)

Number or

quantity

Persons who will handle /

operate this item Last Present

Notes

1 2 3 4 5 6 7

01 phone & 1 Communication facility

02 Wireless

2 Safety Cupboard with some

PPE

1

3 Fire Extinguishers 2

4 Copy of On-Site Emergency

Plan

1

5 List of trained First Aider 1

6 Address & Telephone

Number of Key Personnel

1

7 Address & Telephone

Number outside Agencies &

Factories

1

8 Ambulance Van 1

9 Emergency Siren system 1

10 Emergency Light 1

Site Main controller /

Incident Controller

Security Officer , First Aid

Trained Persons & Time Keeper

Operation

During Mock

Drill

Page 94: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 324

6.2.3.7 FIRE CONTROL ARRANGEMENTS

6.2.3.7.1 FIRE FIGHTING, GAS LEAK CONTROL AND RESCUE OPERATION

A) Role of Manager (Fire and Safety) / Shift In-Charge (Fire & Safety)

1. Incident Controller will be the only person to direct the fire fighting and Emergency

operation.

2. Keep the constant touch with the SMC / In charge - EHS.

3. Direct the crew members to the scene of emergency and arrange replenishment of

Manpower / equipment / extinguishing media etc.

B) Role of EHS Representative:

1. On being notified about the location of fire/ gas leakage immediately proceed to the help.

2. Decide his line of action in consultation with Incident controller and take appropriate

measures to handle the emergency.

3. Assessing the severity of the incident immediately report to emergency controller about

the gravity of the situation.

4. He will assess the extra requirement required if any from the neighboring industry.

C) Fire crew members

1. On hearing fire alarm, emergency siren they shall immediately report to control room

and proceed to the scene of emergency and work under the direction of IC/ Dy IC.

2. The personal availability at the scene of incident to be made optimize.

Page 95: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 325

FIRE & TOXICITY CONTROL ARRANGEMENT

Fire Water :- Total Quantity - 500 M3 + Stand by 200 M

3

No. of Sprinklers : 02 Nos

No. of Monitors : 02 Fixed , 02 Trolley

Fixed Portable

Other

source &

capacity

No. of

hydrant

points

No. of

pumps,

type &

capacity

No. of

hose

reels &

total

length

No. of

fire

tenders

and

capacity Lifting

height Pressure

Lifting

height Pressure

Alternate

power

arrangement

1 2 3 4 5 6 7 8 9 10

10 meter 7

Kg/Cm2

- -

Own

Bore

well

45 Jockey,

Electrical

driven,

Diesel

pump

capacity

7 kg/hr

80 Nos.

of 15

mtrs cap

-

1 Nos DG Set

Dry Powder Type Foam Type Water Jet Products Other

Extinguishers

Personal Protective Equipment

No. of portable No. of portable Respiratory Non- respiratory Type of powder

& total quantity Extingui-

shes

Tonners

Type of

foam &

total

quantity

Exting. Tonners

No. of

size of

blankets

Other jet

products,

quantity

Type Number of

Quantity Type Nos. Type Nos.

12 13 14 15 16 17 18 19 20 21 22 23 24 25

1. DCP Powder 5

kg Cap. 10 kg

Cap.

Extinguishers

2. 150 kgs

storage

40 nos - AFFF

Compounds

1400 Ltrs

Carbo

25 nos - - - Co2 45 nos Self Contained

airline

breathing

apparatus

oxygen kit

Dust mask

7

10

2

150

Cartridge

Helmet

Gumboo

ts

Goggles

Appron

Chemical

Suits

Face

shield

50

100

50

50

20

15

15

Page 96: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 326

FIRE & TOXICITY CONTROL ARRANGEMENT

Contact FFE available PPE available Name & Address

of the factories &

fire stations

Approx.

Distance

Person Telephone

Nos.

Type Quantity Type Quantity

No. of experts

& trained

persons

available

Decontaminatio

n substance

available

Gas

detectors

available

Other

equipmen

t available

26 27 28 29 30 31 32 33 34 35 36 37

M/s. UPL,

Gopipura

Neighb. Mr. N.L. Parmar

Mr. R S Sharma

02676 –

247068

Foam

Co2

DCP

10 nos

50 nos

50 nos

SBA set

Oxy kit

Chemical

suit

04 nos

02 nos

05 nos

Team - Oxygen

meter

-

M/s. Alembic

Pharma Ltd.

API Div - I

Neighb. Mr. M Khokhawala

Mr. Kashyap Raval

247099

247516

Foam

Co2

DCP

10 nos

50 nos

50 nos

SBA set

Oxy kit

Chemical

suit

02 nos

02 nos

05 nos

Team - Oxygen

meter

Explosive

meter

-

M/s. Alembic

Pharma Ltd.

API Div - II

01 km Mr. K.K. Agrawal

Mr. Binaya Debata

02676

304107

Direct

line

Co2

DCP

50 nos

50 nos

SBA set

Oxy kit

Chemical

suit

02 nos

02 nos

05 nos

Team - Do -

We have done mutual aid Arrangement with other’s (M/S. UPL, M/s. Alembic Pharma Ltd. API Div – I & II, Paushak Ltd) and available facility last circulated to each other’s.

Page 97: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 327

6.2.3.8 MEDICAL SERVICES

The roles of Medical officers are as follows;

(a) He will contact immediately to the SMC/IC.

(b) He will render necessary treatment, at Occupational Health Center.

(c) He will arrange for Hospitalization and Treatment at outside hospitals, if required.

(d) He will mobilize in getting the services of External medical agencies, other Para –

medical services etc. and transportation services etc.

(e) He will arrange for extra medical assistance/antidotes, from out, if required.

(f) He will arrange for first-aid trained volunteers for necessary help.

(g) He will liaise with the Government Health Authorities for treatment of the affected

persons nearby.

6.2.3.9 OTHER ARRANGEMENTS

Other arrangements include external transport, cranes, generator sets to supply emergency

power, environment monitoring equipment, rescue items etc. when available resources do

not meet the requirement.

STANDARD OPERATING PROCEDURE (EMERGENCY)

As soon as emergency alarm is heard, all essential workers shall report to IC or SMC.

They shall carefully listen to the instructions given by IC or SMC

According to the type of emergency/accident, they shall get equipped with PPE/Fire

fighting equipment and devices.

The runner among the workers shall inform SMC/IC and key personnel if they are not at

site.

The messenger amongst the workers shall deliver messages to nearby units as per the

instructions of SMC/IC.

The in-charge of medical arrangements shall prepare first-aid and other required

facilities for the injured.

The other essential workers shall try to control the emergency as per the instructions

given to IC.

IC would keep SMC informed about the status of control measures being taken at the

site and ask for other requirements e.g. Mutual aid, equipment etc., if he find necessary.

SMC would co-ordinate with outside agencies regarding control measures being taken,

need for external help, evacuation, medical treatment etc.

Page 98: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 328

MEDICAL ARRANGMENTS

First aid Centers / Ambulance Room / OHC / Hospital Ambulance van or alternante arrangement

In charge person

Residence Sr.

No.

Name &

Location

Telex-

hone

Number Name &

Designation Phone Address

Facilities &

Equipments

Antidotes

avail-able

First

aiders

avail-

able

Accommodation Place of

availability Capacity

Facilities

in the

van

Driver’s

Name &

address

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 OHC -

Paushak

Ltd

02676-

664409

Medical

Assistant

- Premises 01

Ambulance

Van 01 Bed,

Oxygen

Cyl.,

Structure,

Artificial

breathing

apt,

Balance, B P

Meter,

Yes Yes ,

Trained

First

Aider

Available

round

the clock

Yes Main Gate 6 Oxygen

kit, First

Aid bod,

Structure

Driver

available

at Main

Gate

2 OHC –

Paushak

Ltd

02676 –

664409

Dr Rajesh

Pandya

9228763742

,

9825693648

Asiyad

nagar,

kanjari

rd , Halol

01 Bed,

Oxygen

Cyl.,

Structure,

Artificial

breathing

apt,

Balance, B P

Meter,

Yes Yes,

Trained

First

Aider

Available

round

the clock

Yes Main Gate 6 Oxygen

kit, First

Aid bod,

Structure

Driver

available

at Main

Gate

Page 99: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 329

6.3 COMMMUNICATION SYSTEM

After the assessment of risk & their possible environmental impact and after making an

organization for the preparedness to control the emergency, the next most essential step is to

make us ready for Communication at the time of emergency. Communication System is a

Crucial Factor while handling emergency.

Company will have quick & effective Communication System through which, any situation,

which can lead to emergency, can be informed or known to.

i. All working inside the plant.

ii. Key Personnel outside during normal working hours & during off-duty hours.

iii. Outside emergency services, Statutory and Local Authorities and

iv. Neighboring facilities and public leaving in vicinity.

Each and every section, Plant & Department of the Factory shall be connected by internal

telephones. External Phone at Office and Residence and Mobile shall be also available with

Key Personnel and top executive of the factory. Hot lines shall be provided with mutual aid

Partner through the Emergency Control Center. The Communication System begins with

raising the alarm declaring the emergency, Telephone messages and Procedure to

communicate the emergency to other persons & General Public.

6.3.1 RAISING THE ALARM

As soon as incident takes place inside the factory and is noticed by someone, the first step is

to raise the nearest manual emergency bell to alert the nearby people. Next, he/she

informs the security persons to raise the emergency siren located at the factory gate. The

security personnel sound the siren, raising and lowering the sound three times in a 10

second “ON”, 5 second “OFF” sequence. All the security employees shall be trained for

operating the siren to announcing the emergency. In case of power failure, manual bell

shall be also provided.

The alarm sound informs the I.C and the S.M.C that an emergency has been created and

emergency organization is to be activated. The I.C. rushes to the site and takes charge of

the scene.

Page 100: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 330

ALARMS & SIRENS

Plant wise alarm points Sound difference if any Sr.

No.

Plant / Dept./ Location Sr. No

.of

Its place

of

Type of

the

Its period

The alarm

(signal)

Type of Type of

alarm

Duration

of

Type of

sound

1 2 3 4 5 6 7 8 9 10 11 12 13

1 At the

Main

gate

- - 1 At

Security

Gate

Electric Once in a

week/Every

Monday at

10-30 AM

Whole

complex

and

surrounding

area

Fire, Toxic,

Emergency

Release All

clear

2 Phosgene

plant

- - 1 Phosgene

plant

Electric Once in a

week/Every

Monday at

10-30 AM

Entire

Factory

Fire, Toxic,

Emergency

Release All

clear

As per attached siren code

# Public Announcement System Available at ECC / Main Gate for emergency communication and speakers are available in factory premises

as well as offices for fast communication.

.

Page 101: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 331

6.3.2 DECLARING THE MAJOR EMERGENCY

Major emergency has to be declared after sufficient and through check because the

declaration of major emergency puts many agencies on action and it may disturb the

running system, which may be Costly at, time or its Consequence may be Serious. Therefore

major emergency must not be decided on whims or immature judgment or without proper

thought. Looking to all the above, we will have taken care to nominate the persons who can

declare the emergency; we will have selected them on the basis of their knowledge &

experience. These persons will be technically qualified and experienced. They shall advice

the Incident Controller or Site Main Controller regarding the type of emergency. On being

convinced, the Site Main Controller or Incident Controller shall declare an ON-SITE

emergency. The decision about major emergency shall be taken as early as possible and

without wasting time so that control action can be started immediately.

Page 102: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 332

NOMINATED PERSONS TO DECLARE MAJOR EMERGENCY

RESIDANCE Sr.

No

NAME OF THE PLANT,

DEPARTMENT OR

LOCATION

NAME &

DESIGNATION OF

THE NOMINATED

PERSONS TO

DECLARE MAJOR

EMERGENCY

DUTY OR DESIGNATION

GIVEN, IF ANY, UNDER

THE ON-SITE / OF-SITE

EMERGENCY NCY

PLANE

PHONE

No.

INTERNAL

PHONE NO. ADDRESS

1 2 3 4 5 6 7

1 Entire Factory

'Paushak Ltd'

Mr. Debangshu

Bhattacharya

Site Main Controller 4441 9825483161 39, Muktanand

Society, Kareli

baug, Vadodara.

2 TCC, Sp. Chem., ISO - I &

ISO - II Plant

Mr. Sudhir

Chougule

Dy. Site Main Controller 4408 9898506122 B 13, Anand

Vatika, Nr. Gokul

Township, B/h.

Gotri GEB

Substation, Gotri

Road, Vadodara.

3 Storage Yard & Finished

Product Storage

Mr. Mustak Tunia Incident Controller 4443 9825524925 23/B Ashiyana

Duplex, Near

Taifnagar Society,

Tandalja,

Vadodara.

4 Phosgene Plant Mr. M C Patel Dy Incident Controller 4417 9879423192 B/29, Kedardham

Society ,

Manjalpur,

Baroda

5 Boiler House / Utility

Services

Mr. Ramchandra

Kulkarni

Incident Controller 4444 7575070350 104 - Samarpan,

Pancham Heights,

Opp. Canal Road,

New Sama,

Vadodara.

Page 103: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 333

OTHER ARRANGEMENTS

In charge Person's Mutual Aid Arrangements

Residence In charge Peron’s

Sr. No. Type and

Name of

arrangements

available

Qty. Place of

availability

Phone

No. Name &

Designation Phone Address

Place

from

where

the same

thing is

available

Quantity

available Name

&

Phones Address

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Heavy Vehicle 1 Available at

the gate of

our factory

4411 Mr. Jayesh

Bhatt

9825682682 -do- Mutual Aid Arrangements done

1. Truck Dy Mgr -

Store

Halol

2..Tanker

1

Security

Officer

-do-

2 Transporters

for materials

- - 4411 -do- -do- -do- -do- - - - -

3 Power

Alternatives

Engg 4441 Mr. Praful

Kanzariya

9904219582 -do- - - - - - -

1.D.G.Set 750 Asst. Mgr -

Engg

2.Phosgene

DG

125 Phosgene

KVA

4 Utilities

Alternatives

4441 -do- - - - - - -

1. Boiler 1 Utility 4425

Page 104: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 334

In charge Person's Mutual Aid Arrangements

Residence In charge Peron’s

Sr. No. Type and

Name of

arrangements

available

Qty. Place of

availability

Phone

No. Name &

Designation Phone Address

Place

from

where

the same

thing is

available

Quantity

available Name

&

Phones Address

5 Test Facilities’

Thickness

transfer for

tanks/pipe

lines

1 Maintenance

Dept.

4447 -do- -do- - - - - - -

6 Special

Information

MSDS of all

materials,

PPE's

Available

1 Safety Dept. 4442 Mr. Nikunj

Bhatt, Asst.

Manager -

EHS

9712921968 -do-

7 Canteen & HR

Related

Facility

- P & HR Mr. Hitesh

Prajapati

-do-

Page 105: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 335

6.3.3 TELEPHONE MESSAGES

After hearing the emergency alarm and during emergency or even while just receiving the

emergency message on phone, Telephone operator should be precise, sharp, attentive and

quick in receiving and noting the message and subsequently effective in further

Communication A form to record emergency telephone calls shall be available with

telephone operator or Person available in Emergency Control Center, who has to record

such calls during emergency. Telephonic messages shall be given out by the telephone

operator to Site main Controller and key personnel as per the instructions of the Incident

Controller. Telephonic messages shall also be given to authorities and external agencies to

describe the type of emergency. All details of emergency shall be collected/delivered

according to this format shall available with the telephone operator.

6.3.4 COMMUNICATION OF EMERGENCY & STATUTORY INFORMATION

6.3.4.1 COMMUNICATION OF EMERGENCY

An effective system to communicate emergency shall be available.

Inside the factory i.e. workers including key personnel and essential workers, on duty &

inside during normal working hours.

To key personnel and essential workers not on duty and outside during normal working

hours.

To the outside emergency services and the Government authorities.

To the neighboring factory & the General Public in the vicinity.

a) Information to Workers

All personnel inside the factory shall be informed by the sounding of the siren or in case of

electricity by ringing the bell.

b) To key personnel outside during normal working hours

The key personnel outside the factory premises shall be informed as per the need by

external telephones or runners.

Page 106: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 336

c) To the outside Emergency Services and the Authorities

Once the emergency is declared, it is essential that the outside emergency services should

be informed in the shortest possible time. Responsibilities shall be fixed as per the

Incident/Emergency Command structure/plan to contact outside agencies for help and to

communicate to the all the Government and other Authorities such as Fire Brigade, Police,

District Emergency Authorities, Factory Inspectorate & Hospital etc. In case of major

emergency, outside agencies like mutual aid, hospitals, policies, Factory Inspector, Collector,

Fire-brigade etc. shall be informed by telephone or by sending special messenger from

emergency control center.

d) To neighboring factories and the General Public

A major emergency will affect areas outside the works and it is essential that neighboring

factory and General Public, should be informed to enable them to take prompt action to

protect their own workers and to take whatever measures may be possible to prevent

further escalation of the emergency due to effects on their own installations, at the same

time, they may be able to provide assistance as part of a prearranged mutual aid plan.

Further responsibilities shall be fixed to inform the neighboring factories and the General

Public leaving in the vicinity. The neighboring units shall be informed about an emergency

through external telephones or runners. The general public shall be informed about an

emergency using loudspeaker on scooter or rickshaw or car. Help from police shall be

sought if required.

Page 107: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 337

EMERGENCY CONTACT TELEPHONE NUMBERS (ON SITE EMERGENCY)

Sr. Name & Designation Internal No. Mobile/ Resident Number

1. Mr. Debagshu Bhattacharya AVP – Operation 4441 9825483161

2. Mr. Sudhir Chougule AGM – Production 4408 9898506122

3. Mr. Ramchandra Kulkarni AGM – Engg & EHS 4444 7575070350

4. Mr. Bimal Gandhi Sr. Manager – QA 4424 9909408982

5. Mr. Dr. Harish Shukla Head – R & D 4460 9879788756

6. Mr. M C Patel Manager – Phosgene 4417 9879423192

7. Mr. Mustak Tunia Manager – Production 4443 9825524925

8. Mr. U A Sheikh Manager – Production 4443 9979988411

9. Mr. B R Mishra Asst. Manager – Production 4443 9979476848

10. Mr. Rupen Shah Dy. Manager – Production 4443 9558804695

11. Mr. Praful Kanzariya Dy. Manager – Engg. 4447 9727775085

12. Mr. Jayesh Bhatt Manager – Stores 4411 9979765953

13. Mr. Nitin Gajjar Manager – R & D 4418 9898239418

14. Mr. Dashrath Patel Manager – QC 4429 9726787046

15. Mr. Chintan Kansara Executive – HR & Admn. 4415 9510516144

16. Mr. Vilas Patil Manager – PE 4445 7567866987

17. Mr. Nikunj Bhatt Asst. Manager – EHS 4442 9712921968

18. Mr. Dr. Milan Thakar Factory Medical Officer -- 9558804701

19. Mr. Dharmendra Chavda Medical Assistant 4409 9913229795

20. Emergency Contact Number -- 4403 7575804176

21. Main Gate Security Officer 4412 --

Page 108: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 338

EMERGENCY CONTACT TELEPHONE NUMBERS (OFF SITE EMERGENCY)

SR. NAME CONTACT NUMBER

External/Government Authorities

1 Collector Office Godhara 02672 -242800, 241584

2 Disaster Control Room Godhara 02672 – 242536

3 Factory Inspector Godhara 02672 – 241870

4 Factory Inspector Vadodara 0265 – 2432543

5 District Superident of Police DSP –Godhara 02672 – 242200

6 Police Station PSI – Halol 02676 – 220100

7 District Development Officer DDO – Panchamahal 02672 – 253377

8 Taluka Development Officer TDO –Halol 02676 – 221160

9 Mamlatdar Office Halol 02676 – 221066

10 Civil Surgen Godhara 02672 – 240950/242205

11 Gujarat Pollution Control Board GPCB – Godhara 02672 – 245869

12 Fire Brigade Kalol 02676 – 235101

13 Fire Brigade Baroda 0265 – 2420881/2, 2426313,

2426413

14 Fire Brigade Godhara 02672 – 240596, 243184

Hospital/ Doctors

1 Bhailal Amin Hospital Baroda 0265 – 3956222/2285555/

2286666

2 Sayaji Hospital SSG- Vadodara 0265 – 2423122/2422466

3 Krupalu Hospital –Halol Dr. Nitin Dave 02676 – 220897

4 Referral Hospital – Govt. Halol 02676 – 220111

5 Jigar Clinic/ Eye Hospital Halol Dr. Gaurang Patel 02676 – 222898

6 Halol Hospital (ICU) Dr. Niraj Chavda/Dr. Yayati Dave/

Dr. Mihir Butala

02676 – 223108/224108/220171

7 Chhaya Orthopaedic Hospital,

Halol

Dr. Manan Chhaya 02676 – 220632

8 Maa Surgical Hospital, Halol Dr. Vijay Patel 02676 – 226226

Neighboring Companies

1 United Phosphorus Ltd. Factory Manager/ Safety Incharge --

2 Alembic Ltd. API –Plant- II Factory Manager/ Safety Incharge 02676 – 664334-05

3 Alembic Ltd. API Factory Manager/ Safety Incharge 02676 – 664109-01

4 Alembic Ltd. Formulation Factory Manager/ Safety Incharge 02676 – 664281-57-02

Page 109: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 339

6.3.4.2 STATUTORY INFORMATION

a) Information to Workers

Set of Statutory information regarding types of hazards and their prevention and control as

directed in the Factories Act shall be prepared by the unit. This information shall be printed

in the local language and given in the form of booklet to all workers including contract

workers.

b) To the outside emergency services and authorities

Statutory information in the form of booklet shall be given to outside emergency services

and authorities.

c) To neighboring firms and the general public

Statutory information in the form of booklet will be given to neighboring units and the

general public of the villages in the vicinity of the unit.

6.4 ACTION ON SITE

The activities related to emergency time activities shall be divided into two parts. These are

Pre-emergency activities

Post-emergency Activities

6.4.1 PRE-EMERGENCY ACTIVITIES

6.4.1.1 INTERNAL SAFETY SURVEY

A safety committee shall be constituted as per Factories Act. The nominated members of

the committee shall be assigned the responsibility to conduct safety survey once in a month

before safety meeting. The internal safety survey includes –

Identify various hazards in the factory

Check whether protective equipments are in sound working condition

Check various safety installations located at various plants for proper working

Check sprinklers, showers, etc. in all plants

Suggest extra modifications/ requirements to make systems more reliable

Check presence of toxic gases by the help of dragger tube

Frequency of Internal Safety Survey: Once in a month

Page 110: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 340

6.4.1.2 THIRD PARTY SURVEY

A safety survey shall be carried out once in a year by an external agency. It shall include –

Inspection of building, structures for strength and stability

Identify and study the hazards inside individual plants and within the factory

premises.

Check safety system for its adequacy.

Suggest modifications or additions in the operating practices and safety system, if

necessary.

Frequency of Third Party Safety Survey: Once in a year

6.4.1.3 PRESSURE VESSEL TESTING/ EXAMINATION

To prepare list of pressure vessels in the plant with details of operating conditions

and manufacturing details.

To carry out preventive maintenance of valves & fittings on all pressure vessels

(valves, pipelines, pressure gauge, temperature recorders and emergency vent lines)

To arrange for testing and examination of all pressure vessels as per the rules of

Factories Act by govt. certified competent person on due date.

To maintain record of testing and certificates issued by competent person and make

them available to Factory Inspector at the time of inspection.

Frequency of Pressure Vessel Testing / Examination: Twice in a year

6.4.1.4 NON-DESTRUCTIVE TESTING (NDT)

To prepare list of equipment and pipelines in the plant which require NDT as per the

rules of Factories Act?

To arrange for Non-Destructive Testing (NDT) as per the rules under Factories Act by

govt. certified competent person on due dates.

To maintain record of testing and certificates issued by competent person and make

them available to Factory Inspector at the time of inspection.

Frequency of Non-Destructive Testing : Once in a year

Page 111: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 341

6.4.1.5 SAFETY RELIEF VALVES TESTING

To prepare list of Safety Relief Valves installed on various equipment and pipelines in

the unit alongwith detailed specifications.

To prepare schedule for testing and calibration as per the rules under Factories Act

by govt. certified agencies on due dates.

To maintain record of testing and certificates and mark dates of testing and

calibration on the valves.

To carry out repairs/replacement as suggesting by the testing authority.

Frequency : Twice in a year

6.4.1.6 FIRE SYSTEM TESTING

To prepare list of various fire-fighting equipment (Fire Extinguishers, etc.) installed at

various locations in the unit along with detailed specifications.

To prepare schedule for testing of all these equipment and check operability

To maintain record of testing and mark dates of testing on the equipment.

To carry out repairs/replacement of defective equipment

Frequency: Once in a month

6.4.1.7 MUTUAL AID SCHEME

To prepare Mutual Aid Scheme and enter into agreement with the neighboring units

for getting or extending help during emergency

To appoint coordinator for follow-up under mutual Aid Scheme

To review the scheme once in a year with coordinators of neighboring units w.r.t.

scope of help, type of aid, contact persons, etc.

To include the scheme in mock drills

6.4.1.8 MOCK-DRILLS

To conduct minor mock drills to train employees about their role / duties during

emergency

To refresh training to the employees for fire fighting, spill control, use of personal

protective equipments etc.

Page 112: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 342

To check whether various members of emergency control committee remember

their role / duties properly and to find out the faults and points of improvement in

their performance.

To check whether the various equipment for emergency control are operating

satisfactorily and find and rectify the draw-backs if any.

To conduct major mock-drills with permission from the authorities

Mock drills shall be regularly conducted in our unit by our Emergency Control Organization

and the findings are compiled to analyze whether employees are familiarized with the

emergency control procedures and what sort of training is required to be given.

6.4.1.9 SAFETY TRAINING

To organize regular training for the employees for handling of safety equipment, use of

personal protective equipment, first-aid, etc. by internal/external faculty, as well as by

sending persons outside to attend safety programs etc. The topics covered in safety

training will be –

Training on fire fighting

Training on spill control

Training on toxic release control

Training on good housekeeping

Training on use of PPE

The records of the training programs shall be maintained by the Safety Committee. New

topics will be included in the safety training programs year by year to upgrade safety

knowledge among the workers.

Frequency: Once in a year

6.4.1.10 PERSONAL PROTECTIVE EQUIPMENT

To procure adequate number of personal protective equipment (aprons, hand

gloves, safety goggles, helmets, nose masks, safety belts, gas cartridges, self-

breathing apparatus, safety shoes etc.) suitable for plant operations and maintain

records of use.

Page 113: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 343

To have proper system for issuing the PPE and disposal of used PPE

To train the workers about proper use of PPE.

To check the fresh air blowers provided at confined spaces for fresh air to workers.

6.4.1.11 COMMUNICATION

To maintain internal/external telephones in working order

To check alarms / siren / loudspeakers for workability

To provide manual emergency bells at various location for use during power failure

To periodically check wind cock for wind direction

To check lightning arrestors installed at different locations for physical condition and

proper earthing connection.

6.4.1.12 EMERGENCY LIGHTS

To keep sufficient number of emergency torch/ batteries in ECC as well as at the

production site

To maintain the three DG sets available in the factory as stand-by for power failure.

The D.G. sets are set to start functioning within two minutes of failure of electricity.

6.4.1.13 EMERGENCY CONTROL ROOM

It is necessary to maintain the Emergency Control Room and keep it equipped with all

necessary items, documents, telecommunication systems, PPE etc. required in case of an

emergency.

6.4.1.14 ASSEMBLY POINTS

To fix assembly points in the factory for non-essential workers

To fix assembly points for plant emergency staff and coordinators

To maintain record of no. of workers gathered at the assembly points at the time of

emergency. The Safety Committee shall nominate a person for this duty.

Page 114: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 344

6.4.1.15 LIAISON WITH STATE AUTHORITIES

To liaison with civil authorities, local hospitals, Fire-Brigade, Collector, factories

Inspector, Police, etc regarding emergency activities and need for external aid.

To keep the details regarding name, address & telephone numbers of various govt.

authorities and neighboring units available and update the details from time to time.

To inform about Mock-drill in advance and if required conduct mock-drill in presence

of any of these authorities.

To submit report of Mock-drill conducted and the out comings with photograph to

Factories Inspector.

6.4.1.16 HOSPITAL FACILITIES

To equip Occupational Health Centre with First-Aid and medicines

To keep Health records (esp. blood-group records) of all employees

To liaison with hospitals in the area of the unit

To keep list of blood donors ready for reference

To update arrangements with neighboring units for emergency first aid.

6.4.1.17 OUTSIDE SHELTER

To reserve space in nearby schools/hospitals/buildings for temporary shelter during

emergency

To arrange for clothing, food, medicine in temporary shelter

6.4.1.18 STATUTORY INFORMATION

Statutory Information about chemicals handled in the unit, manufacturing process, the

hazards in the unit, methods of prevention and control, first aid measures etc. shall be given

to

- Workers

- Public and Neighboring units

- Government authorities & outside emergency services

Page 115: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 345

6.4.1.19 PROTECTIVE DEVICES & ENGINEERING MAINTENANCE

Installation of safety valve and pressure gauges on vessels used for high pressure

operations.

Installation of temperature indicators on reactors, temperature switch or alarm at

critical reactors

Maintenance of cooling water systems and pumps. To keep standby pump at cooling

tower.

Installation of overhead water tank for emergency. To keep it filled and regular

cleaning of the same

Periodic cleaning of heat transfer surfaces (jacket, reactors, shell & tube heat

exchangers, boilers)

To keep minimum inventory of hazardous materials with records

To maintain good housekeeping and ensure safety compliance

6.4.1.20 LIST OF SUPPLIERS OF SAFETY EQUIPMENT

To prepare and preserve list of suppliers of safety equipment e.g. first aid box,

medicines, fire extinguishers, PPE, communication, self breathing apparatus, chlorine

kit, etc.

To check all supplies every three months

To update the list and keep it ready-to-refer location in the plant as well as at ECC

6.4.1.21 FIRE PREVENTION PLAN

List of major work-place fire hazards

Potential ignition sources

Sparks from electrical fitting / motors

Sparks from welding operations

Ignition system of boiler house

Sparks from static electricity

Fire prevention & control measures

Use of flameproof electrical fittings and electric motors wherever necessary

Page 116: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 346

No welding shall be done anywhere in the plant without prior permission from safety

officer and necessary precautions from in charge of the area.

Ignition system of boiler should be provided with guard

All vessels and pipeline should be properly earthed to prevent static electricity

The vent lines of all vessels and tanks holding flammable materials should be

provided with flame arrestors

Fire extinguishers shall be provided at all critical locations in the unit

6.4.2 POST EMERGENCY ACTIVITIES

These activities are to be carried out after an emergency is over so as to establish the cause

of the emergency and decide the measures to be taken to prevent its re-occurrence. These

activities are –

1. Collection of records of accident, injury, damage to property, buildings, equipment,

material and loss of production

2. Conducting enquiries and concluding preventive measures

3. Making insurance claim for the materialistic loss / damage

4. Implementation of enquiry report’s recommendations

5. Rehabilitation of affected persons within and outside the plant

6. Restarting the plant and normalizing the operations.

6.4.3 EMERGENCY TIME ACTIVITIES

The probable emergency situation that can arise in the unit and the corresponding control

actions are describes below.

6.4.3.1 FLAMMABLE RELEASES

Source / Incident – Fire involving spilled combustible material near or in flammable storage

areas

Control action –

1. Any one who notices fire shall sound emergency alarm.

2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation.

For fire due to spillage of combustible material, he activates the on-site plan as -

Page 117: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 347

He cuts off electric supply to that area and evacuates all the persons to safe

assembly points.

He calls in DIC (if DIC is not present there) and asks essential workers to fight fire

with dry chemical / CO2 fire extinguisher or sand.

He inform fire brigade telling them in briefly about kind of fire and type of

extinguishers required

He informs mutual aid teams and asks for necessary help.

He arranges first-aid / hospitalization for the affected persons.

Fire officer on reaching the site, takes charge of the fire-fighting operations

Mutual aid teams shall be asked for help in the form of first-aid, transport etc.

If fire is growing, fire officer informs IC who alerts neighboring units and through

SMC gets more fire-fighting help.

Fire fighting shall be continued till fire is fully overcome

After extinguishing fire, fire officer cools the entire area with water spray and checks

that no re-ignition shall be likely. After that, he declares the area safe.

IC tells essential workers to sound all clear

The incident shall be recorded

SMC arranges to inform families / relatives of injured / dead.

SMC issues authorized statement to press / media.

SMC informs Factories Inspector about the incident and related information

6.4.3.2 TOXIC RELEASES

Source / Incident – Pressure release due to failure of

- Stuffing box gland packing

- Pressure release valve

- Vessel / pipeline failure

Control action –

1. Any one who notices the release shall sound emergency alarm.

2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation.

For toxic release from a reactor, he activates the on-site plan as -

He evacuates all the persons to safe assembly point.

Page 118: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 348

He calls in DIC (if DIC is not present there) and asks essential workers to wear self-

breathing apparatus and if the reaction is exothermic, start cooling water flow in the

reactor jacket and cool the reactor as soon as possible.

The essential workers stop all the charging pumps of that reactor and the nearby

reactors.

He informs mutual aid teams and asks for necessary help.

He arranges first-aid / hospitalization for the affected persons.

Mutual aid teams shall be asked for help in the form of first-aid, transport etc.

When the leak stops and the air shall clear of toxic release, IC tells essential workers

to sound all clear.

The vessel / rupture disc/gland packing will be attended by maintenance

department.

The incident shall be recorded

SMC arranges to inform families / relatives of injured / dead.

SMC issues authorized statement to press / media.

SMC informs Factories Inspector about the incident and related information

6.4.3.3 CHEMICAL SPILL

Most of the storage tanks shall be located in Storage Tank Yards. Dyke walls of sufficient size

will be connected around the tank yard. Neutralizing material shall be kept nearby. For

dilution, water connection will be provided on all sides of tank farms. Sand buckets shall be

provided for covering spillage of flammable / corrosive materials.

6.4.4 EVACUATION & TRANSPORTATION

All non-essential workers shall be evacuated from incident area and adjacent areas to safe

assembly points. Assembly points shall be clearly marked and assembly point in-charge will

also be designated. The assembly point in-charge will be a well-trained supervisor who shall

keep record of persons arriving at the assembly point and direct them for proper gathering.

He shall also inform the ECC about the persons gathered at the assembly point. Those in

need of medical treatment shall be transported to first-aid center / hospital as the case may

Page 119: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 349

be. In case of major emergency all non-essential workers shall be transported to temporary

shelter.

6.4.5 SAFE CLOSE-DOWN

As per the instructions from IC or SMC, some parts or full of the plant shall be closed down

by the essential workers. The procedure for safe shut-down and start-up will be given in

safety manual given to all workers.

6.4.6 USE OF MUTUAL AID

Mutual aid from neighboring units shall be called up as and when required. The aid shall be

taken under the supervision of SMC.

6.4.7 HELP OF EXTERNAL AUTHORIES

Outside authorities such as Police, District Emergency Authority (DEA), Factory Inspector,

Disaster Management Centre, GIDC officer, Industries Association, Regional Pollution

Control Board, nearby hospitals etc. shall be informed of the on-site and off-site emergency

plans and called in as per need.

6.4.8 MEDICAL TREATMENT

Injured workers shall be located and given prompt first-aid by essential workers and key

personnel. Those requiring medical treatment shall be taken to the hospital / outside

medical center.

6.4.9 ACCOUNTING FOR PERSONNEL

Through daily muster rolls and with the help of shift-in-charge the head count shall be

undertaken to find out whether persons are missing and if so immediate search shall be

carried out to locate them. The list shall include company employees, contract workers as

well as visitors. Help from local authority or fire-brigade shall be taken if required. This list

shall be kept with time keeper / security officer at any time and shall be used to account for

personnel. Injured shall be taken to hospitals and their families/relatives shall be informed

Casualties would be identified, their families and local authority shall be informed.

Page 120: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 350

6.4.10 ACCESS TO RECORDS

In order to inform families/relatives of injured/dead, a up-to-date list of names and

addresses of all the workers is maintained in addition to the muster roll where shift-wise

attendance is marked. Such list includes health records. This list will be available at the ECC

and one such copy shall be available at our head office.

6.4.11 PUBLIC RELATIONS

Our General Manager shall be the only nominated person to issue administrative statement

about the accident or emergency to news/media. No other person shall divulge any

information to any news / media person.

6.4.12 REHABILITATION

In case of Toxic release or chemical spillage, Senior Fire Brigade Officer would ensure that

the incident area shall be safe and cleaned up of all mess. Then only, he would allow people

to re-enter the location. In case of fire, the Senior Fire-Brigade Officer shall ensure that the

area is cooled down and there are no chances of re-ignition. IC shall arrange for clean-up of

the area and then only people shall be allowed to re-enter the area for work. Even when all

clear has been given, great care shall be taken when re-entering affected areas and no work

in connection with the salvage, collection of evidence or start up shall be taken up until a

thorough examination of the area has been carried out. The statutory powers of the

Factory Inspector shall be kept in mind before any evidence is disturbed. Particular care

shall be taken to avoid the introduction of possible sources of ignition, such as diesel

engines, hand or power operated tools, flame cutting equipment, etc. until it has been

established that no flammable materials are present where they could be ignited.

6.5 OFF – SITE EMERGENCY PLAN

6.5.1 NEED OF THE OFF – SITE EMERGENCY PLAN

An off-site emergency plan is prepared to deal with those incidents which have the potential

to harm persons or the environment outside the boundary of the factory premises. A major

accident, major emergency and disaster may affect areas outside the plant. An explosion

Page 121: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 351

can scatter debris over wide areas and its effects of blasts can cover considerable distances.

Wind can spread burning fumes of toxic gases. Thus the events like these described above

can affect outside areas and combating them needs an Off-site Emergency plan.

Envisaging such a rare incident, an off-site emergency plan should be drawn up for the

following purpose.

1. To provide basic information about the risk and environmental impact assessment

related to the unit to local / district authorities, police, fire-brigade, surrounding

units, and the general public. To appraise them of consequences and the protection

/ prevention measures and control actions and to seek their help to communicate

with public in case of a major emergency. The information from all industries shall

enable district authorities to educate public about what could go wrong, and to train

them of measures to be taken as an individual.

2. To enable district authorities to prepare the off-site emergency plan (contingency)

for the district or particular area and to organize rehearsals and initiate actions

learnt from these incidents.

Our Emergency Plan shall be made after considering the all possible effects of incidents on

the neighboring population and the remedial measures will be devised in consultation with

the local authorities and emergency services.

6.5.2 STRUCTURE OF THE OFF-SITE EMERGENCY PLAN

Organization Details of :

Command Structure, Co – Ordination arrangements, warning systems,

implementation procedures, emergency control centers.

Name & appointments of :

Incident Controller, Site Main Controller, their deputies and other key personnel.

Communication Identification of personnel involved, communication center, call signs, network, lists

of key telephone numbers.

Specialized emergency

equipment

Details of availability and location of :

Heavy lifting gear, bulldozer, specialized fire fighting equipments, fire boats.

Specialized Knowledge Details of specialized bodies, firms and people upon whom it may be necessary to

call, egg, people or firms with specialized chemical knowledge, laboratories.

Voluntary Organizations Details of organizers, telephone numbers, resources, etc.

Chemical Information Details of the hazardous substances stored or processed on each site and a summary

of the risks associated with them. (HAZCHEM details).

Meteorological

Information’s

Arrangements for obtaining details of weather conditions prevailing at the time and

for weather forecasts.

Humanitarian

arrangements

Transport, evacuation centers, emergency feeding, treatment of injured – first aid,

ambulance, temporary mortuaries.

Page 122: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 352

Public Information Arrangements for

(a) Dealing with the media, press and office.

(b) Informing relatives etc.

Assessment Arrangements for

(a) Collecting information on the cause of the emergency appointment of a

historian.

(b) Reviewing the efficiency and effectiveness of all aspects of the emergency

plan.

6.5.3 ROLE OF FACTORY MANAGEMENT

The Off-Site emergency Plans are dovetail so that the emergency services shall be

summoned at the appropriate time and shall be provided with accurate information and a

correct assessment of the situation. The responsibility for this is with the Site Main

Controller. The Site Main Controller shall provide a copy of our On-Site and Off-Site

Emergency Plan to the District authorities, the Factories Inspectorate and the Emergency

Services, so that on the basis of information and such authorities can make their emergency

preparedness plan to formulate and execute the District / Area off Site Emergency Plan.

Further on the advice of the authorities we can also modify our plan to make our plan more

effective and perfect.

6.5.4 ROLE OF EMERGENCY CO-ORDINATION OFFICER (ECO)

The various emergency services will be co-ordinated by the Emergency Co-ordination officer

(ECO), who will likely to be a Collector. The ECO will liaise closely with the Site Main

Controller. The Emergency Control Centre of the factory can be utilized by the ECO to keep

liaison with the Site Main Controller.

6.5.5 ROLE OF THE FIRE AUTHORITIES

The control of fire is normally the responsibility of the senior fire officer who would take

over the handling of fire from the IC on arrival at the site.

The senior fire brigade officer may also have similar responsibility for other events

such as explosion and toxic releases. Fire authority having major hazard units in the

area shall- Familiarize themselves with the location and site of all stages of

flammable materials, water and foam supply points, fire fighting equipment.

Act as observer of an on-site exercise involving only site personnel

Page 123: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 353

6.5.6 ROLE OF THE HEALTH AUTHORITIES

Health authorities, including Doctors, Surgeons, Hospitals, and Ambulances so on, have a

vital part to play following a Major Accident and they should form an integral part of any

emergency plan. In case of major fires, injuries will be the result of the effects of thermal

radiation to a varying degree, and the knowledge and experience to handle this type of

injuries cases may be generally available in most of the hospitals. But in case of major toxic

releases, the effects vary according to the chemical, which has leaked, and it is important for

health authorities that might be involved in dealing with the aftermath of a toxic release to

be familiar with the treatment appropriate to such casualties. Major Off-Site incidents are

likely to require medical equipment and facilities additional to those available locally and a

Medical 'Mutual Aid' scheme should exist to enable the assistance of neighboring

authorities to be obtained in the event of an emergency.

6.5.7 ROLE OF TELEPHONE DEPARTMENT

The communication system between the factory and the various above role-playing

authorities must be effective. The ineffective public telephone system will not be useful in

emergency. Therefore, telephone department should maintain the phones and if required

temporary telephone connection may be provided to various above authorities to deal the

emergency.

6.5.8 ROLE OF POLICE AND EVACUATION AUTHORITIES

To protect life and property

To control traffic movement

To inform people to remain indoors or evacuate

To carry-out evacuation

To identify dead, deal with casualties and inform relatives of dead or injured.

For evacuation, the following criteria are useful:

a) In case of major fire, only houses close to fire and in the direction of smoke need

evacuation

Page 124: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 354

b) If fire is escalating and in turn threatening a store of hazardous material, it is

necessary to evacuate people nearby if time is available; otherwise they should be

informed to keep themselves indoor and shield from the fire.

c) For release of toxic gases, limited evacuation may be appropriate in downwind

direction with windows closed and provides good protection. Toxic gases which are

hazardous down to much lower concentration cover a long distance. This factor

must be considered while deciding upon the need and extent of evacuation.

6.5.9 ROLE OF THE MUTUAL-AID AGENCIES

Mutual-aid arrangements shall be made in areas of fire & toxicity control, medical and

transport & evacuation. All partners of mutual-aid shall extend all possible help in these

areas.

Page 125: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 355

6.6 OCCUPATIONAL HEALTH AND SAFETY

For large industries, where multifarious activities are involved during construction, erection,

testing, commissioning, operation and maintenance; the men, materials and machines are

the basic inputs. Along with the boons, industrialization generally brings several problems

like occupational health and safety. The industrial planner, therefore, has to properly plan

and take steps to minimize the impacts of industrialization and to ensure appropriate

occupational health and safety including fire plans. All these activities again may be

classified under construction and erection, and operation and maintenance.

6.6.1 OCCUPATIONAL HEALTH

Occupational health needs attention both during construction & erection and operation &

maintenance phases. However, the problem varies both in magnitude and variety in the

above phases.

6.6.1.1 CONSTRUCTION AND ERECTION

The occupational health problems envisaged at this stage can mainly be due to

constructional accident and noise. To overcome these hazards, in addition to arrangements

to reduce it within TLV's, necessary protective equipments shall be supplied to workers.

6.6.1.2 OPERATION AND MAINTENANCE

The problem of occupational health, in the operation and maintenance phase is primarily

due to noise which could affect consultation. The necessary personal protective equipments

will be given to all the workers. The working personnel shall be given the following

appropriate personnel protective equipments.

Industrial Safety Helmet;

Face shield

Zero power plain goggles with cut type filters on both ends;

Zero power goggles with cut type filters on both sides and blue color glasses;

Welders equipment for eye and face protection;

Cylindrical type earplug;

Ear muffs;

Page 126: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 356

Canister Gas mask;

Self contained breathing apparatus;

Leather apron;

Aluminized fiber glass fix proximity suit with hood and gloves;

Boiler suit;

Safety belt/line man's safety belt;

Leather hand gloves;

Asbestos hand gloves;

Acid/Alkali proof rubberized hand gloves;

Canvas cum leather hand gloves with leather palm;

Lead hand glove;

Electrically tested electrical resistance hand gloves; and

Industrial safety shoes with steel toe.

6.6.1.3 HOSPITAL FACILITIES

It is proposed that client will make formal agreements with nearby hospital having facilities

to attend fire and toxic effect cases for attending the affected persons in the emergency

arising out of accidents, if any.

6.6.1.4 FACTORY MEDICAL OFFICER

A qualified doctor will be appointed as FMO on retainer ship basis. Apart from him,

Paramedical Staff will be employed.

6.6.1.5 PROPOSED FACILITY TO BE MADE AVAILABLE AT OHC

One Room is proposed to be provided to be operated as OHC. The centre will be equipped

with following medical equipments:—

1. Examination Table

2 Dressing Tables For performing Dressing

3. Glucometer For measurement of Blood Sugar

4 Vision chart To evaluate vision acuity

Page 127: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 357

5. Nebuliser For relieving coughs & Breathing Difficulty

6. Infra red light for relieving muscular pain

7. Suction machine For cleaning airway

8. Autoclave machine For sterilizing cotton &dressing material

9. Weighing Machine For measuring body weight

10. Medical Oxygen Cylinder kit

11. Sphygmomanometer To measure blood pressure

12. Refrigerator To preserve medicines

13. Thermometer

OHC (OCCUPATION HEALTH CENTRE)

Item Quantity

First aid boxes 15 Nos

Stretchers 03 Nos

Ambulance 01 No +

(01 Additional in Group Co.)

Availability of Doctors/nurses 02 Nos FMO & (01 Medical Asst.)

Availability of medicines/antidotes Yes , All relevant chemicals

Dr Consulting room 13 * 13 sq ft area

No. of beds in Medical Room 02 Nos ( 27 * 13 sq ft area )

Details of other facilities/equipment OHC related all medical facility &

Mutual Aid facility,

Medical Oxygen cylinders – 03 Nos

Freeze – 01 no

Nebuliser – 01 no

Dressing equipments

Peak flow meter – 01 no

B. P. Meter

Ambush bag

Digital thermometer

Medical Examination Every six month as per Hazardous process

Annually as details examination

Medical record keeping As per GFR Form – 32 & From – 33

6.6.1.6 AMBULANCE VAN

An ambulance van is proposed to be made available 24 hours at Fire Station.

6.6.1.7 FIRST AID BOX

First Aid Boxes are proposed to be made available at the different location in the plant,

Training to be given to employees for First Aid.

Page 128: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 358

FIRST AID BOX (LIST OF MEDICINES)

SR.

NO.

NAME OF MEDICINE

1 Tab. Crocin

2 Eno Powder

3 Iodine Tincture

4 Savlon / Dettol

5 Tube Soframycin

6 Tube Burnol

7 Eye drop –Locula 10% / Gentamacin

8 Bandage roll

9 Cotton

6.6.1.8 PERIODIC MEDICAL EXAMINATION

It is proposed that client will ensure that…

(1) Workers employed shall be medically examined by a qualified medical practitioner/

Factory Medical Officer, in the following manner:

(a) Once in a period of 6 months, to ascertain physical fitness of the person to do the

particular job;

(b) Once in a period of 6 months, to ascertain the health status of all the workers in

respect of occupational health hazards to which they are exposed and in cases where

in the opinion of the Factory Medical Officer it is necessary to do so at a shorter

interval in respect of any workers;

© In periodic and pre-medical examinations, various parameters will be checked. Viz.,

LIVER FUNCRION TESTS, Chest X-rays, Audiometry, Spirometry, Vision testing (Far &

Near vision, color vision and any other ocular defect) ECG and other parameters as will

be found necessary as per the opinion of Factory Medical officer.

(2) No person shall be employed for the first time without a certificate of granted by the

Factory Medical Officer.

Page 129: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 359

6.6.1.9 EMP FOR THE OCCUPATIONAL SAFETY & HEALTH HAZARDS SO THAT SUCH

EXPOSURE CAN BE KEPT WITHIN PERMISSIBLE EXPOSURE LEVEL (PEL)/THRESHOLD

LEVEL VALUE (TLV) SO AS TO PROTECT HEALTH OF WORKERS

1. It is proposed to formulate and implement an EMP for Occupational Safety and

Health with following aims…

To keep air-borne concentration of toxic and hazardous chemicals below PEL

and TLV.

Protect general health of workers likely to be exposed to such chemicals

Providing training, guidelines, resources and facilities to concerned

department for occupational health hazards.

Permanent changes to workplace procedures or work location to be done if it

is found necessary on the basis of findings from workplace Monitoring Plan.

2. It is proposed that this EMP be formulated on the guidelines issued by Bureau of

Indian Standards on OH&S Management Systems: IS 18001:2000 Occupational

Health and Safety Management Systems

3. Proposed EMP will be incorporated in Standard Operating Procedure also.

4. The proposed EMP will also include measure to keep air-born concentration of

toxic and hazardous chemicals below its PEL and TLV, like…

a. Leak Surveys

b. Separate storage for toxic chemicals

c. Exhaust Ventilation

d. Proper illumination

e. On-line detectors toxic chemicals

f. Close processes to avoid spills and exposures

g. Atomization of process operations to hazards of manual handling of

chemicals

h. Supply of proper PPEs like Air mask, Berating canisters, SCBA sets, On-line

breathing apparatus at the places where there is possibility of presence of

toxic chemicals

i. Decontamination procedure for empty drums and carboys.

j. Regular maintenance program for pumps, equipment, instruments handling

toxic and corrosive chemicals

k. Display of warning boards

l. Training to persons handling toxic and corrosive chemicals

Page 130: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 360

5. Workplace Monitoring Plan

It is proposed that a Workplace Monitoring Plan to be prepared & implemented in

consultation with FMO and industrial hygienists.

Each workplace must be evaluated to identify potential hazards from toxic

substances or harmful physical agents. Air-borne concentration of toxic chemicals

will be measured and record will be kept.

The current state-of-the-art exposure measurement model is as follows: For

purposes of measuring worker exposure across a single shift it is sufficient t o place a

reasonably accurate exposure measuring device on the worker , within t he worker ’s

breathing zone, and have it operate for nearly the full shift. Client has been proposed

to study the exposure data when the plant is operative.

6. Health Evaluation of Workers

1. It is proposed that management will device a plan to check and evaluate the

exposure specific health status evaluation of workers

2. Workers will be checked for physical fitness with special reference to the possible

health hazards likely to be present where he/she is being expected to work before

being employed for that purpose. Basic examinations like Liver Function tests, chest

x ray, Audiometry, Spirometry Vision testing (Far & Near vision, color vision and any

other ocular defect) ECG, etc. will be carried out. However, the parameters and

frequency of such examination will be decided in consultation with Factory Medical

Officer and Industrial Hygienists.

3. While in work, all the workers will be periodically examined for the health with

specific reference to the hazards which they are likely to be exposed to during work.

Health evaluation will be carried out considering the bodily functions likely to be

affected during work. The parameters and frequency of such examination will be

decided in consultation with Factory Medical Officer and Industrial Hygienists. Plan

of monthly and yearly report of the health status of workers with special reference to

Occupational Health and Safety.

Page 131: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 361

6.6.1.10 TRAINING AND EDUCATION OF EMPLOYEES AND PERSONAL PROTECTIVE

EQUIPMENTS

Safety awareness training programmes are arranged regularly through safety department

and safety-training programmes are also arranged for workers & staff working in the factory

premises. External faculties are also invited the lectures on the matter of safety in a

practical manner understandable to the workers & staff.

M/s. Paushak Ltd. gives training on the following subjects;

Accident Prevention Technique

Basic fire fighting

Use of Respiration PPE

Handling of Hazardous chemicals

Use of chlorine kit

First Aid program

Breathing Apparatus practical Programme

General safety regulation

Permit to work system

Electrical safety

HAZOP study

On site emergency plan training

MSDS Awareness

SHE SOP’s

Once in a month workmen for different plant are grouped together & practical classes are

held to train them how to operate various types of fire extinguisher to wear the mask, SCBA

apparatus, use of cylinder handling kits. Usefulness of each part of the chlorine kits is also

explained. Fire dill is also conducted regularly. Personal protective equipment such as safety

shoes, safety goggles, hand gloves, gum boots, safety helmet have been given to each

workers & staff. Provided seven nos. of SCBA set with standby extra cylinders in entire

premises, Airline mask provided in each plant. All type of PPE are kept in all related area, we

check them regularly. Fire hydrant points & eye wash showers have been installed at various

places and at various floors of the plant building. They have been instructed how to use.

Maintaining plant as per GFR guidelines.

Page 132: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 362

6.6.1.11 MEDICAL SURVEILLANCE PROGRAM

Pre-employment Medical Check Up

1. Chest X-ray

2. Cardiogram

3. Audiometry

4. Hematological Examination:- CBC, SGOT, SGPT, Cholesterol, Blood Sugar etc

5. Urine Examination

6. Vision test

7. Colour blindness test

8. Lung function test- Spirometry

Periodical Medical Check up

1. Lung Function test

2. Cardiogram

3. Audiometry

4. Hematological Examination

5. Urine examination

6. Vision test

7. Colour blindness test

8. Biomarker in Blood & Urine

6.6.2 SAFETY PLAN

Safety of both men and materials during construction and operation phases is of concern.

Safety plan shall be prepared and implemented in the proposed project activity. The

preparedness of an industry for the occurrence of possible disasters is known as emergency

plan. The disaster in the plant is possible due to collapse of structures and fire/explosion etc.

The proposed expansion project would formulate safety policy keeping in view the

safety requirement during construction, operation, maintenance phases, with the

following regulations:

To allocate sufficient resources to maintain safe and healthy conditions of work;

To take steps to ensure that all known safety factors are taken into account in the

design, construction, operation and maintenance of plants, machinery and

equipment;

To ensure that adequate safety instructions are given to all employees;

To provide wherever necessary protective equipment, safety appliances and clothing

and to ensure their proper use;

To inform employees about materials, equipment or processes used in their work

which are known to be potentially hazardous to health or safety;

Page 133: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 363

To keep all operations and methods of work under regular review for making

necessary changes from the point of view of safety in the light of experience and up

to date knowledge;

To provide appropriate facilities for first aid and prompt treatment of injuries and

illness at work;

To provide appropriate instruction, training, retraining and supervision to employees

in health and safety, first aid and to ensure that adequate publicity is given to these

matters;

To ensure proper implementation of fire prevention methods and an appropriate fire

fighting service together with training facilities for personnel involved in this service;

To organize collection, analysis and presentation of data on accident, sickness and

incident involving people injury or injury to health with a view to taking corrective,

remedial and preventive action;

To promote through the established machinery, joint consultation in health and

safety matters to ensure effective participation by all employees;

To publish/notify regulations, instructions and notices in the common language of

employees;

To prepare separate safety rules for each type of occupation/processes involved in a

plant; and

To ensure regular safety inspection by a competent person at suitable intervals of all

buildings, equipments, work places and operations.

6.6.3 SAFETY ORGANIZATION

Construction and Erection Phase

A qualified and experienced safety officer shall be appointed. The responsibilities of the

safety officer include identification of the hazardous conditions and unsafe acts of workers

and advice on corrective actions, conduct safety audit, organize training programs and

provide professional expert advice on various issues related to occupational safety and

health. He is also responsible to ensure compliance of Safety Rules/ Statutory Provisions.

Operation and Maintenance Phase

When the construction is completed the posting of safety officers shall be in accordance

with the requirement of Factories Act and their duties and responsibilities shall be as

defined there of.

Page 134: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 364

6.6.4 SAFETY CIRCLE

In order to fully develop the capabilities of the employees in identification of hazardous

processes and improving safety and health, safety circles would be constituted in each area

of work. The circle would consist of about five to six employees from that area. The circle

normally shall meet for about an hour every week.

6.6.5 SAFETY TRAINING

Safety training shall be provided by the Safety Officers with the assistance of faculty

members called from Professional Safety Institutions and Universities. In addition to regular

employees, limited contractor labors shall also be provided safety training. To create safety

awareness safety films shall be shown to workers and leaflets shall be distributed.

Some precautions and remedial measures proposed to be adopted to prevent fires are:

Compartmentalization of cable galleries, use of proper sealing techniques of cable

passages and crevices in all directions would help in localizing and identifying the

area of occurrence of fire as well as ensure effective automatic and manual fire

fighting operations;

Spread of fire in horizontal direction would be checked by providing fire stops for

cable shafts;

Reliable and dependable type of fire detection system with proper zoning and

interlocks for alarms are effective protection methods for conveyor galleries;

Housekeeping of high standard helps in eliminating the causes of fire and regular fire

watching system strengthens fire prevention and fire fighting; and

Proper fire watching by all concerned would be ensured.

6.6.6 HEALTH AND SAFETY MONITORING PLAN

The health of all employees shall be periodically monitored for early detection of any

ailment due to exposure to heat and noise.

Page 135: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 365

6.7 TRAINING, REHERASAL & RECORDS

6.7.1 NEED OF TRAINNING & REHEARASAL

Training is important in order to –

Teach worker’s how to handle chemicals safely, how to act as a runner/messenger, how

to use PPE, how to start and shut down the plant, how to carry out emergency repairs

etc.

Teach one to be a safe and alert worker.

Rehearsal is essential for -

Explaining and making key personnel and essential workers aware of their role in

case of an emergency.

Testing the emergency procedure, emergency arrangements and ability of all

involved with it to grasp the procedure and implement the same.

Testing the effectiveness of communication system including the alternative

arrangement in case of failure.

Testing the speed of mobilization of resources, search, rescue and treatment of

casualties, emergency isolation and shut down.

Detecting the shortcomings in the emergency plan and incorporating remedial

measures.

Allowing professional emergency services to test their parts of the plan and testing

co-ordination.

Building confidence in workers which is helpful in facing real situations.

Training shall be given to regular employees and contract personnel also. Effective and

latest teaching aids will be used to train workers and supervisory staff. Such training courses

shall be conducted once in a year and co-ordination with offsite personnel shall be sought

during such training. Records will be maintained for training.

6.7.2 SOME CHECK POINTS

Following points can be checked at the time of training/assessing the adequacy of the

Emergency Plan.

Does the plan cover the range of incidents that can realistically be anticipated?

Page 136: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 366

Have the consequences of the various incidents considered been adequately assessed?

Are there sufficient resources in terms of personnel and equipment on the site to carry

out the Emergency Plan for the various incidents in conjunction with the public

emergency services?

Have the time scales been assesses correctly?

Is there a logical sequence of actions for each person given a role in the plan? Whether

key personnel, especially the nominated incident controllers, consulted in the

preparation of the plan?

Is there 24 hours cover, to take account of absences due to sickness and holidays,

minimum shift manning, operator only periods, silent hours, shutdown periods, only

security personnel being present, or for unmanned sites etc.?

Is there satisfactory co-operation with the local emergency services and district

emergency planning officers?

At sites where an off-site plan to protect people and the environment outside the site in

the event of an incident is appropriate what is the procedure for initiating the off-site

plan and is this satisfactory?

6.7.3 RECORDS AND UPDATING THE PLAN

All records of On-Site and Off-Site Emergency Plan and modifications by experience and

suggestion, the rehearsals and conclusions of such plans and the enquiries shall be well

maintained and preserved. The necessary data bank shall be also maintained for the utility

of industries and others. New information and the deficiencies identified during the

rehearsal is reviewed and incorporated in the document for continual up dating of the plan

and such information shall be communicated to the concerned authorities.

6.8 HAZOP STUDY

6.8.1 OBJECTIVE

For identifying cause and the consequences of perceived mal operations of equipment and

associated operator interfaces in the context of the complete system. It accommodates the

status of recognized design standards and codes of practice but rightly questions the

relevance of these in specific circumstances where hazards may remain undetected.

Page 137: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 367

6.8.2 PURPOSE OF HAZOP

It emphasizes upon the operating integrity of a system, thereby leading methodically to

most potential and detectable deviations which could conceivably arise in the course of

normal operating routine

- including "start-up” and "shut-down" procedures

- as well as steady-state operations.

It is important to remember at all times that HAZOP is an identifying technique and not

intended as a means of solving problems nor is the method intended to be used solely as an

undisciplined means of searching for hazardous scenarios.

6.8.3 FEATURES OF HAZOP STUDY

Subsystems of interest line and valve, etc

Equipment, Vessels

Modes of operation Normal operation

Start -up mode

Shutdown mode

Maintenance /construction / inspection mode

Trigger events Human failure

Equipment /instrument/component failure

Supply failure

Emergency environment event

Other causes of abnormal operation, including

instrument disturbance

Effects within plant Changes in chemical conditions

Changes in inventory

Change in chemical physical conditions

Hazardous conditions Release of material

Changes in material hazard characteristics

Operating limit reached

Energy source exposed etc.

Corrective actions Change of process design

Change of operating limits

Change of system reliability

Improvement of material containment

Change control system

Add/remove materials

How would hazardous During normal operation

Conditions detected? Upon human failure

Upon component failure

In other circumstances

Contingency actions Improve isolation

Page 138: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 368

Improve protection

6.8.4 HAZOP STUDY PROCEDURE

• Procedure in HAZOP study consists of examining the process and instrumentation (P&I)

line diagram, process line by process line.

• A list of guide words is used to generate deviations from normal operation

corresponding to all conceivable possibilities.

• Guide words covering every parameter relevant to the system under review i.e. flow

rate and quality, pressure, temperature, viscosity, components etc.

• Flowchart for application of HAZOP is shown in figure.

Page 139: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 369

HAZOP STUDY FLOW CHART

Page 140: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 370

GUIDE WORDS

NONE No forward flow when there should be

MORE More of any parameter than there should be, e.g. more

flow, more pressure, more temperature, etc.

LESS As above, but "less of" in each instance

PART System composition difference from what it should be

MORE THAN More "components" present than there should be for

example, extra phase, impurities

OTHER What needs to happen other than normal operation, e.g.

start up, shutdown, maintenance?

NONE e.g., NO FLOW caused by blockage; pump failure; valve

closed or jammed: leak: valve open; suction vessel empty;

delivery side over - pressurized: vapor lock; control failure

REVERSE e.g., REVERSE FLOW caused by pump failure: NRV failure or

wrongly inserted; wrong routing; delivery over pressured;

back- siphoning; pump reversed

MORE OF e.g., MORE FLOW caused by reduced delivery head ; surging

; suction pressurized ; controller failure ; valve stuck open

leak ; incorrect instrument reading.

MORE OF MORE TEMPERATURE, pressure caused by external fires;

blockage ; shot spots; loss of control ; foaming; gas release;

reaction; explosion; valve closed; loss of level in heater; sun.

LESS OF e.g., LESS FLOW caused by pump failure; leak; scale in

delivery; partial blockage ; sediments ; poor suction head;

process turndown.

LESS e.g., low temperature, pressure caused by Heat loss;

vaporization; ambient conditions; rain; imbalance of input

and output; sealing; blocked vent.

PART OF Change in composition high or low concentration of mixture;

additional reactions in reactor or other location; feed

change.

MORE THAN Impurities or extra phase Ingress of contaminants such as

air, water, lube oils; corrosion products; presence of other

process materials due to internal leakage ; failure of

isolation ; start-up features.

OTHER Activities other than normal operation start-up and

shutdown of plant ; testing and inspection ; sampling ;

maintenance; activating catalyst; removing blockage or scale

; corrosion; process emergency ; safety procedures activated

; failure of power, fuel, steam , air, water or inert gas;

emissions and lack of compatibility with other emission and

effluents.

Page 141: CHAPTER - 6 RISK ASSESSMENT & DISASTER MANAGEMENT PLANenvironmentclearance.nic.in/.../RiskAssessment/19032018… · placement of material (RIGHT THING AT THE RIGHT PLACE) Mr. Chintan

M/s. PAUSHAK LTD. ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT

Prepared By: Aqua-Air Environmental Engineers Pvt. Ltd., Surat 371

6.8.5 PROCESS HAZARD AND ITS CONTROL

In charge Person

Sr.

No.

Name of the

Plant,

Department

and Operation.

Name of

hazardous

process and

operation.

Materials in the

process /

Operation with

their quantity.

Name of the

vessel and its

location.

Operating

parameters :

pressure,

temperature

etc.

Type of hazards

possible

(exothermic, run

away, pressure

release, fire,

explosion etc.)

Control measure provided Name &

Designation

Telephone

number

1 2 3 4 5 6 7 8 9 10

1 Phosgene Plant CO Generation Oxidation of

Petroleum Coke

CO

generation

Approx

1500 0C

Fire & Toxic Online CO sensor, SCBA

set, Fire fighting facility

Mr. M C Patel

Plant In charge

4417

Chlorination Chlorination of

Carbon Monoxide

Phosgene

Reactor

High Temp &

3 kg/ cm2

Exothermic &

toxic

Air line system, online CO ,

Cl2, Phosgene sensor with

alarm, SCBA set, Fire

fighting facility

Mr. M C Patel

Plant In charge

4417

2 TCC

(Tri Chloro

carbanilide)

Phosgenation Toluene & Amine GLR Phosgenation

at low temp.

& to remove

excess HCL

Gas

i.e. reflux

Exothermic ,

Fire & Explosion

Low temp. addition under

vacuum in dry condition ,

Safety valve, scrubbing

system, Online sensor

available

Mr. Kanu Modi

Plant Incharge

4427/4443

3 Sp. Chem. Phosgenation by

purging gas in to

liquid at low temp

excess gas to

scrubber

Diethyl Amine &

Phosgene

Glass line

reactor &

Glass

assembly

Gas purging

below 0 0C

Exothermic, Toxic

gas release,

fire/explosion

Scrubbing system, cooling

system, Air line system,

online sensor of Phosgene,

Mr. B R Mishra

Plant In charge

4419/4443

4 ISO - II Phosgenation by

purging gas in to

liquid at low temp

excess gas to

scrubber

Toluene , DEA ,

DMA , CHA, BPA,

Aniline , T4 MCHA

, IPA

Glass line

vessel &

glass

assembly

Gas purging

below 0 0C

Exothermic, Toxic

gas release ,

fire/explosion

Scrubbing system, cooling

system, Air line system,

online sensor of Phosgene,

Mr. U A Sheikh

Plant In charge

4423

6.8.6 PLANNING FOR HAZOP

• Safety procedures documents

• Relief/venting philosophy

• Chemical involved

• Piping specifications

• Carry out the study

• Record the results

• Follow-up of actions noted

1. Final report contains resolution of all recommended actions.

2. Must appoint someone as leader to check progress of action.

3. Team may meet again if answers to questions do not simply lead to an action.

4. Team may meet again if significant design changes in interim report.