CHAPTER 12 Cash Flow Estimation and Risk Analysis

39
12 - 1 CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Incorporating inflation Types of risk

description

CHAPTER 12 Cash Flow Estimation and Risk Analysis. Relevant cash flows Incorporating inflation Types of risk. Proposed Project. Cost: $200,000 + $10,000 shipping + $30,000 installation. Depreciable cost: $240,000. Inventories will rise by $25,000 and payables by $5,000. - PowerPoint PPT Presentation

Transcript of CHAPTER 12 Cash Flow Estimation and Risk Analysis

Page 1: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 1

CHAPTER 12Cash Flow Estimation and

Risk Analysis

Relevant cash flowsIncorporating inflationTypes of risk

Page 2: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 2

Proposed Project

Cost: $200,000 + $10,000 shipping + $30,000 installation. Depreciable cost: $240,000.

Inventories will rise by $25,000 and payables by $5,000.

Economic life = 4 years.Salvage value = $25,000.MACRS 3-year class.

Page 3: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 3

Sales: 100,000 units/year @ $2.

Variable cost = 60% of sales.

Tax rate = 40%.

WACC = 10%.

Page 4: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 4

Set up, without numbers, a time line for the project’s cash flows.

0 1 2 3 4

OCF1 OCF2 OCF3 OCF4InitialCosts(CF0)

+Terminal CF

NCF0 NCF1 NCF2 NCF3 NCF4

Page 5: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 5

Equipment -$200

Installation & Shipping -40

Increase in inventories -25

Increase in A/P 5

Net CF0 -$260

NOWC = $25 – $5 = $20.

Investment at t = 0:

Page 6: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 6

What’s the annual depreciation?

Due to 1/2-year convention, a 3-year asset is depreciated over 4 years.

Year Rate x Basis Depreciation

1 0.33 $240 $ 792 0.45 240 1083 0.15 240 364 0.07 240 17

1.00 $240

Page 7: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 7

Operating cash flows:

1 2 3 4Revenues $200 $200 $200 $200Op. Cost, 60% -120 -120 -120 -120Depreciation -79 -108 -36 -17Oper. inc. (BT) 1 -28 44 63Tax, 40% -- -11 18 25

1 -17 26 38 Add. Depr’n 79 108 36 17 Op. CF 80 91 62 55

Oper. inc. (AT)

Page 8: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 8

Net Terminal CF at t = 4:

Salvage Value 25Tax on SV (40%) -10

Recovery of NOWC $20

Net termination CF $35

Q. Always a tax on SV? Ever a positive tax number?

Q. How is NOWC recovered?

Page 9: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 9

Should CFs include interest expense? Dividends?

No. The cost of capital is accounted for by discounting at the 10% WACC, so deducting interest and dividends would be “double counting” financing costs.

Page 10: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 10

Suppose $50,000 had been spent last year to improve the building. Should this cost be included in the analysis?

No. This is a sunk cost.Analyze incremental investment.

Page 11: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 11

Suppose the plant could be leased out for $25,000 a year. Would this affect

the analysis?

Yes. Accepting the project means foregoing the $25,000. This is an opportunity cost, and it should be charged to the project.

A.T. opportunity cost = $25,000(1 – T) = $25,000(0.6) = $15,000 annual cost.

Page 12: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 12

If the new product line would decrease sales of the firm’s other lines, would

this affect the analysis?

Yes. The effect on other projects’ CFs is an “externality.”

Net CF loss per year on other lines would be a cost to this project.

Externalities can be positive or negative, i.e., complements or substitutes.

Page 13: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 13

Here are all the project’s net CFs (in thousands) on a time line:

Enter CFs in CF register, and I = 10%.

NPV = -$4.03IRR = 9.3%

k = 10%0

79.7

1

91.2

2

62.4

3

54.7

4

-260Terminal CF 35.0

89.7

Page 14: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 14

MIRR = ?10%

What’s the project’s MIRR?

Can we solve using a calculator?

0

79.7

1

91.2

2

62.4

3

89.7

4

-260

374.8-260

68.6110.4

10%10%

106.1

Page 15: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 15

4 10 -255.97 0

TV = FV = 374.8

Yes. CF0 = 0CF1 = 79.7CF2 = 91.2CF3 = 62.4CF4 = 89.7 I = 10NPV = 255.97

INPUTS

OUTPUTN I/YR PV PMT FV

Page 16: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 16

Use the FV = TV of inputs to find MIRR

4 -260 0 374.8

9.6

MIRR = 9.6%. Since MIRR < k = 10%, reject the project.

INPUTS

OUTPUTN I/YR PV PMT FV

Page 17: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 17

What’s the payback period?

0

79.7

1

91.2

2

62.4

3

89.7

4

-260

Cumulative:-26.7-260 -89.1-180.3 63.0

Payback = 3 + 26.7/89.7 = 3.3 years.

Page 18: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 18

If this were a replacement rather than a new project, would the analysis change?

Yes. The old equipment would be sold, and the incremental CFs would be the changes from the old to the new situation.

Page 19: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 19

The relevant depreciation would be the change with the new equipment.

Also, if the firm sold the old machine now, it would not receive the SV at the end of the machine’s life. This is an opportunity cost for the replacement project.

Page 20: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 20

.k1

CostvRe

k1

CFNPV t

ttt

tn

0t

Q. If E(INFL) = 5%, is NPV biased?

A. YES.

k = k* + IP + DRP + LP + MRP.

Inflation is in denominator but not innumerator, so downward bias to NPV.

Should build inflation into CF forecasts.

Page 21: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 21

Consider project with 5% inflation. Investment remains same, $260. Terminal CF remains same, $35.

Operating cash flows:1 2 3 4

Revenues $210 $220 $232 $243Op. cost 60% -126 -132 -139 -146Depr’n -79 -108 -36 -17Oper. inc. (BT) 5 -20 57 80Tax, 40% 2 -8 23 32Oper. inc. (AT) 3 -12 34 48Add Depr’n 79 108 36 17Op. CF 82 96 70 65

Page 22: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 22

Here are all the project’s net CFs (in thousands) when inflation is considered.

Enter CFs in CF register, and I = 10%.

NPV = $15.0IRR = 12.6%

k = 10%0

82.1

1

96.1

2

70.0

3

65.0

4

-260Terminal CF 35.0

100.0

Project should be accepted.

Page 23: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 23

What are the three types of project risk that are normally considered?

Stand-alone risk

Corporate risk

Market risk

Page 24: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 24

What is stand-alone risk?

The project’s total risk if it were operated independently. Usually measured by standard deviation (or coefficient of variation). Though it ignores the firm’s diversification among projects and investor’s diversification among firms.

Page 25: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 25

What is corporate risk?

The project’s risk giving consideration to the firm’s other projects, i.e., diversification within the firm. Corporate risk is a function of the project’s NPV and standard deviation and its correlation with the returns on other projects in the firm.

Page 26: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 26

What is market risk?

The project’s risk to a well-diversified investor. Theoretically, it is measured by the project’s beta and it considers both corporate and stockholder diversification.

Page 27: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 27

Which type of risk is most relevant?

Market risk is the most relevant risk for capital projects, because management’s primary goal is shareholder wealth maximization. However, since total risk affects creditors, customers, suppliers, and employees, it should not be completely ignored.

Page 28: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 28

Are the three types of risk generally highly correlated?

Yes. Since most projects the firm undertakes are in its core business, stand-alone risk is likely to be highly correlated with its corporate risk, which in turn is likely to be highly correlated with its market risk.

Page 29: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 29

What is sensitivity analysis?

Sensitivity analysis measures the effect of changes in a variable on the project’s NPV. To perform a sensitivity analysis, all variables are fixed at their expected values, except for the variable in question which is allowed to fluctuate. The resulting changes in NPV are noted.

Page 30: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 30

What are the primary advantages and disadvantages of sensitivity analysis?

ADVANTAGE:

Sensitivity analysis identifies variables that may have the greatest potential impact on profitability. This allows management to focus on those variables that are most important.

Page 31: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 31

DISADVANTAGES:

Sensitivity analysis does not reflect the effects of diversification.

Sensitivity analysis does not incorporate any information about the possible magnitudes of the forecast errors.

Page 32: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 32

Best 0.25 125,000

Perform a scenario analysis of the project, based on changes in the

sales forecast.

Assume that we are confident of all the variables that affect the cash flows, except unit sales. We expect unit sales to adhere to the following profile:

Case Probability Unit sales

Base 0.50 100,000Worst 0.25 75,000

Page 33: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 33

If cash costs are to remain 60% of revenues, and all other factors are constant, we can solve for project NPV under each scenario.

Best 0.25 $57.8

Case Probability NPV

Base 0.50 $15.0Worst 0.25 ($27.8)

Page 34: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 34

E(NPV)=.25(-$27.8)+.5($15.0)+.25($57.8)

E(NPV)= $15.0.

Use these scenarios, with their given probabilities, to find the project’s

expected NPV, NPV, and CVNPV.

NPV = [.25(-$27.8-$15.0)2 + .5($15.0-$15.0)2

+ .25($57.8-$15.0)2]1/2

NPV = $30.3.

CVNPV = $30.3 /$15.0 = 2.0.

Page 35: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 35

The firm’s average projects have coefficients of variation ranging from 1.25 to 1.75. Would this project be of

high, average, or low risk?

The project’s CV of 2.0 would suggest that it would be classified as high risk.

Page 36: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 36

Is this project likely to be correlated with the firm’s business? How would it contribute to the firm’s overall risk?

We would expect a positive correlation with the firm’s aggregate cash flows. As long as this correlation is not perfectly positive (i.e., r 1), we would expect it to contribute to the lowering of the firm’s total risk.

Page 37: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 37

The project’s corporate risk would not be directly affected. However, when combined with the project’s high stand-alone risk, correlation with the economy would suggest that market risk (beta) is high.

If the project had a high correlation with the economy, how would

corporate and market risk be affected?

Page 38: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 38

Reevaluating this project at a 13% cost of capital (due to high stand-alone risk), the NPV of the project is -$2.2 .

If the firm uses a +/-3% risk adjustment for the cost of capital, should the

project be accepted?

Page 39: CHAPTER 12 Cash Flow Estimation and Risk Analysis

12 - 39

A risk analysis technique in which probable future events are simulated on a computer, generating estimated rates of return and risk indexes.

What is Monte Carlo simulation?