2

Lean Production Defined

The Toyota Production System

Lean Implementation Requirements

Lean Services

OBJECTIVES

Page 3: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

3

Lean Production Lean Production can be defined as an

integrated set of activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods)

Lean Production also involves the elimination of waste in production effort

Lean Production also involves the timing of production resources (i.e., parts arrive at the next workstation “just in time”)

Page 4: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

4

Pull System

Customers

Sub

Sub

Fab

Fab

Fab

Fab

Vendor

Vendor

Vendor

Vendor

Final Assembly

Here the customer starts the process, pulling an inventory item from Final Assembly…

Here the customer starts the process, pulling an inventory item from Final Assembly…

Then sub-assembly work is pulled forward by that demand…

Then sub-assembly work is pulled forward by that demand…

The process continues throughout the entire production process and supply chain

The process continues throughout the entire production process and supply chain

Page 5: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

5

Features of Lean Production

• Management philosophy• “Pull” system though the plant

WHAT IT IS

• Employee participation• Industrial engineering/basics• Continuing improvement• Total quality control• Small lot sizes

WHAT IT REQUIRES

• Attacks waste• Exposes problems and bottlenecks• Achieves streamlined production

WHAT IT DOES

• Stable environment

WHAT IT ASSUMES

Page 6: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

6

The Toyota Production System

Based on two philosophies:– 1. Elimination of waste

– 2. Respect for people

Page 7: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

7

Elimination of Waste

1. Focused factory networks

2. Group technology

3. Quality at the source

4. JIT production

5. Uniform plant loading

6. Kanban production control system

7. Minimized setup times

Page 8: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

8

Minimizing Waste: Focused Factory

Networks

CoordinationSystem Integration

These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)

These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)

Some plants in Japan have as few as 30 and as many as 1000 employees

Some plants in Japan have as few as 30 and as many as 1000 employees

Page 9: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

9

Minimizing Waste: Group Technology (Part 1)

Using Departmental Specialization for plant layout can cause a lot of

unnecessary material movement

Using Departmental Specialization for plant layout can cause a lot of

unnecessary material movement

Saw Saw

Lathe PressPress

Grinder

LatheLathe

Saw

Press

Heat Treat

Grinder

Note how the flow lines are going back and forthNote how the flow lines are going back and forth

Page 10: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

10

Minimizing Waste: Group Technology (Part 2)

Revising by using Group Technology Cells can reduce movement and improve product flow

Revising by using Group Technology Cells can reduce movement and improve product flow

Press

Lathe

Grinder

Grinder

A

2

BSaw

Heat Treat

LatheSaw Lathe

PressLathe

1

Page 11: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

11

Minimizing Waste: Uniform Plant Loading (heijunka)

Not uniform Jan. Units Feb. Units Mar. Units Total

1,200 3,500 4,300 9,000

Uniform Jan. Units Feb. Units Mar. Units Total

3,000 3,000 3,000 9,000

Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.

Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.

How does the uniform loading help save labor costs?How does the uniform loading help save labor costs?

or

Page 12: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

12

Minimizing Waste: Inventory Hides Problems

Work in

process

queues

(banks)

Change

orders

Engineering design

redundancies

Vendor

delinquencies

Scrap

Design

backlogs

Machine

downtime

Decision

backlogsInspection

backlogs

Paperwork

backlog

Example: By identifying defective items from a vendor early in the production process the downstream work is saved

Example: By identifying defective work by employees upstream, the downstream work is saved

Page 13: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

13

Minimizing Waste: Kanban Production Control Systems

Storage Part A

Storage Part AMachine

Center Assembly Line

Material Flow

Card (signal) Flow

Withdrawal kanban

Once the Production kanban is received, the Machine Center produces a unit to replace the one taken by the Assembly Line people in the first place

This puts the system back were it was before the item was pulled

The process begins by the Assembly Line people pulling Part A from Storage

Production kanban

Page 14: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

14

Determining the Number of Kanbans Needed

Setting up a kanban system requires determining the number of kanbans cards (or containers) needed

Each container represents the minimum production lot size

An accurate estimate of the lead time required to produce a container is key to determining how many kanbans are required

Page 15: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

15The Number of Kanban Card Sets

C

SDL

k

)(1

container theof Size

stockSafety timelead during demand Expected

C

SDL

k

)(1

container theof Size

stockSafety timelead during demand Expected

k = Number of kanban card sets (a set is a card)D = Average number of units demanded over some time periodL = lead time to replenish an order (same units of time as demand)S = Safety stock expressed as a percentage of demand during lead timeC = Container size

Page 16: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

16

Example of Kanban Card Determination: Problem Data

A switch assembly is assembled in batches of 4 units from an “upstream” assembly area and delivered in a special container to a “downstream” control-panel assembly operation

The control-panel assembly area requires 5 switch assemblies per hour

The switch assembly area can produce a container of switch assemblies in 2 hours

Safety stock has been set at 10% of needed inventory

Page 17: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

17

Example of Kanban Card Determination: Calculations

3or ,75.24

5(2)(1.1))(1

container theof Size

stockSafety timelead during demand Expected

C

SDL

k

3or ,75.24

5(2)(1.1))(1

container theof Size

stockSafety timelead during demand Expected

C

SDL

k

Always round up!

Page 18: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

18

Respect for People Level payrolls

Cooperative employee unions

Subcontractor networks

Bottom-round management style

Quality circles (Small Group Involvement Activities or SGIA’s)

Page 19: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

19

Toyota Production System’s Four Rules

1. All work shall be highly specified as to content, sequence, timing, and outcome

2. Every customer-supplier connection must be direct, and there must be an unambiguous yes-or-no way to send requests and receive responses

3. The pathway for every product and service must be simple and direct

4. Any improvement must be made in accordance with the scientific method, under the guidance of a teacher, at the lowest possible level in the organization

Page 20: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

20

Lean Implementation Requirements: Design Flow

Process Link operations

Balance workstation capacities

Redesign layout for flow

Emphasize preventive maintenance

Reduce lot sizes

Reduce setup/changeover time

Page 21: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

21

Lean Implementation Requirements: Total Quality

Control Worker responsibility

Measure SQC

Enforce compliance

Fail-safe methods

Automatic inspection

Page 22: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

22

Lean Implementation Requirements: Stabilize Schedule

Level schedule

Underutilize capacity

Establish freeze windows

Page 23: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

23

Lean Implementation Requirements: Kanban-Pull

Demand pull

Backflush

Reduce lot sizes

Page 24: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

24

Lean Implementation Requirements: Work with Vendors

Reduce lead times

Frequent deliveries

Project usage requirements

Quality expectations

Page 25: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

25

Lean Implementation Requirements: Reduce Inventory

More Look for other areas

Stores

Transit

Carousels

Conveyors

Page 26: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

26

Lean Implementation Requirements: Improve Product Design

Standard product configuration

Standardize and reduce number of parts

Process design with product design

Quality expectations

Page 27: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

27

Lean Implementation Requirements: Concurrently Solve Problems

Root cause Solve permanently

Team approach

Line and specialist responsibility

Continual education

Page 28: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

28

Lean Implementation Requirements: Measure Performance

Emphasize improvement

Track trends

Page 29: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

29

Lean in Services (Examples)

Organize Problem-Solving Groups

Upgrade Housekeeping

Upgrade Quality

Clarify Process Flows

Revise Equipment and Process Technologies

Page 30: Chapter 12

McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.

30

Lean in Services (Examples) Level the Facility Load

Eliminate Unnecessary Activities

Reorganize Physical Configuration

Introduce Demand-Pull Scheduling

Develop Supplier Networks