Chapter 11 Sill and Floor Construction. Platform Framing One and two story construction Easy Fast...

16
Chapter 11 Sill and Floor Construction

Transcript of Chapter 11 Sill and Floor Construction. Platform Framing One and two story construction Easy Fast...

Page 1: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Chapter 11

Sill and Floor Construction

Page 2: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Platform FramingPlatform Framing

One and two story constructionEasyFastShrinkage is uniformSafe – solid surface for construction

Page 3: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Platform FramingPlatform Framing

Sill Plate – rests on the foundation, the beginning of the wood structure. (2 x 6)

Sill SealerBox sill constructionHeaderFloor Joists

Page 4: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Platform FramingPlatform Framing

Page 5: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Balloon FramingBalloon Framing

Older methodWall studs rest directly on sill plate.Solid / Standard sillT-SillGood Vertical stabilityNeed for fire stopsPoor work surface during construction

Page 6: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Balloon FramingBalloon FramingSolid Sill

No headerNeed for fire stops

Joists nailed to wall studs

Page 7: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Balloon FramingBalloon Framing

T-SillHas headerNo need for fire stop

Page 8: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Balloon FramingBalloon Framing

Page 9: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Joists and BeamsJoists and BeamsJoists – Provide support for the floor2 x 6 to 2 x 1212” , 16” or 24” spacingSoftwoodSize depends on

Length of spanLoad to be supportedSpecies and grade of woodSpacing (O.C)

Page 10: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Wood sizingWood sizing

Nominal vs. Actual2 x 4 is actually

1½” x 3½”1 x 6 is actually

¾“ x 5½” Chart on page 195

Page 11: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Floor Joist Span DataFloor Joist Span Data

Page 196

Page 12: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Floor Systems

Floor Systems

Trusses P. 199GirdersBeamsPartition Walls

(Parallel Walls)Cross Bridging

P. 198

Page 13: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Sub floorSub floor

PlywoodTongue and

GrooveCommon BoardsOSB

Page 14: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

CantileveringCantilevering

Page 15: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.

Post and BeamPost and BeamPosts support BeamsLoad bearing is spread over a greater spanNon load bearing wallsCurtain WallsFoundations are continuous wall or piersBeams are Longitudinal vs. Traverse

In line with the ridge beam

Perpendicular to the ridge beam

Page 16: Chapter 11 Sill and Floor Construction. Platform Framing  One and two story construction  Easy  Fast  Shrinkage is uniform  Safe – solid surface.