Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support...

27
OFFICE OF STRUCTURES STRUCTURAL DETAIL MANUAL Chapter 03 - Superstructure SECTION 03 SUPPORT BRACKETS (SUP-SB)

Transcript of Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support...

Page 1: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

OFFICE OF STRUCTURES STRUCTURAL DETAIL MANUAL

Chapter 03 - Superstructure

SECTION 03

SUPPORT BRACKETS (SUP-SB)

Page 2: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

OFFICE OF STRUCTURES STRUCTURAL DETAIL MANUAL

Chapter 03 - Superstructure

Section 03 – Support Brackets

SUB-SECTION 01

42” F-SHAPE AND SINGLE

SLOPE SLOPE PARAPET

(SUP-SB(42F) and SUP-SB(42SS))

Page 3: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OFSUP-SB(42F)-101 1 2

1.02

c

cc

c

c

c

c

L 4'' conduitc

B

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

#5 Ties. See Sheet

2 of 2.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

B

Bracket

3'' min.3'' min.

Parapet control

joint.

joint.

Parapet control

A

Note:

steel not shown.

•'' Drain at low point

of junction box.

#5- Ties

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

1'-10'' 1'-10''1'-1•'' 1'-1•''

Scale: •''=1'-0''

Scale: •''=1'-0''

See ''Note A''

1'-10''

5'-

7'' Min.

42'' STRAIGHT BACK

Note B:

4-#5 Ties

A (Minimum 6'-5'') see Note B

5''

1'-0''

1'-6‚''

Parapet

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

length of bridge.

4'' conduit, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

epoxy coated.

top and bottom

#5

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

See Sheet 2 of 2.

coated, @ 8'' c/c

8-#5 Ties, epoxy

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

4'' conduit.

Provide holes in box for

junction box with cover.

or fiberglass U.L. listed

cast iron, galvanized steel

6'' x 6'' x 8'' galvanized

SLOPE PARAPET WITH STRAIGHT BACKWITH SINGLE CONDUIT AND 42'' F-SHAPE OR SINGLE

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KET

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 4: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

For exact configuration of overhangConnect drain to low

11'' 11''

4-#5 Ties

2'-

8''

using 8'' max. radius.

12-#9

12-#9

Connect drain to low

point of junction box.

1'-2''

•''

see ''Typical Cross Section'' of bridge.

3''

1'-10''

5''

Scale: •''=1'-0''

8''

SECTION B-B FOR ''F-SHAPE'' BARRIER

4-#8's

4-#7's

Cap

point of conduit.

•'' Drains

1‚'' conduit, bend

1'-0''

3''

3''

42'' STRAIGHT BACK

2'' cl, (typ.)

See ''Note C''

#5 @ 8'' c/c in place of normal

parapet reinforcing

#5 @ 8'' c/c to alternate with

& bottom

#5 top

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(42F)-101 2 2

1.02

c

Note C:

slightly from the joint indicated.

For exact details and location of the

joint see ''Superstructure'' Sheet.

parapet and the deck may vary

SLOPE PARAPET WITH STRAIGHT BACKWITH SINGLE CONDUIT AND 42'' F-SHAPE OR SINGLE

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP-TB(42F)-101 or SUP-TB(42SS)-101.

multispan bridge. Refer to either

opening to centerline of pier in a

in a simple span bridge and expansion

expansion opening to expansion opening

continuously in the parapet from

All #7 and #8 bars shall be placed

Note:

Note D:

barrier type.

purposes only. See plans for

F-Shape barrier is for illustrative

The constr. jt. between the

08/23/2019

Page 5: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

A= Normal parapet contol

joint spacing (Adjust as

necessary to meet

minimum limitations).

#5 Ties. See Sheet

2 of 2.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

PLAN

SECTION A-A

#5 Ties

Scale: •''=1'-0''

Scale: •''=1'-0''

Note:

steel not shown.

42'' DIAMOND BACK

Note B:

c

c

L 4'' conduitc

B

A/2A/2

B

c

Bracketc

3'' min.3'' min.

Parapet control

joint.c

joint.

Parapet control

c

A

5'-

7'' Min.

2'-

3‚''

1'-10''1'-1•''1'-1•''1'-10''

A (Minimum 6'-5'') See Note B

5-#5 Ties

1'-0''

8''

Parapet

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

See ''Note A''

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

of junction box.

•'' Drain at low point

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

for 1‚'' conduit.

drill and tap box

Provide slip hole or

length of bridge.

4'' conduit, full

See Sheet 2 of 2.

coated, @ 8'' c/c

8-#5 Ties, epoxy

epoxy coated.

and bottom

#5 top

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

4'' conduit.

Provide holes in box for

junction box with cover.

or fiberglass U.L. listed

cast iron, galvanized steel

6'' x 6'' x 8'' galvanized

SUP

ER - S

UPP

OR

T

BR

AC

KET1 2SUP-SB(42F)-102

1.02SLOPE PARAPET WITH DIAMOND BACK

WITH SINGLE CONDUIT AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 6: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

1'-6''

12-#9

12-#9

c

5-#5 Ties

2'-

8''

1'-2''

10''

8''

3''

1'-6„''

4‡''

1'-3„''

4-#8

4-#7

7''

•''

Scale: ƒ''=1'-0''

3''

3''

Cap

•'' Drains

1'-0''

42'' DIAMOND BACK

2'' cl. (typ.)

See ''Note C''

#5 @ 8'' c/c to alternate with

8-#5 @ 8'' c/c in place of

normal parapet reinforcing.

not shown.

Normal deck reinforcing

parapet.

back face of

Slope to match

point of junction box.

Connect drain to lowand bottom

#5 top

using 8'' max. radius.

1‚'' conduit, bend

point of conduit.

Connect drain to low

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

Note C:

slightly from the joint indicated.

For exact details and location of the

Sheet.

joint see ''Superstructure''

parapet and the deck may vary

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(42F)-102 2 2

1.02SLOPE PARAPET WITH DIAMOND BACK

WITH SINGLE CONDUIT AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP-TB(42F)-102 or SUP-TB(42SS)-102.

multispan bridge. Refer to either

opening to centerline of pier in a

in a simple span bridge and expansion

expansion opening to expansion opening

continuously in the parapet from

All #7 and #8 bars shall be placed

Note:

Note D:

barrier type.

purposes only. See plans for

F-Shape barrier is for illustrative

SECTION B-B FOR "F-SHAPE" BARRIER

The constr. jt. between the

08/23/2019

Page 7: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

B

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

B

c

Bracketc

Parapet control

joint

c

joint

Parapet control

c

A

Note:

steel not shown.

of junction box.

#5- Ties

3'' min.

1'-10''1'-1•''1'-1•''1'-10''

3'' min.

Scale: •''=1'-0''

Scale: •''=1'-0''

•'' Drain at low point

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

See ''Note A''

#5 Ties. See Sheet

2 of 2.

5'-

7'' Min.

epoxy coated.

2'-

3''

1'-0''

2'-

0''

Parapet

42'' RECESSED BACK

#5

5-#5 Ties

A (Minimum 6'-5'') See Note B

6''

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

Note B:

2-#5 straight barsepoxy coated

c

c

L 4'' conduitc

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

length of bridge.

4'' conduit, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

See Sheet 2 of 2.

coated, @ 8'' c/c.

8-#5 Ties, epoxy

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

4'' conduit.

Provide holes in box for

junction box with cover.

or fiberglass U.L. listed

cast iron, galvanized steel

6'' x 6'' x 8'' galvanized

SUP

ER - S

UPP

OR

T

BR

AC

KET1 2SUP-SB(42F)-103

1.02SLOPE PARAPET WITH ARCHITECTURAL FINISH

WITH SINGLE CONDUIT AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 8: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

For exact configuration of overhang

Connect drain to low

5-#5 Ties

12-#9

12-#9

5''

•''

Scale: •''=1'-0''

see ''Typical Cross Section'' of bridge.

Connect drain to low

point of junction box.

3''

1'-6'' 2'-9''

2'-

8''

2'-3''

10''

1'-0''

1'-0''

2ƒ''

3''

3''

SECTION B-B FOR ''F-SHAPE'' BARRIER

1'-0''

3'-

6''

1'-0''

4-#7

4-#8

#5 bar

Cap

point of conduit.

•'' Drains

42'' RECESSED BACK

1'-3•''

Level

#5 straight bartop and bottom

#5 top andbottom as shown 2

''cl.

(ty

p.)

1‚'' conduit, bend

See ''Note C''

as shown

#5's spaced

as shown#5 @ 8'' c/c bent

finish

architectural

2'' max.

steel or PVC.cap may be galvanized Conduit, drain tubes and Note:

parapet steel8-#5 @ 8'' c/c in place of normal#5 @ 8'' c/c to alternate with using 8'' max. radius.

Note C:

slightly from the joint indicated.

For exact details and location of the

Sheet.

joint see ''Superstructure''

parapet and the deck may vary

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(42F)-103 2 2

1.02SLOPE PARAPET WITH ARCHITECTURAL FINISH

WITH SINGLE CONDUIT AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP-TB(42F)-103 or SUP-TB(42SS)-103.

multispan bridge. Refer to either

opening to centerline of pier in a

in a simple span bridge and expansion

expansion opening to expansion opening

continuously in the parapet from

All #7 and #8 bars shall be placed

Note:

Note D:

barrier type.

purposes only. See plans for

F-Shape barrier is for illustrative

The constr. jt. between the

08/23/2019

Page 9: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

#5 Ties. See Sheet

2 of 2.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

PLAN

SECTION A-A

Note:

steel not shown.

•'' Drain at low point

of junction box.

#5- Ties

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

Scale: •''=1'-0''

Scale: •''=1'-0''

42'' STRAIGHT BACK

Note B:

c

c

B

A/2A/2

B

cBracketc

3'' min.3'' min.

Parapet control

joint.

c

joint.

Parapet control

c

A1'-10'' 1'-10''1'-1•'' 1'-1•''

See ''Note A''

1'-10''

5'-

7'' Min.

4-#5 Ties

A (Minimum 6'-5'') see Note B

5''

1'-0''

1'-6‚''

Parapet

L 3'' conduitsc

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

length of bridge.

3'' conduits, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

epoxy coated.

top and bottom

#5

See Sheet 2 of 2.

coated, @ 8'' c/c

8-#5 Ties, epoxy

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

3'' conduit.

Provide holes in box for

junction boxes with cover.

or fiberglass U.L. listed

cast iron, galvanized steel

6'' x 6'' x 8'' galvanized

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(42F)-201 1 2

1.02SLOPE PARAPET WITH STRAIGHT BACK

WITH DUAL CONDUITS AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 10: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

For exact configuration of overhangConnect drain to low

11'' 11''

4-#5 Ties

2'-

8''

using 8'' max. radius.

12-#9

12-#9

Connect drain to low

1'-2''

•''

see ''Typical Cross Section'' of bridge.

3''

1'-10''

5''

Scale: •''=1'-0''

8''

SECTION B-B FOR ''F-SHAPE'' BARRIER

4-#8's

4-#7's

Cap

point of conduit.

•'' Drains

1‚'' conduit, bend

42'' STRAIGHT BACK

3''

3''

point of junction box (typ.).

1'-10''

2'' cl, (typ.)

#5 @ 8'' c/c in place of normal

parapet reinforcing

#5 @ 8'' c/c to alternate with

See ''Note C''

10''

& bottom

#5 top

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

Note C:

slightly from the joint indicated.

For exact details and location of the

joint see ''Superstructure'' Sheet.

parapet and the deck may vary

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(42F)-201 2 2

1.02SLOPE PARAPET WITH STRAIGHT BACK

WITH DUAL CONDUITS AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP-TB(42F)-101 or SUP-TB(42SS)-101.

multispan bridge. Refer to either

opening to centerline of pier in a

in a simple span bridge and expansion

expansion opening to expansion opening

continuously in the parapet from

All #7 and #8 bars shall be placed

Note:

Note D:

barrier type.

purposes only. See plans for

F-Shape barrier is for illustrative

The constr. jt. between the

08/23/2019

Page 11: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

A= Normal parapet contol

joint spacing (Adjust as

necessary to meet

minimum limitations).

#5 Ties. See Sheet

2 of 2.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

PLAN

SECTION A-A

#5 Ties

c

Scale: •''=1'-0''

Scale: •''=1'-0''

Note:

steel not shown.

42'' DIAMOND BACK

Note B:

c

c

L 3'' conduitsc

B

A/2A/2

B

c

Bracketc

3'' min.3'' min.

Parapet control

joint.c

joint.

Parapet control

A

5'-

7'' Min.

2'-

3‚''

1'-10''1'-1•''1'-1•''1'-10''

A (Minimum 6'-5'') See Note B

5-#5 Ties

1'-0''

8''

Parapet

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

See ''Note A''

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

of junction box.

•'' Drain at low point

length of bridge.

3'' conduits, full

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

for 1‚'' conduit.

drill and tap box

Provide slip hole or See Sheet 2 of 2.

coated, @ 8'' c/c

8-#5 Ties, epoxy

epoxy coated.

and bottom

#5 top

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

3'' conduit.

Provide holes in box for

junction boxes with cover.

or fiberglass U.L. listed

cast iron, galvanized steel

6'' x 6'' x 8'' galvanized

SUP

ER-C

ON

CR

ET

E

WO

RKSUP-SB(42F)-202

1.02

1 2

SLOPE PARAPET WITH DIAMOND BACKWITH DUAL CONDUITS AND 42'' F-SHAPE OR SINGLE

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 12: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

1'-6''

12-#9

12-#9

c

5-#5 Ties

2'-

8''

1'-2''

10''

8''

3''

1'-6„''

4‡''

1'-3„''

4-#8

4-#7

7''

•''

Scale: ƒ''=1'-0''

Cap

•'' Drains

42'' DIAMOND BACK

3''

3''

1'-10''

2'' cl. (typ.)

See ''Note C''

#5 @ 8'' c/c to alternate with

8-#5 @ 8'' c/c in place of

normal parapet reinforcing.

10''

not shown.

Normal deck reinforcing

parapet.

back face of

Slope to match

and bottom

#5 top

using 8'' max. radius.

1‚'' conduit, bend

point of conduit.

Connect drain to low(typ.).

point of junction box

Connect drain to low

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

Note C:

slightly from the joint indicated.

For exact details and location of the

Sheet.

joint see ''Superstructure''

parapet and the deck may vary

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(42F)-202

1.02

2 2

SLOPE PARAPET WITH DIAMOND BACKWITH DUAL CONDUITS AND 42'' F-SHAPE OR SINGLE

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP-TB(42F)-102 or SUP-TB(42SS)-102.

multispan bridge. Refer to either

opening to centerline of pier in a

in a simple span bridge and expansion

expansion opening to expansion opening

continuously in the parapet from

All #7 and #8 bars shall be placed

Note:

Note D:

barrier type.

purposes only. See plans for

F-Shape barrier is for illustrative

SECTION B-B FOR "F-SHAPE" BARRIER

The constr. jt. between the

08/23/2019

Page 13: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

B

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

B

c

Bracketc

Parapet control

joint

c

joint

Parapet control

c

A

Note:

steel not shown.

of junction box.

#5- Ties

3'' min.

1'-10''1'-1•''1'-1•''1'-10''

3'' min.

Scale: •''=1'-0''

Scale: •''=1'-0''

•'' Drain at low point

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

See ''Note A''

#5 Ties. See Sheet

2 of 2.

5'-

7'' Min.

epoxy coated.

2'-

3''

1'-0''

2'-

0''

Parapet

6''

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

Note B:

A (Minimum 6'-5'') See Note B

#5

5-#5 Ties

2-#5 straight barsepoxy coated

c

c

L 3'' conduitsc

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

length of bridge.

3'' conduits, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

See Sheet 2 of 2.

coated, @ 8'' c/c.

8-#5 Ties, epoxy

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

3'' conduit.

Provide holes in box for

junction boxes with cover.

or fiberglass U.L. listed

cast iron, galvanized steel

6'' x 6'' x 8'' galvanized

SUP

ER-C

ON

CR

ET

E

WO

RKSUP-SB(42F)-203 1 2

1.02SLOPE PARAPET WITH ARCHITECTURAL FINISH

WITH DUAL CONDUITS AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

42'' RECESSED BACK

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 14: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

42'' RECESSED BACK

c

For exact configuration of overhang

Connect drain to low

5-#5 Ties

12-#9

12-#9

5''

•''

Scale: •''=1'-0''

see ''Typical Cross Section'' of bridge.

Connect drain to low

3''

1'-6'' 2'-9''

2'-

8''

2'-3''

10''

1'-0''

1'-0''

2ƒ''

SECTION B-B FOR ''F-SHAPE'' BARRIER

1'-0''

3'-

6''

4-#7

4-#8

Cap

point of conduit.

•'' Drains

3''

3''

point of junction box (typ.).

1'-10''

1'-3•''

Level

#5 straight bartop and bottom

#5 top andbottom as shown 2

''cl.

(ty

p.)

See ''Note C''

using 8'' max. radius.

1‚'' conduit, bend

#5 bar

10''

as shown

#5's spaced

as shown#5 @ 8'' c/c bent

finish

architectural

2'' max.

steel or PVC.cap may be galvanized Conduit, drain tubes and Note:

parapet steel8-#5 @ 8'' c/c in place of normal#5 @ 8'' c/c to alternate with using 8'' max. radius.

Note C:

parapet and the deck slab may vary

slightly from the joint indicated.

For exact details and location of the

joint see ''Superstructure''

Sheet.

SUP

ER-C

ON

CR

ET

E

WO

RKSUP-SB(42F)-203 2 2

1.02SLOPE PARAPET WITH ARCHITECTURAL FINISH

WITH DUAL CONDUITS AND 42'' F-SHAPE OR SINGLESUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP-TB(42F)-103 or SUP-TB(42SS)-103.

multispan bridge. Refer to either

opening to centerline of pier in a

in a simple span bridge and expansion

expansion opening to expansion opening

continuously in the parapet from

All #7 and #8 bars shall be placed

Note:

Note D:

barrier type.

purposes only. See plans for

F-Shape barrier is for illustrative

The constr. jt. between the

08/23/2019

Page 15: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

OFFICE OF STRUCTURES STRUCTURAL DETAIL MANUAL

Chapter 03 - Superstructure

Section 03 – Support Brackets

SUB-SECTION 02

PARAPET WITH SIDEWALK

(SUP-SB(SW))

Page 16: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

B

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

#5 Ties. See Sheet

2 of 2.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

B

cBracketc

3'' min.3'' min.

Parapet control

joint.

c

joint.

Parapet control

c

A

Note:

steel not shown.

•'' Drain at low point

of junction box.

#5- Ties

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

1'-10'' 1'-10''1'-1•'' 1'-1•''

Scale: •''=1'-0''

Scale: •''=1'-0''

See ''Note A''

1'-10''

5'-

7'' Min.

Face of curb

1'-0''

A (Minimum 6'-5'') see Note B

4-#5 Ties

Note B:

Parapet

SIDEWALK WITH STRAIGHT BACK

c

c

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

L 4'' conduitc

6'' x 6'' x 10''

galvanized cast iron,

galvanized steel or

fiberglass U.L. listed

junction box with cover.

If stain is applied to inside

face of concrete the color

of the cover shall match

the stain. Provide holes in

box for 4'' conduit.

1'-2‚''

length of bridge.

4'' conduit, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

epoxy coated.

and bottom

#5 top

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

Sheet 2 of 2.

as shown, See

coated, spaced

5-#5 Ties, epoxyHook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

WITH STRAIGHT BACK AND SIDEWALKWITH SINGLE CONDUIT AND PARAPET

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-101

2.00

1 2

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 17: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

12-#9

12-#9

c

5-#5 Ties

11'' 11''

4-#5 Ties

SECTION B-B FOR SIDEWALKS WITH PARAPET

using 8'' max. radius.

For exact configuration of overhang

Connect drain to low

Same elevation as top

of sidewalk at parapet.

Normal parapet

reinforcing.

Connect drain to low

point of junction box.

& bottom

#5 top

1'-2''

•''

3''

1'-10''

Scale: •''=1'-0''

see ''Typical Cross Section'' of bridge.

8''

Cap 1‚'' conduit, bend

point of conduit.

•'' Drains

3''

3''

See ''Note C''

2'' cl, (typ.)

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

7‚''

SUP-TB(SW)-101.

pier in a multispan bridge. Refer to

expansion opening to centerline of

opening in a simple span bridge and

from expansion opening to expansion

be placed continuously in the sidewalk

All longitudinal bars are #5's and shall

Note:

Note C:

The constr. jt. between the sidewalk and

For exact details and location of the

the joint indicated.

joint see ''Superstructure'' Sheet.

the deck may vary slightly from

WITH STRAIGHT BACK AND SIDEWALKWITH SINGLE CONDUIT AND PARAPET

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-101 2 2

2.00

2'-•''

SIDEWALK WITH STRAIGHT BACK

08/23/2019

Page 18: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

A= Normal parapet contol

joint spacing (Adjust as

necessary to meet

minimum limitations).

2 of 2.

Bottom to match underside

of fascia, parallel to grade.

A/2A/2

PLAN

SECTION A-A

B

#5 Ties

c

c/c

Bracketc

3'' min.3'' min.

#5- Ties

Parapet control

joint.c

joint.

Parapet control

c

epoxy coated.

and bottom

#5 top

A

#5 Ties See Sheet

For Section ''B-B'' see Sheet 2 of 2.

1'-10'' 1'-10''1'-1•'' 1'-1•''

Scale: •''=1'-0''

Scale: •''=1'-0''

2'-

3‚''

See ''Note A''

length of bridge.

4'' conduit, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

5'-

7'' Min.

Note:

steel not shown.

See Sheet 2 of 2.

coated, @ 12''

5-#5 Ties, epoxy

Face of curb

A (Minimum 6'-5'') See Note B

Note B:

1'-0''

SIDEWALK WITH DIAMOND BACK

c

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

c

Deck overhang reinforcing

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

•'' Drain at low point

of junction box.

Sleeves for anchor bolts. See ''Note A.''

Parapet

1'-7''

box for 4'' conduit.

the stain. Provide holes in

of the cover shall match

face of concrete the color

If stain is applied to inside

junction box with cover.

fiberglass U.L. listed

galvanized steel or

galvanized cast iron,

6'' x 6'' x 10'' galvanized

L 4'' conduitc

B

WITH DIAMOND BACK AND SIDEWALKWITH SINGLE CONDUIT AND PARAPET

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-102

2.00

1 2

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 19: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

1'-6''

c

5-#5 Ties

1'-2''5-#5 Ties

10''

3''

1'-2ƒ''

•''

•'' Drains (Galv.)

7''

3''

3''

Scale:•''=1'-0''

8''

Cap

SECTION B-B FOR SIDEWALKS WITH PARAPET

2'' cl, (typ.)

12-#9

12-#9

See ''Note C''

3'-

6''

7‚''

1'-1•''

of junction box.

Connect drain to low point

parapet.

back face of

Slope to match

& bottom

#5 top

using 8'' max. radius.

1‚'' conduit, bend

reinforcing.

Normal parapet

point of conduit.

Connect drain to low

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

Note C:

The constr. jt. between the sidewalk and

For exact details and location of the

the deck slab may vary slightly from

the joint indicated.

joint see ''Superstructure'' Sheet.

SUP-TB(SW)-102.

pier in a multispan bridge. Refer to

expansion opening to centerline of

opening in a simple span bridge and

from expansion opening to expansion

be placed continuously in the sidewalk

All longitudinal bars are #5's and shall

Note:

SIDEWALK WITH DIAMOND BACK

WITH DIAMOND BACK AND SIDEWALKWITH SINGLE CONDUIT AND PARAPET

SUPPORT BRACKET FOR MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-102 2 2

2.00

2'-•''

08/23/2019

Page 20: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

B

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

BcBracketc Parapet control

joint

c

joint

Parapet control

c

A

Note:

steel not shown.

of junction box.

#5- Ties

3'' min.

2'-

2•''

1'-10''1'-1•''1'-1•''1'-10''

3'' min.

Scale: •''=1'-0''

Scale: •''=1'-0''

•'' Drain at low point

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

See ''Note A''

5'-

7'' Min.

Parapet

#5 Ties, epoxy

coated.

RECESSED BACK WITH SIDEWALK

Face of curb

3''

Note B:

A (Minimum 6'-5'') See Note B

1'-0''

4-#5 Ties

2-#5 straight barsepoxy coated

c

c

L 4'' conduitc

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

1'-7''

6'' x 6'' x 10''

galvanized cast iron,

galvanized steel or

fiberglass U.L. listed

junction box with cover.

If stain is applied to inside

face of concrete the color

of the cover shall match

the stain. Provide holes in

box for 4'' conduit.

length of bridge.

4'' conduit, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

epoxy coated.

#5

Sheet 2 of 2.

as shown See

coated, spaced

8-#5 Ties, epoxy

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

ARCHITECTURAL FINISH AND SIDEWALKWITH SINGLE CONDUIT AND PARAPET WITH

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-103

2.00

1 2

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 21: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

12-#9

c

4-#5 Ties

SECTION B-B FOR SIDEWALKS WITH PARAPET

For exact configuration of overhang

Connect drain to low

Scale: •''=1'-0''

•''

3''

using 8'' max. radius.

see ''Typical Cross Section'' of bridge.

Connect drain to low

point of junction box.

10''

1'-6''

2'-2•''

8''

1'-0''

Typ.

2ƒ''

3''

3''

Cap

point of conduit.

•'' Drains

1‚'' Conduit, bend

1'-0''

RECESSED BACK WITH SIDEWALK

12-#9

See ''Note C''

#5 top andbottom as shown

Level

#5 straight bartop and bottom

1'-3•''

2''cl.

(ty

p.)

#5

4'-

4''

4'-

3''

7‚''

2'-3•''

as shown

#5 spaced

Finish

Architectural

2'' Max.

shownc/c, bent as#5 @ 8''

parapet reinforcing

in place of normal

8-#5 ties @ 8'' c/c

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

SUP-TB(SW)-103.

pier in a multispan bridge. Refer to

expansion opening to centerline of

opening in a simple span bridge and

from expansion opening to expansion

be placed continuously in the sidewalk

All longitudinal bars are #5's and shall

Note:

Note C:

The constr. jt. between the sidewalk and

For exact details and location of the

the joint indicated.

joint see ''Superstructure'' Sheet.

the deck may vary slightly from

ARCHITECTURAL FINISH AND SIDEWALKWITH SINGLE CONDUIT AND PARAPET WITH

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-103 2 2

2.00

2'-•''

08/23/2019

Page 22: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

B

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

#5 Ties. See Sheet

2 of 2.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

B

cBracketc

3'' min.3'' min.

Parapet control

joint.

c

joint.

Parapet control

c

A

Note:

steel not shown.

•'' Drain at low point

of junction box.

#5- Ties

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

1'-10'' 1'-10''1'-1•'' 1'-1•''

Scale: •''=1'-0''

Scale: •''=1'-0''

See ''Note A''

1'-10''

5'-

7'' Min.

1'-0''

4-#5 Ties

A (Minimum 6'-5'') see Note B

Note B:

SIDEWALK WITH STRAIGHT BACK

Parapet

Face of curb

c

c

L 3'' conduitsc

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

6'' x 6'' x 10''

galvanized steel or

fiberglass U.L. listed

junction boxes with cover.

If stain is applied to inside

face of concrete the color

of the cover shall match

the stain. Provide holes in

galvanized cast iron,

1'-2‚''

box for 3'' conduit.

length of bridge.

3'' conduits, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

epoxy coated.

and bottom

#5 top

Sheet 2 of 2.

as shown See

coated, spaced

5-#5 Ties, epoxy

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

WITH STRAIGHT BACK AND SIDEWALKWITH DUAL CONDUITS AND PARAPET

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-201 1 2

2.00

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 23: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

5-#5 Ties

11'' 11''

4-#5 Ties

SECTION B-B FOR SIDEWALKS WITH PARAPET

For exact configuration of overhang

Connect drain to low

Same elevation as top

of sidewalk at parapet.

Normal parapet

reinforcing.

Connect drain to low

1'-2''

•''

3''

1'-10''

Scale: •''=1'-0''

see ''Typical Cross Section'' of bridge.

8''

Cap

point of conduit.

•'' Drains

3''

3''

1‚'' conduit, bend using 8'' max. radius.

point of junction box (typ.).

2'' cl, (typ.)

See ''Note C''

12-#9

12-#9

7''

2'-

7•''

7‚''

& bottom

#5 top

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

SUP-TB(SW)-101.

pier in a multispan bridge. Refer to

expansion opening to centerline of

opening in a simple span bridge and

from expansion opening to expansion

be placed continuously in the sidewalk

All longitudinal bars are #5's and shall

Note:

Note C:

The constr. jt. between the sidewalk and

For exact details and location of the

the joint indicated.

joint see ''Superstructure'' Sheet.

the deck may vary slightly from

SIDEWALK WITH STRAIGHT BACK

WITH STRAIGHT BACK AND SIDEWALKWITH DUAL CONDUITS AND PARAPET

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-201 2 2

2.00

08/23/2019

Page 24: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

A= Normal parapet contol

joint spacing (Adjust as

necessary to meet

minimum limitations).

2 of 2.

Bottom to match underside

of fascia, parallel to grade.

PLAN

SECTION A-A

#5 Ties

#5 Ties See Sheet

For Section ''B-B'' see Sheet 2 of 2.

Scale: •''=1'-0''

Scale: •''=1'-0''

Note:

steel not shown.

Note B:

A/2A/2

B

c

c/c

Bracketc

3'' min.3'' min.

#5- Ties

Parapet control

joint.c

joint.

Parapet control

c

A

1'-10'' 1'-10''1'-1•'' 1'-1•''

2'-

3‚''

See ''Note A''

5'-

7'' Min.

Face of curb

A (Minimum 6'-5'') See Note B

1'-0''

SIDEWALK WITH DIAMOND BACK

c

c

L 3'' conduitsc

Deck overhang reinforcing

Spacing to match that of deck overhang steel (Varies 5''

to 7''). Bars to be placed between deck overhang steel.

Sleeves for anchor bolts. See ''Note A.''

6'' x 6'' x 10''

galvanized cast iron,

galvanized steel or

fiberglass U.L. listed

If stain is applied to inside

face of concrete the color

of the cover shall match

the stain. Provide holes in

box for 3'' conduit.

junction boxes with cover.

of junction box.

•'' Drain at low point

epoxy coated.

and bottom

#5 top

length of bridge.

3'' conduits, full

for 1‚'' conduit.

drill and tap box

Provide slip hole or See Sheet 2 of 2.

coated, @ 12''

5-#5 Ties, epoxy

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

Parapet

1'-7''

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-202 1 2

2.00

08/23/2019

WITH DIAMOND BACK AND SIDEWALKWITH DUAL CONDUITS AND PARAPET

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 25: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

1'-6''

c

5-#5 Ties

1'-2''5-#5 Ties

10''

3''

1'-2ƒ''

•''

•'' Drains (Galv.)

7''

Scale:•''=1'-0''

8''

Cap

SECTION B-B FOR SIDEWALKS WITH PARAPET

3''

3''

1‚'' conduit, bend using 8'' max. radius.

12-#9

12-#9

See ''Note C''

SIDEWALK WITH DIAMOND BACK

10''

3'-

6''

2'-

7•''

7‚''

1'-1•''

parapet.

back face of

Slope to match

& bottom

#5 top

reinforcing.

Normal parapet

point of conduit.

Connect drain to low

of junction box (typ.).

Connect drain to low point

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

SUP-TB(SW)-102.

pier in a multispan bridge. Refer to

expansion opening to centerline of

opening in a simple span bridge and

from expansion opening to expansion

be placed continuously in the sidewalk

All longitudinal bars are #5's and shall

Note:

Note C:

The constr. jt. between the sidewalk and

For exact details and location of the

the deck slab may vary slightly from

the joint indicated.

joint see ''Superstructure'' Sheet. WITH DIAMOND BACK AND SIDEWALKWITH DUAL CONDUITS AND PARAPET

SUPPORT BRACKET FOR MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-202 2 2

2.00

08/23/2019

Page 26: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

B

c

Station for light post

support bracket shown on

Plans is only approximate.

Bracket to be located

midway between parapet

control joints.

Bottom to match underside

of fascia, parallel to grade.Sleeves for anchor

A/2A/2

PLAN

SECTION A-A

BcBracketc Parapet control

joint

c

joint

Parapet control

c

A

Note:

steel not shown.

of junction box.

#5- Ties

3'' min.

2'-

2•''

1'-10''1'-1•''1'-1•''1'-10''

3'' min.

length of bridge.

3'' conduits, full

Scale: •''=1'-0''

Scale: •''=1'-0''

•'' Drain at low point

For Section ''B-B'' see Sheet 2 of 2.

bolts. See ''Note A.''

See ''Note A''

for 1‚'' conduit.

drill and tap box

Provide slip hole or

5'-

7'' Min.

Parapet

#5 Ties, epoxy

coated.

RECESSED BACK WITH SIDEWALK

Face of curb

3''

Sheet 2 of 2.

as shown See

coated, spaced

8-#5 Ties, epoxy

epoxy coated.

#5

4-#5 Ties

Note B:

minimum limitations).

necessary to meet

joint spacing (adjust as

A = Normal parapet control

control joints.

A (Minimum 6'-5'') See Note B

1'-0''

2-#5 straight barsepoxy coated

c

to a paraffin joint.

side only shall be changed

joint beyond, on one

pier, The first control

control joint at the L of

at L of pier, eliminate the

If a light post is placed

c

L 3'' conduitsc

Deck overhang reinforcing

Hook one end.

deck overhang steel.

placed parallel to

shown, top and bottom

coated, spaced as

12#9's, epoxy

to 7''). Bars to be placed between deck overhang steel.

Spacing to match that of deck overhang steel (Varies 5''

1'-7''

6'' x 6'' x 10''

galvanized steel or

fiberglass U.L. listed

junction boxes with cover.

If stain is applied to inside

face of concrete the color

of the cover shall match

the stain. Provide holes in

galvanized cast iron,

box for 3'' conduit.

ARCHITECTURAL FINISH AND SIDEWALKWITH DUAL CONDUITS AND PARAPET WITH

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KETSUP-SB(SW)-203 1 2

2.00

08/23/2019

height of pole for this detail is 40'.

leveling nuts on anchor bolts. Max

light poles to be set plumb using

identified on the Lighting Plan(s). All

lighting contractor for the fixture

anchor bolts shall be provided by the

The bolt circle dimension and size of

Note A:

Page 27: Chapter 03 - Superstructure SECTION 03 SUPPORT …chapter 03 - superstructure section 03 – support brackets sub-section 01 42” f-shape and single slope slope parapet (sup-sb(42f)

APPROVAL

DIRECTOR

OFFICE OF STRUCTURES

DATE:

VERSION

STATE HIGHWAY ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

STATE OF MARYLAND

OFFICE OF STRUCTURES

DETAIL NO. SHEET OF

SECTION B-B FOR SIDEWALKS WITH PARAPET

For exact configuration of overhang

Scale: •''=1'-0''

•''

3''

see ''Typical Cross Section'' of bridge.

Connect drain to low

10''

1'-6''

8''

1'-0''

Typ.

2ƒ''

Cap

3''

3''

1'-0''

point of junction box (typ.).

4-#5 Ties

RECESSED BACK WITH SIDEWALK

12-#9

12-#9

See ''Note C''

c

Connect drain to low

2'-2•''

point of conduit.

•'' Drains

Level

#5 straight bartop and bottom

1'-3•''

#5 top andbottom as shown 2

''cl.

(ty

p.)

#5

7''

4'-

4''

4'-

2'' 2'-

7•''

7‚''

2'-3•''

as shown

#5 spaced

Finish

Architectural

2'' Max.

parapet reinforcing

in place of normal

8-#5 ties @ 8'' c/c

may be galvanized steel or PVC.

Conduit, drain tubes and cap

Note:

shownc/c, bent as#5 @ 8''

1‚'' Conduit, bend using 8'' max. radius.

SUP-TB(SW)-103.

pier in a multispan bridge. Refer to

expansion opening to centerline of

opening in a simple span bridge and

from expansion opening to expansion

be placed continuously in the sidewalk

All longitudinal bars are #5's and shall

Note:

Note C:

The constr. jt. between the sidewalk and

For exact details and location of the

the joint indicated.

joint see ''Superstructure'' Sheet.

the deck may vary slightly from

ARCHITECTURAL FINISH AND SIDEWALKWITH DUAL CONDUITS AND PARAPET WITH

SUPPORT BRACKET FOR BRIDGE MOUNTED LIGHT POST

SUP

ER - S

UPP

OR

T

BR

AC

KET2 2SUP-SB(SW)-203

2.00

08/23/2019