    Change man main Panel:

    To create a package give 1;1

  • 7/28/2019 Changeman Points

    4/5

    To enter the package go to chanheman ie u;h and select option 5(list).

  • 7/28/2019 Changeman Points

    5/5

    Checkout: for checking out a component give C1. We can chk out only those

    component which are from production library. If we do not checkout a

    component from production library and try to stage it then we get an error

    message CHECK OUT ENFORCED.

    If we try to chk out a comp which is not there in prod lib then we get amessage MEMBER NOT FOUND.

    If we check out a comp which is already checkedout in package then we get

    a error message DUPLICATE CHECKOUT.

    Whle testing the status of package is DEV. When we move the package to

    prod the status becomes BAS(Baselined).

    Before BAS we need to Freeze the package and the status becomes FRZ. Aft

    FRZ the change man group approve the package and status becomes APR.

    aft APR we do the production move and Status becomes BAS.

    To promote give PR.

    To demote give DM.

    To audit give AP.

    When audited it gives a return code 2001.