Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated...

51
Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15 th Annual ITEA TI Workshop May 12, 2011 Jack Benzie Technical Director

Transcript of Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated...

Page 1: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Challenges of Integrated Testing & Training

at a Live Fire Sea Range

For 15th Annual ITEA TI Workshop

May 12, 2011

Jack Benzie

Technical Director

Page 2: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Discussion

• PMRF - Background

• History

• Mission & Vision Statement

• Capabilities

• Details on Training Mission

• Details on Test & Evaluation Mission

• Unique Challenges as an Integrated Range

• Alignment under COMPACFLT

• Personnel and Asset Surge

• WESTPAC Capability Expansion (Training Mission)

• Funding and Charging Policies

• Systems Sponsors, Sustainment, I&M

• Scheduling

• Summary

Page 3: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

BRIEF HISTORY OF BARKING SANDS

Kauai’s First Grass Airstrip

Mana Airport for Hawaiian and Pan American Airlines. • WWII brought in the military

presence • Heavy Military Traffic • Base population 6-8,000

Bonham Air Force Base B-26 Light Bombers

Southern Cross takes off on historic flight to Australia. Originating from Oakland Airport, San

Francisco , the whole distance, was later calculated as 7,389 miles (11890 km), 83 hours and 11 minutes.

Navy enters Joint Use Agreement with USAF (1956)

Navy becomes principle user with Training and Test &

Evaluation

Significant expansion of mission, test sites, & capabilities • Today’s workforce (1000) consists of Military, Civil Service and Contractor

1970 to Present 1920s & 30s 1950s

1960s

1940s

PACIFIC MISSILE RANGE FACILITY

Page 4: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF’s Mission and Vision

PMRF’s Mission is to provide integrated range services in a modern, multi-threat, multi-dimensional environment, assuring safe conduct and evaluation of Force Readiness Events.

PMRF’s Vision is to Provide Premier Range services to meet present and future Warfighting requirements with clear and measurable benefits throughout the Pacific Theater.

Today's Testing Leads to Tomorrow's Training

with Systems our Warfighters Must Have to Win in Combat

Page 5: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF -

“Home” to ~1000 Employees

Military (Officers/Enlisted)……………………. 60

Civilian (DOD)/ MWR (GS)…………………….. 140

Contractors, Tenants, and MWR…………….. 800

TOTAL 1000

• Over 50% of our

workforce has called

Kauai home for more

than 5 years

• 95% of workforce

reside in community

Page 6: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF - Crossroad of the Pacific

Australia

• World’s Largest Underwater Instrumented Range

• Unconstrained by Geography

• Provides Complex/Realistic Scenarios

• Limited Encroachment

• Minimal Air Traffic/Sea Traffic

Page 7: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Hawaii Range Complex and WESTPAC Support

Page 8: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Range Complex

N I I H A U

I S L A N D

KAMOKALA RIDGE M A K A H A

KOKEE PARK

BARKING SANDS

PORT ALLEN

R I D G E

K A U L A

I S L AN D

MAUNA

K A P U

Page 9: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Joint / Combined Training Supporting Force Readiness Continuum

• Anti-Submarine Warfare

• Anti-Air Warfare

• Anti-Surface Warfare

• Strike Warfare

• Electronic Combat

• Mine Warfare

• Naval Special Warfare

• Amphibious Warfare

• Rim of the Pacific (RIMPAC)

• Hollywood

• Remote Site Training Operations

Page 10: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Does . . . . .

Ordnance Storage

Range Clearance

Monitoring & Safety

Weapons Recovery

Optics Telemetry

Precision Radar

Subsurface Exercise

Surface Targets

Aerial Targets

Training RDT&E

Telemetry

Precision Radar

Range Support

Ballistic Missile

Defense

Environmental

Stewardship

OPFOR

Page 11: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

MDA - AEGIS BMD

• Began trials in 1997

• Live Missile Launches starting 1999

• Intercepts 2002 to present

– 21 Hit to Kill Intercept Events

– 46 Support Events

» Low Altitude SM-2

» High Altitude SM-3

» RIMPAC

» Japanese Cooperative Development

– Next mission FTM-16 Event 3, Aug 2011

BURNT FROST (Feb 08)

– The USS LAKE ERIE fired a SM-3 into space at the malfunctioning satellite USA 193.

– The mission achieved the objective of destroying the satellite's hydrazine tank.

– The impact occurred at about 150 miles above the Pacific Ocean with an impact velocity of around 22,000 mph.

Page 12: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

MDA - THAAD

• Moved to PMRF from White Sands

Missile Range in 2006

• 1ST Test at PMRF Jan 07

• 7 THAAD Interceptor Launches

(6 missions) to date – All Successful

• Average 2 missions per year through 2009, now 1 annually

• Last Mission: FTT-14

– Completed 28 June 2010

• Next Mission: FTT-12

– Planned for Sep 2011

Page 13: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

THAAD

Radar Site

Deckhouse

SPY-1D, Fire Control

Range Operations THAAD Launch

Area KTF

Aegis Ashore Footprint at PMRF

MK-41 Launch Site

•$68.10M

•Ongoing site survey & discussion

•Aggressive timeline

•1st test Q1FY14

Page 14: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Aegis Ashore & THAAD Concept

Target Launch

PMRF

Interceptor Launch

USCG

MATSS

Datalink

PACOM

Oahu

KAUAI

HALO

Page 15: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Aegis Ballistic Missile Defense

PMRF

Target Launch

USCG

MATSS

Datalink

PACOM

Oahu

KAUAI Datalink

HALO

Interceptor Launch

Page 16: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Alignment with Acquisition and Operational “Navy Readiness Enterprise Continuum”

Test & Evaluation Focus Fleet Training Focus

CURRENT READINESS

RQMTS /

RISKS

FROM

FLEET/

OPNAV

CO

RE

FU

NC

TIO

NS

&

PR

OC

ES

SE

S S

UP

PO

RT

C

US

TO

ME

R B

AS

E

ENTERPRISE FOCUS Integration of Functions and Processes

PMRF CONDUCTS OPERATIONS ACROSS THE ENTIRE NAVY READINESS ENTERPRISE

S & T

OPERATIONS &

SUPPORT

PRODUCTION &

DEPLOYMENT

SYSTEM DEVELOPMENT

& DEMONSTRATION

CONCEPT &

TECHNOLOGY

DEVELOPMENT

F U T U R E R E A D I N E S S

Office of Naval Research (ONR)

Naval Research Laboratory (NRL)

Maritime Synthetic Range

FORCEnet

Advanced Airborne Test Facility

Force Protection Battle Lab

Laser/Optical System Integration

Cooperative Engagement Capability

ASAP X-Band Radar

Directed Energy

MDA Targets

Minuteman III

Ground-Based Midcourse Defense

Terminal High Altitude Area Defense

Trident

Standard Missile – 6

Aegis BMD

Aegis Ashore

Basic/Intermediate/Advanced Training

• Air/Surface/Subsurface Platforms

Fleet Exercises

• Rim of the Pacific

• Hollywood

• Pacific Blitz

Disaster Response

Combat System Ships Qualification Trials

Remote Ops

• Pohakuloa Training Area (PTA)

• Guam

• Okinawa

• Maui

Page 17: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Alignment within Navy Command Structure

• Aligned under USFF and COMPACFLT along with other Navy Training Ranges

• Not under SYSCOMs (NAVSEA, NAVAIR) as Navy Test Ranges

• Utilize Fleet Wide organizations and commands for Information Assurance (NETWARCOM), Frequency Management (NMSC), Contracts (NAVSUP/FISC)

• Fleet Training Requirements tend to be more stable and consistent, thus the supporting commands are not always familiar with the more flexible and changing requirements associated in testing

• Indirect benefit of enforcing some discipline with the test programs, minimizing short notice requirements creep

Page 18: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Range Utilization (Primary Operations)

8 Major T & E

events

Page 19: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Personnel Surge & Asset Support

from Other Ranges

• Since range manning is predominantly resourced to meet the more stable service and systems sustainment requirements associated with Fleet training, PMRF leverages use of personnel resources at other ranges and commands to support T&E

• Missile Defense Agency (MDA) Pacific Range Support Team (PRST) & Asset Tool Kit:

– Surge personnel from NAWC Pt. Mugu, NAWC China Lake, WSMR & RTS for support in Safety (Flight & Ground), Overhead Surveillance, MK-74 Radar, and communications systems

– Mobile Range Safety Assets to augment the PMRF MATSS - RTS KMRSS & NAWC Pt. Mugu RASA

– NAWC P-3/C-130s, Honolulu based USCG C-130s, NRL P-3, NAVAIR Contract Aircraft to meet the long range surveillance and clearance requirements

– NAWC China Lake Doppler Radar deployment to PMRF – Proof of Concept to meet Early Launch Tracking requirement for Safety to support upcoming dual interceptor THAAD mission (FTT-12) and Aegis Ashore (SM-3)

– WSMR (NAVSEA Det) assist in sustainment & certification of the 50K launcher for BMD targets

• Benefit: reduce overall costs across the ranges for personnel resources by higher utilization of personnel & assets, thus minimizing excess capacity

• With more programs conducting tests requiring operations at multiple ranges (i.e. MDA, HTV, AHW), once schedules have been locked in, there have been minimal issues to deconflict use of surge personnel & assets

Page 20: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Navy - PMRF WESTPAC Expansion

• MULTISAIL: Large scale periodic Group Sail by WESTPAC FDNF units (surface & air) for training and proficiency; PMRF deploys a Portable Underwater Tracking Range (PUTR) off the coast of Japan for Anti-Submarine Warfare (ASW) events; commenced in 2005 at one event annually; expected to increase to twice annually in the near future due to increasing customer base

• Guam range boat (TR-6) expanded support to include:

– SUBEX

– Supports control and deployment of surface target capability which PMRF stood up in 2010 to meet Navy helo crew recurring lasing proficiency and live fire qualifications

• Okinawa EWEX (1-2 per year); commenced in 2009 - for USN and USMC aviation

• Additional Notes:

– Replacement boat for TR-6 (Range Training Support Craft) has an expected delivery date of 2014; will increase capability for targets, PUTR deployment, EW threat signals, longer range/higher sea state/extended duration

– Plans to stand-up EW threat signal and aircraft tracking/scoring capability in Guam and Marianas Training Area for Naval Aviation are in progress

– Philippines support USMC PHIBLEX 2009 & 2010 (Electronic Warfare)

• Crawl, Walk, Run – surge philosophy being used until capability is demonstrated and matured for sustainment, and customer base warrants permanent presence

Page 21: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF – Sustained Integrated Test

and Training

PMRF is a Mission Funded Navy Training Range. Only DoD range that

conducts business across the entire operational and acquisition continuum.

PMRF IS CURRENTLY OPERATING AS AN INTEGRATED RANGE

FY08 Execution

ROS Reimbursable

Support w/o MRTFB

23%

MRTFB Support

5%

ROS Fleet Training

27%

BOS

36%

Off-shore

Contracts

9%

ROS Reimbursable

Support w/o MRTFB

32%

MRTFB Support

4%ROS Fleet Training

23%

BOS

32%

Off-shore Contracts

9%

ROS Reimbursable

Support w/o MRTFB

25%

MRTFB Support

6%

ROS Fleet Training

27%

BOS

32%

Off-shore

Contracts

10%

FY10 Execution

FY09 Execution

Page 22: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Funding / Charging Policy

• Multiple funding lines:

– Range Operations Sustainment (ROS) Institutional - Sustain range infrastructure & operations to meet Fleet Training requirements

– MRTFB – Sustain capabilities that predominantly support RDT&E

» 4 Capabilities at PMRF – Telemetry, Optics, Signature Radars, Mobile At-Sea Sensor (MATSS) System

– Reimbursable – RDT&E programs

» “Direct Charge” policy for use of both ROS Inst & MRTFB assets

» 9 capabilities sponsored by MDA for sustainment to meet infrastructure (THAAD, Aegis BMD, C2BMC) and data collection requirements

– Will increase with stand-up of Aegis Ashore testing

– Base Operations Sustainment – Sustain base infrastructure and operations via CNIC

• Challenges:

– With only 4 MRTFB capabilities, difficult to leverage I&M funding for upgrades to other critical systems (i.e. networks, communications, radars, etc.)

– Fleet has limited funding for improvement and modernization of critical range systems

Page 23: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Funding the O&M Contract Whose Bill is the

white space

below the line?

T&E Support Funded by Reimbursable RDT&E

(Direct Cost Only)

Surge capability

Overtime, Part-time

Page 24: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Major Sensors

PRECISION TRACKING RADAR (11-PMRF)

4 - MPS-25 ROSA (2 B/S, 1 Kokee Park, 1 M/R)

1 - FPS-16 (Kokee Park)

2 - FPQ-10 (2 M/R)

3 - DR-COSIP (2 M/R, 1 MATSS)

1 - MK-74, Mod-15 XDAS Guided Missile Fire Control

System with Imaging (Kokee Park)

SURVEILLANCE RADAR (7-PMRF, 1-FAA, 1 HIANG)

1 - SPS-48E (M/R)

3 - APS-134V (M/R, Kokee Park, Niihau)

1 - SPS-67 (B/S)

1 - FPS-117 (HIANG) 1

1 - APS-140 (C-26)

1 - ARSR-4 (Mt Kaala) 2

COMMAND & CONTROL

3 - Range Operation Control Centers

1 - Battle Management Interoperability Center

1 - Command & Control Processor (C2P) / CDLMS

(Link 11 / Link 16 SATCOMM)

OPTICS

2 - Stabilized High-Accuracy Optical Tracking

System (SHOTS) (1 B/S, 1 MATSS )

2 - Versatile Tracking Mounts (VTM) (1 B/S, 1 M/R)

12 - Launch Area Photographic System (LAPS) cameras

(10 “Phantom 9” and 2 “Phantom 10” cameras)

NOTES:

1 - HIANG (Hawaii Air National Guard), FAA

2 - FAA Asset

3 - NASA Asset

4 - DOE / SNL (Sandia National Lab) Asset

5 - DET2 SMC

TELEMETRY (8-PMRF, 1-NASA, 2-KTF, 2-USAF, 4-MRSS)

1 - GKR-8A (M/R)

3 - KAM 43’ (M/R)

4 -150-20’ (3 M/R, 1 Kokee Park)

1 - Unified “S” Band (Kokee Park) 3

1 - 15’ Autotracking System (KTF) 4

1 - 20’ Autotracking System (KTF) 4

1 - Dual-Helix P-band Array (KTF) 4

1 - 46’ Tracking System (USAF/Kaena Pt) 5

1 - 60’ Tracking System (USAF/Kaena Pt) 5

1 - 8’ Antenna (MRSS)

2 - 12’ Antennas (MRSS)

1 - 24’ Antenna (MRSS)

FLIGHT TERMINATION SYSTEM (5-PMRF, 2-KTF, 1-MRSS)

5 - Command Transmitter Sets (4 Kokee Park,

1 MRSS)

1 - Command Transmitter Set (KTF) 4

1- Airborne FTS Relay Sets (C-26)

Blue = MRTFB

Red = MDA

Page 25: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Infrastructure Sponsors (FY 2010)

MRTFB MDA

MRTFB PAYS MGMT, ADMIN, MAINTENANCE MDA INFRASTRUCTURE COST

CUSTOMER PAYS DIRECT OP COSTS

Q-4 WB COSIP MOBILE RANGE SAFETY SYSTEM (MRSS) T&E CUSTOMER USAGE > 50% OF TOTAL ASSET HOURS % T&E CUSTOMER USAGE < 50% OF TOTAL ASSET HOURS %

Q-15 WB COSIP TELEMETRY OPERATION SUPPORT ROOM (TOSR) BATTLE MGMT INTEROPERABILITY CENTER (BMIC) 100% RANGE DATA PRODUCTS GROUP (RDPG) 49%

Q-16 MOBILE WB COSIP DATA ANALYSIS CENTER (DAC) GROUND/LAUNCH SUPT (ORD MAB) 100% REAL TIME COMPUTER CENTER (RTCC) 49%

MK-74 RADAR ROCC CONSOLE EXTENSION MISSILE ACCIDENT EMERGENCY TEAM (MAET) 100% Q1 MPS-25 49%

TELEMETRY C-BAND BAND SATELLITE EARTH STATION (SES) MESSAGE CENTER 97% Q11 APS-134 1 MAKAHA RIDGE 48%

GKR-8A LAUNCH AREA PHOTOGRAPHIC SYSTEM (LAPS) FIC BARKING SANDS 97% Q5 FPQ-10 47%

43' KAM TRANSLATED GPS RANGE SYSTEM (TGRS) ORDNANCE SUPPORT (ORD) 91% Q6 FPQ-10 47%

150-20 CLASSIFIED VIDEO DISTRIBUTION SYSTEM (CVDS) COMM MAKAHA RIDGE 76% FIC MAKAHA RIDGE 46%

SHOTS I & II INSTRUMENTATION CONTROL CENTER (ICC) 73% Q2 ROSA MPS-25 42%

VTM I & II HIANG / FAA VIDEO SERVICES 70% Q10 SPS-67 41%

MATSS FPS-117 I-NET 67% Q12 APS-134 2 NIIHAU 41%

MATSS COMM RANGE CONTRACTOR COORDINATORS (RCC) 66% Q7 SPS-48E 41%

MATSS VSAT FAA COMM B/S 63% Q8 MPS-25 39%

ARSR-4 - MT KAALA NTDS LINK 11/LINK 16 63% TSUNAMI 38%

DOE/Sandia National Lab COMM KOKEE 63% NAVY TACTICAL DATA SYSTEM (NTDS) 38%

AUTOTRACKING SYSTEMS DET2 SMC Q9 ROSA MPS-25 60% LARGE AREA TRACKING RANGE (LATR) 35%

15' AUTOTRACKING SYSTEMS TRACKING SYSTEM BQM-74 57% RANGE SURVEILLANCE/RATC 34%

20' AUTOTRACKING SYSTEMS 46' TRACKING SYSTEM - KAENA PT CONTROL ROOMS 57% NCTS 24%

DUAL-HELIX P-BAND ARRAY 60' TRACKING STSTEM - KAENA PT Q3 FPS-16 57% WRB 101 23%

COMMAND TRANSMITTER SET COMMAND TRANSMITTER SET BUSINESS INFORMATION SYSTEM (BIS) 57% WRB 102 22%

SAFETY CLUSTER 54% EW M/R 22%

SPECTRE/DATA FUSION FORMERLY APIS 53% TWR 833 20%

SURFACE NAVAL TARGET CONTROL (SNTC) 52% UNDERWATER TRACKING SYSTEM (UTS) 20%

FLEET

FLEET PAYS MGMT, ADMIN, MAINTENANCE AND FLEET OP COSTS OTHER CUSTOMERS PAY DIRECT OP COSTS

(ASSETS LISTED BY PERCENTAGE OF T&E UTILIZATION DERIVED FROM TOTAL ASSET UTILIZATION HOURS)

Page 26: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Space & Missile Defense

T&E Resource Modernization

• 1997-2005: Modernization of launchers, telemetry, optics,

radars, and MATSS

– Program Drivers: Aegis BMD

• 2005-2010: Range upgrades to radars, range safety

systems, data systems and networks

– Program Drivers: Aegis BMD and THAAD

• 2010-2015: Planned upgrades to telemetry, optics,

radars, MATSS, range safety systems, MILCONs and

transfer of KTF from DOE to DON

– Program Drivers: Aegis BMD, THAAD, ARDEL, Aegis Ashore,

Directed Energy, and LEONIDAS

Page 27: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

OPERATIONAL ================================================================================================================

PUBLIC ===========> RDT&E ==================================================================================================>

Non-DoD DoD PMRF PMRF DoD PMRF DoD

UNCLASSIFIED/SENSITIVE CLASSIFIED/SECRET CLASSIFIED/TOP SECRET

Non-DoD DoD PMRF PMRF DoD PMRF DoD

LOCATED AT PMRF

CUSTOMERS

SDREN HPCMO

tNet

NMCI PEO EIS

raNet

Internet

rcNet NISPOM

DREN HPCMO

CUSTOMERS Sensors PLATFORM IT

Queen 4 PLATFORM IT

Tactical SIPRNet

SIPRNet DISA

NMCI PEO EIS

iNet rdNet

Sensors PLATFORM IT

JWICS DISA

NOT INSTALLED

IA PROTECTION SUITE

thaadNet

CDS

B3

SA

SA

B1

ISP

Page 28: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Data Transport Backbone

Background / Need PMRF currently uses Asynchronous Transfer Mode (ATM) technology as the

backbone for all data transport between Barking Sands, Makaha Ridge, Kokee, & MATSS; transports both classified and unclassified data

ATM is a 1980s-developed technology; becoming obsolete and unsupportable •Equipment end-of-life 2012 •No manufacturer support after 2012

Programmatic Impact If Not Funded By 2012, manufacturer support will stop, the current ATM equipment may not meet mission readiness and quality assurance goals

Proposed Funding Arrangement Cost sharing between Fleet, MDA, and MRTFB

$8.5M Total Project Cost •FLEET --$3.0M •MDA --$3.0M •MRTFB -$2.4M

Page 29: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

MRTFB POM-12 Composition Review

PMRF POM-12 Composition Review to OPNAV N43 (Navy Range Office) via

COMPACFLT to include:

(1) MPS-25 NB ROSA (4 each)

(2) Source Integration Server (SIS)

(3) Mobile Range Safety System (MRSS)

(4) Launch Area Photographic System (LAPS)

(5) Classified Video Distribution System (CVDS)

(6) Safety Cluster – (2 each) Unclassified, 1 Classified

(7) SNL/KTF (Staffing continues at OPNAV for potential transition from

DoE to Navy as T&E capability)

Proposal, with exception of KTF, identical to POM-10 submittal.

POM-12 Shortfall/Delta not reflective of composition

recommendations.

Page 30: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Scheduling Considerations

• MDA/Other Major T&E Programs (MM-III, SM-6, HTV, AHW, Trident) - 12-18 months out (primary launch date, max 2 back up dates; never gone to 2nd b/u date)

• Fleet Training – 4-8 months out; upon completion of quarterly C3F scheduling conference units submit requests for the next two quarters

• S&T – as requirements are identified; i.e. radar programs, typically work evenings and weekends since using limited range services and must de-conflict common use of the frequency spectrum

• Annual keep out periods (Fleet Training & Maintenance):

– COMSUBPAC Prospective Commanding Officer Ops (2 weeks each Feb/Aug)

– RIMPAC (Jul of even years)

– Maintenance Stand-down (2 weeks, 1-2 periods per year as requirements dictate)

– Holiday Stand-down – three weeks Dec/Jan

• Challenges:

– Prioritization matrix does not align for Fleet vs T&E

– On range schedule for Fleet training is fairly stable; more common for T&E programs to delay and reschedule on short notice due to technical issues

• Adjudication to COMPACFLT for unresolved conflicts; only one instance (2008, THAAD) requiring direct involvement at Flag level for resolution – the policy works as long as customers understand potential trade space when changing schedule inside 60 days out

Page 31: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Summary

• PMRF is a national asset that operates as an integrated test and training range – 60 Military, 140 Government Civilians, 800 Contractors

– 4,300 Acres; 2.1 million square miles of controlled air/sea space

– Fleet Training

– R&D / S&T

• Uniquely capable to support Fleet Training at PMRF & remote locations, MDA missions (AEGIS, THAAD, GMD), as well as other T&E programs (SM-6, ARDEL, Directed Energy, CNO Projects, ONR/NRL programs, etc.)

• Aligned with Navy and National priorities – Sustain Combat Readiness

– Build a Fleet for the Future

– Develop 21st Century Leaders

– Regional Engagement (RIMPAC, Foreign Military Sales)

Page 32: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Mahalo & Aloha

Page 33: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Backup Slides

Page 34: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Reporting Chain

CHIEF OF NAVAL OPERATION

ADM Roughead

COMMANDER

U.S. PACIFIC FLEET

ADM Walsh

COMMANDER

NAVY INSTALLATION

COMMAND

VADM Vitale

COMMANDER

NAVY REGION

HAWAII

RDML Smith

COMMANDING OFFICER

PACIFIC MISSILE RANGE FACILTY

CAPT Mongillo

COMMANDING

OFFICER

PACIFIC MISSILE

RANGE FACILITY

CAPT Mongillo

Page 35: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Organization Chart

N00

Commander

(CAPT Nicholas Mongillo)

ROS & BOS

N1 (GS-13)

Total Force

Manpower

(Ms. Sharon

Yamagata)

N3A

Air Ops

(LCDR Kortney

Kropp)

N6 (GS-14)

Range

Systems

(Mr. Tam Tran)

N4F

Facilities/

Environmental

(LCDR Don

George)

N4S(GS-13)

Supply Office

(Mr. Ignacio

Xavier)

N7

Training &

Readiness

(LCDR Jason

Anstead)

N8 (GS-13)

Range

Business Office

(Mrs. Irene

Shimaoka-Jensen)

N9 (NA-4

Fleet & Family

Readiness

(Mr Steve Taylor)

NEX-Mart

Manager

(Ms. Pat Huber)

N02 (GS-15)

Technical Director

(Mr. John Benzie)

N01

Executive Officer

(CDR Jim Wucher)

N3S

Security Dept

(CW02 Dexter

Carr)

Special Assistants (SAs have direct access to N00

on matters under their cognizance)

• Staff Chief Information Officer GS-14 (N02-1) (Mr. Paul Schoberg)

• Staff Chief Technology Officer GS-14 (N02-2) (Mr. Joseph Schneider)

NEXCOM

Special Assistants (SAs have direct access to N00

on matters under their cognizance)

• Staff Public Affairs GS-12 (N00-PAO) (Mr. Tom Clements)

• Staff Protocol GS-09 (N00-2) (Ms. Keiko Puu)

• Staff Legal (N01-1) (LT Gil Gatchalian)

• Staff Security Manager GS-11 (N01-2) (Mr. Mark Edgar)

• Staff CCC (N01-3) (EM1(SW) Francis Garcia)

• Staff DAPA (N01-4) (MA1 Wade Hemry)

• Staff SWO (N01-5) (LCDR Jason Anstead)

• Staff Fitness Coord (N01-6) (ENC Shane Eckhart)

• Staff EMO GS-12 (N01-7) (Mr. Bud Bouche)

• Staff NOSH Safety GS-11 (N01-8) (Ms Cheryl Holiday)

Command

CMC/Sr Enlisted Advisor (N00-1)

(AFCM Willie Canaya)

N3R

Range Ops

(CDR Juan

Navarrete)

N4C (GS-13)

Contracts

Admin

(Ms. Judith

Moore)

CPF

UIC 0534A

CNIC

61064/3536A

NAVFAC

62478/46778

FISC

UIC 00604

Test & Evaluation

Fleet Training

Range Control

Systems Engineering

Instrumentation Systems

Data Systems

Support Systems

Communication Systems

Page 36: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Instrumentation Barking Sands

Range Operations

Control Center

(ROCC)

Kauai Test

Facility

2

Aerial north view

Kamokala Ridge

1. PMRF North Launch

Complex

2. Missile Assembly Bldg. 573

3. Missile Assembly Bldg. 590

4. THAAD Launcher

5. THAAD Block House

6. Ordnance, Targets &

Underwater Weapons (Red

Label Area)

7. THAAD Contractor

Logistics Support

8. Control Tower Crash/Fire

Bldg. 300

9. Hangar Bldg. 384

10. THAAD Central Support

Facility

11. MPS-25 ROSA (Queen 8)

12. MPS-25 ROSA (Queen 1)

13. SPS-67 (Queen 10)

14. Active Runway 16/34

15. Ordnance Magazine

16. Range Operations Area

1

3

6

5 4

8

9

7

10

11

12

13

15 16 14

Kaumualii Highway

Page 37: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Tracking Radars

1

2

3

4 6

5

1. MPS-25 (Queen-1)

2. MPS-25 (Queen-8)

3. DR COSIP (Queen-4)

4. MPS-25 (Queen-2)

5. FPQ -10 (Queen-5)

6. FPQ-10 (Queen-6)

7. Mk-74 X-Band Doppler Imaging

Parcel “A” Kokee Park.

8. DR COSIP (Queen-15)

9. AN/SPS - 67 (Queen-10)

10. (1) COSIP/MATSS (Queen-16)

Not shown.

11. APS-140,RC-26

7

9

8

10

9

11

Page 38: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Kokee Park

Parcel “A”

Parcel “C”

(4) CCT

UHF/VHF COMMUNICATIONS

Parcel “D” (1) FPS-16

(1) MPS-25

(1) 150-20’ Telemetry Antenna

Parcel “E” NASA VLBI

USB Antenna

Parcel “B” Power Plant Substation

Mk-74 X-Band Radar &

future central fiber node

At an elevation above 3,800 feet, Kokee Park extends the line-of-site coverage from Kauai to 90 nautical miles.

Page 39: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Makaha Ridge

1 - Telemetry Bldg 752

a. KAM TM antennas

b. 150-20 TM antennas

2 - Radar Maint. Bldg. 742

3 - DR COSIP(Queen-4)

4 - FPQ-10 (Queen 5&6)

5 - DR COSIP (Queen-15)

6 - SPS-48E Surveillance

7 - APS-134 Surveillance

8 - Comm. Bldg. 708

9 - Electronic Warfare

10 - MPS-25 ROSA (Queen 2)

Surveillance, Data Collection,

Electronic Warfare, & Experimentation

2

3

6

7

4 4

5

10

8

1 a a a

b

9

Approximately seven nautical miles north of Barking Sands, Makaha Ridge overlooks the BARSTUR and BSURE ranges. Site elevations are between 1500

and 1700 feet, providing line-of-sight coverage to 60 nautical miles.

a

Page 40: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Ordnance Facilities

Missile Assembly Bldg. 590

Kamokala Ridge

Kauai Test Facility

North Launch Complex

Red Label Area

Page 41: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF / KTF Sensors

Tracking Radar Systems

4 – AN/MPS-25 ROSA

2 – AN/FPQ-10

3 – WB COSIP

1 – AN/FPS-16

Surveillance Radar Systems

1 – AN/SPS-67(V)1

1 – AN/SPS-48E

3 – AN/APS-134(V)

2 – AN/APS-140

Guided Missile Fire Control System

1 – MK74 MOD15

Telemetry Equipment

1 – GKR-8A antenna

3 – KAM TM antennas

4 – 150-20 TM antennas

1 – 20-ft Autotracking Antenna (KTF)

1 – 15-ft Autotracking Antenna (KTF)

1 – 15-ft S-band Antenna (KTF)

1 – Dual-Helix P-band Array (KTF)

150-20 TM

Antennas

AN/SPS-67

Radar

AN/APS-134(V)

Radar

AN/FPQ-10

Radar

AN/SPS-48E Radar

AN/APS-140 Radar

WB COSIP Radar

MATSS – WB DR-COSIP Radar

Page 42: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF / KTF Launch Capability

KAUAI TEST

FACILITY (KTF) Stool Launcher (1)

20k Launcher (2)

7.5k Launcher (2)

50k Launcher THAAD

MRT

TTV

(3) BQM-34

Rail Launcher

BQM-74 Launch

VANDAL BQM-8G Mk-5 Launcher

GQM-163

TERRIER

Page 43: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF / KTF Launch Capabilities

PMRF North Launch Pad

F. Dual Vandal BQM-8G Launcher (1)

G. BQM-34 (Permanent) Launcher (1)

H. BQM-34 (Portable) Launchers (2)

I. BQM-74C Launchers (4)

J. LOKI Rocket Launchers (2)

K. Super HAD Launcher (1)

L. MK-5 Launcher (1)

KTF (Kauai Test Facility)

C. Rail-guided 7.5k Launchers (2)

D. Rail-guided 20k Launchers (2)

E. STARS Launch Pad (1)

M. 7.5k Launcher @ Kokole Pt. (1)

PMRF Multi-Use Launch Pad

A. 50k Launcher (1)

B. Lance (Portable) Launch Sites (2)

Smokey Sams (Portable Launchers) (Smokey Sams Not Shone)

L

G

J

I

H

F

K

E D

D C

C

A

B

B

7.5k

Launcher @

Kokole Point

M

Page 44: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

APS-134 General Purpose Surface Search Radar,

Remotely Operated on Niihau Island

Surveillance Capabilities

SPS-67 Surface Search Radar (Queen-10)

SPS-48E Surface & Air Search Tracking

Radar (Queen-7)

APS-134 General Purpose Surface Search Radar

(Queen-12)

P-3

Satellite

C-130

G-3

APS-140 Airborne Surface Search Radar

on C-26

(2) Contractor operated S61N

Page 45: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Makaha Ridge, Kauai

4 UPT-2A (fixed)

1 CESSIM

1 ULQ-26

2 FIC

Barking Sands, Kauai

1 JTE (mobile)

1 MRES (mobile)

2 AGTTS

5 UPT-2A (mobile)

1 STE

2 PADS

7 Target Mock-ups

1 FIC

Stinger Rounds

Smokey Sams

Perch Site, Niihau

1 MRES

2 UPT-2A

1 ULQ-26

Mauna Kapu, Oahu

1 ULQ-26

3 UPT-2A (fixed)

1 FIC

Barbers Point, Oahu

3 UPT-2A (mobile)

PTA, Big Island

6 Target Mock-ups

Moch Airfield

Echo Target

AAA/SAM Site

PADS

AGTTS MRES

UPT-2A JTE

CEESIM

ULQ-26

Target Mock-up

Electronic Warfare

Page 46: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Underwater Range

Barking Sands Underwater Range Expansion (BSURE)

Depths: 6,000 – 15,000 Feet

Area: 22.5 x 40 Nautical Miles, 900 Square Miles

Existing Hydrophones: 18

• BSURE TO BE UPGRADED / REFURBISHED

TO 41 HYDROPHONES IN OCT 2010.

Barking Sands Tactical Underwater Range (BARSTUR)

Depths: 1,800 – 6,000 Feet

Area: 12 x 10 Nautical Miles, 120 Square Miles

Hydrophones: 42

Shallow Water Training Range (SWTR)

Depths: 129 – 1,800 Feet

Area: 12x10 Nautical Miles, 80 Square Miles

Hydrophones: 118

Total Area = 1100 Square Miles

• Largest Instrumented Range in the World

• Up to 12 Mk-84 Coded Pulse Pingers

• Splash Point Metric Location Capability

• Tracking: 10 feet - Splash Point: 30 feet

Underwater Ranges uses for training/operations include:

• Sonar

• Torpedo Training (ASW Exercises/ASW Rodeo) • Tactics (Combat System Ships Qualification Trials)

• Ship Detection

• Submarine Commanders Graduation Course (Hollywood)

Page 47: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF POM 12 BRIEF - 47

MAKAHA RIDGE

MK-74 KOKEE PARK

SHOTS

1

5

2

4

1 –COSIP WB Radars (3)

2 – Telemetry Antenna’s

(8)

3 – SHOTS (2)

4 – VTM (2)

5 - MK-74

6- MATSS (HM&E,

Comms)

1

2 2

2

VTM

3

1

2

2

MATSS

6

3

PMRF MRTFB Current Assets

Page 48: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

• Radar Type: Wide Band Digital Receiver

COherent SIgnal Processor

(WB DR-COSIP)

• Radar Description: Wideband digital

instrumentation and

tracking radar

• Radar Location: Makaha Ridge/MATSS

• Frequency Band: C-Band (5.4 – 5.9 GHz)

• Bandwidth: 8, 500 MHz

• Parabolic antenna (20 ft diameter)

• Q-4/15: Antenna located in radome

• Range Tracking Subsystem:

• Radar Control Computer (RCC)

• Provides on-site real time or playback metric

and signature displays

• Resolution: Wideband 0.5m, Narrowband

37m, Doppler 0.26m/s

WB COSIP at Makaha Ridge

WB COSIP on MATSS

WB DR-COSIP RADAR - Wide Band Digital Reciever-COherent SIgnal Processor -

Page 49: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

PMRF Optics

SHOTS

PMRF

SHOTS

MATSS

– 2 Stabilized High-Accuracy Optical Tracking Systems (SHOTS)

– 2 Versatile Tracking Mounts (VTM)

– Launch Area Photographic System (LAPS)

– Photography & Video

VTM MR LAPS

VTM 105 & Guest Sensor Cube

on Optics Pad

Page 50: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Telemetry Sites

MAKAHA RIDGE

KOKEE PARK

Receiver Subsystem

Antenna Controllers

Recorder

Subsystem

K T F

Page 51: Challenges of Integrated Testing & Training at a Live Fire Sea ......Challenges of Integrated Testing & Training at a Live Fire Sea Range For 15th Annual ITEA TI Workshop May 12, 2011

Mobile AT Sea Sensor (MATSS)

DR COSIP

Radar

C-band

VSAT

Radar

Ku-band

VSAT Radar

SHOTS

Mobile Range Safety System

Telemetry Antennas

Flight Termination System (FTS)

Antennas

(2) Omni Dir.

FTS Antennas

• Tended by tug at all times

• 8 knots in Sea State -3

• 6 knots in Sea State -5

• Berthing for 36 persons,

duration of 21+ days

• Fully established operational

and safety procedures for crew

and riders.

Deck House w/ Optics

Inmarsat, Mini-M &

Surface Radar