Ch-5 Flow Analysis 1

Flow

The heart of plant layout and the beginning of the material handling plan.

Page 2: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 2

Flow

Flow is the continuous movement of material through the manufacturing processes and on to the customer.

Wholesalers Retailers

Primary components

Supplier 2 Customers

Information flow

Material flow

M

M

M M

Manufacturers

Supplier 1

Supplier n

Page 3: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 3

Flow

If an operation with perfect flow could be established, it will nearly eliminate all waste associated with:

(1) Inventory,

(2) Storage space,

(3) Transportation,

(4) Waiting.

Page 4: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 4

The Impact of Flow

Exceptional flow leads to:

(1) Lower inventories

(2) Better quality

(3) Less floor space

(4) Better communication

(5) Quicker responses to problems

(6) Faster throughput

Page 5: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 5

Two Basic Types of Flow

Process orientation layout

Page 6: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 6

Two Basic Types of Flow

Product orientation layout

Page 7: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 7

Process-oriented layout and product-oriented layout

1. Material flow will be much smoother.

2. The distance material has to travel will be much shorter. 

3. There is less confusion about which process sequence to use, or when and where finished material should be transferred into next station.

 

4. One concern with the product-oriented layout is the restriction of the machine capacity. Instead of using one fast, flexible, expensive machine that can produce many different parts, cheaper machines that can be used solely for one part are acquired.

In product-oriented layout:

Page 8: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 8

Versatile Versus Dedicated Equipment

Page 9: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 9

Flow

The following lean practices merit strong consideration:

(1) Pull system

(2) One-piece flow

(3) Cellular operation

(4) Product orientation layout (5) Balanced operations

Page 10: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 10

Cellular operation

Operations must be tied together in work cell.

U cell: the best use of floor space

Page 11: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 11

Flow Analysis Techniques

Flow analysis determines the path that every part takes through the plant, which minimizes

(1) distance traveled (measured in feet),

(2) backtracking,

(3) cross traffic,

(4) cost of production.

Page 12: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 12

Flow Analysis Techniques

Flow analysis will assist the manufacturing facilities designer in the selection of the most effective arrangement of machines, facilities, workstations, and departments.

If you improve the product flow, you will automatically increase profitability.

A core principle of lean manufacturing is the product-oriented flow layout.

Page 13: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 13

Flow routing

To establish the best arrangement of equipment, following four techniques are used:

1. A string diagram

2. A multi-column process chart

3. A from-to chart

4. A process chart

Page 14: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 14

Flow routing

Example 1: 5 part-8 workstation layout.

5 parts: 1, 2, 3, 4, 5;

8 workstations: R, A, B, C, D, E, F, S.

R: receiving station

S: shipping end

Page 15: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 15

String diagram

Efficiency = 35/67 = 52%

Where is the number 35 from?

Upper lines: jumping;

Lower lines: backtracking.

Page 16: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 16

String diagram

Efficiency = 35/67 = 52%

Where is the number 35 from?

C-D: four paths

B-D: two paths

A-C: four paths

D-S: three paths …,

Page 17: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 17

Improved string diagram

Efficiency = 35/57 = 61%

How efficiency can you make this layout?

Page 18: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 18

Multi-column process chart

It uses the same routing information as used in string diagram, but in different view.

Page 19: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 19

From-To Chart

The from-to chart is the most exact technique of the three. We can develop an efficiency that considers the importance of the parts. Up until now, we have considered each part as equal in importance, but the quantity and weight of each part was recorded and should be considered.

(Example 1 continued)

Page 20: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 20

From-To Chart

From-To Chart of Part 1 with an equal importance value of 1.

The routing of Part 1:

RABDCFS

Page 21: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 21

From-To Chart

From-To Chart –Alphabetical Layout for all 5 parts considering the importance values.

Page 22: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 22

From-To Chart(Original)

From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.

Upper triangle matrix:

P.P. = Importance value X forward step(s)

Lower triangle matrix:

P.P. = IV X (2 FS)

Page 23: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 23

From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.

Efficiency = 283/1077.5 = 26%

From-To Chart(Original)

Upper triangle matrix:

P.P. = Importance value X forward step(s)

Lower triangle matrix:

P.P. = IV X (2 FS)

Page 24: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 24

From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.

From-To Chart(Improved)

Upper triangle matrix:

P.P. = Importance value X forward step(s)

Lower triangle matrix:

P.P. = IV X (2 FS)

Page 25: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 25

From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.

Efficiency = 283/548 = 51.6%

From-To Chart(Improved)

Upper triangle matrix:

P.P. = Importance value X forward step(s)

Lower triangle matrix:

P.P. = IV X (2 FS)

Page 26: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 26

Flow Diagram

The flow diagrams show the path traveled by each part from receiving to stores to fabrication of each part to subassembly to final assembly to packout to warehousing to shipping. These paths are drawn on a layout of the plant.

The flow diagram will point out problems with such factors as cross traffic, backtracking, and distance traveled.

Cross traffic:Where flow lines cross. Cross traffic is undesirable and a

better layout would have less intersection paths. Anywhere traffic crosses is a problem because of congestion and safety considerations.

Page 27: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 27

Flow DiagramOne part Toolbox

Page 28: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 28

Page 29: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 29

Page 30: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 30

Page 31: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 31

Where Can One-piece Flow Processing Be Applied?

A, B, C, D are workstations, and the bar indicates the cycle time. The dash line shows takt time for the processes.

Page 32: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 32

Where Can One-piece Flow Processing Be Applied?

1.The largest cycle time in the line should be less than takt time.2.The line should be balanced (The cycle times should be even).

Figure-13 shows re-balanced cycle times for the line. To balance the line, process D is taken off form the line.

Page 33: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 33

Balancing Concerns

Bottlenecks: overloaded work stations (large cycle time stations) that do not have enough capacity for the prescribed load.

Bottlenecks dictate throughput.

Time saved at a non-bottleneck saves the system nothing.

Using a non-bottleneck 100% of the time does not produce 100% utilization.

The capacity of the system depends on the capacity of the bottleneck.

Page 34: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 34

Managing Bottlenecks

Establish time buffer before each bottleneck.

Control the rate of material feeding the bottleneck (gate operation).

Do everything to increase capacity of bottleneck.

Adjust loads, change schedule. Loads that can be split, should be.

Page 35: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 35

Push or Pull?

In a push system, the traditional manufacturing, items from one workstation are “pushed” onto the succeeding workstation indiscriminately, regardless if that plant is ready to process the items or not.

The material movement is scheduled by ‘plan.’

That plan is made some time before and based on forecasting.

This is a production-oriented approach.

Page 36: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 36

Push or Pull?

A push system

Page 37: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 37

Push or Pull?

The main advantages of push system are:

(a) It spreads overhead cost and continuous utilization of people and equipment.(b) It allows for the development of well-integrated production plant.

(c) It is most familiar to the employees.(d) It has the flexibility to produce various product types.

Page 38: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 38

Push or Pull?

The following problems may occur in push system:

(1) High inventories (or WIP)(2) Potential quality problem (3) High floor space(4) Poor communication(5) Slow responses to problems(6) Over production or shortage(7) Queuing or starvation

Page 39: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 39

Push or Pull?

In a pull system: production is triggered by the demand at the final stage. At each intermediate stage, it is triggered by its succeeding stage(s)—this process is carried all the way from the final stage to the beginning stage. Thus, the production is controlled (i.e., pulled) by demand of the succeeding stage.

The JIT (Just-in-time) system is easily implemented.

Kanban is usually a tool for ‘pull’ production system.

Lean manufacturing likes pull badly. It is a customer-oriented approach.

Page 40: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 40

Push or Pull?

A pull system

Page 41: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 41

Push or Pull?

The main advantages of the pull system are: (a) It is relatively inexpensive as it does not

require a comprehensive entourage of employees and information processing equipment to be functional.

(b) Inventory is not perpetual.(c) The production model reflects the actual

production better. (d) The approach leads itself to a very simple

control mechanism, best known as kanban system. The workers working in a kanban controlled production line only need to follow the simple rule: No kanban, no production.

Page 42: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 42

Push or Pull?

The disadvantages of the pull system are:

(1) People and equipment may not be fully in use at all times.

(2) No detailed plans.

(3) People are unfamiliar with a pull system.

(4) It does not maintain the same level of flexibility as push system.

Page 43: Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.

Ch-5 Flow Analysis 43

Push or Pull?

Spearman and Zazanis (1992) examined the behavior of push and pull production systems. After comparisons, they included three conjectures:

(1) pull systems had less congestion.(2) pull systems were inherently easier to control.(3) the benefits of a pull environment owed more

to the fact that WIP was bounded than to the practice of “pulling” everywhere.