Presented by Michael Davies CFMS-ASRC Business Manager
CFMS-ASRC
Bristol, September 2011
![Page 2: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/2.jpg)
advanced simulation research centre
![Page 3: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/3.jpg)
TRANSFORMING SIMULATION What is CFMS?
“CFMS is an independent, not-for-profit organisation, committed to
accelerating the delivery of more intuitive and powerful design
processes.”
![Page 4: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/4.jpg)
Rolls-Royce data-strictly private
CFMS Limited
• A not for profit company, limited by guarantee has been established to manage delivery of the CFMS Vision via the CFMS Framework*
• The company is known as CFMS Ltd
• Member Companies are: • Airbus
• BAE Systems
• Frazer-Nash Consultancy
• MBDA UK
• Rolls-Royce
• Williams F1
• Activities carried out by CFMS Ltd include: • Technology road-mapping
• Project scoping and facilitation
• Project management support
• Facilities provision
• All services are available to organisations beyond the Member companies of CFMS Ltd
The CFMS Framework is a co-ordinated programme of research and technology deployment projects, the scope of which has been defined to achieve the CFMS Vision
*
![Page 5: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/5.jpg)
TRANSFORMING SIMULATION
Advanced Simulation Research Centre
Created to challenge our perceptions of a
“traditional working environment”
• On-site HPC cluster
• IT Lab (flexible infrastructure)
• Visualisation suite
• Integration room
• Collaborative working areas
• Hot-desking and touchdown-desking
• Meeting rooms & conference facilities
• Break-out areas
“An inspiring and stimulating environment to encourage collaboration and
innovation, alongside the cutting-edge facilities required to support the
development and demonstration of the latest technologies”
![Page 6: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/6.jpg)
TRANSFORMING SIMULATION
Associates Scheme
Primary method of CFMS engagement
Brings together end users, technology developers
and researchers
Unique programme of activities to improve
awareness and identify longer-term developments
• Best practice exchange
• Road-mapping
• Demonstrations
• Networking
• Forums
• Technical notes/white papers
• Newsletters
“Introduce organisations to technologies and methodologies which will make their
design processes quicker, cheaper and more effective”
![Page 7: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/7.jpg)
October 2010
7
![Page 8: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/8.jpg)
Facility elements
Capability Lab a facility to support collaborative research & development
HPC – High Performance Computer
IT laboratory a facility to support R&D in emerging IT architectures
![Page 9: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/9.jpg)
An open plan office space, with flexible partitioning
Focus on supporting CFMS programmes and methods
developments
Front office:
Desktop clients with docking stations for ‘approved’ laptops
Wireless internet access,
Wired access to HPC and IT Lab
Visualisation/Integration/Conferencing/Meeting Rooms
Back office servers:
18 Xeon-based severs (development, code, email,…etc)
3.6TB storage
Software stacks
Capability Lab
![Page 10: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/10.jpg)
HPC
2880 core clusters – latest Nehalem (six-core) chipset
- Fast file server : 60TB usable
- QDR IB interconnect, 40Gbps bandwidth
- IBM iDataPlex, with water-cooled rear doors
1440 cores Rolls-Royce, 720 cores Airbus, 720 cores third-party
Head/login nodes
2 x PostProcessing-nodes
2 X Visualisation nodes, with Nvidia Quadroplex 2200S4 GPUs
OS: RHE v5.4
Scheduler: SunGridEngine
![Page 11: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/11.jpg)
Rolls-Royce data-strictly private
Facility floor plan
*
Ground Floor Layout
ITLab HPC
v
vv
v Venus Integration
Room Mars Visualisation
Zone
Game Zone
Break-out Zone
15
16
17 18 19 20
22
21
23 24
Venus Integration
Room
Mars Visualisation
Zone
Max capacity = 25 people (8 people in baseline layout)
Max capacity = 25 people (12 people in baseline layout)
![Page 12: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/12.jpg)
Rolls-Royce data-strictly private
Facility floor plan
*
First Floor Layout
CFMS
ASRCASRC
ASRCASRC
Saturn Room
Jupiter Room
Mercury Room
Neptune Room
Transit Zone
5
6
4 3
1 2
Neptune Room
Mercury Room
Saturn RoomJupiter Room Transit Zone
7
8
9
Max capacity = 40 people in seminar room layout (24 people in training room layout)
Max capacity = 25 people in seminar room layout (16 people in training room layout)
Max capacity = 20 people in seminar room layout (6people with baseline layout)
Max capacity = 14 people in seminar room layout (4people +2 desks with baseline layout)
Capacity = 6 people with baseline layout
10
11
12
13 14
![Page 13: Cfms project (asrc)](https://reader034.fdocuments.net/reader034/viewer/2022051816/54755642b4af9f980a8b5a06/html5/thumbnails/13.jpg)
Rolls-Royce data-strictly private
Organisation
Member Organisations
RR, Airbus, Williams F1, Fraser Nash, MBDA, BAE
CFMS Board
B Barzegar, I Martindale, P Best, N Buckland, A Burns, G Gapper, B Davis
ASRC Board
Martin Aston
Frank McQuade
Carolyn Webb
Andy Williams
Implementation
Manager
Mike Davies
Business Manager
Zoe Thorne
Administrator
Neil Whyld Paul Edwards
Outreach Manager Technical controller Operations/Facilities
Nathan Harper
IBM Support