Transcript of CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for...
![Page 1: CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for 30/90 day (150%/133% cut off) Production: 128%/179%](https://reader036.fdocuments.net/reader036/viewer/2022072015/56649ebb5503460f94bc2e1c/html5/thumbnails/1.jpg)
CESM WG co-chair meeting
March 18 2014
![Page 2: CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for 30/90 day (150%/133% cut off) Production: 128%/179%](https://reader036.fdocuments.net/reader036/viewer/2022072015/56649ebb5503460f94bc2e1c/html5/thumbnails/2.jpg)
Announcements/Updates
CSL Usage:Development: 73%/113% for 30/90 day (150%/133% cut off)Production: 128%/179% for 30/90 day (220%/190% cut off)
• Extension to CSL will appear May 1• LandIce/Paleo/CCVWG meeting updates• Gokhan’s seminar today!• Other updates/announcements?
NO MEETING NEXT WEEK (BVSD SPRING BREAK)
![Page 3: CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for 30/90 day (150%/133% cut off) Production: 128%/179%](https://reader036.fdocuments.net/reader036/viewer/2022072015/56649ebb5503460f94bc2e1c/html5/thumbnails/3.jpg)
CISM Development Timeline
June, 2013(CESM1.2)
June, 2014 June, 2015(CESM1.3)
June, 2016(CESM2)
CISM1 physics (SIA)
CISM2 code base included in CESM
One-way coupling(no feedbacks from CISM to
other components)
Physics
Coup
ling
Dycore
CISM2 stand-alone release
Runoff / calving fluxes -> POP
CISM2 in CESM(nominal sci. support)
Two-way couplingwith CISM1 physics(and ideally CISM2)
Two-way couplingwith CISM2 physics
Development & testing of robust CISM2 dycore
Testing of CESM-CISM2 coupled system
Additional testing and support for CESM-CISM2 (relative to 1.3 release)
Scientific validation oftwo-way coupling
with CISM2 physics
CISM2 physics (parallel, 3d, 1st-order accurate dycore)
test & validate parallel conservation of mass & energy schemes
test & validate working isostasy for CISM2 in CESM; test & validate
enthalpy scheme for energy conservation
Glacier areas -> CLM
Topography -> CAM(no immediate plans to bring to trunk) Complete conservation
Limited support for Antarctica
Scientific evaluation oftwo-way coupling
V & V toolkit (in collab. w/ PISCEES)
CISM2 in CESM(additional sci. support)
CISM2 physics (parallel, 3d, 1st-order accurate dycore)
![Page 4: CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for 30/90 day (150%/133% cut off) Production: 128%/179%](https://reader036.fdocuments.net/reader036/viewer/2022072015/56649ebb5503460f94bc2e1c/html5/thumbnails/4.jpg)
CVCWG Timeline
2014 2015 2016CESM2.0
Release LE data
Complete 30 member LE
Decadal prediction ½°
Single forcing at ¼°
¼°CAM5-SE AMIP and coupled including full suite
Perturbed physics: land and atmos
Time slices at ¼°
CESM1-IAM 1°
Decadal Prediction
CESM1/GLIMMER-CISM
Hurricane effects (CCSM4 1°)
BGC RCP runs at 1°
Complete CESM1-CAM5 single forcing runs
CESM2/BGC at ¼°
1/8° CAM5-SE
Time slices at 1/8°
Decadal prediction ¼°
5-member AMIP CAM5 1° and ¼° (1900-present)
8-member POGA w/o radiative forcing changes
CESM1/CAM5 (1920-pres)
![Page 5: CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for 30/90 day (150%/133% cut off) Production: 128%/179%](https://reader036.fdocuments.net/reader036/viewer/2022072015/56649ebb5503460f94bc2e1c/html5/thumbnails/5.jpg)
PaleoWG updateMarch 2014
• Last Millennium (LM) “mini-MOAR” simulation to be started this week.
• Plan to submit LM ensemble to CMIP6; requires DECK experiments to be completed with CESM1.1.1(CAM5) FV2x1.
• Release of LM simulation ensemble in Fall 2014.
• Stable water and carbon isotope coupling among components: discussions needed among relevant WGs
• Plan to support tools for creating datasets for paleo runs only for CESM1.1.1 and later.
![Page 6: CESM WG co-chair meeting March 18 2014. Announcements/Updates CSL Usage: Development: 73%/113% for 30/90 day (150%/133% cut off) Production: 128%/179%](https://reader036.fdocuments.net/reader036/viewer/2022072015/56649ebb5503460f94bc2e1c/html5/thumbnails/6.jpg)
PaleoWG CESM2 development (in progress)
Abiotic radiocarbon
in POP2
Biotic carbon isotopes in
POP2
CESM1.3 coupled water
isotopes
2014 2015 2016June 2014
June 2015
June 2016
Pa/Th and Neodymium
Carbon isotopes in CAM5 and
coupler
Water isotopes in
CAM5, POP2,
coupler
Water isotopes
in CLM4.5 CICE4, RTM
CESM1.3 coupled carbon
isotopes
Carbon isotopes in
RTM (?)
Transition carbon isotopes to CAM6, CLM5
Transition water isotopes to CAM6, CLM5, CICE5