Ces 4.1 Answer Key
-
Upload
michael-honrada -
Category
Documents
-
view
4.116 -
download
481
description
Transcript of Ces 4.1 Answer Key
AAET
AAETTransistor
AAJTA large temperature drop across the drier.
AALB30 litres pr. nautical mile.
AAWElowering of at least one lifeboat after any necessary preparation for launching
ABAFHe has control of the navigation and movement of the vessel
ABAMCavitation
ABBGFigure 1
ABDQWater Pump Pliers
ABENnot less than 180m
ABFCOne long blast followed by two short blasts at intervals of not more than 2 min
ABHVForward breast line is given by C on the figure
ABKJBy soft machine scrubbing with red pad and a renewing of polish only where there is heavy traffic (f.i. in the middle of corridors and not the whole floor).
ABLHYes, even if he/ she did not die while onboard.
ABPJThe employer/master.
ACAJSecure hatches
ACBXTo avoid pollution.
ACGCEnsure that the chart and the GPS use same datum
ACKJChemical foams
ACMUAtmosphere is not combustible in either situation.
ACPGBy smothering and also by providing some cooling
ACXK2 h, 2 candelas (about 1,7 mile range at normal meteorological sight)
ACYLNotify the Chief Officer or officer on duty and run the ventilation for at least 15min
ADLSCharts, nautical publications, GMDSS log, Oil Record book(s)
ADNNMachinery spaces of category A
ADTBBecause they wanted to make sure that the ship could be turned safely.
ADVCYes - any consular official can detain a vessel
AECJThe water can be applied in a fine spray starting from the front in a sweeping motion.
AECLSodium Hydroxide Solution
AEFBFirst aspect confirm death. Notify company, and next-of-kin, and if on board to be advised and comforted as may be required. Arrange to have body moved to freezer area. Notify local agents and British Consul when abroad. Entry to be made in Record of Bir
AEKVEvery three months
AEMQRed
AENETo prevent the steam and water in the boiler from discharging out by the feed line, if a feed line fracture or a joint in the line blows.
AEOGTo determine wether the ship is seaworthy
AEPTDisperse or dissolve the oil into the water
AEPVYes, the bottles can be dumped if they are ground so that the resulting particles can pass through a screen with 25 mm openings
AFCL5% by volume.
AFRFroutine
AFTYselect the telex in on-line position
AFYYWhen unsaturated chemical compounds are heated under pressure, the molecules react with each other and form large molecules.
AGCHFlat file
AGECA tank is only to be considered as gas free when no traces of flammable and/or poisonous gas are measured and in addition O2 content is measured to be 21 %.
AGGLAll mentioned.
AGGMFairlead is given by C on the figure
AGLK30 months / 5 years
AGRJGet out of the engine room as soon as possible.
AGXIHigh delivery pressure
AGYCSpecific heat
AHCFdoes not sustain burning or continue melting after being totally enveloped in a fire for a period of 2seconds
AHCJThis call will normally be followed by a DSC acknowlegment call
AHGMEmergency Position Indicating Radio Beacon.
AHIC23:23
AHIFat least 12 distributed on both sides of the ship
AHJUTo avoid uncontrolled decomposition the cargo should be discharged overboard.
AHTRThe HSE has authority only where an interface exists between the ship and shore e.g. means of access regs. In a serious case, they would contact the local Marine Officer
AHWAVessels with bulbous bow, LPG- and LNG-vessels must provide their own projector
AHWEPanama lead is given by C on the figure
AHWFTell the jettyman to stop loading immediately.
AHXBoutside the sea areas A1, A2 and A3
AIGKGood eyesight and able to communicate with the OOW (officer on watch)
AIHGWater-tube boilers are more efficient and contains less water. They suffer from major damages when run dry during operation.
AIIWThe bottom washing starts whilst there is still a small amount of cargo in the tank.
AINUChecking that passengers and crew are suitably dressed and lifejackets correctly donned
AINYF1B
AIQEStop the washing process and not resume until the oxygen content in the tank is below 8%.
AISXNear to the deck, crawl out keeping your face as near to the deck as possible.
AISYTest pressure equal to 1.5 times the maximum allowable working pressure
AIWEhave separate draining pumps of sufficient capacity
AIWHStart water-spray
AIXAA 2 stroke engine has an ignition every time the piston reaches its top position.
AJBFIn Section 6 of the Act.
AJMXVitamin B
AJSPSARSAT-COSPAS EPIRBS
AJUHEvery four years
AJWXinterrupt
AJXS0,5 - 1 watt
AKAHCavitation
AKAJInsufficient amount of bowl closing water
AKFYAny of the below
AKQAAt such locations that at least two jets not emanating from the same hydrant may reach any part of the ship normally accessible to the crew while the ship is being navigated, one of these jets coming from a single length of hose (the other jet may come from a connection of several lengths of hoses)
AKRPDuring loading/discharging of persistent/non persistent oil?
AKRT1 min
AKRWthe sea areas
ALENOrange
ALIJYes.
ALUCPublic announcement system to be used for informing. The cabin attendant should proceed to their cabin section, and search all cabins. If the area is inaccessible report to their superior.
AMAXtwo efficient painters
AMDHAlarm instruction
AMDJAct according to the check list "during crude oil washing".
AMEGG2B
AMGWEmployment agreement, report on seamen and documentation that the seafarer has the necessary qualifications, health certificate, record of service
AMHQHe shall arrange for proper care within what he may find to be reasonable expenses
AMMREvery 5 years
AMPXIn the cargo tanks we use either float or radar type gauge to control the liquid level
AMWOStretch a painter from fore to aft
AMYIred
ANBUIn the port where the occurance took place/ first port of call after the occurance took place - postponed only in exceptional cases and pursuant to provisions.
ANDGstarting and operating the lifeboat engine
ANMLProtect against corrosion
ANMNFresh water system failure
ANNGCapacitor
ANOY4
ANQSSteering gear and alarm system
ANSHAs the piston passes "The Lubrication Points" in an upward direction.
ANSKDecreasing the speed of rotation will decrease the discharge pressure.
ANSMRectifier
ANXCThe Chief Engineer
AOBPOpen steam valve very slowly, considering system expansion.
AOBRValve in the outlet line partly closed.
AODGImmediately stop the discharging.
AOHGOnce a week.
AOHJThe AB's Certificate (or equivalent), the seaman's discharge book, the medical certificate
AOJD17 - 20 C
AOMDPiston rod
AOML2.15 V
AOQQMaritime Rescue Coordinating Centre
AOWNMaritime Mobile Service Identity
AOYBdetails of the general emergency alarm signal consisting of seven or more short blasts, followed by one long blast.
APAOThe water level is between the water cock connection of the boiler, and the bottom of the gauge glass. It is safe to put feed water into the boiler.
APGHHave all scuppers plugged
APGNNotify Ch.Eng., find cause of leakage, remedy the leakage and then immediately start cleaning of the tank top.
APHLCollect water/cargo to be pumped out
APKMThey are going to weigh the anchor
APKUAfter 20 minutes
APLTCollect rain water
APRH20 000 dwt
AQAMSufficient amount for fifteen hours operation at full capacity
AQBLThe assistance of the vessel is no longer required
AQBNthe sun
AQCAA thick rope to tie up the ship.
AQCCOSC to be designated by an appropriate RCC or RSC.
AQEOBy soft machine scrubbing with red pad and a renewing of polish only where there is heavy traffic (f.i. in the middle of corridors and not the whole floor).
AQEY1,5 Bar
AQHEbooster pump coming on the line and discharging properly
AQSAFoam that is not a "alcohol resistant" type and water spray.
ARAFTwo lettres
ARAJ10-200
ARGAan EGC-message destined for ships of a certain company
ARGGMeans of Access Regs
ARJLIt requires less maintenance
ARMXAll answers
ARNTExhaust valve
ARQGWith IOPP certificate we mean International Oil Pollution Prevention certificate and the ship is classed to prevent oil pollution
ARSYJacket water cooler is clogged.
ARUMNo, food waste can not be dumped overboard
ASQCDensity, viscosity, flow rate, temperature, gravity disc diameter
ASQXAn approved hook with a locking device
ASUJRegulating freon liquid flow to the evaporator.
ASXUposition
ASYNthe direction of the electrical field
ATCSThe ITU List of Callsigns and Numerical Identities of Stations used by the Maritime Mobile and Maritime Mobile-Satellite Services
ATLVbe secured in a manner as not to interfere with abandonment procedures
ATVXground wave
AUAY85% of the gas can be discharged into the space within two minutes
AUBY8 minutes
AUDNJ3E
AUIHMilk and cheese
AUIJuser of the installation
AUNFBy producing and making available anonymous reports of incidents and accidents
AUSG1 VHF RT + DSC+ DSC watch receiver - 1 or 2 SART - 1 NAVTEX and/or 1 EGC receiver and/or 1 HF NBDP watch receiver - 2 or 3 VHF portable - 1 EPIRB - 1 MF RT + DSC+ DSC watch receiver - 1 HF RT + DSC+ DSC watch receiver
AUYIOil Detection Monitoring Equipment.(ODME).
AVBUthe speed of light
AVCHLower the viscosity and improve purification.
AVDConly to certificate holders
AVEDApplying 12 - 15% nitric acid on tank surfaces, either with a brush or spray; then washing off after 10 - 20 minutes using copious amounts of fresh water?
AVFYAt exits and in corridors
AVGTThey can have hold back hooks not subject to control station release providing the emergency plan details a person to close them.
AVGUjump from a height of not less than 4.5m into the water without damaging the suit or being injured
AVHNShip's name, Official number, Length, breadth and draft, type of vessel, type and size of engine, name and address of the registered owner
AVOCAir in the fuel oil system.
AVSJTo prevent combustion gases to flow back and enter the burner.
AVXJA substance with a viscosity equal to or greater than 25 mPa.s at the unloading temperature.
AWAOTo improve the sealing surface between valve and seat during operation of the engine (compensate for the bending of the valve disc caused by combustion pressure).
AWAWSalted meat and ham, potato dumplings, mashed swedes, boiled potatoes.
AWMIThroughput too high.
AWPRBroken water seal.
AWUUAny of the mentioned alternatives.
AWWHHe is looking for navigational dangers.
AWXGTo ensure that the proper residuals of treatment chemicals, as specified, are maintained all time.
AWYWThe Master?
AXEVNCS common channel
AXHHOn the Scene Co-ordinator
AXRHTo make sure gas pressure can enter freely on top of and behind the piston ring
AXSBAll the listed alternatives
AXTUSlagging.
AXVMOnly when the design temperature is below -55oC and the tank is not independent type C , we must have full side ballast tanks
AXYUAir draught is given by C on the figure
AYHHnine digits, beginning by 4
AYOU 2182 Hz
AYQIHigh air/fuel ratio rises the condensation temperature, and thereby reducing the safe limits between normal operation and condensation temperature.
AYRGYes, one if the ship is under 500 brt. And two if the ship is over 500 brt.
BABOTell the deck officer to hoist the red flag. (letter " B ") day signal, or red signal light in the signal mast during night time
BABSChecking that life-jackets are correctly donned
BACN5 compressions after every 1 inflation
BADLIn case of major work the fire main shall be under pressure.
BAEBLoading cargo "on top" of the oil and cargo residues in the sloptanks
BAEYin radiotelex-traffic in the MF/HF bands between ship and shore stations
BAFTFluids (liquids).
BAIEone buoyant line, not less than 50m in length, of sufficient strength to tow a liferaft
BAIFone set of fishing tackle
BAIGAll ships of 500 tons gross and upwards
BAIHQuay is given by A on the figure
BANYmust be replaced before the expiry date is exceeded
BAPVthe use of SART transponders
BAQTTo confirm to public supervisory authority that the requirements for the seafarer's service on board have been checked, are satisfied and that the compliance with the requirements has been duly documented.
BAUNSemi-refrigerated gas carrier can be discharged by pressurising the cargo tanks or condensate the cargo to shore or another cargo tank or boil of the cargo
BAUPLatex
BAWIHe will find a lubricating chart in the maintenance manual
BBAU8 tons.
BBCCa jack-knife attached by a lanyard
BBDFRelease gripes
BBHFPermits the passage of vapor but not of flame
BBVQ A class fire door self closing
BCARStop operation?
BCCECareful ahead manoeuvring
BCETAt the beginning of every watch
BCKQCarry out a risk assessment, make use of available equipment, and instruct staff on lifting techniques
BCLOIsomer compounds is substances with same chemical formula but different characteristic
BCQLTwistlocks?
BCTNMilk
BCVPFor at least three years
BCXUCalculation 3 is correct.
BDNBHe wants the Chief Officer to organise a lifeboat drill
BDPJBringing the engine up to sufficient number of revolutions for combustion to take place and engine to run.
BDRDAll members of the crew
BDRIMake the tug fast on port shoulder to pull
BDXVSame as certificate to which it applies
BEJIUse a water extinguisher to put out the fire
BEJMReject the offer?
BELEBleed off may be taken from any of the cargo pumps.
BEOPBy muster lists exhibited in conspicuous places
BEXXSend a distress message and collect survival suits / thermal bags.
BFBFRocket parachute flares
BFCWif the whip-antenna is replaced by an antenna of about the same length as the original one
BFDTIdentify the extent of damage to own vessel and take necessary steps to safeguard the complement and the vessel.
BFENTug towing line is given by D on the figure
BFGXToo high amplification
BFGYThe Chief Officer wants the 1st Engineer to empty the starboard bilge in hold No. 5
BFHQShe will turn to port and the speed will drop gradually
BFHWThat the combustion chamber of the boiler is checked being empty for oil and that the pre ventilation function prior to ignition is functioning.
BFIKBy soft machine scrubbing with red pad and a renewing of polish only where there is heavy traffic (f.i. in the middle of corridors and not the whole floor).
BFINdon a lifejacket without assistance
BFIRAll the mentioned alternatives.
BFJIPre-wash the tanks with cold water first?
BFKFAmmonium nitrate?
BFNOan efficient radar reflector (or radar transponder)
BFQWan EGC-message destined for ships with the same group call number
BFSLNo openings in sides and bottom
BFTH6 air changes per hour
BFTITo minimize the scale formation, the Sea Water outlet temperature should never exeed 50 C
BGBBFuel with a flash point of 44C or more
BGDMThey have had problems securing the gangway
BGJKLube oil cooler
BHFXrescue boat
BHIJ326.6 Mt
BHSEA signal representing 0 = "low" and 1 = "High"
BHTCfading
BHTY5 - 10 Degr. C.
BHUWProtecting cloths, safety shoes, gloves, goggles, earmuffs.
BHWNOn area A1 this function is based on the use of SART transponders
BINDMinimum eight crew members.
BINYbe secured in the lifeboat (except boat-hooks) by lashings, storage in lockers, compartments, brackets or similar arrangement
BIOW100 ohm at 0 C
BIPRIn case of bursting pipe, to avoid oil spray hitting adjacent high heat surfaces of exhaust pipes etc.
BIUQRadiotelephony - Single sideband suppressed carrier
BIWPlifebuoy
BIYBThat the MARVS is less than 0,7 bar
BJJWNo, the sea water pumps are still running
BJKRSwelling below the bandage and heavy pain.
BJPVControlled closing of fire doors
BJREA deck officer or certificated person shall be placed in charge of each survival craft to be used.
BKGJWhen the design temperature is below -55oC and the tank is not independent type B or C, we must have full secondary barrier
BKGK40 meters
BKKMImprove the scaling surface function, increase the service time of the exhaust valve in the engine.
BKNU245329000
BKQGThey will be closed if the ship get a damage on the ships hull, and taking in water. It will prevent the water to fill the whole deck. In case of fire they can also be used to stop the fire and smoke from diverge.
BKTWA device which prevents an operation of equipment to take place, to allow access or maintenance to be carried out
BLAKMaximum cargo tank pressure on an fully refrigerated gas carrier can be 0,7 bar
BLARChannel 16
BLBFIonisation.
BLCDSOLAS
BLDCRadar transponder
BLDXa sea-anchor with a hawser of more than 10m in length
BLFHAtmosphere is not combustible in either situation.
BLGFTo relieve excessive high pressure in the cylinder to protect the engine from being damaged.
BLIR406,025 et 121,5 MHz
BLWWMaking the grab bucket open and close.
BLXALine throwing appliance
BLXWVHF / W-T
BMESRadiotelex and DSC - Frequency shift keying of carrier with error correction
BMIRIn G3E mode - on duplex basis
BMKPSufficient amount for 15 hours of operation at full capacity
BMLKTo neutralize the acids occurring in the condensate system.
BMTQ- 4 C
BMWYEPIRB
BNEOChannels 6, 13 & 16
BNKJExcessive cooling water velocity
BNLEFigure 1
BNOQPotentiometer, 10 kilo-ohms
BNPFIncrease the dosage of chemicals, and take new test of the water.
BNUCthe use of VHF DSC
BNXPThe main purpose with booster pumps is to increase the manifold pressure
BNXRNo, membrane tanks is normally designed for transport of fully refrigerated cargoes
BOGCweekly
BOGVFigure 3
BOIObrass knife
BOIQAct according to the check list "during crude oil washing".
BOKCWhen a Panama Canal pilot is onboard
BOLTThe method and use of sea-anchors (drogues).
BONMSurvival suit and lifeline
BOTHCheck that the painter is made fast to a secure point and that the sea below is clear
BOTIa DSC-message for all vessels within certain area marked by areference position, given in the DSC message and the degrees are given in southerly and easterly direction
BOTKList of Call Signs and Numerical Identities
BOXPThere is 5 special area where it is forbidden to pump out any sludge or oil residues
BPDKIt could poison the fresh water if leakage occurs.
BPEXBecause they expected the harbor pilot to board the ship at 0730.
BQAQStop all cargo operations and close the deck IG line isolating valve
BQASThe Gulf of Mexico
BQCLSecure hatches
BQDKLubricating oil.
BQFBMF
BQFYAll the answers are good
BQIEMCA
BQKTYes
BQNGThat the shipowner is a Norwegian subject or fulfils other requirements stated in Norwegian acts
BQQRA number of lifejackets equal to at least 10% of the total number of passengers and crew to be placed in the vicinity of the muster stations
BQRJ-79?C
BQYDConnect bonding cable then connect hose.
BRCFthe use of MF and/or VHF R/T
BRDDNAVTEX-receiver
BRJTBridge is given by A on the figure
BRKRUpper Flammable Level / Lower Flammable Level of explosive atmosphere?
BRKUAnti-alcohol foam
BRRNReduce motor speed by about 10%
BRURDo not carry lighters or matches on the tank deck.
BRXDSeparation with correct temperature and low flow rate.
BRXFEither of the mentioned alternatives.
BRYXAfter 20 minutes
BSAQdistress alerting
BSDAwith weak incoming signals distortion is reduced
BSFKa liquid that mixes with water
BSHDMetals
BSJYIf time permits, send someone to try to find him. Notify the agent. Have the seaman's possessions collected and packed by two crewmembers, with three lists of contents. Notify the company.Sign the seaman off in his absence, detailing reason for him/her no
BSMEToo lean ( less than 2% by volume of hydrocarbons) or over rich ( in excess of 15% by volume of hydrocarbons ).
BSMJBoth persons in charge
BSNHFigure 1
BSNIFigure 1.
BSPOanti-seasickness medicine and one seasickness bag for each person
BSTUThe Secretary of State responsible for Shipping
BSVJL(S) = 4 H
BSVKThe Master?
BSYRProvisions on maritime inquiry and death and burial.
BTBLgases, flames, smoke and heat
BTESIt allows the wearer to jump from height of at least 4.5 m into the water without injury and without damaging the life-jacket.
BTHEThe Part Flow System makes it possible to observe the discharge visually for oil content, on older tankers with discharge below the waterline
BTKKConstructed of non-combustible material
BTNTTank top
BTOOloss of suction
BTPMAir from stage one goes through discharge valves in stage one and through suction valves into stage two. In stage two it will be compressed to high pressure air.
BTTWthe applicant on board wishes to have a conversation with a person whose name is known
BTVE9 digits
BUAIBefore the tank is entered, lifeline, rescue harness and compressed air apparatus shall be ready at the relevant hatch.
BUAKOnce a year/18 months
BUCX30 L/nm
BUDWAirway Breathing Circulation
BUFMPlan for safety preparedness
BUGDrequesting an "automatic linetest"
BUOOIt confirms that a ship has been "carved" and allows the Ship's Register to be issued
BUOR16 times 0,17 SDR
BURDEnsure adequate circulation in all conditions of steaming.
BUWV322753810
BVESTwo
BVJNVHF-channel 87
BVJQMuster and embarkation stations shall be readily accessible from accommondation and work areas.
BVKILiquefied gases is defined as chemicals with vapour pressure above 2,8 bar absolute at 37,8oC
BVQC10 minutes
BVTJYes, a ship can be detained on hygiene grounds, but it is more likely that after inspection the hygiene officer would call in other inspectors
BWEGthe nature of distress is unknown
BWEIlisten out on VHF channel 16
BWKEExcessive cooling water velocity
BWKGAs a safety net, for improved cleaning of the fuel oil
BWLW60?C
BWSOEither of the mentioned alternatives.
BWVBAll those listed in the other alternatives
BWWT85 - 90 Centigrades.
BXFYAll personnel onboard (crew and passengers) must be registered to keep a track of number of people onboard.
BXKDequipping of the survival craft
BXPCAs near as possible to the ship's manifold?
BXUAFigure 1
BYAUBy use of a float switch or differential pressure in the liquid receiver
BYINU.S.A
BYKVA throughput of at least 400 litters a minute and a "throw" of 15 metres?
BYKXDo nothing.
BYKYOn area A4 this function is based on the use of HF R/T
BYMICinnamon
BYMK2187.5 and 2182 KHz
BYSGat sea, outside territorial waters, and in a port or harbour
BYSNYes, on a form prescribed or approved by the Norwegian Maritime Directorate
CABBViscosity.
CABE2182KHz
CABTAll of the mentioned actions
CADHAlarm, st.by start, slowdown. shutdown
CAFEWhite or light grey to ensure all minor spills and leakages are noticed and dealt with.
CAFGWhere the ship has passenger spaces below the bulkhead deck
CAGFAhead is given by A on the figure
CAGVExhaust gas temperatures are higher than normal.
CBAHAs instructed by the helicopter pilot
CBBTAbout 80 %
CBECSomeone of at least school leaving age and less than 18
CBHKSearch and Rescue radar transponder
CBHQMaximum 8 hours per day, or 40 hours per week
CBJFonce a month
CBTHWalk to a smoking area inside the accomodation?
CBUIReport to the chief officer or chief engineer.
CBYE12 h
CCCTIn ports only
CCEH200 cm
CCML6 times the hose diameter.
CCNFLeave him in bed or request him to have some fresh air.
CCOEBroken water seal.
CCOFEmergency shut down.
CCSFYou set watch on channel 2182 KHz
CDBNSolid, liquid and gases
CDJYProvide a replaceable wear surface for the pump housing/impeller.
CDRHComputer-aided maintenance
CDVTAir from stage one goes through discharge valves in stage one and through suction valves into stage two. In stage two it will be compressed to high pressure air.
CDWFA duly completed application with certificate etc. must be made to the public supervisory authorities as an endorsment/ qualification document
CDWKAutomatic gain control
CEBMToo little gas in the system.
CEHBAVR and speed governor
CEIB98 Centigrades.
CEICCO2
CEJUBecause they wanted to make sure that the ship could be safely turned.
CEMEShip owner has Document of Compliance issued, and vessel is assessed and holds all statutory certificates
CEOVVHF and MF
CEPQBecause a cook handles food and beverages and could easily be a spreader of viruses and infections.
CETSFor minimum 3 years
CETXmeasured by the "dopler" shift in the signals
CFBLBecause he was married.
CFBMAll answers are goods
CFDUAllow removal of the sensor also when liquid is flowing in the pipe.
CFGHWhen manoeuvring?
CFHBR(L) = R(s)
CFOPStrainer in operating water low-pressure side is clogged.
CFSAThey will be closed if the ship get a damage on the ships hull, and taking in water. It will prevent the water to fill the whole deck. In case of fire they can also be used to stop the fire and smoke from diverge.
CFWGA bolt in every hole
CFXDThey can bring any seafarer involved in an incident on the UK coast to court and provide evidence regarding the incident
CFYNTo obtain a proper sealing and correct distance between piston and cover in TDC position
CGAH1:4
CGAJThe smallest diameter piston is the stage two piston.
CGDWF1B
CGERa manually controlled lamp fitted on the inside
CGONReport to bridge or duty officer, actuate the fire alarm, call the persons around the fire and join the fire squad
CGUHInsulated on both sides with approved non-combustible material
CGXSThe clearance between the rocker arm and valve pushrod.
CGXVHe should be aware of the steel thickness of the valve
CHHVDonning of fire protection clothing
CHMAStop discharge, inform USCG and Qualified Individual.
CHNUA 2 stroke engine has an ignition every time the piston reaches its top position
CHPKWith this type of material the hatches should not be battened down. The fire can only be extinguished by using large quantities of water.
CHQAdoing a "linktest"
CHQCa light plus a whistle
CHRBMake it possible to retain most of the recovered oil in the primary slop tank, while cleaner part of the water will flow into the secondary slop tank, where it can be re-used as wash-water
CHRUThe speed should be less than 5 knots, normally 3 - 5 knots
CHXSSafety shoes or safety boots
CHYNadjust the threshold level for admitting signals and refusing noise
CIAGAll of the mentioned equipment.
CIIOChemical, physical or mechanical foams
CIMU1.25 times the maximum working pressure
CIPMAll alarms are reengaged prior to switching to UMS-mode
CIUK1 year
CIULmonth
CJLYthe use of SART transponders
CJNMGreat circle
CJNRthe height of the antenna
CJUBDeck cargo shall not block emergency exits or exits from accommodations or machinery spaces.
CKAUOne minute.
CKAY0.7 bar?
CKBYYes, the turning diameter will increase if I reduce speed
CKFAComparing input and output values against a documented standard
CKHN20 seconds or less
CKHS75 Kg
CKIHit allows the wearer to jump from height of at least 4.5 m into the water without injury and without damaging the life-jacket
CKII48 hours
CKLTMAYDAY
CKPAPrevent excessive furnace heat losses
CKPXIn case of a bursting pipe, to avoid oil spray hitting adjacent hot surfaces or coming into machinery air intakes
CKRMPeriods not exceeding 3 months
CKSH15 compressions followed by 2 full ventilations.
CKSJDiamond and graphite.
CLAVThe water supply hoses contain internal wires that act as conductors
CLIBAllow for increase in water volume
CLNBare a fire hazard because they are liable to spontaneous combustion
CLPRAll of these.
CLUSAt least two sets of instruments to detect each type of gas expected to be encountered?
CLUUBlow the boiler and renew water until the PH-value is normal again.
CLWK40 gr of each
CLYVThe master of a ship who coordinates on scene search and rescue operations
CMETkkkk
CMJBNot more than 10 minutes
CMLLThe Master
CMOAFor all vessels.
CMTSall sea-areas (A1 to A4)
CMWCQuay is given by A on the figure
CMWHPort quarter is given by D on the figure
CNLMThey tend to contain heavy vapours inboard during cargo operations?
CNNXA sink is always needed irrespective of the type of the dishwashing machine provided.
CNOSAbove the bulkhead deck
CNQGonly be given receipt when the ship is actually able to give assistance
CNQHwatertight, as far as possible,except for drain holes in the container bottom
CNSUDiesel oil leakage to the lub oil system.
COHG All the mentioned alternatives
COHVTo the Master
COJVVitamin C
COKQImmediate availability of water for at least one effective jet of water from any hydrant in an interior area
CONYalways passed on to a LUT
COOQthe volume
COVLThe two gases is Freon 22 and carbon monoxide
COYWall the answers are good
CPAKEndeavour to hold the anchored/yawing vessel steady
CPDRAny of the listed alternatives.
CPEQThe difference between possible maximum and minimum measurement
CPIYIf any of the main registered particulars e.g. length were changed
CPKJability to make weak stations audible
CPLHAct 18 June 1971 relating to enrolment of employees on board ships.
CPNValmost rectilinear
CQDWThe "Abandon ship" signal is not specified, only the general emergency alarm signal is stated
CQHRThe Norwegian Maritime Directorate
CQUIOnce every month
CQXUCaps and cocks should be closed at all times, to prevent ingress of water into the engine room in case of tank bottom damage.
CQYKLenght overall is given by B on the figure
CRBDall of the alternatives together
CRBQSmoke going out the stack
CRCRis intended for radio traffic onboard of the own ship
CRILhave permanent boarding arrangements on both sides to enable persons in the water to board the lifeboat
CRQBGive the coating time to "weather out" the trapped solvents using good ventilation, and recover it's hardness again, prior loading the next cargo?
CRQTPressure to electric current converter.
CRRPCheck the ballast tanks for oil after the ballast tanks have been filled
CRTJDistress traffic, urgency traffic, safety traffic
CRUEbe made of fire-retardant material
CSFCF1B
CSGXnine digits, beginning by 6
CSOCMAYDAY RELAY
CSOETo avoid the compressor-oil to disapper from the crankcase during starting.
CTCNSeparation with correct temperature and low flow rate.
CTDHTo prevent serious damages on main components.
CTLRUse the rudder hard over both sides while reducing engine power, so-called "high frequency rudder cycling"
CTTECrankshaft
CUARTo prevent freon condensing when the compressor is stopped.
CUBKAll the items mentioned
CUCFToo fast
CUCGOn the fire control plans
CUCJR(S) =18 ohm
CUFX1.15 Ohms
CUYCFloor space is usually more valuable than height.
CVAPIt should be avoided, unless the tank atmosphere is inerted.
CVNAAll the spaces mentioned
CVOVA manually operated release system only
CVTQAt least once a watch
CVTVSerial adapter
CVXDIt satisfies the SOLAS requirements for ship safety
CVXGInto the crankcase and mix with the lube oil.
CVXYThe bows of the ships will be pushed away from each other
CVYYMethod to measure alkalinity and acidity.
CWBDThe number of persons should be clearly stated on the outside of the boats bow.
CWNWTo improve the sealing surface between valve and seat during operation of the engine (compensate for the bending of the valve disc caused by combustion pressure)
CWOQAs low as possible.
CWTRFire is easily spread in dust and trash and wet floors may cause different accidents.
CWTTRadio Regulations
CWVHConnect to the hydrant before lowering the machine into the tank.
CWWYMCA, Lloyds Register, Bureau Veritas, Det Norske Veritas, American Bureau of Shipping, Germanischer Lloyd, Registro Italiano Navale
CXDQTo prevent freon condensing when the compressor is stopped.
CXSSPushing on ship's flat side and make fast in the vessel for pulling if needed
CXXRthe identification of the vessel in distress and her position
CYGFThe atmosphere should be gas free and contain at least 21% oxygen.
CYGG95 Celsius
CYHAGravity disc is too small. Flow rate is too high
CYJILubricate the piston rings.
CYKLCover all exposed parts of the body, protect the area, move people and if possible use a compartment with extraction fans:
CYVAFloor space is usually more valuable than height.
DABDthe O.O.W deems it necessary
DABIMackerel
DADRHeavy fuel oil leakage to the lub oil system.
DADVTo allow at least 3 hours of operation
DAPISeven or more short blasts followed by one long blast
DAQE2
DAVJ1250 m3
DAYP15 minutes
DBBK1 litre
DBORsummoning of passengers and crew to muster stations with the alarm required
DBRDBy double blank flanges with a drain between them?
DBSUBollard is given by D on the figure
DBUF10% of the number of persons the liferaft is designed to carry, or two, whichever is the greatest
DBWCStop discharge.
DBXAStuffing box.
DCAJThe dispersing additives in lubricating oil, break up the contaminants in even smaller particles and keep them in suspension
DCJM Space protected by foam
DCKH3150 m3 per hour.
DCLCPortable bridge between ship and shore.
DCQBStarboard bow is given by A on the figure
DCQCmuster station
DCQDTo keep the valve in correct position and to maintain proper sealing.
DCSLWhen you put rudder amidships, she will continue on a straight course
DCSNSeafarers employed or engaged on board ship on the business of that ship as part of the ship's complement with designated safety or pollution duties
DCVCuncompanded channels
DCXPOpen the flue gas isolating valve
DDGBThe installation shall include equipment for radiotelephone communication on distress frequencies in addition to working frequencies
DDIQ2 sec
DDMTit has windows to admit sufficient daylight inside the lifeboat with the canopy closed
DDNQUse the "cleaning in place" arrangement to open the heat exchanger for visual inspection and manual cleaning.
DDTIto exclusively receive MSI-reports meant for the NAVAREA where the vessel is
DECLThe diesel speed and excitation current.
DECMCheck the cargo tanks for water prior to loading
DEJE100 mm/water gauge.
DENETo isolate the fuel source before extinguishing the flames on a gas fire
DERPIt is both a prevention and protection measure
DEVQA carbon dioxide (CO2) system
DFCKThere must always be one man on the ship's manifold, operating the manifold valve in order to avoid to much pressure raise in the tank.
DFDIBy muster lists exhibited in conspicuous places
DFHMProportional + integral (PI)
DFLSFEC mode
DFMIGlycerine is compatible with both of the other cargoes.
DFPXNon-combustible material
DFQS21% oxygen by volume and 0% hydrocarbon of LEL.
DFSNCarbon dioxide
DFTX45% of the total volume of the space
DFXEThermocouple sensor
DFXGFigure 2.
DFYB25, 45, or 70 mm
DFYEAll the listed alternatives
DFYJuntil - 15C
DGGMAll the mentioned alternatives.
DGIILower lifeboat to water
DGKRAdjustable wrench
DGLLStart with intermittent firing, using small firing periods and long intervals gradually building up to longer firing periods and shorter intervals.
DGRI3 sets
DGRLAt all times
DGRNA short circuit occurs between earth faults and the ventilation fan fuse blows
DGTCConductivity test.
DGTVTwo prolonged blasts on the whistle at intervals of not more than two minutes
DGXCClearing escape routes
DGXDLower explosive limit.
DGXMSafety call
DHIBReject it?
DHJBTrip/stop all nonessential loads that are connected to the switchboard
DHKTsummoning of passengers and crew to muster stations with the alarm required
DHNG1.44 MB
DHPRStarboard quarter is given by C on the figure
DHUVa painter attached to the release device and placed at the forward end of the boat
DIEPHarness with a rope secured to a safe point on the ship.
DIHCAft part of the tank-deck
DIKMTo obtain a proper sealing and correct distance between piston and cover in TDC position.
DIKP1.5C per hour after the first 0.5h immersion in calm water at a temperature of 5C
DIKRA transducer that converts a known electric current to a pressure proportional to the current.
DJDAThe ship's master
DJDVThe signal out from a thermocouple is mV,and can not be transferred over any longer distance without loss of voltage, giving a very bad accuracy.
DJFMA thorough ventilation of the combustion chamber before the ignition takes place.
DJGL1,3 Bar.
DJJPsafety belts to be designed to hold a person of 100 kg securely in place with the lifeboat in a capsized position
DJQGHow to muster at the assigned stations
DKKGA combination of hydrocarbons.
DKQFChecking the moorings for tightness/slack.
DKWVThe entering permit shall be based on the check-list for gas freeing and check-list for equipment and preparedness.
DKXPSurvival craft distress pyrotechnic signals
DLCBRadiotelex and DSC - Frequency shift keying of carrier with error correction
DLDNA unit composed of trained personnel suitable equipped for expeditious search and rescue operations.
DLGBFleetNET
DLGY70
DLJMEvery 5 years
DLNNThe same as suction pressure.
DLVYVery large crude carrier.
DMDIA 60
DMFAOn the fire control plans
DMGWMultistage centrifugal.
DMKVA receipt issued by the Chief Officer, stating quantity and condition of goods loaded onboard?
DMUESART transponder
DMVBskates and fenders to facilitate launching down the side of a ship
DNJE8 hours
DNKBThey are liable to spontaneous combustion.
DNLNIt will try to reduce the deviation between set-point and process value
DNNIWe are controlling the process inlet side
DNOCThe main supply valves in the deck storage are closed prior to switching to UMS-mode
DNSLWeekly
DNSN2912 hours
DOAB8364 kHz
DOBR3
DOBSWeather on-scene.
DODHReduce speed and use soot blowers if some are fitted
DOFYThe location and capacity of all fuel and cargo tanks on the vessel
DOGTAt least four sets
DOHOCall the bridge and request for position and permission to discharge overboard through oilywater separating and filtering equipment.
DOKAone boat-hook
DOOF15 m
DOOUimmersion suit
DOPYYes, all crew must be able to communicate on the language spoken by the majority of the passengers, or demands set by the company.
DOTFEmergency lighting
DOWROne for each person on board who is not provided with an immersion suit
DPAOSinkage is the change in draft a vessel obtains when moving through the water.
DPEXalways allowed
DPHLName of every crew member, reference number, name of last ship, home address, next of kin, date of signing agreement, date of discharge
DPMIDensity, viscosity, flow rate, temperature, gravity disc diameter
DPOWAt all times when identified as a control method with risk assessment
DPWHNitro glycerine tablets.
DPYVwhen its area is of 4m? or more
DQAIRadiotelephony - Single sideband suppressed carrier
DQEULUT
DQICFor personnel assigned to shipboard duties.
DQKNIn emergency generators
DQSBIt will move aft as the ship slows down
DQUJStop the separator and drain the water from the tank
DQUN1 member
DQUPWhen the boiler is firing on high rate.
DQVH4-20mA/3-15 PSI
DQVNA period not exceeding 48 months
DQWGDischarge the washing to shore reception facilities only?
DRIUThe temperature is equal to or over the flash point
DRKOChange the lube oil.
DRKP8,3 - 9.
DRMBThe appointed lifeboat commander
DRMV1100
DRVCthe use of HF DSC and INMARSAT C SAFETYNET
DRYMAny of the others.
DSIQDirection B
DSIYPilotage is compulsory and the pilot is only the master's advisor
DSPLRadiotelephony - Single sideband full carrier
DSVCEnsure all doors are in closed position.
DSYM7
DTBAThree years after the last note was made
DTBGFigure 2
DTEHTo store quantities of oil at working pressure on the discharge side of a pump and smooth out any pressure fluctuations.
DTHWFixed known objects on the shore
DTIRNotify Master, Deck officer and engineer in charge.The loop for this special sensor to be switched off and take normal precautions for hot work.
DTRUFEC
DTSUSeparation with correct temperature and low flow rate.
DUAGPressure-relive valve setting should not be less than 0.2 bar for gravity tanks.
DVGAFaulty governor.
DVHQAt least once every month by a responsible officer and once every year by an expert?
DVUWThree hours
DWBTInsufficient amount of bowl closing water
DWFAThe three international conventions that cover the shipping trade is SOLAS 74/78, STCW 78/95 and MARPOL 73/78
DWGWSteel or stainless steel.
DWKUUse protective equipment where necessary.
DWOFCapillary tube
DWPWYes, all kind of food waste can be dumped overboard
DWRPRotterdam, the Netherlands
DWYYLower lifeboat to water
DXBPFixed CO2 fire-extinguisher system
DXLKEasy accessible by the gangway
DXNDis within radio traffic range of at least one VHF- coast station where continuous DSC-alerting is available
DXRLit allows the wearer to jump from any height without injury and without damaging the lifejacket
DXUTOnce every month
DYBFRemove any oil or scum on water surface
DYCH10 minutes
DYHBS-Band Radar.
DYHH200 gr
DYIYTo by-pass, adjust and isolate all machinery that is to be worked on under his supervision.
DYLL All Stations - This is "SAINT-ROMAIN"
DYOSunknown
DYSAThe types of compressors are piston, screw or centrifugal type
EAACarrangements for providing an adequate view forward, aft, and to both sides
EAHL20 metres
EAKCAll working spaces accessible by the crew
EATYFrom the condenser.
EAUSA contract between Master/Owner and Shipper for transportation of goods?
EAWNis fitted with a light and a whistle
EAXBa possibility to receive MSI
EBAUIt is the number of revolutions, and the one used on the cargo is oil-free
EBAVWe use inert gas to purge out cargo vapour and have a neutral atmosphere in cargo tanks and spaces
EBLRHave one slack tank as last tank
EBOEThe blower air inlet
EBOX1) 5 tons 2) 5 tons
EBPSIn case of accidents, it is important that a wide range of personnel must be permitted and trained to operate the pump.
EBRICargo holds and engine rooms
EBWHFreeboard is given by B on the figure
ECATThe speed of the shock wave created by the initial combustion
ECHFPassenger ships, ro-ro's, bulk carriers, ships which may present a special hazard ships which have had several recent deficiencies and ships flying the flag of a state appearing in the 3-year rolling average table of delays and detentions
ECKQSugar lump, sugar drink or something sweet.
ECLLSafe working load
ECMIBi-stable flip-flop
ECOS+ 4 C
ECSDThe meteorological station connected with the CES used
ECSVimmersion suit
ECTRCut it with the safety knife stowed on the exterior of the canopy close to the painter attachment point
EDCEMaking the crane jib move from side to side.
EDFHmust not be passed on
EDHGNo. More readings should be taken and sediments, sludge and residue should be removed at least 10 m from working site.
EDKOOn the cargo tank area all time?
EDPPautomatically comparing the message earlier received ones
EDRBBecause certain types of dry powder can cause breakdown of a foam blanket
EDWGCentrifugal force
EDXV1620 Mt
EEAMEnsure all doors are in closed position.
EEBG3 litres
EECDHe is asking about the position of the chain
EECHNot allow the clothes to be hung anywhere in the unmanned machinery spaces.
EEDPAll the answers are good
EEFIMerchant Ship Search and Rescue Manual.
EEHCGo to your lifeboat station (muster station).
EEYRRaise the feed water temperature.
EFADTo lubricate and cool the engine.
EFBEa license
EFFHalso after 1 February 1999
EFHPNo, only those listed in the Seamen's Act as dereliction of duty.
EFHRThe deck officer of the highest rank present
EFOMTo respond to oil pollution and take appropriate action as may be necessary
EFRBThree months.
EFRCStop the bunkering until safe communications are established
EFVHgeostationary orbits
EGBBIn the muster list.
EGCPVI
EGHMThe deck log book
EGNIRisk of deposits on heat transmitting surfaces.
EGNNall of the above-mentioned
EGOGIn and outlet temperatures, and flow rates for both media
EGSUthe use of VHF DSC
EHEBExhaust valve
EHLPHerring
EHMQDaily
EHNJ4 - 5 C
EHQXtwo boat-hooks
EHVAValve in the outlet line partly closed.
EHWTThe use of devices for protection in launching areas
EICLMake sure that the compartment has been evacuated
EIGQ2
EIHPCentrifugal separator.
EIQQThe way to board, launch and clear the survival craft and rescue boats
EIXMAt all times
EJAAIn suitable lockers easily accessible, yet segregated from the living spaces themselves?
EJAR+ 18.5 bar
EJBRThe stevedore superintendent?
EJCHTurned at intervals of not more than 30 months and renewed every 5 years
EJJC1 year
EJLQAs a safety net, for improved cleaning of the fuel oil
EJQOburn with a bright orange colour
EJYATemperature-control
EKARSweep holds clean first and lift out solid residues manually prior washing. After washing again lift out remaining wet residues after carefully stripping out only the accumulated water?
EKCBRadiotelephony - Frequency modulation
EKEXNine digits, beginning with a four (4).
EKLM4
EKLO1.5 litre
EKTVThe vessel anchoring assumes responsibility
EKULLiquid at high pressure.
EKUQLeave the engine room immediately.
EKWGLine throwing appliance
EKXFBetween 3% and 6%
EKYY75 C
ELDWThere are three main reliquefaction systems, Direct cooling one to three stage, direct cascade cooling and indirect cooling
ELERMaximum allowed Oxygen content in the inert gas on gas carriers is 5% by volume.
ELOQLeakages from seawater coolers
ELOW10 minutes
ELPLDifferentiator
ELPOAnchor watch responsibility rests with both vessels, each with its own watch
ELQPBecause that was the safest passage considering the ship's draft.
ELTYMilk
ELUKOne fire hose forward and aft of the manifold, and portable fire extinguisher near to ships manifold?
ELVJGMDSS
ELXBthe use of HF DSC and INMARSAT C SAFETYNET
EMBDTo remove the oxygen and by that avoid a chemical reaction.
EMIRWith the pointer of the synchronoscope at 0 (12 O'clock) and both synchronizing lamps dark (off)
EMKKThe Flag State language with copies in English or French
EMKLtools for minor adjustments to the engine
EMLNpreparation and launching of the survival craft
EMMFYes, by putting the rudder hard stb. it will shield waterflow to the stb. side of the propeller and vice versa to port, this will effect turning of the ship
EMON220 liter
EMRELifejacket
ENBFObtain permission from charters and note procedures in oil record book and deck log
ENCDHave the engine ready for immediate manoeuvre and adjust speed for safe navigation
ENCX12 - 16 times per minute
ENGEAt all times
ENHXThe pressure switch has contact(s) that will change between open and closed position.The pressure transmitter converts a pressure signal into an electric signal.
ENIYDrainage/waste from toilets/urinals.
ENJGBy visual and audible signal at the control panel and indicating units
ENJTEvery 12 months.
ENLD500 kHz, 2182 kHz and 156.8 MHz
ENMD2275300
EOBE15 percent.
EOBS3.5 - 3.9 %
EOCWTo avoid unexpected oilspill
EODRAstern is defined as D on the figure
EOEQPeriodical survey every 12 months
EONQHow to recover survival craft and rescue boats including stowage and securing
EORC98 %
EOXSAll alternatives
EOYLSecured via a weak link to a secure part of a ship
EPAEa searchlight which can work continuously for not less than 3 hours
EPBTSugar
EPEHnumber of vibrations per unit of time
EPEJPassenger ship initial surveys, Initial surveys of a Certificate of Fitness or International Noxious Liquid Substances Certificate and initial surveys for SEC or IOPP, and all radio surveys.
EPFCTX: 2189.5 kHzRX: 2177.0 kHz
EPIMlocation of embarkation ladder
EPUEDesign temperature on the cargo containment system on a LPG/LEG carrier are -103oC
EPWOReserve accumulator battery for two hours normal use to be provided
EPXNPut the plates in water with qualified cleaning chemicals, and use soft brush, or high pressure cleaner with care.
EQAWGoggles and shield.
EQBV2
EQLQThe load that can be safely lifted during normal working conditions.
EQPDLIC
EQRN2.0 bar
EQRQA ship with a length to beam ratio less than 5.5
EQTB2 valves
EQTDLiferafts intended for throw-overboard launching shall be stowed amidships secured to means for transfer to either side
EQYEwarning the passenger
ERATFoam.
ERIMIncrease.
ERJEOn the main beam
ERLQAt least four sets or more depending on the type and the size of the vessel
ERNFLeather safety boots and gloves
ERXD Yes, showing how it has been calculated and with possible deductions.
ERXJTo ensure that we do not have any water assembly in the cylinders when the compressor start.
ESCJSufficiently manned with officers and crew to permit safe handling of vessel
ESCKno fault - hard earth - light earth
ESEAClean the system and change the oil.
ESFOThe input impedance is made much larger than the output impedance
ESGNfeet
ESHHtwo buoyant rescue quoits with buoyant line
ESIYCall immediately the person in charge.
ESOTdistress alerting
ESOVa book of directions for search and rescue at sea
ESPOat any moment before the ship proceeds to sea
ESUMAll valves on the delivery side and adjust the propellant pressure.
ETBHVarying the excitation field strength by regulating excitation voltage/current
ETESWhen coming up with another vessel from a direction more than 22.5 degrees abaft her beam
ETJYLEL is lower explosive limit
ETKKBecause if we don`t clean it will influence safety, economy, our own well-being and maintenance.
ETLEDifferent products to be placed on separated and labelled shelves.
ETMCSection 32
ETSYnine digits, beginning by 3
ETTXF1B
ETXE5 V and 12 V
ETYXInitially rise, then reset to the set value.
EUCHOn area A3 and A4 this function is based on the use of SARSAT COSPAS Epirb
EUDTInitial and intermediate
EUDVOnce every month
EUTXRaise the governor speed controller of the incoming alternator and reduce the governor speed controller of the alternator already on the switchboard
EUUN0.7 bar?
EUUQOhmmeter
EUWE1
EUXVHe will find new brake bands in the engine store
EVNSmV.
EVNTReduce the sea echoes.
EVRYAs stated in the COW manual
EVVGan efficient radar reflector
EWBAThe condition shall be noted and plans for further actions developed.
EWHSWhen the tank has been satisfactory cleaned there shall be a 24 hour quarantine. Ventilation to be stopped and gas levels measured every second hour.
EWIQ24h after their embarkation
EWKFThe process will oscillate and get out of control
EWMYShut off the starting air supply and open the indicator cocks
EWPKDry running of the pump, high temperature of the contents and various flowrate.
EWPL70 C
EWRW30 minutes
EWUJexclusively past to a ground-station between 70 degrees N and 70 degrees S
EWULlifebuoy with light
EWVAHe shall ensure obedience by the use of force if he finds it necessary, but not use harsher means than the circumstances make necessary.
EXCO122700
EXDRthe time of transmission
EXEG Wheeled fire extinguisher
EXGVA combination of ullage soundings and readings from the remote gauges
EXHSSwitch the UMS selector switch to manual mode and engage the "dead man alarm"
EXILThe plan must show where to clean every day and where/when periodically cleaning should be done.
EYCQClose them to prevent the spread of fire, and allow the extinguishant to be released without time wasting.
EYFYThat correct temperature and washing products are chosen for the linen to be washed.
EYJDTo connect the ship fire main to the shore lines
EYJGonly with the master
EYKASolid combustibles
EYMKIn Part 16.
EYSQF1B
FATMNot to damage the rotor blades
FAUGPushing, made fast in the vessel
FAVAUse the opportunity to plot direction and rate of drift for later use
FBBBLeave the engine room as quickly as possible, closing all doors behind you.
FBNLSeven digits beginning with a one (1).
FBSHInspect/measure all areas surronding loaded tanks for leakage. Result to be recorded in the deck log book.
FBUXlifebuoy with light and smoke
FBVAMuster station
FCFD10 000 000 Ohms
FCGXBourdon Tube manometer
FCHSCircuit breaker operating time
FCHU70 % of MCR
FCINThe IMO at London and the ITU at Geneva
FCJCBecause we need old ships in good condition to meet the world's demand for transportation.
FCNJAct according to instruction given in the fire plan.
FCQYTX: 2187.5 kHzRX: 2187.5 kHz
FCWRThe fire is extinguished by avoiding the contact between the fuel vapours and the oxygen
FDAX Heat detector
FDBR200 gr
FDCLElectric Contact manometer
FDCQ Foam release station
FDHMto neutralize the sulfur and get a lubricating oil film between piston rings and liner
FDOFnothing or a special characters will be printed
FDYBPaint store
FECM6 knots for 24 hours
FEIAA hearing shall be held before a committee on board.
FEPXThe ship's cow manual and ejector's performance curves.
FEUPnot less than 400 mm
FEWCthe amount of ionisation
FEWH25 nautical miles off the coast
FEWLTarragon
FFBPThe should be blown completely dry by the use of air or nitrogen and then blanked.
FFFR121,3 MHz and/or 243,0 MHz
FFMFInterface towards center.
FFRCComplete 15 compressions at the rate of 80 compressions per minute
FFSGKeep the floors and decks free from fat and grease.
FFSUImmediately notify the captain so he can notify the proper authorities, so the pollution can be dealt with by professionals
FFTACross flooding arrangement
FFTUAn explosion-proof, self-contained, battery-fed lamp
FFYRalerting
FFYSthe ship's radio log
FGBHRapid recovery shall be possible with the boat's full complement of persons and equipment.
FGCYAll these methods can be adopted
FGEQAll the mentioned alternatives
FGKNTo prevent the water from freezing.
FGOPRest, Ice, Compression, Elevation.
FGPTthe date when the battery must be replaced
FGRBPAN PAN (3x)
FGSDa rustproof graduated drinking vessel
FGVBLye, metasilicate and soda ash.
FGVGInter-ship channel
FGWAto both passengers and cargo ships? Yes.
FGXWNear to the deck, crawl out keeping your face as near to the deck as possible
FHGMThe deck for the lifeboats.
FHIQLights as per rules regulated by the shape and total length of the towing
FHJOIncreased turbocharger revolutions
FHKJLoad line certificate
FHLBThere must be a complete interchangeability of hose couplings and nozzles
FHUHAlkaline detergent (strong).
FHVLBlack
FIAIYes
FIBFBall bearings on the pump shaft, and wear rings on pump housing or impeller.
FIEJTurbocharger
FIIPList and trim correction tables.
FIJHHe has a special a special role as company agent
FIKIIn the Act relating to the enrolment of employees onboard ships.
FILEAll the items mentioned
FIPClifebuoy with light and smoke
FIRAThe engine shall be provided with an electric power starting system with rechargeable energy batteries
FISUBy immersing them in buckets with oil and water.
FIULAll of the above
FJAH15 PPM
FJGXAll alternatives
FJHVThe Act relating to holydays and Regulations relating to holydays for employees on ships.
FJPBFirst aspect confirm death. Notify company, and make arrangements for notification of next-of-kin. Arrange to have body moved to freezer area. Notify local agents and British Consul when abroad. Complete Births and Deaths section of Official Log book. Ma
FJPCNo - his certificate is not valid
FKABIMO
FKBRRaise the water level a couple of inches above normal
FKCQRomeo, Alpha, Delta, India, Oscar
FKDLAir leaks on suction side
FKPYIntermittent signals by the ship's alarm bells.
FKQQThe name of the person in charge of the transfer operation
FKROOne bolt in every hole
FKRPHenry
FKSJPrevent manual synchronising outside permitted limits
FKUA4
FLBSPoor cylinder condition - blow by -including leaking exhaust valves.
FLCNMaximum is 30 litre pr nautical mile and total is 1/30000 part of full cargo on the ballast voyage.
FLDHYes, all crew must be able to communicate on the language spoken by the majority of the passengers, or demands set by the company.
FLMJThe foam should be aimed at the bulkhead behind the fire and allowed to spread out slowly over the fire.
FLPTWithin 24 hrs
FLPVTo avoid damage and miscolouring of different types of fabric when washing.
FMATInhibitor name, concentration of inhibitor, duration of effectiveness of inhibitor, expected duration of sea voyage, temperature limitation qualifying the lifetime of the inhibitor and number of cargo tanks inhibited
FMKTDual purpose (jet/spray) type incorporating a shutoff
FMOVThe ITU List of Ship Stations
FNCMTraining in lifeboat handling.
FNEV Regulating freon liquid flow to the evaporator.
FNIF9
FNIYyes, with the MF/HF-radio telex
FNMIBy reports prepared by the master/employer.
FNPN3731101234567#
FNYBIt is possible since the ballasted vessel stops faster than the loaded vessel
FOBJTo avoid the compressor-oil to disappear from the crankcase during starting.
FOEVMay
FOGOProves the name of the owners of shares in the ship and nationality
FOJVPorts in exposed position shall be closed and properly battened before the ship leaves the quay or berth.
FOJWAn unofficial translation of "Den norske skipskontrolls regeler" leaving out some provisions, such as speed limits, relating to local Norwegian waters. (The authorised Norwegian original applies in cases of discrepancies etc.);
FOPP20 seconds or less
FOUNInsuline.
FOVILower the load
FOXWStart engine
FOYQApprox. 18 Days
FPJVFoam.
FPRBYou are running into danger
FPRDLack of oxygen?
FPSUNo - their role is purely investigatory to establish the facts -not to apportion blame
FPUNto stop fuel oil from getting back from the HP fuelpipes between the pump strokes.
FPUOwith the exception of the areas A1 and A2 within the range of a geostationary satellite of Inmarsat in which an uninterupted alerting is possible
FPVHManual operated release system only
FPWBEmergency fire pump?
FPYNRadiotelephony - Frequency modulation
FQDRImprove the scaling surface function, increase the service time of the exhaust valve in the engine.
FQELBroken water seal.
FQJOConductivity test.
FQLGFigure 4 is correct.
FQMBMaking the crane jib move up and down.
FQQXdirect access to the navigating bridge
FQULlifeboat
FQVBWait until the coast-station calls again
FQVCafter ga+ the radio telex-command msg+?
FQWVRadiotelephony - Single sideband suppressed carrier
FQYJat least 50 % of N (*)
FRFGyou must check the date that the battery must be replaced
FRGXthermal protective aids for the number of persons the liferaft is permitted to accommodate
FRGYCourse, speed and risk of collision.
FRKDHeavy seas from behind.
FRKLA leak of exhaust gases from boiler or diesel engines.
FROO14
FRQVBest use of the survival craft facilities in order to survive.
FRTIall of the above
FRYGTake action to start the process to solve the situation, but do it diplomatically.
FSBAChanging of filter element would not interrupt the engine operation.
FSFAMAYDAY RELAY (3x)
FSGQMF
FSILAll the mentioned alternatives?
FSPXIt is the seawater temperature and the purity of the vapour that gives the condensation pressure
FSYDPrevent biological growth
FTAVCrane No.1
FTAXProtect the SCR against damage caused by high voltage spikes
FTECEmergency generator?
FTFDalways simplex
FTGSNot less than half the total number of lifebuoys shall be provided with self-ignition lights.
FTLQautomatically repeated after 3 and a half to 4 and a half minutes
FTYAEvery month
FUBRRF-Gain
FUKPNot less than 10000 kJ
FULLBy using a liquid receiver on the vapour line between the cargo tank and the compressor
FULOThe Health & Safety at Work Regulations (1997)
FUOGSignals for vessels restricted in their ability to manoeuvre
FUPYCast off the rope.
FUSEThe team is applying water and the temperature is decreasing
FUVPA search inside the crankcase for tools and rags.
FUWKA pharmacy authorised to do so or if no such pharmacy is available, the master and an approved seamen's doctor
FVJYPump will overheat
FVOQa manual pump for effective bailing
FVYAOn a time sheet arranged by the Norwegian Maritime Directorate
FWEUTo relieve excessive high pressure in the cylinder to protect the engine from being damaged
FWFPWater extinguisher.
FWHCIncomer picks up as a generator
FWTRThe master checks all the relevant documentation is valid and in date. He completes the seaman's details in section ALC 1a, ALC 1b or ALC 1c as appropriate. The seaman signs in section a) of the signature of seaman section of the appropriate ALC form.
FWVKOne for each person on board who is not provided with an immersion suit
FWVLRemove the toggle which will release the painter
FXAIIonization type
FXAK30 minutes
FXCGThe visible smoke that is a result of combustion
FXDXWhen you apply the rudder, she will continue to turn when the rudder is put amidship, and may even increase the rate of turn
FXGKreceipt of a distress alert
FXIA0.2 Bar
FXIYA SAR coordinating centre
FXTTEvery 12 months
FXYNFor cooling and to maintain correct viscosity on the fuel when injected
FXYPA vessel, other than a rescue unit, designated to co-ordinate surface search and rescue operations within a specified area.
FYALLonger
FYCVClimatic condition check list.
FYKGInjection valve opening pressure is too low.
FYNQEnsuring that all persons avoid smoking in bed.
FYRUThe gas is harmful when the consentration is 5 parts per million or more.
FYXS14 hours a day
FYYNThe Norwegian Consular Court concerned.
GAAKwhen technical problems are experienced with the Inmarsat-terminal
GAPOIt is important that the rotation direction is correct to avoid dry running.
GAPQWater
GAQHOnce a week.
GAQJKeep steady course.
GATRDifferentiating
GATXa binnacle containing an efficient compass
GBCCsolid, liquids and gases
GBHBmuster station
GBHDIt is visible for a shorter time than a fuel oil spill
GBIWStop loading
GBNAthe use of SART transponders
GBOKA, B, D
GBPLThe vessel's bow is pushed away from the nearest bank
GBQHNot re-measured, but re-registered
GCCDBefore hot work or welding in tanks is started, a complete set of duly signed check lists and certificates shall be provided.
GCDSQuantity of ballast discharged from segregated ballast tanks
GCDVFigure 3.
GCEQThree years
GCFLa MF radio telephony installation
GCGEToxic gases
GCLI8 hours
GCOU..
GCRAhe SOLAS convention
GCSVESD is Emergency Shut Down and the release buttons are located different places onboard
GDCTTo all seafarers.
GDDYPressure diaphragm
GDFKTurning the plunger piston according to engine load.
GDHAFull astern and drop the anchor
GDHXSent to RSS within 48 hours of closure
GDJKRadiotelex and DSC - Frequency shift keying of carrier with error correction
GDNRMeasuring distance from cargo level to ullage point
GDQBSufficant, but minimum 3 complete sets.
GDRCA water pad should be maintained during loading, transit and discharging. In addition a inert gas pad should be maintained during transit.
GDRYThe minimum temperature at which a combustible gives off vapours that may burn in contact with oxygen in air, and at which combustion persists once the source of ignition has been removed
GEDQEvery three months. Details of test with signatures of Master and witness
GEFB8 MHz band
GEGAurgency
GELUPropylene oxide may not be stowed in a tank adjacent to butyric acid.
GEPB1000 000 Hz
GERSJ3E
GESHThe master.
GEYGStart slowly and closely monitor to ensure that discharging is actually taking place in order to avoid overflow. When the level is below 98% the tank overfill alarm must be reset.
GFAWCodes, MSC resolutions etc which are implemented in the regulations and which are expressly mentioned.
GFLQMade of material resistant to the different liquids to be stowed and also well ventilated?
GFLWA relief valve.
GFPUThe wheels of hatchcover No. 7 came out off their tracks
GFPVIn two separate rooms outside the engine room space.
GFPW16
GFQXOn all international voyages (except on short voyages) all lifejackets shall be fitted with a light and a smoke signal
GFRWTo receive information about ships in the vicinity.
GFSPPrepare it immediately before serving.
GFUAThe current and wind are holding the vessel back.
GGUQsemi-duplex
GHAVTraining in lifeboat handling.
GHAXSometimes it is necessary to facilitate overhauling.
GHFP80 % of the Inert gas generator's capacity.
GHFXIncondensible vapour in the cargo and shortage of refrigeration.
GHGMduring manoeuvre and manoeuvre speed condition (arrival and departure)
GHHHIn chapter IV
GHKSSmall.
GHLS227530000
GHNDThey automatically prevent any gap between the ship side and the lifeboat at the first stage of its launching
GHOTthe test function on the SART
GHQVQualified Individual
GHUMYes.
GHYDEither of the Sen.Off.Deck if he feels the situation is heading out of control due to bad weather, bad manoeuvring, or for any other reason.
GHYXWhenever the gangway is rigged.
GIDFPhysically smaller for the same capacity.
GIGGThe International Convention on Standards of Training, Certification and Watchkeeping of Seafarers
GIHISafetynet
GIRDNo fixed extinguishing systems are generally required for any other spaces protected according to this method
GITVTo ensure that the proper residuals of treatment chemicals, as specified, are maintained at all times
GJCX518kHz
GJHG15 ppm
GJKNCooling, smothering and dispersion
GJSRHe is supposed to paint the evaporator and use a brush to apply the paint
GJVGCarbon monoxide, nitrogen dioxide, nitric oxide, sulfur dioxide?
GKDTPiston
GKHFIt is the Certificate of Fitness that is issued in accordance with the IGC code
GKLCThe place of welding-work to be cleaned and all unnecessary objects to be removed.
GKORImportant due to different material and working conditions
GKPKAs soon as possible determine how the ship is drifting to establish if there is any danger
GKPMActivate the nearest fire alarm button and advise bridge of the location of the fire.
GKQHSet the engine to dead slow ahead, and change the course 10 degrees to port
GKRENavigational warning.
GKVIthe use of MF and/or VHF R/T
GKXRa tiller permanently linked to the rudder or removable if the lifeboat has a remote steering mechanism
GKYLTake a visual search of the sea around the ship
GLIPA keeps out of the way of B
GLJKThreshold Limit Value.
GLJLThe pressure drop across the filter.
GLKFStrain gauge
GLKGTwo sets or more depending on the type and the size of the vessel
GLKH4
GLLG5
GLRYPAN PAN
GLWTSame number as beds in the cabin
GLYLCrosshead
GMHSGet out of the engine room as soon as possible.
GMIRAll the mentioned alternatives.
GMJMCorrect water level is obtained by refilling the cooling system, and the entire system is checked for leakages
GMLAAND
GMOEThey reduce the surface tension of water
GMOKCollect rain water
GMQYlifebuoy with line
GMUYYes
GMVY1.5 times designed working pressure, but not more than two-fifts of it`s bursting pressure.
GNDLAll the mentioned alternatives.
GNELthe use of VHF DSC
GNGSAs per Builders' specification?
GNHN12th day, 1310 hours UTC
GNXLNo, as only the output from the barrier is intrinsically safe this is not allowed.
GOCONotify as soon as you have knowledge of any spill, or threat of a spill
GOYBMake sure your vessel + crew are safe and then offer your assistance to the other vessel
GPATIt is centrifugal pumps that is normally used on gas carriers
GPGQCrew accommodation and provisions and water must be inspected on a weekly basis
GPLPGas levels measured in tanks where work is to be carried out.
GPMKLubricating oil pressure is too low.
GPPA10000 ppm.
GPPOBy double blank flanges with a drain between them?
GPPWAny of the alternatives.
GPQRConnect the firelines ship/shore
GPRM8 MHz
GQAUThat all the valves on the delivery side are open before starting.
GQJBA vessel of more than 50m in length engaged in pushing a barge/barges ahead
GQPUVenting of the tank must be carried out after cargo discharge to ensure removal of any cargo which may have been absorbed into the coating system.
GQQRFind out from officers and crew who have been in connection with the collision, what they have seen, so that detailed and complete description of the sequence of events can be entered in the log-book.
GQSB16
GQTUWe are allowed to gas up LPG on inert gas if the charterer do not instruct the vessel to use nitrogen
GRDUCorrect donning of life-jackets.
GRHBthe closed-type feed-water system
GRLMPersonnel working in regulated areas must use respirators
GRPICan identify small targets
GRPOtelephone signals in the same frequency band are generally weaker than DSC signals
GRTSBowl opens unintentionally during operation.
GRWDNot necessary, he shall use all available resources. He should resist the temtation to step in and do it all by himself
GSCW38205
GSCYI am in distress and require assistance
GSDTThe master.
GSES30 m
GSFPmaximum permitted height of stowage above waterline
GSQLcompletely watertight
GSWBposition of the aerial
GSWFOil Transfer Procedure manual
GSXASeparation of water and oil.
GTDUNorwegian law unless otherwise provided in or pursuant to a statue?
GTGB30 minutes
GTJJYes, you must attend to a course held by certified personnel, and then be certified by national authorities (NMD, USCG, etc)
GTJLThe company has to ensure that an agreement is always confirmed in writing
GTQE4 times the outer diameter of the lifebuoy
GTRAIntrinsically safe.
GTSUNo, glass bottles can not be dumped overboard
GTTSContain any oil-spill onboard the ship
GTVXBlow the boiler and renew water until the PH-value is normal again.
GTWA0,2 Bar
GTWWOverhaul the compressor unit.
GUGUWe are allowed to gas up LPG on inert gas if the charterer do not instruct the vessel to use nitrogen
GUNK90 air-changes.
GUNQThe gudgeon pin, big end-, or main bearing clearances is too large.
GUNSAir, Breathing, Circulation.
GUONPortable bridge between ship and shore.
GUPAAs specified in the vessel' s Planned Maintenance System, (Ref. Makers Instruction).
GVGWDry ice
GVIOPush the hook through the skin until the barb protrudes, then cut the hook between the barb and the skin and gently withdraw the hook.
GVIPCharterers requirement in this example.
GVKX30 minutes
GVRSshut off the oil flow if the flames goes out
GVVCis fixed by manufacturer
GVWWgive relevant instructions and warnings
GVYKBLEVE
GWDJBy control of liquid flow
GWGPIn a secure and sheltered position and protected from damage by fire or explosion
GWIDEPIRB
GWKURemove the toggle which will release the painter
GWMNSierra, Charlie, Hotel, India, Papa
GWNIA glogged bilge strainer
GXAXYes it is.
GXFWone daylight signalling mirror
GXLQThe inlet- and exhaust valve tappet clearance is off adjustment.
GXNGInformation about the ships fire preparedness do we find in the alarm instruction
GXRDApproximately 5 metres
GXXF7
GXYDThe fishing vessel keeps out of the way of the power driven vessel restricted in her ability to manoeuvre
GYAWWe can trim the ship by stern as much as possible. This will most likely change the direction and rate of drift
GYBPThrottling the delivery valve, adjust the RPM, by-pass.
GYLMMonkey wrench
GYMIThey have responsibility for setting, monitoring and enforcing standards of safety and pollution prevention on vessels flying the countries flag
GYQI300 PPM.
GYVKGas may enter, but even if an explosion takes place the fittings is so strong that the explosion will be contained within it and will not be blow out?
GYVOLoss of alkalinity, corrosion of boiler metal surfaces, and loss of phosphate reserve in the boiler.
GYVQOne prolonged, one short, one prolonged and one short blast
GYVSCamshaft
HACLEquipment for detecting flammable vapours.
HADHTo minimise oil losses and prevent the sludge getting too hard
HAEFSeawater
HAFFCheck in appendix 2 of MGN 1
HAJAThat a secondary auxiliary set is switched to automatic standby mode
HANHOn the motherboard
HANIStop the engine immediately and keep the luboil pump running for at least 20 minutes before opening the crankcase?
HAPCIt shall be cleaned daily and oiled and inspected regularly.
HAQPBy pumping test of each bilge before loading?
HARO22 A
HARQRadiotelephony - Single sideband full carrier
HAUFThis is firezones which can be divided from eachother with firedoors. If a fire start in one zone, all firedoors in front and aft of the fire will be closed from the bridge to stop the smoke and fire from spreading.
HAWMOnce every month
HAYEAlkaline cleaner.
HAYGon board communications (intra-ship traffic)
HBGOPassenger ships carrying more than 36 passengers
HBJXAlarm the rescue centre and commence searching for any survivors
HBOCFigure 1
HBQVYes, if the seafrers demands it
HCATA sticking start air valve.
HCBIA fixed sprinkler system at the cargo manifold
HCBOAll of the mentioned
HCCJ12MHz
HCMGPart ALC 1d of the crew agreement, giving details of specific terms and conditions for seafarers
HCQMThe emergency generators
HDATIncreased.
HDBMWash thoroughly and hang up for drying.
HDCJ one whistle or equivalent
HDFTSection 3.
HDJVIt could be any of the alternatives listed.
HDKPNot less than 10000 kJ
HDOT38
HDPTEvery three months
HDQQRescue boat
HDSW1st February 1999
HDTUSmoke and increased pressure in the crankcase of the engine.
HDVMType of oil or gas chemicals having been carried in the actual tank and the adjacent tanks.
HDXCLeave a "cushion"of water in the sloptank, to minimize the risk of polluting the sea
HDXUSo that no part of any corridor is more than 20m away from any manually operated call point
HDYYIt will always be a deviation between the set-point and the process value
HEBHall alternatives
HEOTApplying 12 - 15% nitric acid on tank surfaces, either with a brush or spray; then washing off after 10 - 20 minutes using copious amounts of fresh water?
HEVDFigure 2 is correct.
HEWFRemoving trash, dusting and light cleaning in cabins, messrooms and WC.
HFLBOn the fire control plans
HFLGFull power on the forward tug, reduce on the aft tug while checking the gyro
HFMTthe painter
HFNQThe master.
HFPIAt least one
HFQDthe use of HF DSC and SARSAT COSPAS Epirbs
HFQISecure hatches
HFRAFasten seat belts
HFSQIt keeps the boat alongside the embarkation deck so that the tricing pennants can be released
HFXUHydrochloric acid and citric acid.
HFXVThis is not correct, inter-ship has to be intra-ship
HFYQassembling passengers at muster station
HGCYSerious emergency - all vessels to stop or divert according to instructions
HGDTInerted to less than 8% oxygen(IMO).
HGEONot at temperatures used for pre-heating
HGGEStop bunkering, and establish facts, before bunkering is resumed
HGGYOpen the tank, provide adequate ventilation/lighting, test oxygen content, have someone standing by with rescue equipment, complete a tank entry permit then commence work.
HGHBCooling water spaces insufficiently vented.
HGHYThe change needed in the input signal to produce a change in the output signal.
HGKKAt least one hose for each 30 meter length of ship plus one spare
HGLBLeather safety boots and gloves
HGNWMarine Officers of the MCA
HGOMThe ITU List of Ship Stations
HHBWThe pump is not primed.
HHCOYes, the ship usually steers better if trimmed by the stern
HHDNPork
HHFA2
HHIJCentre line is given by A on the figure
HHLEThat the wires are just above the water line at all times
HHNLthe time in minutes, or parts of it, when the landline was used
HHNNThe master, and any person who does not form part of the crew e.g. riding squad
HHUDMaintain the specified boiling temperature
HHWS3 sets
HHYMCh.70
HIBY 1. Switch off the transmitter - 2. Switch equipment on - 3. Make broadcast on channel 16 "Mayday all stations" and cancel the false distress alert.
HIFC3 - 30 MHz
HIHWYes, by "distress priority" one always is assigned a channel
HINFThe fixed fire fighting medium in engine room, pump room etc. is Carbon Dioxide CO2, Halon or foam
HIWPIt is an automatic system for plotting vessels for rescue purposes
HIXIJust in forepart of the rudder square (figure 3)
HIXJin presence of atmospheric or interfering signals automatically adjust itself
HJCNShips fitted with free-fall life-boats may carry thermal protective aids instead of immersion suits
HJLSRe-pack the stuffing box loosely with the correct size packing at the earliest opportunity.
HJMN reduce the "noise" in the background
HJMQSafetynet
HJNLPressure relief valve.
HJPY98 Centigrades
HJSITo prevent contamination of the cargo.
HJVMRSS, HM Coastguard, Marine Officers, Enforcement Unit, Channel Surveillance Unit, MPCU
HKDC4 Rocket parachute flares / 6 hand flares / 2 buoyant smoke signals
HKLJ+ 85 C
HKMFbe as small and of as little mass as possible
HKNFCheck linearity
HKSD6
HKTASpecial section for Births and Deaths and also to be included in narrative section
HKUVlifebuoy with light
HKXEYes
HKYXThe seafarers shall have available for their use the Seamen's and NIS-acts with regulations, together with all relevant CWA`s/CBA`s.
HLFNInverting amplifier
HLIXIn stairways, corridors and escape routes
HLJSHigher measuring accuracy.
HLNCAll the mentioned alternatives
HLOWsearch and rescue at sea
HLQNinstruction in the use of radio life-saving appliances
HLRCa person who holds a "certificate of proficiency in survival craft"
HLVJFlat file
HLWFSpace thoroughly ventilated, Oxygen and gas readings taken, communication set up, permit to work completed, Crewmember standing by, with rescue gear.
HLXEHe wants the heating coils inspected
HMBIExhaust leakage
HMEVAssorted canapes.
HMGDOn area A3 this function is based on the use of INMARSAT A, B or C
HMGNa ship idendity number
HMLFAll preventive methods to avoid spreading of bacteria and fungus.
HMPKTo protect both owners and charterers
HMSWSafety purpose?
HMTSWhen the container also contains water
HMYNAll the actions listed in the other alternatives
HNAL30 minutes
HNCTDepth is given by B on the figure
HNCUFully slacken and remove top ones first, then middle, then bottom.
HNLEOpening water function missing.
HNVGScavenge box fire
HNVIChannels 6, 13 & 16
HNWYIt should be about 20%
HOCTCOTP-zones may have additional rules and regulations
HOLAA throughput of at least 400 litters a minute and a "throw" of 15 metres?
HOLXWater extinguisher.
HOQE4.5 bar
HORY- 43 C
HOTHAdiabatic.
HOUEYes, you must attend to a course held by certified personnel, and then be certified by national authorities (NMD, USCG, etc)
HOWTWater-tube boilers are more efficient and contains less water. They suffer from major damages when run dry during operation.
HOYJAll launching appliances shall be capable of recovering survival crafts and rescue boats with their crew
HPDQ4.25% of the volume of the room
HPDUAft breast line is defined as B on the figure
HPGWPlate
HPHRZener diode
HPHU5 seconds
HPLEWhen you need to protect your eyes.
HPMA40 ohm
HPMR10 %
HPPBThe smallest diameter piston is the stage two piston.
HPPCDeballasting and loading simultaneously.
HPTHTo maintain a record of all British ships and British certificates
HPVBRegularly check your pressure gauge and note how much air you used to reach your work area. Start to return when you have this amount left plus a reasonable reserve
HPVXImmersion suit
HQAX1 m depth per minute
HQEFFigure 1
HQGUcontinuously after having been immersed for a period of 10 seconds under 100mm of water
HQHTShut off the starting air supply and open the indicator cocks
HQISNot more than 13,5 litres and not less than 9 litres
HQJGAvoid spilling water and fat on the floors.
HQLUForward spring is given by D on the figure
HQQSTo do a full calibration.
HQQWthe degree of priority
HQQY8 MHz band
HQXOBow/stem is given by B on the figure
HQXQOutside the coloured zone.
HRCTEqual power on both tugs while checking the gyro
HREENo. 1 diesel and No. 2 diesel
HREYHe is to check the heater for the hydraulic oil
HRJVRadiotelephony - Single sideband full carrier
HSTT11 %
HSUT Use the "cleaning in place" arrangement or open the heat exchanger for visual inspection and manual cleaning.
HSXBCargo ships of less than 500 tons gross
HSYUYou cannot survive in H.E. foam as the oxygen content is reduced.
HTAQ3 cm radar
HTAU4 Rocket parachute flares / 6 hand flares / 2 buoyant smoke signals
HTPSRaise the load
HTPXLoose tight clothing, ask all unnecessary bystanders to leave and carefully place something soft under the head. If casualty is unconscious, place the person in Recovery position.
HTQNAir in the cooling water system.
HTVIIn tanks not adjacent to the ship's shell plating having heating coils?
HTYWForward spring is given by D on the figure
HUHCExpands
HUIBThey shall be carried in cargo tanks independent of the ships hull structure?
HUPOSingapore
HUSVFoam.
HUTXDuration of public correspondence communications
HVEREach lifeboat shall be launched with its assigned crew, and manoeuvred in the water at least once every three months during an abandon ship drill
HVGCWilliamson Turn
HVGDAnswering Pendant
HVGHHe is asking about the position of the chain
HVJOChemical powder is the main medium for tank deck fire fighting on gas and chemical carriers
HVKHYes, neutral atmosphere in hold space on all gas carriers exempt from those who have independent type C tanks
HVQGOne month
HWBCToo low suction pressure.
HWCB2 lines of position.
HWDR2
HWHDTo cool, remove sulphur dioxide and particulate soot from the flue gas?
HWKIsubstitutes for key persons who may become disabled
HWQGStand on dry insulating material and pull the person away with isulating material.
HXBCLower lifeboat to water
HXCQan area within the radiotelephone coverage of at least one VHF coast station in which continuous DSC alerting is available
HXGDVHF-equipment
HXGIrescue boat
HXHSFor at least three years
HXIMWhen temporary bulkheads (bins) are used on deck, openi