CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional...

14
CERN X-band Test-Stand CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide =50 mm SLED Pulse compressor Mode convertors RF Valve Circular pumping port Status 03/2010

Transcript of CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional...

Page 1: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

CERN X-band Test-StandCERN X-band Test-Stand

CERN - CEA – PSI – SLAC

High voltage modulator

Klystron XL5

Directional coupler

Circular waveguide =50 mm

SLED Pulse compressor

Mode convertorsRF Valve

Circular pumping port

Status 03/2010

Page 2: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

MilestonesMilestones

12.2006 CLIC Frequency change: 30 GHz ► 12 GHz 01.2008 Mandate for 12 GHz test-stand at CERN 10.2008 SLAC WFOA: Design and Production of

klystron 09.2008 “ French White Paper”: Modulator, PC and

RF-Component Supply 12.2008 CERN component review 02.2009 Pulse Compressor order to GYCOM 05.2009 CEA tender for Modulator 09.2009 Modulator contract with Scandinova 12.2009 Start of klystron testing at SLAC

2

Page 3: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

OrganizationOrganization

CLIC WS October 08

KlystronG.McMonagleG. Rossat

ModulatorCEA &G.McMonagle

WaveguidesG.McMonagleG. Rossat

Pulse CompressorCEA &I.SyratchevK. Schirm

Operation/ControlsM.DraperS. Dobert

Low-level RFJ. MourierL. Timeo

InfrastructureJ.MonteiroK. Schirm

Test-StandG.RiddoneS. DobertK. Schirm

G. McMonagleF. Peauger CEAK. Schirm

Page 4: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

KlystronKlystron

KM Schirm BE-RF4

Page 5: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

XL5 2AXL5 2A

5

Page 6: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

XL5 dressingXL5 dressing

6

Page 7: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

XL5 1A testingXL5 1A testing

7

Page 8: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

TWT driverTWT driver

8

Page 9: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

ComponentsComponents

GYCOM

Cooling System

Oil Pumps/Filter

Filament PS Core Bias PS

Primary Power Connections

Control PCB, Sol PS, Vac PS, RF equippment

HVPS, New place

Flow Guards

RF-Valve Courtesy: F. Peauger CEA

Pulse Compressor Courtesy: GYCOM/I. Syratchev

Page 10: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

Pulse Compressor Pulse Compressor (GYCOM)(GYCOM)

KM Schirm BE-RF 10

Page 11: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

CLIC WS 10/2009 KM Schirm BE-RF 11 1Time (ns)

Output PC power amplitude (MW)

Input PC power amplitude (MW)

Input PC power phase (deg)

Time (ns)

Q0 = 150000

QL = 25000

β=Q0/Qx = 5

Reflexion coef = 0.67

SLED Filling time = 0.663 µs

Phase step of 86 deg (1.5 rad) and linear variation from 86 to 180 deg

Filling SLED: 1.2 µs

Slope phase step: 20 ns

Flat top : 300 ns

120 MW, 300 ns assuming 15% of losses in the RF network

Pulse waveform after SLED compression

Power multiplication factor = 2.75

Page 12: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

LL-RFLL-RF

Collaboration Meeting 01/2009 KM Schirm BE-RF12

Page 13: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

FlangesFlanges

CLIC WS 10/2009 KM Schirm BE-RF 13

Page 14: CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.

ConclusionConclusion

Delays in the supply of modulator, some RF network components and installation (due to fire)

Klystron performance promising Pulse Compressor needs additional effort Installation will proceed in 3 phases: Power source

commissioning - RF network comm. – Test Stand comm.

14