CERN Safety Alarm MonitoringCERN Safety Alarm Monitoring(CSAM)(CSAM)
CERN Safety Alarm System Supervisory BoardCERN Safety Alarm System Supervisory Board
6st meeting6st meeting
Luigi Scibile & CSAM project teamLuigi Scibile & CSAM project team
CSAM ProjectCSAM Project
Status reportStatus report (Since last Supervisory Board)(Since last Supervisory Board)
Contract signed 3rd September 2001Contract signed 3rd September 2001 Training of the contractor teamTraining of the contractor team Successful Work Package 1 - Phase 1Successful Work Package 1 - Phase 1
Quality Assurance Plan, Development Plan and Safety Plan, project Management Plan, Configuration Management Plan
General Specifications and Preliminary Risk Calculations
Installed HMI prototype for the validation of the firemenInstalled HMI prototype for the validation of the firemen CSAM on EDMS and new Web_Working_areaCSAM on EDMS and new Web_Working_area EMC directives and expected resultsEMC directives and expected results
CSAM ProjectCSAM Project
Current StatusCurrent Status
Approval of the detailed SW/HW specifications Approval of the detailed SW/HW specifications Working on SW/HW designWorking on SW/HW design Validation of the HMI for the firemen Validation of the HMI for the firemen Review of the network strategy with IT/CSReview of the network strategy with IT/CS Test using the recommended SCADA not successful so Test using the recommended SCADA not successful so
farfar
Financial plan in line with estimates and with no cutsFinancial plan in line with estimates and with no cuts
CSAM ProjectCSAM Project
Review of the network strategyReview of the network strategy(current status of the review)(current status of the review)
For LHC For LHC Safety Network -> New Accelerator Network Technical Network -> General Network
For SPS and prevessinFor SPS and prevessin Safety Network -> ? - New Accelerator Network Technical Network -> Extension of General Network
(Not present in the BAs)
For Meyrin siteFor Meyrin site Safety Network -> ? - New Accelerator Network Technical Network -> General Network
Alim: Via ST/EL
€: Included in IT Budgets
Alim: Via ST/EL
€: Included in IT Budgets
Alim: ?
€: ?
Alim: ?
€: ?
Alim: Via ST/MA ??
€: connections included in ST budgets
Alim: Via ST/MA ??
€: connections included in ST budgets
CSAM ProjectCSAM Project
Short-term milestonesShort-term milestones
System realisation completed by May/June 2002System realisation completed by May/June 2002 Pilot installation in SM18 by August/September 2002Pilot installation in SM18 by August/September 2002 Acceptance Testing by October/November 2002Acceptance Testing by October/November 2002
CSAM ProjectCSAM Project
ConclusionsConclusions
After a period of orientation, the consortium is After a period of orientation, the consortium is performing up to expectations and in a very good performing up to expectations and in a very good partnership spiritpartnership spirit
Few problems encountered during the set-up of the Few problems encountered during the set-up of the contracts have been successfully solvedcontracts have been successfully solved
Budget cuts have indirectly affected the projectBudget cuts have indirectly affected the project Networks, Cabling, UPS, etc.
The proposal for the safety network is being revisedThe proposal for the safety network is being revised The tests on the safety aspects of the recommended The tests on the safety aspects of the recommended
SCADA system have not been successful so farSCADA system have not been successful so far