by WilkinsonEyre Ceramics Galleries Link Bridge, Victoria & Albert Museum This jewel-like bridge plays an important role in the ongoing development of the Victoria & Albert Museum in London. It provides a stepped escape route from the newly refurbished Ceramics Gallery across an external space to the adjacent Secretariat block. This functional requirement has been beautifully resolved with a dramatic and elegantly detailed structural form. A simple folded, perforated stair plate is supported between angled portal frames arranged at regular centres. Shelter is provided overhead by an integrated glazed canopy and the whole composition is celebrated at night by an illuminated wall which will be visible from Cromwell Road outside the Museum. Having received unconditional planning approval, unexpected for such a sensitive site, the bridge was completed in October 2009, in time for the opening of the refurbished Ceramics Galleries. Details Location: London, UK Client: Victoria & Albert Museum Architect: WilkinsonEyre Structural Engineer: Dewhurst MacFarlane Span: 7.5m Value: £250k Completed: October 2009 Awards RIBA 2010 Shortlisted

Transcript of Ceramics Galleries Link Bridge, Victoria & Albert Museum · Ceramics Galleries Link Bridge,...

by WilkinsonEyre

Ceramics Galleries Link Bridge, Victoria & Albert Museum

This jewel-like bridge plays an important role in the ongoing development of the Victoria & Albert Museum in London. It provides a stepped escape route from the newly refurbished Ceramics Gallery across an external space to the adjacent Secretariat block. This functional requirement has been beautifully resolved with a dramatic and elegantly detailed structural form.

A simple folded, perforated stair plate is supported between angled portal frames arranged at regular centres. Shelter is provided overhead by an integrated glazed canopy and the whole composition is celebrated at night by an illuminated wall which will be visible from Cromwell Road outside the Museum. Having received unconditional planning approval, unexpected for such a sensitive site, the bridge was completed in October 2009, in time for the opening of the refurbished Ceramics Galleries.

DetailsLocation: London, UK Client: Victoria & Albert Museum Architect: WilkinsonEyre Structural Engineer: Dewhurst MacFarlane Span: 7.5mValue: £250k Completed: October 2009

AwardsRIBA 2010 Shortlisted