eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03 CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue Edouard-Belin 31401 TOULOUSE Cedex 4 Rond-point de l'Espace 91023 EVRY Cedex SDS/G BP 254 - 97377 KOUROU CEDEX CODE IDENTIFICATION PROJET VG-CT-2-C-0002-CNES EDITION : 2 REVISION : 0 Date édition ou dernière révision :16/05/2003 REF. D'AUTEUR:SDS/PL/OI/2003-0119 CLASSE : 1 CATEGORIE : 1 RESERVE A L'INDUSTRIEL PROJECT : VEGA GROUND SEGMENT DOCUMENT TITLE : SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT – CALL FOR TENDER “FLUID GENERAL MEANS VEGA” NOM & FONCTION DATE & SIGNATURE PREPARE PAR: Pour l’ensemble des auteurs P. ROYO SDS/PL/OI 16/05/2003 POUR APPROBATION: J BERTRAND SDS/PL/OI 16/05/2003 POUR ACCEPTATION: M VALES Chef de projet SDS/PL/SV 16/05/2003 APPLICATION AUTORISEE PAR: M CARDONE VEGA GS Manager ESA/IPT LISTE DE DIFFUSION Nb A I SDS/SG/MS/BT 1 X SDS/PL/OI PM ROBERT T FIGEAC SDS/SM/CT C GAULHET J PEGOURIE SDS/SM/CT B AUDEGEAN C MOULY SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA A DESROCHES SDS/PL/IR P GUILHEM SDS/PL/SE J TANGUY A=Action I=Information

Transcript of CENTRE NATIONAL D'ETUDES SPATIALES...

Page 1: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Sous-Direction Développements Sol

18, Avenue Edouard-Belin 31401 TOULOUSE Cedex 4

Rond-point de l'Espace 91023 EVRY Cedex

SDS/G BP 254 - 97377 KOUROU CEDEX

CODE IDENTIFICATION PROJET

VG-CT-2-C-0002-CNESEDITION : 2 REVISION : 0

Date édition ou dernière révision :16/05/2003

REF. D'AUTEUR:SDS/PL/OI/2003-0119

CLASSE : 1 CATEGORIE : 1

RESERVE A L'INDUSTRIEL

PROJECT : VEGA GROUND SEGMENT

DOCUMENT TITLE :

SPECIAL TECHNICAL CONDITIONS OF THECONTRACT – CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

NOM & FONCTION DATE & SIGNATURE

PREPAREPAR:

Pour l’ensemble desauteurs

P. ROYOSDS/PL/OI

16/05/2003

POURAPPROBATION: J BERTRAND

SDS/PL/OI

16/05/2003

POURACCEPTATION: M VALES

Chef de projetSDS/PL/SV

16/05/2003

APPLICATIONAUTORISEE

PAR:

M CARDONEVEGA GS Manager

ESA/IPT

LISTE DE DIFFUSION Nb A I

SDS/SG/MS/BT 1 X

SDS/PL/OI PM ROBERT T FIGEAC

SDS/SM/CT C GAULHET J PEGOURIE

SDS/SM/CT B AUDEGEAN C MOULY

SDS/SM/AS JC PATALANO

SDS/SM/ES P CLAUZEL

SDS/AP/SY A CUENCA A DESROCHES

SDS/PL/IR P GUILHEM

SDS/PL/SE J TANGUY

A=Action I=Information

Page 2: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Sous-Direction Développements Sol

18, Avenue Edouard-Belin 31401 TOULOUSE Cedex 4

Rond-point de l'Espace 91023 EVRY Cedex

SDS/G BP 254 - 97377 KOUROU CEDEX

LANGUE:Fr EDITION : 2 REVISION : 0

DATE D'EDITION OU DERNIERE REVISION : 16/05/2003

CODE IDENTIFICATION PROJET

VG-CT-2-C-0002-CNES

FICHESIGNALETIQUE

FICHIER INFORMATIQUE

D:\Donnees\Secrétariat\Projet VEGA\AO Avril 2003_CF etFluides\2_Docs modifiés suite à PRE-TEB\Anglais\Volume 1 -

Anglais - Doc\eng_CCTP-OIPR0011903.20A

Nombre de pages totales (y/c annexeset pages de garde): 36

Nb de pagesannexes:

TITRE:

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT – CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

NOM (S) AUTEUR (S)P. ROYO SDS/PL/OI) C GAULHET – C MOULY – J PEGOURIE – B AUDEGEAN(SDS/SM/CT) P CLAUZEL (SD/SM/ES) JC PATALANO (SDS/SM/AS)

TYPE DE DOCUMENT

NOTE TECHNIQUE

CLASSEMENT PHYSIQUE N° MARCHE CLASSE: 1

CATEGORIE: 1

RESUME D'AUTEUR

This document presents the Special Technical Conditions of the contract (CCTP) for the Corporate Call for TenderDossier (DCE) concerning the construction of the “Fluid”, “Safety Low Current” and “Communication” systeminstallations of the future VEGA Launch Site in French Guyana (SLV).

MOTS CLES (mis par l'auteur) RESERVE AUX INDUSTRIELS

CCTPFluidsSafety Low CurrentsCommunicationVEGA

Page 3: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 3/36 Ed.: 2 Rév.: 0 Date :16/05/2003

EDITION REVISION DATE OBJET DE LA MODIFICATION

1 0 28/03/2003 Original Issue, DCE Version

2 0 16/05/2003 DCE Version after PRE-TEB.

Page 4: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 4/36 Ed.: 2 Rév.: 0 Date :16/05/2003

TABLE OF CONTENTS1. PURPOSE ............................................................................................................................................................................7

2. PRESENTATION OF S.L.V ..............................................................................................................................................7

3. CORPORATE CALL FOR TENDER TECHNICAL DOSSIER ...................................................................................7

3.1. MANAGEMENT SPECIFICATIONS.........................................................................................................................83.2. GROUND QUALITY SPECIFICATIONS ..................................................................................................................83.3. TECHNICAL SPECIFICATIONS ...............................................................................................................................8

3.3.1. FLUID SYSTEMS .....................................................................................................................................................83.3.2. LOW CURRENT AND SAFETY SYSTEMS ..............................................................................................................83.3.3. COMMUNICATION SYSTEMS................................................................................................................................8

4. APPLICABLE DOCUMENTS...........................................................................................................................................9

4.1. STANDARDS ..............................................................................................................................................................94.2. DECREES, CIRCULARS AND RULES .....................................................................................................................94.3. DIRECTIVES...............................................................................................................................................................94.4. GROUND TECHNICAL INSTRUCTIONS ................................................................................................................94.5. INFORMATION SYSTEM SAFETY REQUIREMENTS ........................................................................................104.6. SOFTWARE CONFIGURATION MANAGEMENT REQUIREMENTS................................................................104.7. SITE ACTIVITIES.....................................................................................................................................................104.8. SPECIAL COMPONENT AND EQUIPMENT SPECIFICATIONS ........................................................................104.9. CONTROL COMMAND INTERFACES SPECIFICATIONS..................................................................................10

5. REFERENCE DOCUMENTS..........................................................................................................................................11

6. APPLICABLE DRAWINGS ............................................................................................................................................11

6.1. FLUID PROCESS DRAWINGS:.........................................................................................................................................116.2. FLUID NOMENCLATURE: ..............................................................................................................................................116.3. GENERAL INFORMATION 1600............................................................................................................................116.4. INTER SITES 1603....................................................................................................................................................126.5. MECHANICAL DRAWINGS BIV 1602...................................................................................................................126.6. VEGA 1601 LAUNCH BUNKER .............................................................................................................................126.7. GANTRY....................................................................................................................................................................136.8. 1D60 SUB-STATION ................................................................................................................................................156.9. ZEPHIRO CELL.........................................................................................................................................................156.10. VEGA OFFICE BUILDING ......................................................................................................................................166.11. CDL3 ..........................................................................................................................................................................16

7. GLOSSARY .......................................................................................................................................................................17

8. DCE PARTICULARITIES...............................................................................................................................................18

8.1. GUYANA SPACE CENTER .............................................................................................................................................188.2. SYSTEM CLASSIFICATION.............................................................................................................................................188.3. SITE RECONNAISSANCE .......................................................................................................................................188.4. RECOVERY OF EXISTING EQUIPMENT .............................................................................................................18

9. GENERAL TECHNICAL INFORMATION..................................................................................................................18

9.1. RACKS.......................................................................................................................................................................199.2. CABLE TRAYS .........................................................................................................................................................199.3. EQUIPMENT PROTECTION INDEXES..................................................................................................................209.4. EXPLOSION RISK ZONES ......................................................................................................................................209.5. LIGHTNING PROTECTION.....................................................................................................................................209.6. ELECTRO-MAGNETIC COMPATIBILITY (C.E.M)..............................................................................................209.7. EQUIPMENT IDENTIFICATION ............................................................................................................................21

Page 5: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 5/36 Ed.: 2 Rév.: 0 Date :16/05/2003

10. INTERFACES...............................................................................................................................................................21

10.1. INTERFACES WITH THE CIVIL ENGINEERING WORK PACKAGE.....................................................................................2110.2. INTERFACES WITH THE ENERGY WORK PACKAGE .......................................................................................................21

10.2.1. Power supplies ...................................................................................................................................................2110.2.2. Information re-transmission...............................................................................................................................22

10.3. INTERFACES WITH THE AIR-CONDITIONING WORK PACKAGE......................................................................................2210.4. INTERFACES WITH THE MECHANICAL WORK PACKAGE...............................................................................................22

10.4.1. Electrical coiled cables ......................................................................................................................................2210.4.2. Installation of equipment and cable trays ..........................................................................................................2310.4.3. Partition crossings .............................................................................................................................................23

10.5. INTERFACES WITH THE CCS SYSTEM...........................................................................................................................2310.6. INTERFACES WITH THE BCV SYSTEM ..........................................................................................................................23

11. PROPERTY MANAGEMENT....................................................................................................................................23

12. PRODUCT FLOWCHART .........................................................................................................................................24

13. REGULATORY CHECKS ..........................................................................................................................................24

14. TESTS ............................................................................................................................................................................24

14.1. FACTORY ACCEPTANCE TESTS..........................................................................................................................2414.2. INDUSTRIAL TESTS ON SITE (TYPE 0) .................................................................................................................24

14.2.1. For fluid systems ................................................................................................................................................2514.2.2. For Low Current and Communication systems..................................................................................................25

14.3. SITE ACCEPTANCE TESTS (TYPE 1)......................................................................................................................2514.4. TECHNICAL QUALIFICATION TESTS .................................................................................................................2614.5. INTEGRATED AND COMBINED TESTS...............................................................................................................26

14.5.1. Integrated tests...................................................................................................................................................2614.5.2. Combined tests ...................................................................................................................................................2614.5.3. Test team ............................................................................................................................................................27

15. AVAILABILITY BEFORE INTERVENTION..........................................................................................................27

16. SOFTWARE CONFIGURATION MANAGEMENT ...............................................................................................27

17. INFORMATION SYSTEM SAFETY .........................................................................................................................28

18. DEPENDABILITY .......................................................................................................................................................28

19. MAINTENANCE ..........................................................................................................................................................28

20. MAINTENANCE BATCH ...........................................................................................................................................28

21. INITIAL BATCH..........................................................................................................................................................28

22. DOCUMENTATION....................................................................................................................................................29

23. TRAINING ....................................................................................................................................................................29

24. WORKS STUDY SYNTHESIS....................................................................................................................................29

25. SCHEDULING, COORDINATION AND STEERING.............................................................................................29

25.1. SCHEDULING AND PLANNING.......................................................................................................................................2925.2. COORDINATION ...........................................................................................................................................................3025.3. STEERING ....................................................................................................................................................................30

Page 6: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 6/36 Ed.: 2 Rév.: 0 Date :16/05/2003

26. CLEANING ...................................................................................................................................................................30

27. SPS COORDINATION.................................................................................................................................................30

28. SITE INSTALLATIONS..............................................................................................................................................30

29. GUARANTEE ...............................................................................................................................................................30

30. SCOPE OF SUPPLY ....................................................................................................................................................31

31. TIME SCHEDULE AND PLANNING .......................................................................................................................31

32. APPENDIX NO.1 ..........................................................................................................................................................31

33. VARIANTS....................................................................................................................................................................35

33.1. FLUIDS SYSTEMS (VG-ST-2-C-0016-CNES): .............................................................................................................3533.2. LOW CURRENT AND SAFETY SYSTEMS (VG-ST-2-C-0006-CNES): .............................................................................3533.3. OPTICAL AND VIDÉO SYSTEMS (VG-ST-2-C-0028-CNES): ........................................................................................36

34. LES MATERIELS IMPOSES .....................................................................................................................................36

34.1. FLUIDS SYSTEMS (VG-ST-2-C-0016-CNES): .............................................................................................................3634.2. LOW CURRENT AND SAFETY SYSTEMS (VG-ST-2-C-0006-CNES): .............................................................................3634.3. ROMULUS EXTENSION AND OPERATIONAL REPORTS (VG-ST-2-C-0025-CNES):....................................................3634.4. INTERCOM AND RADIO MEANS SYSTEMS (VG-ST-2-C-0027-CNES): .........................................................................3634.5. OPTICAL AND VIDEO SYSTEMS (VG-ST-2-C-0028-CNES): ........................................................................................36

Page 7: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 7/36 Ed.: 2 Rév.: 0 Date :16/05/2003

1. PURPOSEThis document presents the Special Technical Conditions of the contract (CCTP) for the Corporate Callfor Tender Dossier (DCE) concerning the construction of the “Fluid”, “Safety Low Current” and“Communication” system installations of the future VEGA Launch Site in French Guyana (SLV).The future contract shall be named: FLUIDS � GENERAL MEANS

2. PRESENTATION OF S.L.VThe VEGA Launch Site installed in the Guyanese Space Center shall mainly comprised the followingstructures:� a launch zone including the bunker, the umbilical mast and the mobile gantry (former Ariane No.1

Launch Zone).

� a VEGA Launch Center VEGA installed in a room on the first floor of the armored part of the ArianeNo.3 Launch Center.

� offices and industrial rooms intended for VEGA teams working in the KEPLER and BESSELbuildings existing in the preparation zone of the Ariane No.2 Launch Complex.

� an integration cell of the ZEPHIRO stage installed in the preparation zone of the Ariane No.2 LaunchComplex.

� A launcher container storage zone installed in the assembly hall existing in the preparation zone ofthe Ariane No.2 Launch Complex.

The general presentation document of the VEGA Ground Segment reference VG-NT-2-C-0012-CNESmentioned in DR1 describes:� the main missions of the Ground Segment� the main definitions of the Ground Segment� the design constraints� the composition of the Ground Segment� the general architecture of the main structures

The layout drawings of the structures are listed in paragraph 6 of this document.

3. CORPORATE CALL FOR TENDER TECHNICAL DOSSIERThe Corporate Call for Tender Technical Dossier consists of:� Ground management specifications� Ground Quality specifications� CCTP� technical specifications of the “Fluids”, “Safety Low Currents” and “Communication” systems� a layout drawing dossier

Page 8: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 8/36 Ed.: 2 Rév.: 0 Date :16/05/2003

� the project planning.

3.1. MANAGEMENT SPECIFICATIONSThe applicable management specifications concerning the technical part are presented in documentDS-SM-2-C-0005-CNES.

3.2. GROUND QUALITY SPECIFICATIONSThe applicable quality specifications are presented in document VG-AP-20006-C-0008-CNES.

3.3. TECHNICAL SPECIFICATIONS3.3.1. FLUID SYSTEMSFluid systems to produce are described in the technical specification, reference: VG-ST-2-C-0016-CNES.Fluid systems encompass:� The compressed air system� The Nitrogen system� The Helium system� The drench water system� The UDMH system� The N2O4 system� The flame chute effluent treatment system

3.3.2. LOW CURRENT AND SAFETY SYSTEMSThe systems to produce are described in the technical specification reference: VG-ST-2-C-0006-CNES.Low Current and Safety systems encompass:� The pre-wiring system� The public address system� The Fire Detection system (DI)� The Fire Extinguishing system (EI)� The Gas Detection system (DETG)� The Toxic Vapor Detection system (DVT)� The Evacuation Alarm (AE) and Withdrawal system (AR)� The Ancillary Ground Process Interface system (INTF CCS)� The Operational Ground Process Interface system (INTF BCV)� The Ground Link system

3.3.3. COMMUNICATION SYSTEMSThe communications systems encompass the following systems, which are discussedindividually in a technical specification.� Intercom and radio means VG-ST-2-C-0027-CNES� Corporate network VG-ST-2-C-0026-CNES

Page 9: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 9/36 Ed.: 2 Rév.: 0 Date :16/05/2003

� PLANET extension and Telephony VG-ST-2-C-0029-CNES� Optical and video VG-ST-2-C-0028-CNES� Time synchronization VG-ST-2-C-0024-CNES� ROMULUS Extension and Operational Reports VG-ST-2-C-0025-CNES.

4. APPLICABLE DOCUMENTSThe applicable documents to be taken into account to produce the systems of the future Fluids �General Means contract are listed below:

4.1. STANDARDSAll harmonized European standards are applicable. Applicable national standards (French) may berequired for certain systems and especially:

NF.C-15-100: Low voltage electrical systems (New issue 2002)NF.C-17-100 (Dec. 1997): Lightning protection.C18610 (50166-2) on the exposure of the human body to electro-magnetic fields (operators)NF EN 10021 Compressed air for breathing apparatusNF EN 671-1 Fixed fire fighting systems

4.2. DECREES, CIRCULARS AND RULESDecree dated 14/11/88: Protection of operatorsDecree No.99.1046 dated 13/12/99: Transposition of European directive 97/23/CEE dated 29 May1997 into French law: Provisions applicable to pressurized equipment.Circular DPPP/SE – 28/10/96 and 28/12/93: Related to lightning protectionDecree 2002-775 dated 3 May 2002 on the exposure of the human body to electro-magnetic fields

(general public)Rules APSAD

4.3. DIRECTIVESDirective 73/23/CEE – Low VoltageDirective 89/336/CEE – Electro-magnetic compatibilityDirective 89/686/CEE – Individual protection equipmentDirective 94/9/CE – Explosive atmosphere regulations for free circulation of equipmentDirective ATEX 1999/92/CE – Explosive atmosphere regulations for protection of operators.

4.4. GROUND TECHNICAL INSTRUCTIONSDA 1 CSG-IP-1-1241-METC Special instructions for Low Current wiring of CSGDA 2 DS-IT-AP-33 Ground Technical Instruction “Electrical systems in explosive atmospheres”DA 3 DS-IT-IR-37 Ground Technical Instruction “Lightning protection”DA 4 DS-IT-AP-53 Ground Technical Instruction “General construction and installation rules for

electric and electronic equipment”DA 5 DS-IT-AP-54 Ground Technical Instruction “General requirements for links by busses

and optical fibers”DA 6 DS-IT-AP-57 Ground Technical Instruction “Earth and ground networks”DA 7 DS-IT-OI-60 General cleanliness specifications for cryogenic and non-cryogenic fluid

circuitsDA 8 DS-IT-OI-62 General specifications for non-cryogenic fluid circuit measurement

instrumentation

Page 10: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 10/36 Ed.: 2 Rév.: 0 Date :16/05/2003

DA 9 DS-IT-OI-63 General specifications for hydraulic proofing of cryogenic and non-cryogenic fluid circuits

DA 10 DS-IT-OI-64 General specifications for sealing of cryogenic and non-cryogenic fluidcircuits

DA 11 DS-IT-OI-65 General specifications for the construction of cryogenic and non-cryogenicfluid circuits

DA 12 DS-IT-OI-66 General specifications for type 0 acceptance testing of non-cryogenic fluidcircuits

DA 13 DS-IT-OI-67 Technical instruction related to welding of piping and fluid componentsDA 14 DS-IT-OI-68 Symbols and identification of fluid systems and instrumentationDA 15 DS-IT-OI-69 Welder qualifications.

4.5. INFORMATION SYSTEM SAFETY REQUIREMENTSAs part of these activities, the following documents are applicable:DA 16 VG-ST-21005-C-0021-CNES SSI technical requirements for systems in the Fluids �

General Means contract of the VEGA Ground SegmentDA 17 CSG-CS-B7-149-SPSI Version 2.0. Safety requirements specifications for information

systems for any contract or order given by the CNES

4.6. SOFTWARE CONFIGURATION MANAGEMENT REQUIREMENTSAs part of these activities, the following documents are applicable:

DA 18 VG-ST-2-C-20008-0030-CNES Technical requirements for software configurationmanagement

4.7. SITE ACTIVITIESAs part of site activities, the following documents are applicable:DA 19 VG-RS-2-C-0002-CNES Site regulationsDA 20 CSG-PR-SBX-000261-SEMS The safety presentation manual for welcoming outsidecontractorsDA 21 The General Coordination Plan, reference 3023-3-ang/SS Edition3

4.8. SPECIAL COMPONENT AND EQUIPMENT SPECIFICATIONSDA 22 VG-LC-20008-C-0001-CNES: List of recommended fluid components

DA 23 VG-ST-20008-C-0021-CNES: Fluid piping classes

DA 24 SDS-ST-0-0009-CNES : Technical Specifications - Silencers

DA 25 SDS-ST-0-0010-CNES : Technical Specifications - Exchangers

DA 26 SDS-ST-0-0011-CNES: Pressure relief and distribution panel

DA 27 SDS-STA-0-0012-CNES: Technical Procurement Specification – Fluid components

4.9. CONTROL COMMAND INTERFACES SPECIFICATIONSAs part of these activities, the following documents are applicable:

DA 28 VG-SI-200091-C-0015-CNES: BCV interfaces specifications

Page 11: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 11/36 Ed.: 2 Rév.: 0 Date :16/05/2003

DA 29 800.CS.1739.0001: CCS interfaces specifications

DA 30 SI/D/ZFRT-UW/01 : Unitelway interface specifications

DA 31 SI/D/ZFRT-MB/01 : Mod Bus interface specifications

5. REFERENCE DOCUMENTSDR 1 VG-NT-2-C-0012-CNES General presentation of the VEGA Ground SegmentDR 2 CNES-FD/SI-2001-520 Edition 1 Revision 0 “Integration policy for the information system safetyrelated to projects”DR3 CSG-IP-0361-269-AMMC Software configuration management requirements managed byAMMCDR4 VG-NT-210-C-0-00118-CNES Fluids implementation principle

6. APPLICABLE DRAWINGSThe drawings listed below represent the reference for the preparation of the technical and financialproposal by the tenderer:

6.1. Fluid process drawings:� 1600-TD-1739-0200: Fluid Process Drawings – N2O4� 1600-TD-1739-0300: Fluid Process Drawings – UDMH� 1600-TD-1739-0701: Fluid Process Drawings – Air Instruments (to come)� 1600-TD-1739-0600: Fluid Process Drawings – Helium / Nitrogen� 1600-TD-1739-0601: Fluid Process Drawings – LPS test panel� 1600-TD-1739-0602: Fluid Process Drawings – Pressure relief valve test panel� 1600-TD-1739-0603: Fluid Process Drawings –ACS test panel� 1600-TD-1739-0700: Fluid Process Drawings – Air� 1600-TD-1739-0800: Fluid Process Drawings – Drench water� 1600-TD-1739-0850: Fluid Process Drawings –Flame chute effluent treatment

6.2. Fluid nomenclature:� 1600-TN-1739-0001: Active Component Nomenclature� 1600-TN-1739-0002: Passive Component Nomenclature� 1600-TN-1739-0003: Instrument Component Nomenclature

6.3. GENERAL INFORMATION 1600-Vega Launch Zone No.1600.GD.1739.0001 1600G001-DCE.dwgExisting layout drawing

-Launch zone for Vega No.1600.GD.1739.0002 1600G002-DCE.dwgSite installation

- Vega Launch Zone No.1600.GD.1739.0003 1600G003-DCE.dwgRoadway project

Page 12: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 12/36 Ed.: 2 Rév.: 0 Date :16/05/2003

- Vega Launch Zone No.1600.GD.1739.0004 1600G004-DCE.dwgFluid network projectLow Current Energy

- Vega Launch Zone No.1600.GD.1739.0005 1600G005-DCE.dwgExisting roadway and miscellaneous networks ground

- Vega Launch Zone No.1600.GD.1739.0006 1600G006-DCE.dwgWater network project

6.4. INTER SITES 1603-Vega Launch Zone NO.1603.GD.1739.0001 1603G001-002-DCE.dwgIntersite drawing for TRANSPORTER P80 path

-Vega Launch Zone NO.1603.GD.1739.0002 1603G001-002-DCE.dwgIntersite drawing ELA2 ZLV.

6.5. MECHANICAL DRAWINGS BIV 1602� 1602 FD 1739 0010: BIV layout drawing, civil engineering interface� 1602 FD 1739 0011: BIV layout drawing, Level 14200/16400� 1602 FD 1739 0012: BIV layout drawing, Level 18400� 1602 FD 1739 0013: BIV layout drawing, Level 21200� 1602 FD 1739 0014: BIV layout drawing, Level 24000� 1602 FD 1739 0015: BIV layout drawing, Level 26600� 1602 FD 1739 0016: BIV layout drawing, Level 29200� 1602 FD 1739 0017: BIV layout drawing, Level 31800� 1602 FD 1739 0018: BIV layout drawing, Level 34400� 1602 FD 1739 0019: BIV layout drawing, Level 37000� 1602 FD 1739 0020: BIV layout drawing, Level 58150 – Travelling Crane� 1602 FD 1739 0021: BIV layout drawing, Cross-section AA� 1602 FD 1739 0022: BIV layout drawing, Cross-section� 1602 FD 1739 0023: BIV layout drawing, Elevator platform, plate1/4� 1602 FD 1739 0023: Elevator platform, bottom view, plate 2/4� 1602 FD 1739 0023: Elevator platform, front view, plate 3/4� 1602 FD 1739 0023: Elevator platform, side view, plate 4/4� 1602 FD 1739 0024: BIV layout drawing, Doors� 1602 FD 1739 0025: BIV layout drawing, Cross-section CC� 1602 FD 1739 0026: BIV layout drawing, Level 55000

6.6. VEGA 1601 LAUNCH BUNKER

CIVIL ENGINEERING PART-Vega Launch Area NO.1601.BD.1739.0001 1601B001-DCE.dwgProject Level + 14.00m

-Vega Launch Area NO.601.BD.1739.0002 1601B002-DCE.dwgGround floor Project

Page 13: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 13/36 Ed.: 2 Rév.: 0 Date :16/05/2003

-Vega Launch Area NO.1601.BD.1739.0003 1601B003-DCE.dwgBasement Project

-Vega Launch Area NO.1601.BD.1739.0004 1601B004-005-007-DCE.dwgCross-sections BB and CC

-Vega Launch Area NO.1601.BD.1739.0005 1601B004-005-007-DCE.dwgCross sections AA and DD

Vega Launch Area NO.1601.BD.1739.0006 1601B006-DCE.dwgFresh air intake

-Vega Launch Area NO.1601.BD.1739.0007 1601B004-005-008-DCE.dwgCross section CC Flame chute covered

-Vega Launch Area No.1601.BD.1739.0008 1601B004-005-008-DCE.dwgCross-sections BB CC Flame chute covered Option 2

ENERGY PART

-Vega Launch Area No.1601.ED.1739.0001 1601E001-DCE.dwgSchematic diagram

-Vega Launch Area No.1601.ED.1739.0002 1601E002-DCE.dwgGround floor Project, Equipment installation

-Vega Launch Area No.1601.ED.1739.0003 1601E003-DCE.dwgBasement Project, Equipment installation.

AIR-CONDITIONING

-Vega Launch Area No.1601.VD.1739.0001 1601V001-DCE.dwgAir-conditioning block diagram

Vega Launch Area No.1601.VD.1739.0002 1601V002-DCE.dwgGround floor Air-conditioningEquipment installation

-Vega Launch Area No.1601.VD.1739.0003 1601V003-DCE.dwgBasement Project, Air-conditioningEquipment installation

6.7. GANTRYAIR-CONDITIONING PART

-Vega Launch Area No.1602.VD.1739.0001 1602V001-DCE.dwgGantry air-conditioningEquipment installation, Level 14.2- 16.40

-Vega Launch Area No.1602.VD.1739.0002 1602V002-DCE.dwg

Page 14: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 14/36 Ed.: 2 Rév.: 0 Date :16/05/2003

Gantry air-conditioningEquipment installation, Level 18.40

-Vega Launch Area No.1602.VD.1739.0003 1602V003-DCE.dwgGantry air-conditioningEquipment installation, Level 21.20 22.20

-Vega Launch Area No.1602.VD.1739.0004 1602V004-DCE.dwgGantry air-conditioningEquipment installation, Level 24.00

-Vega Launch Area No.1602.VD.1739.0005 1602V005-DCE.dwgGantry air-conditioningEquipment installation, Level 26.60

-Vega Launch Area No.1602.VD.1739.0006 1602V006-DCE.dwgGantry air-conditioningEquipment installation, Level 29.20

-Vega Launch Area No.1602.VD.1739.0007 1602V007-DCE.dwgGantry air-conditioningEquipment installation, Level 31.80

-Vega Launch Area No.1602.VD.1739.0008 1602V008-DCE.dwgGantry air-conditioningEquipment installation, Level 34.40

-Vega Launch Area No.1602.VD.1739.0009 1602V009-DCE.dwgGantry air-conditioningEquipment installation, Level 37.00

-Vega Launch Area No.1602.VD.1739.0010 1602V0010-DCE.dwgGantry air-conditioningEquipment installation, Level 55.00

Vega Launch Area No.1602.VD.1739.0011 1602V0011-DCE.dwgGantry air-conditioning Equipment installation, Level 58.150

Vega Launch Area No.1602.VD.1739.0012 1602V0012-DCE.dwgGantry air-conditioning Equipment installation, Longitudinal Cross-section

Vega Launch Area No.1602.VD.1739.0013 1602V0013-DCE.dwgGantry air-conditioningEquipment installation Transversal Cross-section

ENERGY PART

-Vega Launch Area No.1602.ED.1739.0002 1602E002-DCE.dwgGantry energyEquipment installation, Level 18.40

Page 15: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 15/36 Ed.: 2 Rév.: 0 Date :16/05/2003

-Vega Launch Area No.1602.ED.1739.0003 1602E003-DCE.dwgGantry energyEquipment installation, Level 21.20-22.20

-Vega Launch Area No.1602.ED.1739.0004 1602E004-DCE.dwgGantry energyEquipment installation, Level 24.00

-Vega Launch Area No.1602.ED.1739.0005 1602E005-DCE.dwgGantry energyEquipment installation, Level 26.60

-Vega Launch Area No.1602.ED.1739.0006 1602E006-DCE.dwgGantry energyEquipment installation, Level 29.20

-Vega Launch Area No.1602.ED.1739.0007 1602E007-DCE.dwgGantry energyEquipment installation, Level 31.80

-Vega Launch Area No.1602.ED.1739.0008 1602E008-DCE.dwgGantry energyEquipment installation, Level 34.40

-Vega Launch Area No.1602.ED.1739.0009 1602E009-DCE.dwgGantry energyEquipment installation, Level 37.00

6.8. 1D60 SUB-STATION

-Vega Launch Area No.16006 BD 1739 0001 16006B001-DCE.dwg1D60 sub-station, plan view

-Vega Launch Area No.16006 ED 1739 0001 16006E001-DCE.dwg1D60 sub-station, plan viewEquipment installation

-Vega Launch Area No.16006 ED 1739 0002 16006E002-DCE.dwg1D60 sub-station, Block diagramH.T. Cells

6.9. ZEPHIRO CELL

-ELA2 Preparation zone No.1981 GD 1739 0001 1600?G001-DCE.dwgPreparation cell installation, Zephiro

-ELA2 Preparation zone No.1981 BD 1739 0001 1600?B001-DCE.dwgCell preparation building, Zephiro

-ELA2 Preparation zone No.1981 ED 1739 0001 1981E001-DCE.dwgCell preparation building, Zephiro

Page 16: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 16/36 Ed.: 2 Rév.: 0 Date :16/05/2003

Energy installation.

6.10. VEGA OFFICE BUILDING-Preparation zone ELA2 No.1604.BD.1739.0001 1604B001-DCE.dwgFitted out Vega office buildingKepler Bessel ground floor

6.11. CDL3-ELA3 Preparation zone No.841.BD.1739.0002 841-bd-1739-0002-s.dwgLaunch Center CDL3Vega project room fitting out1st floor, plan view.

Page 17: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 17/36 Ed.: 2 Rév.: 0 Date :16/05/2003

7. GLOSSARY

ACS Attitude Control SystemAD To be definedAE Evacuation AlarmAR Withdrawal AlarmATEX Explosive AtmosphereAVUM Attitude Vernier Upper MobileBIV VEGA Integration BuildingCCS Housekeeping Control-CommandCCTP Special Technical Conditions of the ContractCDL3 Ariane No.3 Launch CenterCEE European Economic CommunityCEM Electro-magnetic CompatibilityCNES French Space AgencyDA Applicable DocumentDCE Corporate Call for Tender DossierDETG Gas DetectionDI Fire DetectionDR Reference DocumentDVT Toxic Vapor DetectionEI Fire ExtinguishingESA European Space AgencyINTF BCV VEGA Ground Checkout Equipment Process InterfaceINTF CCS Housekeeping Control-Command Process InterfaceLPS Liquid Propulsion SystemMAD AvailabilityMTBF Mean Time Between FailureMTTR Mean Time To RepairN2O4 Nitrogen PeroxideNSI Non-built in safetyPGC General Coordination PlanPLANET Payload Local Area Net WorkROMULUS Space Oriented Multi-Service Operational NetworkSDS Ground Sub-divisionSI Built-in SafetySLV VEGA Launch SiteTD Sectioning SwitchboardTQC As BuiltUDMH Asymmetric DimethylhydrazineVRD Roadways and Miscellaneous Networks

Page 18: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 18/36 Ed.: 2 Rév.: 0 Date :16/05/2003

8. DCE PARTICULARITIESThe attention of the tenderer is drawn to the fact that the proposal must take into account the mainparticularities related to the environment of the future project.The future contract holder cannot, in any case, make claims (financial or schedule) concerning theseparticularities.

8.1. Guyana Space CenterWorks shall be carried out within the confines of the Guyana Space Center (CSG).The tenderer shall abide by the rules and directives applicable at CSG.Consequently, the tenderer, prior to handing in any proposal, shall read these rules. In no casewhatsoever can the tenderer make claims with regard to these constraints.

8.2. System classificationStructure of the VEGA Ground Segment Project (and especially the launch zone) shall be subject toan authorization to operate according to ICPE regulations (Classified System for EnvironmentalProtection).The future holder of the contract shall comply with this regulation and provide all document required toprepare the operation authorization request (DDAE), following.

8.3. SITE RECONNAISSANCEAs most systems to produce are interfaced with existing systems and as installation of these systemsis on an operational site, the tenderer may carry out a reconnaissance visit at his expenseThis visit will make it possible to take into account in particular:

� the site access constraints� the back-up constraints� the technical constraints related to the Guyanese environment

8.4. RECOVERY OF EXISTING EQUIPMENT

All equipment as specified in the various technical specifications indicated in applicable documentsshall be provided to the holder of the future FLUIDS & GENERAL MEANS contract.However, the customer reserves the right to provide a certain amount of equipment recovered fromexisting systems of the Ariane No.2 Launch Complex.In this case, the future contract holder promises to use all recoverable equipment. He will considerthat the equipment shall be provided on the site in good operating condition.Transport of this equipment for future possible acceptance, platform type, shall none-the-less be athis expense.Currently, the list of recoverable equipment has not been completed.

9. GENERAL TECHNICAL INFORMATION

Page 19: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 19/36 Ed.: 2 Rév.: 0 Date :16/05/2003

This chapter details specific technical points to be taken into account when estimating the proposal forthe future “Fluids & General Means” contract in compliance with the different GROUND technicalinstructions referred to in paragraphs of documents applicable to this CCTP.

9.1. RACKSIn addition to the requirements in DS-IT-AP-53, the main characteristics of the racks to install arelisted below� Metal structure� standard 19"� maximum height 42 U� mechanical attachment to ground� front and rear door translucids, removable and key lockable� fitted with a device enabling mechanical sealing of side panels and doors� equipped with electric power supply cut-off devices� identification complying with CNES specifications� mechanical extraction of air according to heat dissipation of integrated equipment� equipotential link bond to the ground.For the gantry and the bunker, ELDON make racks (or equivalent) are recommended.

For the mast and Room 101 of the bunker, reinforced racks made by TSEIN (or equivalent) arerecommended.

Actually, those racks provide the facility to be sprang in order to absorb vibration and noise producedby the launcher take off.

The futur tenderer will not be in charge of the absorbing system.The tenderer will mention the weightof each completly integrated racks.An equipment layout drawing dossier, with wiring and connections, shall be provided for each rack.

9.2. CABLE TRAYSCable trays to install shall consist of marine slabs, hot galvanized, size enabling a 30% extension.Cabling trays shall be located at a distance of at least 50 cm from energy cable trays and shall beinter-connected to the ground network every meter, or at least at each connection.A fireproof product (isoflam type) shall be laid under and on cables over a distance of approximately50 cm on either side of any crossings through partitions.

The following separate cable trays shall be installed:� Low Currents for all communication and safety low currents system cables except for electric

power supply cables which will be routed on the high current cable trays.� High Currents for all electrical power supply cables of the fluid, safety low current and

communication systems.� Operational process interface or NSI housekeeping for all non-fail-safe cables transmitting

information� Operational process interface or SI housekeeping for all fail-safe cables transmitting information� NSI SAFETY process interface for non-fail-safe cables transmitting safety information� SI SAFETY process interface for all fail-safe cables transmitting safety informationThe different cable trays shall be identified with an engraved label secured to the cable tray at leastevery 3 m and in each new room.This cable shall be blue for SI cable trays.

Page 20: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 20/36 Ed.: 2 Rév.: 0 Date :16/05/2003

9.3. EQUIPMENT PROTECTION INDEXES

The equipment to install in the various rooms or outside shall be adapted to the risks encountered(protection against risk of shock, sprayed water or penetration of solid bodies) and to the externalenvironment of Guyana (humidity, sunlight, air salinity)

All rooms in SLV buildings shall be classified in compliance with standard NF C 15100 except forgantry and ZEPHIRO cell rooms which will comply with the IP 55 protection index and the IK 07mechanical impact resistance index.

9.4. EXPLOSION RISK ZONESExplosion risk zones (ATEX) of the VEGA Launch Zone are limited to:1 – The gantry for the room and circulation areas of storable propellant “UDMH”The identified explosion risk volumes are:� circulation between the gantry entry and the lift� the gantry lift� circulation between the lift and the fluid room “UDMH”� fluid room “UDMH”� a 3 meter cylindrical volume around flexible pipes and fixed piping between the fluid room

“UDMH” and the hooking device on the AVUM stage� a 5 meter spherical volume around the UDMH hooking device on the AVUM stage during fuelling

operations� 3 meters around the skin of the AVUM stage and of the fairing after fuelling2 – To the toxic effluent treatment zone UDMH: For this zone, the explosion risk volumes shall bedefined later.

In these zones, the equipment and electrical systems shall be adapted to IIB T4for class risks.

To ensure system conformity, a check to be carried out by an approved organization during studiesand on site, shall be scheduled by the tenderer.

9.5. LIGHTNING PROTECTIONVery special care shall be made to lightning protection of all equipment and provisions associatedwith implementation of cable trays and links in compliance with the applicable documents mentionedin paragraph 4 of this CCTP.

9.6. ELECTRO-MAGNETIC COMPATIBILITY (C.E.M)The tenderer shall pay special care to the observance of the electro-magnetic susceptibility of thevarious existing systems.In particular, for systems where the function is to out-search and depending on the location ofequipment the contractor shall prove the compatibility of transmission levels with the susceptibility of:� launchers� payload� ground equipment (French and European standards in force)� pyrotechnical equipmentAlso, the tenderer shall take into account all precautions required to ensure that installed equipment isnot disturbed by the various existing systems that may be sources of radiation (radar, antennae, etc…).

Page 21: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 21/36 Ed.: 2 Rév.: 0 Date :16/05/2003

Extrated from the VEGA launcher specification VEGA – ESA – SP - 001 , the tenderer shalltake intoaccount the following transmission levels :

From launcher to ground system :90 dBµV/m max in the frequency bandwith from 14kHz à 18 GHz

From ground system to launcher :100 dBµV/m max in the frequency bandwith from 14kHz à 1 GHz (35 dBµV/m de 420MHz à 480MHz)145 dBµV/m max in the frequency bandwith from 2 GHz à 18 GHz (70 dBµV/m de 5.45MHz à 5.825MHz)

9.7. EQUIPMENT IDENTIFICATIONTerminal equipment, cables and rack identification shall be in compliance with the applicabledocument indicated in paragraph 4, by default, as specified elsewhere in the different technicalspecifications.

10. INTERFACESThis chapter defines the main scopes of services with regards to other contracts and systems. Generallyspeaking, the contractor shall present in his proposal a summary per system of pre-requisites required toprovide the systems for which he is responsible.

10.1. Interfaces with the Civil Engineering Work PackageInterfaces with the Civil Engineering Lot concern buried routes and under-slab routes.

Generally speaking, trenches, channels and sleeves are not part of the supply of the Fluids � GeneralMeans contract.However, if the presented channel and sleeve network on guide layout drawings is found insufficient,the tenderer shall indicate this in his proposal.Provisions for routing of cables and piping between different rooms and with the outside shall bequantified by the tenderer in his proposal. If provisions presented on layout drawings are foundinsufficient, the tenderer shall indicate this in his response.

On the other hand, trenches required for installation of piping shall be supplied by the Fluids �General Means contract.

Furthermore, the tenderer shall verify whether rooms and surface areas allocated to install all hisequipment are sufficient. Otherwise, the tenderer shall report this in his answer.

10.2. Interfaces with the Energy Work PackageInterfaces with the Energy Work Package concern:� electrical power supplies for racks and equipment� re-transmission of system status and measurement alarms.

10.2.1. Power suppliesThe Energy Lot shall make available the various outgoings required by these electrical powersupplies in distribution boxes according to the energy category. Three categories shall beavailable on the SLV:

Page 22: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 22/36 Ed.: 2 Rév.: 0 Date :16/05/2003

� Category 1 � Internal network (Voltage 230-410V � 2.5% 50Hz � )� Category 2 � Network backed-up by groups (Voltage 230-410V � 1.5% 50Hz �)� Category 3 A � Network backed-up by undulators (Voltage 230-410V � 1.5% 50Hz

�0.05%)� Category 3 B � Network backed-up by undulators (Voltage 230-410V � 1.5% 50Hz

�0.05%)The scope of supply of the Energy Work Package shall be located on the terminals downlinefrom TD (sectioning board) involved.The tenderer shall specify in his response the outgoings required per system with relatedspecifications (power, voltage, nominal consumption and energy category).

10.2.2. Information re-transmissionFor re-transmission of alarms and energy system statuses to CCS the scopes of supply aredescribed in the paragraph on the housekeeping ground process interfaces of the Safety LowCurrent Technical Specification, reference: VG-ST-2-C-0006-CNES.

10.3. Interfaces with the Air-conditioning Work PackageInterfaces with the Air-conditioning Work Package are limited to� re-transmission of system statuses and alarms to the CCS� reception of servo-control commands from the EXTI system� the supply of chilled water by the contract holder of the Infrastructure contract� making available of instrumentation air by the contract holder of the Fluids � General Means

contract

The scopes of supply are presented in:� the “Housekeeping ground process interface system” paragraph and “Fire extinguishing system”

of the Safety Low Current Technical Specification, reference: VG-ST-2-C-0006-CNES.� in the “Scope of supply and interface” paragraph of the Fluids System Technical Specification,

reference: VG-ST-2-C-0016-CNES.Furthermore, the tenderer shall verify that rooms and surface areas allocated for the installation of allequipment are sufficient. Otherwise, the tenderer shall give all relevant information in his response

10.4. Interfaces with the Mechanical Work Package

Interfaces with the Mechanical Work Package mainly concern:� the use of electrical coiled cables connecting the elevator platforms to the gantry� the use of the electrical coiled cable connecting the bunker to the gantry� the installation of equipment and cable trays in the gantry and in the mast� the partition crossings and cladding of the gantry.

10.4.1. Electrical coiled cablesThe tenderer shall specify in his proposal the surface area of the path required for “low current”coiled cables and “high current” coiled cables, including a growth potential of approximately30%.The type of cables to be used shall be class 6.The tenderer shall also specify the surface area required for routing the flexible air pipe betweenthe bunker and the gantry.

Page 23: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 23/36 Ed.: 2 Rév.: 0 Date :16/05/2003

10.4.2. Installation of equipment and cable traysTo install and secure equipment and cable tray slabs it is strictly prohibited to drill holes in theframework and/or in the cladding.Four provisions are scheduled in the gantry over the full height for vertical routing (2 for pipesand 2 for Safety and Low Current cables).In the mast, two provisions are scheduled over the full height for vertical routing (1 for cablesand one for piping).The tenderer shall equip these main pins with cable ladders to support all cables required by the“Safety Low Current” and “Communication” systems and the BCV (ground checkout equipment)system. BCV cable sizing shall be provided later by the future holder of the BCV contract.If the provisions indicated in layout drawings are found insufficient, the tenderer must give fullinformation in his response.

10.4.3. Partition crossingsProvisions for routing all cables shall be incorporated by the tenderer. Generally speaking,crossings in partitions inside buildings and between rooms at different pressures shall be bymeans of sealed partition crossings, MCT type from AFIMES.For crossings in the cladding, the tenderer shall forward a technical solution ensuring thetightness of this crossing for this crossing.

10.5. Interfaces with the CCS systemThe interfaces and scope of supply with the CCS system are presented in the paragraph“Housekeeping ground process interface system” of the Low Current and Safety TechnicalSpecification: VG-ST-2-C-0006-CNES.Furthermore, the future holder of the Fluids � General Means contract shall define, supply and installcable trays corresponding to the extension of the CCS system.Sizing of cables for the CCS system shall be provided later by the future holder of the CCS extensioncontract.

10.6. Interfaces with the BCV systemThe interfaces and the scopes of supply with the BCV system are presented in the following technicalspecifications:Safety and Low Currents: VG-ST-2-C-0006-CNESTime synchronization: VG-ST-2-C-0024-CNESROMULUS Extension and Operational reports VG-ST-2-C-0025-CNES.

Furthermore, the future holder of the Fluids & General Means contract will define, supply and installcable trays related to the BCV system.Sizing of cables related to the BCV system for all buildings shall be provided later by the future holderof the BCV contract.

11. PROPERTY MANAGEMENTManagement of the property of all systems to install is described in document reference VG-SOW-2-C-004-IPT.

Page 24: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 24/36 Ed.: 2 Rév.: 0 Date :16/05/2003

12. PRODUCT FLOWCHARTThe tree structure to observe as part of coding for the product flowchart is presented in the managementspecification reference VG-SM-2-C-0005-CNES.

13. REGULATORY CHECKSThe tenderer, in his proposal, shall detail the contents, the duration, the location as well as the name ofthe approved organization carrying out the various regulatory checks on these systems.The main checks concern:� electrical checks before powering of racks and equipment� compliance of equipment in relation to ATEX zone requirements� radio frequency transmissions.

14. TESTSThe tests to be run in compliance with the future contract on the various systems encompass:� The factory acceptance tests� The industrial tests on site (type0)� The site acceptance tests (type1)� The technical qualification tests� The integrated tests� The combined testsThe method to observe to run these tests is presented in the applicable quality specification VG-AP-20006-C-0008-CNES.The tenderer, in his proposal, shall present the test schedule per system and the related duration andcost.All consumable materials or products required to carry out the various tests shall be supplied by thefuture holder of the contract.In the special case regarding fluid systems, the consumption of fluids required for the various tests shallbe paid by the future holder of the contract.

14.1. FACTORY ACCEPTANCE TESTSThe factory acceptance tests make it possible to verify correct operation of components andequipment prior to packing and transport to the site.

For certain systems, a test on a platform representing the system shall be run in the factory. This testwill make it possible to validate the various functional features of the system in relation torequirements and performance levels required as well as the various interfaces. A technicalinstruction defining the platform and a test plan shall be prepared before hand by the future holder ofthe contract. This memorandum will make it possible to author the corresponding test procedure.This platform test requirement is specified by the system in the various technical specificationsinvolved.

14.2. INDUSTRIAL TESTS ON SITE (type 0)

Page 25: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 25/36 Ed.: 2 Rév.: 0 Date :16/05/2003

Industrial tests will enable the future holder of the contract to verify, on the one hand, the complianceof system installation and, on the other hand, to verify the functional features and performance ofeach system in its final configuration.Results from industrial tests will authorize the acceptance test phase.

The tenderer, in his proposal, shall present the type of industrial tests scheduled per system on thesite and the test duration.

14.2.1. For fluid systemsTests shall mainly comprise:

� Phase 0 tests before integration:� Non-destructive testing of welds (dye penetrant and gammagraphy)� Hydraulic proofing.� Cleanliness checks according to the cleanliness specification in force.

� Phase 0 tests after integration� The compliance checks of circuits with regard to process plans, installation drawings and existing

nomenclatures.� Valve internal sealing checks.� Instrument rating checks.� Global tightness checks towards the outside.� Final cleanliness check.

A report listed in a PFCE will be prepared following each check.

14.2.2. For Low Current and Communication systemsChecks mainly concern:� the system compliance checks,� the general tests of all copper links for continuity and insulation� the reflectometric tests for all optical fiber links� the regulatory checks as requested in paragraph 12� the correct operation checks of all equipment

A report shall be prepared for each check.

14.3. SITE ACCEPTANCE TESTS (type 1)Site acceptance tests make it possible to pronounce the integral acceptance of each system betweenthe future holder of the contract and his customer.

These tests are carried out on the entire system, including interfaces, making it possible to validateeach system in relation to requirements and performance requested in the different technicalspecifications.

Non-regression tests on existing interfaced systems and installations will be associated with thesetests.

Page 26: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 26/36 Ed.: 2 Rév.: 0 Date :16/05/2003

The special test requirements are specified for each system in the technical specifications.

A technical test definition memorandum for each system shall be prepared beforehand by the futureholder of the contract. This memorandum will make it possible to write the corresponding testacceptance procedure

These two documents shall be forwarded to the customer for approval.

The tenderer, in his proposal, shall present the site acceptance test type scheduled and the relatedduration per system.

For fluid systems, these tests will make it possible to:� Verify the performance (pressure/output/temperature/hygrometry) of the various distribution points.� Verify weighing system performances� Verify effluent treatment system performances� Prove the observance of fluid cleanliness requirements at the various distribution points of each

network and the purity (breathable air)

The means required to carry out these tests shall be provided by the tenderer.

These phase 1 tests shall be carried out with the following fluids� Water network: Water.� Air network: Air.� Nitrogen network: Nitrogen� Helium network: Nitrogen. The tenderer shall, based on the results obtained with nitrogen and by

applying a correction coefficient, calculate and justify the performance expected with Helium.� UDMH and N2O4 network: These tests shall not be carried out by the contract holder. However, the

contract holder shall participate in these tests as naturally he remains responsible for theperformance levels of the networks.

14.4. TECHNICAL QUALIFICATION TESTSTechnical qualification tests shall be run on systems operated by CSG if interfaces were not validatedduring the site acceptance phase. These tests shall be carried out by the operator on all systemsincluding interfaces.During this phase, the tenderer shall provide technicians for technical support. The supporttechnicians shall work in the test teams made available by the future holder of the Fluids � GeneralMeans contract. The size of this team is defined in the Integrated Test and Combined Test paragraph.

14.5. INTEGRATED AND COMBINED TESTS14.5.1. Integrated testsThe purpose of integrated tests is to validate the systems from a connection, manualimplementation, automatic implementation and count down repeat standpoint without a launchermodel. These tests concern, in general, all systems participating in preparation and launchoperations.

14.5.2. Combined tests

Page 27: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 27/36 Ed.: 2 Rév.: 0 Date :16/05/2003

The purpose of combined tests is to validate implementation of nominal and downgradedoperations in manual and automatic mode using launcher electric models and launcherdeployment models.These tests cover:� for fluid systems, validation of operations related to on board HP tanks (sealing, drainage,

pressurization, depressurization), to propellant tanks (sealing, drainage, filling, emptying,pressurization, depressurization and drainage) and the different ventilation operations,

� for the Optical system, validation of all filming capacities and nominal and downgradedoperations.

14.5.3. Test teamIn this phase, the future holder of the Fluids � General Means contract shall provide technicalsupports by technicians made available to the customer on the site. This support will cover theintegrated and combined test phases as indicated in planning VG-PP-2-C-0006-CNESappended to this document.The tests support team shall comprise:� 1 test manager� 2 fluid technicians for adjustment and implementation� 1 low current technician for system implementationThese people will have participated in the industrial and site acceptance tests.The tenderer shall quantify in his proposal the services corresponding to this support and thecomposition of the team with details on personnel qualification.

15. AVAILABILITY BEFORE INTERVENTIONPrior to any work on an existing system, availability shall be verified between the existing systemmanager and the future holder of the Fluids � General Means contract. A contradictory inventory shallbe made prior to any work on the existing system.This inventory shall take place in the presence of:� the manager of the existing system� the SDS site follow up manager� the SDS site quality manager� the site industrial manager� the industrial quality manager

A written report will relate the various subjects discussed and the actions decided upon.If the customer wants to use a system, subject of a future contract, before final acceptance a MAD shallbe prepared with a prior inventory.After use of this system a new MAD will be made between the user and the contract holder.

16. SOFTWARE CONFIGURATION MANAGEMENTThe technical requirements applicable to management of software configurations at CSG are presentedin document DR 3 (CSG-IP-0361-269-AM/MC).

Page 28: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 28/36 Ed.: 2 Rév.: 0 Date :16/05/2003

The technical software configuration management requirements applicable to the Fluids & GeneralMeans contract are described in document DA 16.

17. INFORMATION SYSTEM SAFETYThe CNES policy on SSI is described in document DR2.The requirements applicable for information system safety are presented in the two following applicabledocuments:� System SSI technical requirements for the GENERAL MEANS contract of the VEGA ground segment

VG-ST-21005-C-0021-CNES� Information system safety specifications for any contract or order given by the CNES Reference:

CSG-CS-B7-149-SPSI Version 2.0.In addition to these two applicable documents, a study of the technical goals of the VEGA groundsegment is under progress. This study will result in the writing of specific SSI technical requirementdocuments applicable to each system. These applicable documents, as part of the future contracts, willbe available during June 2003.

18. DEPENDABILITYSystem allocations to take into account for studies and production of the different systems are given inreference document: VG-AP-20006-C-0008-CNES.The MBTF and MTTR of all installed equipment shall be provided by the holder of the future contract.

19. MAINTENANCEThe tenderer shall quantify, in his proposal, the supply of a maintenance plan per system. Thismaintenance plan will integrate the constraints related to the SLV shutdown periods lasting around 6months.Furthermore, the tenderer shall quantify the performance of system maintenance operations, subject ofthe future Fluids & General Means contract, as of their implementation and this up to the end of theintegrated and combined tests.Consequently, the tenderer shall supply a batch of maintenance parts to meet the requirements of thisperiod.The tenderer, in his proposal, shall quantify this maintenance service and the composition of themaintenance team and indicate the qualification of these personnel.

20. MAINTENANCE BATCHIn addition to the supply of a batch of maintenance parts required to cover the period of time betweensystem commissioning and the end of integrated and combined tests, described in the last paragraph,the tenderer shall quantify, in his proposal, the supply per system of spare parts required for preventativeand curative maintenance operations for one year as of the end of the combined tests.

21. INITIAL BATCHTo ensure satisfaction of the production and commissioning planning for each system the tenderer shallprovide a batch of “initial spare parts” making it possible to meet all requirements concerning a failure tothe system during the implementation and test phaseThis batch of spare parts shall be prepared by the contract holder and handed over t the customer duringfinal acceptance.

Page 29: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 29/36 Ed.: 2 Rév.: 0 Date :16/05/2003

The tenderer, in his proposal, shall quantify this service and the composition of the initial batch of spareparts.

22. DOCUMENTATIONThe requirements concerning the contents and the supply of the documentation according to the variousproject steps are described in the management specification reference VG-SM-2-C-0005-CNES.

23. TRAININGThe tenderer, in his proposal, shall detail and quantify for each system, the content, duration andlocation for training sessions, with supply of training material included.The training requirements with regard to the number of trainees, the duration and location are specifiedper system in the technical specifications.Training courses shall be run in French.

24. WORKS STUDY SYNTHESISThe works study synthesis for all contracts shall be provided by:� the holder of the MECHANICAL contract for all works concerning the gantry, the mast and the launch

table� the holder of the INFRASTRUCTURE contract for all works concerning the bunker, the flame chutes,

the 1D20 sub-station, the ZEPHIRO cell, roadworks and miscellaneous works, VEGA offices and theVEGA operations room of CDL3.

These industrialist contractors shall implement and run a summary cell to which the holder of the futureFluids & General Means contract and the SDFS Prime Contractor will participate.In particular, these industrialist contractors shall ensure that the works summary is realized for:� all provisions in works (position, dimensions, quantity, etc …)� routing and laying of all networks in structures (crossing points, relative positions, etc …)� the terminal apparatus (positions, dimensions, etc …)Documents produced by these summary cells shall be forwarded to the SDS for approval.� All industrialist contractors of the VEGA Project shall provide drawings and working documents to the

industrialist contractor in charge of the summary cell.� The industrialist contractor in charge of systems shall specify the format to be used for documents to

be provided (computer medium and hardcopy) as well as the number of copies (at least 3 hardcopiesand 1 copy on a computer medium).

25. SCHEDULING, COORDINATION AND STEERING25.1. Scheduling and planningScheduling and planning of works under the responsibility of the holders of the contracts (Mechanical,Infrastructure, Fluids & General Means and Ground Checkout Equipment) shall be the responsibilityof the contract holder of the INFRASTRUCTURE contract.Work consists of analyzing the elementary task concerning works and work studies, determiningrelated sequencing and critical paths using charts and in proposing steps targeted at observing worksperformance turnaround times.

Page 30: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 30/36 Ed.: 2 Rév.: 0 Date :16/05/2003

25.2. CoordinationCoordination between the works under the responsibility of the holder of contracts (Mechanical, CivilEngineering Infrastructure, Fluids & General Means and Ground Checkout Equipment) shall be theresponsibility of the contract holder of the INFRASTRUCTURE contract, whether these works areperformed by the holder of the INFRASTRUCTURE contract himself, by the holder of another contractor by a sub-contractor approved by ESA.Co-ordination consists of harmonizing over time and space the actions of the various partners duringworks and in steering inter-corporate Health and Safety boards.All industrialist contractors must formally inform, in advance, the holder of the INFRASTRUCTUREcontract and the CNES/SDS Prime Contractor of any work involving the other contract holders at thetime the envisaged works are to be carried out.Coordination between works under the responsibility of contract holders and existing systems on ELAshall be carried out by the CNES (SDS) Prime contractor. The company shall formally advise thePrime Contractor SDS in advance of any work to be carried out on structures or equipment existing atthe date the envisaged works are to be carried out.

25.3. SteeringWorks steering shall be carried out by the Prime Contractor SDS for all contracts concerning theVEGA Project Ground Segment.Steering consists of implementing, as of the beginning of works and until all outstanding works arecompleted within the turnaround times stipulated in the works contract, the various organizationalsteps decided upon as part of scheduling and coordination.

26. CLEANINGCleaning of the site and keeping it clean shall be the responsibility of the future holder of the Fluid &General means contract in compliance with the PGC indicated in DA

27. SPS COORDINATIONThe future holder of the contract shall comply with all requirements:� of the general coordination plan (PGC) prepared by the SPS co-ordinator, accredited by the sponsor� the CNES site regulations.These two documents are appended to the corporate tender dossier.

28. SITE INSTALLATIONSSite installations shall comply with the site requirements stipulated in the PGC and the site regulations.However, site system requirements corresponding to the completion of the Fluids & General Meanssystem works shall be defined with SDS and the SDS co-ordinator according to the recommendations inPGC.The proposal shall include a provisional site installation plan with the associated cost.

29. GUARANTEEThe requirements concerning the guarantees are described in the management specifications, referenceVG-SM-2-C-0005-CNES.

Page 31: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 31/36 Ed.: 2 Rév.: 0 Date :16/05/2003

30. SCOPE OF SUPPLYThe scopes of supplies and interfaces are defined per system in the technical specification and in the“interface” paragraph of this document.The requested service concerns:� studies, supply, transport, installation, configuring and implementation of each system with the

internal and external interfaces to the VEGA Launch Site� the performance of factory tests� the performance of industrial tests (type 0) on the site� the performance of regulatory inspection operations� the performance of site acceptance tests (type1)� the production and supply of all documentation� the updating and the supply in TQC status of the existing documentation� the training of operators� the support to SDS equipment for the performance of combined and integrated tests� the maintenance, implementation operation of systems on SLV between commissioning and the end

of combined tests.

31. TIME SCHEDULE AND PLANNINGThe tenderer shall present in the proposal a detailed plan for performance making it possible to verifysatisfactory incorporation of the general goals of the project planning, reference VG-PP-2-C-0006-CNESappended to the Cal for Tender dossier.Any differences found by the tenderer shall be identified and analyzed in the proposal.

The main dates and meeting points in the project planning are listed below:� Contract kick-off August 27 2003� RDPI November 12 and 13 2003� RCDI January 28 and 29 2004� System commissioning See detail in planning VG-PP-2-C-0006-CNES� Acceptance, all systems September 22 2005� Integrated and combined tests September 29 2005 to March 30 2006

Requirements concerning the management and supply of planning documents during projectperformance are described in the management specification, reference VG-SM-2-C-0005-CNES.

32. APPENDIX NO.1The applicable reference planning VG-PP-2-C-0006-CNES is appended.No. Task Name1. GS SDR: Ground Segment System Definition Review2. RCD progr. (SCDR): System Critic Design Review3. VES: VEGA Electrical Stimulator4. GCQRR5. GSTQ KP

Page 32: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 32/36 Ed.: 2 Rév.: 0 Date :16/05/2003

6. GSORR7. CRE QO System (GSQR): Ground Segment Qualification Review8. Kick-off date of the Fluid & General Means contract9. RDPI BCV and CCS Interface and Fluid Processes10. RDPI Low Current, Safety and Telecommunication systems11. RCPI BCV and CCS Interface and Fluid Processes12. RDPI Low Current, Safety and Telecommunication systems13. Availability (MaD) Bunker, 1D60 Sub-station, Zephiro cell, Assembly Hall14. Availability Bessel & Kepler, CDL315. Availability Mast16. Availability Gantry (with temporary energy and air-conditioning)

17. Fluid Systems18. Partial commissioning of systems: Compressed air, Nitrogen

Helium, Drench water, UDMH, N2O4, Effluent treatment19. Low Current and Safety systems20. Partial commissioning of fire detection system (DI)21. Partial commissioning of Systems: Evacuation Alert (AE) and Withdrawal (AR)

Ground Links (Site Telephone)22. Partial commissioning of systems: Public Address, Gas Detection (DETG)23. Partial commissioning of Operational (INTF CCS) and Housekeeping

Ground Control systems (INTF CCS)24. Partial commissioning of systems: Pre-wiring, Fire Extinguishing (EI),

Toxic Vapor Detection25. Communication Systems26. Partial commissioning of the Time Synchronization system27. Partial commissioning of Radio, Telephone systems28. Partial commissioning of Intercom, Video and Optical systems,

ROMULUS extension and Operational reports29. Partial commissioning of systems: Corporate Network, Satellite Customer Network30. All IAR Systems31. Beginning of integrated and combined tests (GSQRR)32. End of integrated and combined tests (GSORR)

Page 33: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 33/36 Ed.: 2 Rév.: 0 Date :16/05/2003

Page 34: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 34/36 Ed.: 2 Rév.: 0 Date :16/05/2003

Page 35: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 35/36 Ed.: 2 Rév.: 0 Date :16/05/2003

33. VARIANTSThe future tenderer shall describe all variants as identified in the documents listed in 3.3 technicalspecifications.

33.1. Fluids systems (VG-ST-2-C-0016-CNES):UDMH systemVariant 1 :Propos a flame chute effluent treatment system by “bubling” as defined on the process plannumber 1600-TD-1739-0300Variant 2 : Propos a flame chute effluent treatment system by “wasching”

N2O4 systemVariant 1 :Propos a flame chute effluent treatment system by “bubling” as defined on the process plannumber 1600-TD-1739-0200Variant 2 : Propos a flame chute effluent treatment system by “wasching”

Fluids components:Variant 1 : Propos fluids components as described in document VG-LC-20008-C-0001-CNESVariant 2 : Propos fluids components differents from those described in document VG-LC-20008-C-0001-CNES

33.2. Low current and safety systems (VG-ST-2-C-0006-CNES):Detection gas systemVariant 1 : Propos a system based on ICARE groupe TAURUS hard wareVariant 2 : Propos a system based on GASMASTER hard ware

Toxic vapor detection systemVariant 1 : Propos a system based on Single Point Monitor (SPM)Variant 2 : Propos a system based on Continuous Monitor 4 Channels ( CM4)

Ancillary Ground Process interface systemVariant 1 : Propos a system architecture with one single acces point on the CCS front frame locatedin massif.Variant 2 : Propos a system architecture with two acces points ( 1 on the CCS front frame located inmassif AND 1 ON THE API located in the mobile gantry .

Operational Ground process interface systemVariant 1 : Propos the connection of all analogic mesures through wire links, except for ergol weightmesures connected through separated serial linkVariant 2 : Propos the connection of all analogic mesures through two industrial bus, and ergol weightmesures connected through separated serial link

Page 36: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-2-C-0002-CNESemits.sso.esa.int/emits-doc/ESRIN/AO4451En-VG-CT-2-C-0002-CNES.pdf · SDS/SM/AS JC PATALANO SDS/SM/ES P CLAUZEL SDS/AP/SY A CUENCA

eng_CCTP-OIPR0011903.20A SDS Validated Version Imprimé le 16 / 05 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Titre du document :

SPECIAL TECHNICAL CONDITIONS OF THE CONTRACT –CALL FOR TENDER

“FLUID � GENERAL MEANS VEGA”

Sous-direction Développements Sol

VG-CT-2-C-0002-CNES

Page : 36/36 Ed.: 2 Rév.: 0 Date :16/05/2003

33.3. Optical and vidéo systems (VG-ST-2-C-0028-CNES):Variant 1 : Propos a system architecture with a dedicaced video matrix for VEGAVariant 2 : Propos a system architecture as aon enhancement of the existing video matrix, located inCDL3.

34. LES MATERIELS IMPOSESThe futur tenderer shall take into account, in it answer the imposed hardware as identified in eachtechnical specifications listed en 3.3

34.1. Fluids systems (VG-ST-2-C-0016-CNES):For fluids system, the suggested components are described in the list included in DA22.

34.2. Low current and safety systems (VG-ST-2-C-0006-CNES):The main imposed hardware are :Sound system : Amplificators sound BOUYER 150WFire detection and extinguishing systems : Harware SIEMENS CERBERUSGas detection system: Hardware GASMASTER ou ICARE Groupe TaurusToxic vapor detection system : hardware ZELLWEGER AnalyticsGround Process interface system Power supplies LAMBDA

Sécurité Intrinsèque GEORGIN

34.3. ROMULUS extension and Operational reports (VG-ST-2-C-0025-CNES):Hardware UMUX 1500 of KEYMILE

34.4. Intercom and radio means systems (VG-ST-2-C-0027-CNES):Hardware MOTOROLA to the radio system

34.5. Optical and video systems (VG-ST-2-C-0028-CNES):Hardware THOMSON to the video system