Page 1: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

Elevating the MWD/LWD Platform

Page 2: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

Centerfire ImprovementsCOMMITMENT TO SUCCESS

Page 3: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

Mechanical Upgrades

Page 4: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Anti- Rotation Pin Q1 2013 Issue – Rotation between internals and outer body

causing electrical failure

Resolution – Alignment pin locking all components in position

Crown Entrance Q2 2014 Issue – High insertion force.

- Damage to male Wet Connect seals and springs.

- Accelerated wash.

Resolution – Addition of entrance rampLarger flow channel

Anti-Rotation Pin

Legacy

Current

Entrance Ramp

Larger Flow Channel

Female Wet Connect

Page 5: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

ID Reduction Q1 2020 Issue – Downhole seals on Male Wet Connect dragged across Female assembly

during insertion. High insertions force & seal damage.

Resolution – Reduce diameter at downhole end of Male and Female assemblies

Female Wet Connect

Reduced ID

Page 6: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Conductor Spring Gift Ring Q1 2014 Issue – Springs damaged during insertion – pinched and extruded

Resolution – Embedding a gift ring in the spring

Male Wet Connect

Gift Ring

Legacy Current

Easy deformation

Resists deformation

Page 7: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Wiper Seal, O-Ring and Back Up Rings Q1 2020 Issue – Excessive insertion force leads to seal damage

Back Up Rings trapped by assembly so can’t deform at temperature

Resolution – Wiper seals replaced with O-ringsDownhole O-ring size reduced together with assembly OD reduction Back Up Ring redesign

Male Wet Connect

OD Reduction

O-rings replace Wipers Smaller O-ringsNew Back Ups

Page 8: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Wiper Seal, O-Ring and Back Up Rings Q1 2020 Issue – Excessive Insertion Force >1000 lbf

Damage to seals and contactsRig time wasted

Resolution - Testing of all upgrades shows significant improvementsCurrent design requires 200 lbf until uphole O-ringsFinal 0.25” of seating requires 480 lbfZero damage recorded on any seal

Combined Wet Connect Upgrades

Insertion Force v distance

After Insertion – no damage

Page 9: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Redesign for Seals Q2 2014 Issue – Limited squeeze potential of 0 series O-Ring on legacy design creating

risk in HPHT situation

Resolution – Change design of cap to allow 200 series O-Ring to be usedPeek backup used instead of Teflon

Wet Connect Feedthru Cover

Page 10: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Locking Mechanism Q4 2019 Issue – Jarring and/ or high vibration at high angle could lead to unseating of Tensor from

the Centerfire – loss of CTF data, electrical failure

Resolution – Redesign of Muleshoe and Pulser to include a locking ring ~350 lbf added extraction force

Muleshoe

Muleshoe Pulser/ Latching Helix End

Retainer Ring

Wear Cuff

Abrasion Ring

221 O-ring

Page 11: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Redesign Q4 2019 Issue – Lack of protection in extreme conditions

Resolution – Added Wear bands and redesign position to maximize protection and minimize turbulence/ wash.

Wear Band

Legacy Current

Wear Bands

Page 12: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Faxon to SBO Q4 2015 Issue – Multiple quality issues with supplier Faxon

Resolution – STOP work. Quality review. Move all collar production to SBO

Enhanced collar inspection procedures

Collar Quality

Page 13: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Design and Material Q2 2014 Issue – Premature cracking of Centralizer

body

Resolution – Material change to Inconel 718Thicken Web to withstand stressUpdate Back Up Rings

Gamma Ray Centralizer

Legacy

Thicker web

Current

Page 14: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Design and Material Q2 2015 Issue – Risk of galling on Collar during installation

and removal

Resolution – Material and design change.Procedure update.

Anchor and Feed Thru Bolts

Page 15: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

HTHP & H2S Q1 2014 Issue – Generic VITON O-rings and Teflon Back

Up Rings not rated for HTHP and H2S

Resolution – Changed all O-rings to VITON V1238

Changed all Back Up Rings to PEEK

Arctic O-Rings Q1 2015 Issue – O-rings not rated for extreme low

temperatures (-40ºC)

Resolution – Offer Arctic O-ring Kits of VG109 material rated to -45ºC

Seals

Page 16: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

Electronic Upgrades

Page 17: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Receiver Board Q4 2014

Issue –Drift at high temperature and high resistivity

Resolution – Redesign with replacement of key components

Recorder Board Q1 2014

Issue – Obsolescence and temperature stability

Resolution – Complete redesign

PCBs

Current

Stable

Legacy Temperature Cycle

InstabilityTemperature

Page 18: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

LogView II – 2013 to 2019 Issue – Customer demands to meet operational needs and end user

requirements Resolution – 100+ individual upgrades/ improvements to LogView

Tensor Firmware qMPTx 3.03b Q2 2017 Issue –Gamma module must be run below the CTF collar Resolution – MPU handles probe gamma if CTF detected allowing gamma to be

run in MWD string

Centerfire Firmware 2.01J Q2 2017 Issue –Resistivity Status Register not stored in memory Resolution – Inclusion of ReSR

Firmware & Software

Page 19: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Centerfire RealTime Software V38-43 2014 - 2019 Issue –Requirement for visualization of data for tool testing Resolution – CTF RT software developed and updated

Memory Visualization Software Q4 2019 Issue –CTF Recorder files have 40+ data sets. Complex data analysis Resolution – Data files can be graphed for quick analysis.

Firmware & Software

Page 20: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

Customer Enablement

Page 21: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Training Issue – Customers lack resistivity experience Resolution – Theoretical e-learning (3 languages) and

comprehensive hands on courses

Troubleshooting Issue – Complex tool wiring and 6 x PCBs Resolution – Interactive troubleshooting guide with

detailed electrical testing and fault diagnosis.

Customer Enablement

E-Learning

Troubleshooting Guide

Page 22: Centerfire Improvements - Tensordt.com · 2020. 5. 31. · wet connect upgrade program: 127193832. 1/mar/15: arctic temperature centerfire o- rings and back -up rings. 128506125:

© Copyright 2019 | Tensor Drilling Technologies | All Rights Reserved | No part of this document may be reproduced, in any form or by any means without the express written consent of the author. Information contained in this presentation can be proprietary and is subject to change without notice.

Technical Information Letters

TIL # Date Details117343835 10/SEP/14 IMPROVED GAMMA CENTRALIZER DESIGN - 4.75” CENTERFIRE

114349668 01/OCT/14 NEW SEAL CAP WET CONNECT FEED THRU– 4.75” CENTERFIRE

120762001 02/OCT/14 CENTERFIRE ANTENNA STYCAST REPAIRS

126865777 02/FEB/15 WET CONNECT UPGRADE PROGRAM

127193832 1/MAR/15 ARCTIC TEMPERATURE CENTERFIRE O-RINGS AND BACK-UP RINGS

128506125 02/APR/15 CENTERFIRE IMPROVED ANCHOR AND FEEDTHRU BOLT MATERIAL

152235422 04/AUG/16 ALTERNATIVE METHOD OF WRITING AIR HANG COEFFICIENTS

154272448 18/OCT/16 NEW AND UPDATED CENTERFIRE SPARE PARTS KITS

156198307 19/OCT/16 Release of Centerfire Realtime v40

166285834 21/JUN/17 RELEASE OF CENTERFIRE 2.01J FIRMWARE & CENTERFIRE REALTIME 43 SOFTWARE

TDT00002 22/OCT/19 LOCKING MULESHOE/ BOTTOM END

TDT00001 06/JAN/20 TENSOR UPGRADES