Cementing Engineering Manual Part 4
-
Upload
rolysimangunsong -
Category
Documents
-
view
78 -
download
14
description
Transcript of Cementing Engineering Manual Part 4
-
Navigate to the Monograph PageCover pageTable of ContentsGENERALIntroductionSafety Considerations
PRIMARY CEMENTINGIntroduction to Primary CementingDesignWell AnalysisSlurry SelectionMud Removal - WELLCLEAN* TechnologyPrimary Cement-Job Design Example
ExecutionJob-Design OptimizationWell PreparationEquipment RequirementsMixing TechniquesExecution Procedures
EvaluationHydraulic TestingTemperature, Tracer and Noise LogsAcoustic Logs
CEMENT PLUGSCement Plugs
SQUEEZE CEMENTINGConventional Squeeze CementingSqueeze Cementing through Coiled Tubing
SPECIAL CONSIDERATIONSGas MigrationFoamed CementingHorizontal Well CementingGroutingLost CirculationHigh-Temperature Cementing
CEMENT TESTINGSlurry PropertiesThicking TimeFluid LossFree Water and SettingRheologyGel StrengthOther Slurry Properties
Set-Cement PropertiesCompressive StrengthPermeabilityOther Set-Cement Properties
MISCELLANEOUSCement BlendingAdditive MixingSamples & SamplingCementing EquipmentAuxiliary Cementing EquipmentCementing Temperatures
APPENDICESOverview of API SpecificationsCentralizer DataConversion FactorsCement-System CalculationsPrimary Cement-Job Calculations