CEEQUALSustainability assessment and awards for civil engineering, infrastructure,
landscaping and the public realm
CEEQUAL Version 5 Assessor Update Course
© CEEQUAL Ltd
Domestic Arrangements
Fire escape routes are up to you wherever you are!
Refreshments – we’ll take a break after about an hour
Toilets – ditto! Mobile phones Handouts
CEEQUAL Versions 2 & 3, 2003 and 2004:The Civil Engineering Environmental Quality
Assessment and Awards scheme
For UK and Ireland Projects
CEEQUAL Version 4.1, 2010:The assessment and awards scheme for improving sustainability in civil engineering, infrastructure,
landscaping and the public realm
For UK and Ireland Projects
CEEQUAL Version 4.1 in 2011:The assessment and awards scheme for improving sustainability in civil engineering, infrastructure,
landscaping and the public realm
CEEQUAL for International Projects launched
CEEQUAL Version 4.1 in 2011:The assessment and awards scheme for improving sustainability in civil engineering, infrastructure,
landscaping and the public realm
CEEQUAL for Term Contracts launched
CEEQUAL Version 5, 2012:Sustainability Assessment, Rating and Awards for civil engineering, infrastructure, landscaping and
the public realm
For Projects anywhere!
© CEEQUAL Ltd
Scope of Workshop
Progressive development of the Scheme Reasons for developing Version 5 of the CEEQUAL
Methodology How What’s changed What’s new What’s the same
© CEEQUAL Ltd
Objectives of the Workshop
To provide participants with the competence and confidence to undertake assessments to Version 5
To enable understanding of the upgraded scheme the nature and reasons for the changes the re-weighting and scoring process what’s changed, new and unchanged
To provide comment and input for further development
© CEEQUAL Ltd
Version 5 Upgrade Summary
Updated but also upgraded Increased scope and improved coverage Revised Question set Streamlined Sections Improved consistency between the Sections Raised the bar in some areas New weightings exercise Revised Question scoring
Applications welcome now
Manual available to Assessors and Verifiers from now
Applicants can opt to use Version 4 until 31 October, & will stay with Version 4 until completion of assessment
Two types of Awards ... depending on use of the Project Strategy Section
© CEEQUAL Ltd 201215
Upgrade Process
Section Experts developed revised question set and guidance
Scheme Managers and TAG developed Project Strategy Section
Undertook Weighting exercise Section Experts developed question scoring Draft Version 5 manual reviewed by:
Subject experts Some international users Marine/offshore experts
Finalised by CEEQUAL Scheme Managers for TAG review and sign off
Careful review of Manual for presentation & consistency
© CEEQUAL Ltd
Version 5 Upgrade
Process of the CEEQUAL Assessment is unchanged One Question Set Double weighted scoring Assessor in Project Team Assessor drives assessment External Verifier Verifier supports during assessment Scoping-out to match Question Set to your project NSO still there, but now ‘Mandatory’ Verifier & Assessor agree Scoping-out as early as
possible Online Assessment Tool still used ... but upgraded Verification process as before
© CEEQUAL Ltd17
CEEQUAL Structure
Upgrades made to the overarching methodology Cascaded to each of the forms that the Scheme is available in Ensures all works (mainstream civil engineering,
infrastructure, landscaping and public realm) are assessed against the same criteria
Overarching Methodology
Projects
International
UK & Ireland
Term Contracts
Multiple Small Works
Maintenance
© CEEQUAL Ltd18
CEEQUAL Structure to come?
Upgrades made to the overarching methodology Cascaded to each of the forms that the Scheme is available in Ensures all works (mainstream civil engineering,
infrastructure, landscaping and public realm) are assessed against the same criteria
Overarching Methodology
Projects
International
UK &
Ireland
Other
Regions?
Term Contracts
Multiple Small Works
Maintenance
Operations?Small Projects?
© CEEQUAL Ltd 201219
Improved Coverage
New Project Strategy Section Applicability to marine and offshore projects
Input from marine & offshore specialists Mostly textual and Scope-out rule changes.
Human environment, health & welfare More-focused questions
• users• neighbours• construction workforce
Upgrade process addressed issues that may be only relevant outside the UK aim of strengthening of the International Scheme e.g. addressing different climatic conditions ... but did not find any!
© CEEQUAL Ltd 201220
Streamlining/consolidating questions
Improving the consistency of approach Framing of questions Multi-part questions Scoring scales
Overlapping/very similar questions Streamline questions that asked similar things
Streamlined from 12 to 8 sections, so now 9 in total
Overall objective to reduce the number of questions headline Qs reduced from 208 to 178 54 new questions; 52 consolidated or removed So total number of questions including part questions
essentially the same, despite scope stretch
© CEEQUAL Ltd 201221
The 9 Sections of CEEQUAL Version 5
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources
9. Transport
© CEEQUAL Ltd 201222
The 9 Sections of CEEQUAL
Basic Principles Environmental
management Contractual/Procurement
process Environmental/Social
Performance Communicating best
practice
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources
9. Transport
© CEEQUAL Ltd 201223
2. Project Management
New questions/topics in Version 5: Delivery of resource efficiency Targets for performance during construction to
include sub-contractors Communicating best practice on environmental
management Communicating best practice on innovation
© CEEQUAL Ltd 201224
The 9 Sections of CEEQUAL
Brief and design Consultation with
stakeholders Implementation &
monitoring Continuing Engagement
with local groups Effectiveness of
community engagement Human environment,
aesthetics & employment
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources – Use and management
9. Transport
© CEEQUAL Ltd 201225
3. People and Communities
Significant re-arrangement and consolidation
New questions/topics in Version 5: Implementation of mitigating measures Communications related to community
demographics
© CEEQUAL Ltd 201226
The 9 Sections of CEEQUAL
Land use principles (incl bed of rivers, lakes, estuaries and sea-bed)
Land and sea-estuary-lake bed contamination
Flood risk Landscape principles Legal requirements Implementation and
management Completion & aftercare
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources – Use and management
9. Transport
© CEEQUAL Ltd 201227
4. Land use and Landscape
New questions/topics in Version 5: Demonstrable process for considering Project
location alternatives Demonstrable process for justification of chosen site Balancing land use efficiency & other priorities Selection of land for temporary use during
construction Long-term flood resilience & adaptation Appropriateness of species selected
© CEEQUAL Ltd 201228
The 9 Sections of CEEQUAL
Baseline studies Legal requirements,
planning and consultation
Conservation and enhancement
Use of appropriate materials and specialists
Information dissemination/public access
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources – Use and management
9. Transport
© CEEQUAL Ltd 201230
The 9 Sections of CEEQUAL
Basic principles Legal requirements Conservation and
enhancement Habitat creation Monitoring and
maintenance
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources – Use and management
9. Transport
© CEEQUAL Ltd 201231
6. Ecology and Biodiversity
New topic covered in Version 5: Surveys for protected species specified by the client?
© CEEQUAL Ltd 201232
The 9 Sections of CEEQUAL
Basic principles Legal requirements Protection of freshwater
and marine environments
Enhancement of the water environment
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources – Use and management
9. Transport
© CEEQUAL Ltd 201233
7. Water Environment
New questions/topics in Version 5: Splitting out planning and implementation for Control
of impacts on the water environment during construction
Preventing pollution (as well as physical damage) of existing water features during construction
Managing run-off at source
© CEEQUAL Ltd 201234
The 9 Sections of CEEQUAL
Basic principles
Embodied impacts
Design for Resource Efficiency
Energy and carbon in use
Energy and carbon during construction
Water use
Responsible sourcing, re-use and recycling
Minimising use/impact of hazardous materials
Site waste management planning & legal requirements
Wastes management
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources Use and management
9. Transport
© CEEQUAL Ltd 201235
8. Physical Resources – Use & Management
New questions/topics covered in Version 5: Policies & targets for resource efficiency Implementing policies for resource efficiency Life-Cycle Analysis Percentage of using renewable / low-carbon / zero-
carbon energy during construction implemented Embodied water Design and implementation of reducing water
consumption during operation of completed works Requirements & targets for minimising water use
during construction Permitting for waste treated or used on site Reducing surplus materials ordered
© CEEQUAL Ltd 201236
The 9 Sections of CEEQUAL
Basic principles Operational transport Construction transport Minimising workforce
travel
1. Project Strategy
2. Project Management
3. People and Communities
4. Land Use and Landscape
5. Historic Environment
6. Ecology and Biodiversity
7. Water Environment
8. Physical Resources – Use and management
9. Transport
© CEEQUAL Ltd 201237
9. Transport
New questions/topics covered in Version 5: Project’s relationship to transport infrastructure Assess differently for
• projects that are part of the transport networks
• ‘destinations’ with significant loads on the transport networks, such as stadia
• other projects that are neither Access for pedestrians and cyclists Need for additional transport infrastructure Resilience of the network Performance for non-motorised users
© CEEQUAL Ltd
What is Project Strategy?
A new optional section to the Version 5 methodology
Developed to widen the scope of the Assessment
Moves on from assessing whether project teams are performing well from a sustainability perspective to
Whether the project team has considered and assessed the contribution (or future contribution) of the project to communities having a more-sustainable way of life
© CEEQUAL Ltd 201242
Why add Project Strategy?
CEEQUAL so far has been performance assessment
CEEQUAL so far has excluded assessment of client’s decision to go ahead, and our planning system’s approval
Still no appetite to do that … but
Increasing interest in identifying what is a ‘good project’ from a sustainability perspective, alongside performance assessment
© CEEQUAL Ltd 201243
Why add Project Strategy?
Aiming for
Sustainability Assessment, Rating and Awards for
Civil Engineering, Infrastructure, Landscaping & the Public Realm
Inclusion of Project Strategy enables CEEQUAL’s transition from environmental assessment and awards to sustainability assessment, rating and awards.
© CEEQUAL Ltd 201244
CEEQUAL and the sustainability agenda
Sustainable Development
Economic Success
Social Success
High Environmental
Quality
CEEQUAL assesses the environmental and many social issues
Client’s economic analysis
Planning approval deals with social acceptability
H&S
© CEEQUAL Ltd 201245
CEEQUAL and the sustainability agenda
Sustainable Development
Economic Success
Social Success
High Environmental
Quality
CEEQUAL assesses all environmental and almost all social issues, plus many economic matters
Client’s economic analysis
Planning approval deals with social acceptability
H&S
46© CEEQUAL Ltd 2012
Performance and Pathway / Sustainable Living Contribution
Doing the right things!
Sustainable Project
Contribution Framework
Sustainable Project
Contribution Framework
“Performance Contribution”“Performance Contribution”
“Pathway Contribution”
towards Sustainable
Living
“Pathway Contribution”
towards Sustainable
Living
Doing things right!
FIDIC Project Sustainability Management II – not yet published
© CEEQUAL Ltd
New Project Strategy Section – What it covers
Project Strategy
Economics assessment
Social impacts assessment
Environmental impact assessment
Pathway contribution
Resource strategy and life cycle assessments
Improving quality of life, health & well-being, and reducing hazard
© CEEQUAL Ltd
Applicability of Project Strategy Section
Section will be optional – Why?
Focus of its use (we think!) will be on WPAs and WPA+I
But the Section includes Construction Strategy, so the Section is applicable to all partial awards too
© CEEQUAL Ltd
CEEQUAL Awards
2 Award Types will be available:
Sustainability Strategy & Performance Award
• The project has been assessed under all 9 Sections of CEEQUAL including Project Strategy
• Will need a neutral or positive answer on pathway contribution
Sustainability Performance Award
• The project has not included the Project Strategy section into the Assessment
© CEEQUAL Ltd
Upgrades to www.ceequalonline.com
New read-only access level
Two Versions in parallel
Automatic re-scoring for International Projects
Export of pdf print-out of the Assessment
Single upload of evidence that is used or referred to on more than on Q
Assessor & Verifier Forum
More materials on the document library
© CEEQUAL Ltd
Other recent changes
Old ‘Scheme Description and Assessment Process Handbook’ has been split: Scheme Description for public website Assessment Process Handbook only for Assessors and
Verifiers is on ceequalonline.com For Version 4 as well as Version 5 Version 5 Manuals not on public website
Term Contracts Version Extension Courses available
Website upgraded Printed Publicity Material updated and re-designed Outstanding Achievement Awards: next on 11 March 2013 Site banners – active encouragement to use them more
© CEEQUAL Ltd
Websites, including Case Studies
www.ceequal.com = prime public source of information
What CEEQUAL is
How it works
More on International Term Contracts
Download Scheme Descriptions UK Manuals Feescales Application forms etc
Case studies
www.ceequalonline.com = CEEQUAL ‘intranet’ – incl document library
Thank you for coming
Thank you for participating
Good luck in your assessments!
Roger Venables | 0203 137 2379 [email protected]
Ian Nicholson | 01509 320100 [email protected]
Philip Charles | 0207 549 3302 [email protected]
Sarah Macpherson | 0207 549 [email protected]