CE5350 Introduction.pdf

download CE5350 Introduction.pdf

of 60

Transcript of CE5350 Introduction.pdf

  • 7/21/2019 CE5350 Introduction.pdf

    1/60

    CE5350Geos nthetics

    &

    Reinforced

    Soil

    Structures

    NPTELVideo:GeosyntheticsandReinforcedSoilStructures

    http://www.nptel.iitm.ac.in/courses/105106052/

  • 7/21/2019 CE5350 Introduction.pdf

    2/60

    withsoil

    in

    geotechnical

    constructions.

    Natural:coir,

    jute,

    hemp,

    etc.

    Artificial: ol mericormetallic

  • 7/21/2019 CE5350 Introduction.pdf

    3/60

    TYPES OF GEOSYNTHETICS Geotextiles

    Geogrids Geonets

    Geomembranes

    Pre-fabricated vertical drains PVD

    Geosynthetic Clay Liner (GCL)

    - Geocomposites & Geo-others

  • 7/21/2019 CE5350 Introduction.pdf

    4/60

    Graphical symbols proposed by IGS

    letter

  • 7/21/2019 CE5350 Introduction.pdf

    5/60

    Letter Symbols for

    Different Functions of Geosynthetics

    B Barrier (fluid)D Drainage

    E Surficial Erosion Control

    F FiltrationP Protection (of geomembranes)

    R Reinforcement

    S Separation

  • 7/21/2019 CE5350 Introduction.pdf

    6/60

    FlexibleBreakwaterunitmadeof

    geosyn e cs

    eac

    san

    e

    ags

    inropenetgabions

  • 7/21/2019 CE5350 Introduction.pdf

    7/60

    REINFORCED SOIL

    Soil+reinforcement=reinforcedsoil

    Reinforcement:Ancient:Treebranches,grassreeds,straw,rootsof

    v g , , u

    Modern: Steel,polymeric,naturalmaterials

    tension

    Combinedproducthasmuchbetterengineeringproperties

    v u

    u Reinforcedsoilconceptissimilartothatofreinforced

    concrete

  • 7/21/2019 CE5350 Introduction.pdf

    8/60

    Need for Retaining Walls

    o as g compress ve strengt ut m te

    tensile and shear strengths

    repose Stee er slo es re uire lateral su ort

    Purpose of the retaining walls is to provide lateral

    support to the soil to make it stand at steep anglesInitialsoilposition

    withsteepslope

    Finalslope

    at

    angleofrepose

    cv

  • 7/21/2019 CE5350 Introduction.pdf

    9/60

    Unreinforced

    Embankments

    slope

    9

  • 7/21/2019 CE5350 Introduction.pdf

    10/60

    Reinforced Soil

    m an men s

    slope

    Stee

    reinforced

    spacegained

    slope

    10

  • 7/21/2019 CE5350 Introduction.pdf

    11/60

    Conventional

    Retainin

    Walls

    MasonrygravityretainingwallReinforcedconcretesemigravityretaining

    11

  • 7/21/2019 CE5350 Introduction.pdf

    12/60

    Componentsofreinforcedsoilretainingwalls

    layers

    ac soac ng

    panelsLevelling pad

    -

    Levelling pad is usually 150 mm thick and 300-400 mm wide

    Backfill soil is select non-plastic fgranular fill

    12

  • 7/21/2019 CE5350 Introduction.pdf

    13/60

    Constructionofairportat

    13

    ,

    Ms/

    Maccaferri India

  • 7/21/2019 CE5350 Introduction.pdf

    14/60

    14Constructionof

    33

    m

    high

    embankment

    at

    Shillong

    bypass

    Road

  • 7/21/2019 CE5350 Introduction.pdf

    15/60

    Brief history of MSE Walls in India

    First

    MSE

    wall

    in

    mid

    1980s

    at

    Ludhiana MostRoBs onNHAIprojectsbuiltusingthistechniques

    VerycommontoseeMSEwallheightsmorethan10m

    Geosyntheticsand

    steel

    ladders,

    steel

    strips,

    plymeric

    s r ps,anc orsys emsuse as ma er a s

    Soilandflyashusedasbackfillmaterial

    OneprojectcurrentlyunderwayinSikkimwithheight

    15

  • 7/21/2019 CE5350 Introduction.pdf

    16/60

    DifferentTypesofREWallsbuiltinIndia

    Fullheightwalls Modularblockwalls Panelwalls

    Steelmeshreinforcement Steelstripswithanchor Gabionfacings

    Geogridreinforcement Polymericstripreinforcement16

  • 7/21/2019 CE5350 Introduction.pdf

    17/60

    View of 2-tier Wall from Krishna River17

  • 7/21/2019 CE5350 Introduction.pdf

    18/60

    Topviewofthecompleted4tierwall18

  • 7/21/2019 CE5350 Introduction.pdf

    19/60

    Viewof

    the

    additional

    parking

    space

    gainedatthetopofthehill

    19

  • 7/21/2019 CE5350 Introduction.pdf

    20/60

  • 7/21/2019 CE5350 Introduction.pdf

    21/60

    Bituminous wearing course

    Base course

    TSub-base course

    Subgrade soil

    Thickness of the pavement (T) depends on the

    s reng o su gra e so , ra c oa ng, es gn e,

    properties of layers

  • 7/21/2019 CE5350 Introduction.pdf

    22/60

    WBM material

    WBM

    GSB

    WBM & GSB Layers in a flexible pavement

  • 7/21/2019 CE5350 Introduction.pdf

    23/60

    T ical Granular sub-base GSB la er in a flexible avement

  • 7/21/2019 CE5350 Introduction.pdf

    24/60

    aggregatelayergeotextileseparator

    subgrade

    soil

    Prevents the intermixing,

    prevents piping, strength of

    aggregate is preserved

  • 7/21/2019 CE5350 Introduction.pdf

    25/60

    Drainagefunctionofageotextilelayer

    ingressofwaterintopavementlayers

    flowofwaterflowofwater

    ra n

    Thick geotextile with good drainage properties is

    used at interface

  • 7/21/2019 CE5350 Introduction.pdf

    26/60

    FiltrationFunction

    Geotextilelayeractingas

    a

    filter

    Watercomingoutleavingbehind

    the

    fine

    soil

    particles

    intact

  • 7/21/2019 CE5350 Introduction.pdf

    27/60

    Conceptual representation of filtration phenomenon

    Larger particles have

    arger n er-par c e

    space

    Filter layer(s)

    Flow

    direction

    Base soil

    Pore pressure dissipation through soil

  • 7/21/2019 CE5350 Introduction.pdf

    28/60

    Simpleexplanationofthefilter

    Tea filter should allow the

    passage of liquid tea whileretaining the tea powder

    If the openings in the filter are

    large, tea powder will flowroug , w c s un es ra e

    If the filter openings are too,

    through freely, which is also notdesirable

  • 7/21/2019 CE5350 Introduction.pdf

    29/60

    Geogrid reinforced pavement construction

    wrinkles in the geosynthetic

  • 7/21/2019 CE5350 Introduction.pdf

    30/60

    BackDumpingAggregate

    Minimum cover of 150 to 200 mm soil above geosynthetic

  • 7/21/2019 CE5350 Introduction.pdf

    31/60

    Geocell reinforcedflexiblepavement

  • 7/21/2019 CE5350 Introduction.pdf

    32/60

    Compact the Aggregate

    using suitable compaction equipment.

  • 7/21/2019 CE5350 Introduction.pdf

    33/60

  • 7/21/2019 CE5350 Introduction.pdf

    34/60

  • 7/21/2019 CE5350 Introduction.pdf

    35/60

  • 7/21/2019 CE5350 Introduction.pdf

    36/60

  • 7/21/2019 CE5350 Introduction.pdf

    37/60

  • 7/21/2019 CE5350 Introduction.pdf

    38/60

  • 7/21/2019 CE5350 Introduction.pdf

    39/60

  • 7/21/2019 CE5350 Introduction.pdf

    40/60

    Cover system

    GL GL

    as e e -up n ayers

    with alternate soil layers

    Liner system

  • 7/21/2019 CE5350 Introduction.pdf

    41/60

    Barrier concept in landfills (Gartung 1996)

  • 7/21/2019 CE5350 Introduction.pdf

    42/60

    typesofgeosynthetics

    yp ca crosssec ono a an w eren ypeso geosyn e cs

  • 7/21/2019 CE5350 Introduction.pdf

    43/60

    Hindustan Zinc Factory, Visakhapatnam

  • 7/21/2019 CE5350 Introduction.pdf

    44/60

    Embankment was constructed using the granules

    o zeros e m xe w murum so

  • 7/21/2019 CE5350 Introduction.pdf

    45/60

    reinforcement used to maintain steep slopes

  • 7/21/2019 CE5350 Introduction.pdf

    46/60

    Linin of the surface with HDPE eomembrane

  • 7/21/2019 CE5350 Introduction.pdf

    47/60

    Spreading the geomembrane layer down the slope (notice

    the joints along the slope and not across the slope)

  • 7/21/2019 CE5350 Introduction.pdf

    48/60

    Rolls of geomembranes ready to be rolled on the landfill slopes

  • 7/21/2019 CE5350 Introduction.pdf

    49/60

    Leak testin of eomembrane seams

  • 7/21/2019 CE5350 Introduction.pdf

    50/60

  • 7/21/2019 CE5350 Introduction.pdf

    51/60

    ATNSCB

    House

    lost

    into

    sea

    due

    to

    coastal

    erosion

    in

    May

    2012

  • 7/21/2019 CE5350 Introduction.pdf

    52/60

    Dee ulle s formedonhi hwa slo esb rainwater

    inducederosion noticethefinesilty soilwhichishighly

    susceptibleto

    erosion

  • 7/21/2019 CE5350 Introduction.pdf

    53/60

    ew o e an a er cover ng w vege a on

  • 7/21/2019 CE5350 Introduction.pdf

    54/60

    Use of coir mat to

    promote vegetation

    growth to preventsurface erosion

    54/48Geosynthetics - Introduction

  • 7/21/2019 CE5350 Introduction.pdf

    55/60

    UseofstonefilledropenetgabionsforshorelinestabilizationatSwami

    ara n emp e, a , u ara

    55/48Geosynthetics - Introduction

  • 7/21/2019 CE5350 Introduction.pdf

    56/60

    ComponentsoftheGrassPlant(Hall1992)

  • 7/21/2019 CE5350 Introduction.pdf

    57/60

    InnovativeuseofgeogridsforshoreprotectionatNavi Mumbai

  • 7/21/2019 CE5350 Introduction.pdf

    58/60

  • 7/21/2019 CE5350 Introduction.pdf

    59/60

  • 7/21/2019 CE5350 Introduction.pdf

    60/60

    S . No. Topic Approx. no. o c asses1 Introduction to course and different types

    of geosynthetics & applications

    3

    2 Principles, concepts and reinforcement 4

    Mechanism

    3 Types of polymers and manufacture of

    geosynthetics

    2

    4 Determination of ro erties of 7

    geosynthetics

    5 Design of road bases and earth beds using

    geosynthetics

    5

    7 Design of reinforced soil embankments 6

    8 Soft ground improvement using PVDs &

    other geosynthetics

    3

    pp ca ons o geosyn e cs n an s

    10 Case studies & summary of course 2Total 41