CDM-MR-FORM
Version 06.0 Page 1 of 28
Monitoring report form
(Version 06.0)
Complete this form in accordance with the instructions attached at the end of this form.
MONITORING REPORT
Title of the project activity Kocaeli Landfill Gas to Electricity Project
Gold Standard reference number of the project activity
GS1013
Version number of the PDD applicable to this monitoring report
06
Version number of this monitoring report
07
Completion date of this monitoring report
08/01/2018
Monitoring period number 4
Duration of this monitoring period 01/01/2016 – 31/05/2017 (first and last days are included)
Monitoring report number for this monitoring report
1
Project participants Körfez Enerji Sanayi ve Ticaret Anonim Şirketi
Host Party Turkey
Sectoral scopes Sectoral Scope 13, Waste Handling and Disposal Scope 1, Energy industries (renewable / non-renewable sources).
Applied methodologies and standardized baselines
ACM0001 “Flaring or Use of Landfill Gas” version 15.0
Amount of GHG emission reductions or net anthropogenic GHG removals achieved by the project activity in this monitoring period
Amount achieved before 1 January 2013
Amount achieved from 1 January 2013
0 tCO2e 249,919tCO2e
Amount of GHG emission reductions or net anthropogenic GHG removals estimated ex ante for this monitoring period in the PDD
181,107 tCO2e
CDM-MR-FORM
Version 06.0 Page 2 of 28
SECTION A. Description of project activity
A.1. General description of project activity
>> Landfill is a significant source of global warming as it contains a high share of methane (CH4), which is a potent greenhouse gas. The Kocaeli Landfill Gas to Electricity Project contributes to the reduction of greenhouse gas through destruction and avoidance of methane in the landfill area. The project activity developed by Körfez Enerji Sanayi ve Ticaret Anonim Şirketi, is a landfill gas recovery and utilization project at the site of Solaklar Landfill Area in Solaklar District, Kocaeli Province, Turkey. Solaklar Landfill Area has been built in 1997 as a sanitary landfill area under the responsibility of İZAYDAŞ and is the biggest landfill area in Kocaeli Municipality. On 13/07/2010, İZAYDAŞ has transferred the right of use of the closed lots to the Project Participant. The Project Participant has the right to recover the landfill gas and generate electricity by utilization of the LFG from the closed lots. On 22/03/2011 the construction has started and started operation on 01/03/2012 and is operational since then. The project activity is planned to destroy methane through landfill gas extraction from the landfill area. The landfill gas is furthermore used for the purpose of electricity generation via gas engines. The electricity generated is delivered to the national grid system, substituting the baseline energy fuel which is mainly based on fossil fuels. Brief description of the installed technology and equipment: The proposed project activity involves: - Gradual covering of the landfill - A gas extraction system which can support gas engines for electricity generation - A flaring system - Gas engines During the fourth monitoring period from 01/01/2016 – 31/05/2017, the total emission reduction achieved is 249,919 tCO2eq.
CDM-MR-FORM
Version 06.0 Page 3 of 28
A.2. Location of project activity
>> Host Party: Republic of Turkey The province is located at the Gulf of İzmit in the Sea of Marmara, about 100 km east of Istanbul, on the north western part of Anatolia. The city center has a population of 354,464 (2016 census). The population of the province (including rural areas) is about 1,830,772. The Solaklar Landfill is the largest landfill area within Kocaeli Province and is located within the headquarter facilities area of IZAYDAŞ. The GSP coordinates of the project are 40°47'14.83"N / 30°1'33.60" E.
CDM-MR-FORM
Version 06.0 Page 4 of 28
A.3. Parties and project participants
Parties involved Project participants Indicate if the Party involved wishes to be considered as project participant (Yes/No)
Turkey (Host Country) Körfez Enerji Sanayi ve Ticaret Anonim Şirketi
No
A.4. Reference to applied methodologies and standardized baselines
>> Applied approved baseline and monitoring methodologies:
Approved consolidated baseline methodology ACM0001 “Flaring or Use of Landfill Gas” version 15.0;
Used tools:
“Project emissions from flaring” version 02.0.0;
“Tool to determine the mass flow of a greenhouse gas in a gaseous stream” version 03.0
“Emissions from solid waste disposal sites" version 08.0;
“Tool to calculate the emission factor for an electricity system” Version 05.0,
‘Tool to calculate baseline, project and/or leakage emissions from electricity consumption’ version 02.
For more information regarding the methodology please refer to https://cdm.unfccc.int/methodologies/PAmethodologies/approved
A.5. Crediting period type and duration
>> The project was registered on 06/12/2012 with a renewable crediting period. The first crediting period is from 01/03/2012 to 28/02/2019.
SECTION B. Implementation of project activity
B.1. Description of implemented project activity
>> Currently the project is operational with 5 sets of gas engines with a total capacity of 6,5081 MW installed capacity. One of the installed engines is MWM TCG2020 v12 type engine2 manufactured by the German Company MWM GmbH, and the second, third, fourth and fifth engines are Jenbacher engines manufactured by GE. All engines are dedicated to LFG utilization. Commissioning dates of the engines are presented as follows:
1 The technical capacity of both engines add up to 1,200 kWe (MWM) + 1,063 kWe (Jenbacher) + 3 x 1,415
kWe (Jenbacher) = 6,508 kWe according to the specifications provided by the manufacturers.
2 Reference:
http://issuu.com/mwm_energy/docs/mwm_lb_tcg_2020_en?mode=window&backgroundColor=%230065A6
CDM-MR-FORM
Version 06.0 Page 5 of 28
Date Event Total Capacity
01.03.2012 Start of operation of first PGU (Actual) 1.2 MW
15.10.2012 Start of operation of second PGU (Actual) 2.263 MW
29.08.2014 Start of operation of third and fourth PGU (Actual)
5.093 MW
09.12.2016 Start of fifth PGU (Actual) 6.508 MW
Currently there are 5 engines running in the plant. 6th and 7th gas engines have not been installed yet due to a new investment planning. They are envisaged to be installed in the future. A high temperature enclosed flare system manufactured by HAASE is used in the plant. Main components of the flare system or High Temperature Combustion plant are the combustion chamber and a proportioning mixer. The combustion chamber is designed with a heat-insulating ceramic lining, stable against temperature. Combustion temperature is 1000ºC and maximum permissible working temperature is 1350 ºC.
B.2. Post-registration changes
B.2.1. Temporary deviations from the registered monitoring plan, applied methodologies or standardized baselines
>> There are no temporary deviations from registered monitoring plan, applied methodology or applied standardized baseline.
B.2.2. Corrections
>> There are no corrections to the PDD within this monitoring period.
B.2.3. Changes to the start date of the crediting period
>> There are no changes to start date of crediting period.
B.2.4. Inclusion of monitoring plan
>> There are no inclusion of a monitoring plan
B.2.5. Permanent changes to the registered monitoring plan, or permanent deviation of monitoring from the applied methodologies, standardized baselines, or other applied standards or tools
>> There are no permanent changes from registered monitoring plan, applied methodology or applied standardized baseline.
B.2.6. Changes to project design
>> There has been no changes to project design of registered project activity.
SECTION C. Description of monitoring system
>> The monitoring system has been developed in a way to cover all the procedures required as per the approved methodology ACM0001 validated monitoring plan. Quality control (QC) and quality assurance (QA) procedures
CDM-MR-FORM
Version 06.0 Page 6 of 28
VER Site operating team is responsible for the quality management, which ensures the quality and accuracy of the measured data. For quality management, the following things are included; data records and data storage, equipment calibration and maintenance, corrective action and emergency procedures for unintended emissions.The amount of methane captured will be determined by continuous measurements from flow meter and gas analyser. The electricity meters are bi directional and measure both the electricity generated by the project activity and the electricity consumed by the facility. The meters are sealed by the electricity distribution/transmission company and the Project Participant cannot intervene with the devices. Electricity meter is subject to regular (in accordance with stipulation of the meter supplier) maintenance and testing to ensure accuracy. The readings is checked by the electricity distribution company. Electricity distribution company submits monthly a protocol to the project owner. The monthly electricity data are transferred to the excel sheet used for the emission reduction calculations. The calculation of GS VERs for the monitoring period is carried out through a separate
spreadsheet. The project owner is Körfez Enerji Sanayi ve Ticaret Anonim Şirketi and therefore
responsible for the operation and the monitoring of the project activities. Simplified monitoring diagram is as follows
Landfill Area
Booster
- Volumetric flow of LFG
- Volumetric fraction of CH4 - Temperature of LFG
Gas Engines - Operation of gas engines
Grid
- Net amount of electricity generated using LFG - Quantity of electricity consumed by the project activity
CDM-MR-FORM
Version 06.0 Page 7 of 28
The data is archived and stored electronically during the crediting period and two years after. Roles and responsibilities Mr Turan Kargın is responsible for the site and the system while the VER team is managed by Mr. Ahmet Müslehiddinoğlu. Internal audits and control measures There are daily checks if the data from the day before was stored successfully on the servers. Aggregation of data and cross checks takes place periodically.
SECTION D. Data and parameters
D.1. Data and parameters fixed ex ante
Data/Parameter ID.1 / OXtop-layer
Unit Dimensionless
Description Fraction of methane that would be oxidized in the top layer of the SWDS in the baseline
Source of data Consistent with how oxidation is accounted for in the methodological tool “Emissions from solid waste disposal sites Version 8”
Value(s) applied 0.1
Choice of data or measurement methods and procedures
-
Purpose of data/parameter Calculation of the baseline emissions
Additional comments -
Data/Parameter ID.2 / GWPCH4
Unit tCO2e/tCH4
Description Global warming potential of CH4
Source of data IPCC
Value(s) applied Under the PDD the GWPCH4 has been considered as 25 for ex-post calculations.
Choice of data or measurement methods and procedures
-
Purpose of data/parameter Calculation of the baseline emissions
Additional comments
In line with the requirements of GS3: 25 for the monitoring period that falls within the second commitment period (from 01/01/2013)
3 Reference: GS TAC&Rule update published on January 2013:
http://www.goldstandard.org/sites/default/files/documents/global-warming-potentials-for-gold-standard-project-activities-2013.pdf
CDM-MR-FORM
Version 06.0 Page 8 of 28
Data/Parameter EFEL,y
Unit tCO2eq/MWh
Description Emission factor for the production of the electricity in the project activity
Source of data Registered PDD
Value(s) applied 0.542
Choice of data or measurement methods and procedures
-
Purpose of data/parameter Calculation of the baseline and project emissions
Additional comments The value is calculated ex-ante and has been fixed throughout the first crediting period.
Data/Parameter SD.1 / wH2S
Unit Fraction
Description Fraction of sulphide within the LFG determined ex-ante for SD.1 “Air quality”
Source of data Registered Gold Standard Project Passport
Value(s) applied 0.5%
Choice of data or measurement methods and procedures
-
Purpose of data/parameter Used for Gold Standard Sustainable Development Monitoring Parameter SD.1 “Air Quality”
Additional comments -
D.2. Data and parameters monitored
Data/Parameter ID.22 / Opj,h
Unit -
Description Operation of the equipment that consumes the LFG
Measured/calculated/ default
measured
Source of data Project participant
Value(s) of monitored parameter
2016 (h) 2017 (h)
SGM1 2,356 2,306
SGM2 1,606 3,327
SGM3 7,935 3,293
SGM4 6,102 1,329
SGM5 8,069 3,494
Monitoring equipment Counting devices of each power generation unit
Measuring/reading/recording frequency
The counting devices of the engines are counting the operational hours continuously as the operational hours are also used for maintenance reasons.
CDM-MR-FORM
Version 06.0 Page 9 of 28
Calculation method (if applicable)
The operation of the plant h is monitored by: - Products generated (such as electricity generation)
Opj,h=0 when:
- No products are generated in hour h Otherwise Opj,h=1
QA/QC procedures -
Purpose of data/parameter Calculation of baseline emission
Additional comments -
Data/Parameter ID.23 / Management of SWDS
Unit -
Description Management of SWDS
Measured/calculated/ default
Project participants will refer to the original design of the landfill to ensure that any practice to increase methane generation have been occurring prior to the implementation of the project activity.
Source of data
One of the following sources could be used: - Original design of the landfill - Technical specifications for the management of the SWDS Local or national regulations
Value(s) of monitored parameter
There has been no changes to the design of the landfill to increase methane generation which have been occurring prior to the implementation of the project activity
Monitoring equipment Visual inspection
Measuring/reading/recording frequency
Once each verification
Calculation method (if applicable)
-
QA/QC procedures -
Purpose of data/parameter Calculation of baseline emission
Additional comments -
Data/Parameter ID.24 / Vt,db,engine
Unit m³ dry gas / h
Description Volumetric flow of the gaseous stream (to the electricity generating units) in time interval t on a dry basis
Measured/calculated/ default
Measured
Source of data Measured continuously through a mass flow meter
Value(s) of monitored parameter
2016: 18,387,302 2017: 9,225,202
CDM-MR-FORM
Version 06.0 Page 10 of 28
Monitoring equipment
Thermal mass flow measuring system by Endress & Hause, Proline t-mass 65I, Serial number J804F902000. Tolerance limit for the measurements are ±1.5%
Measuring/reading/recording frequency
The monitoring system works with continuous measurement devices. It is programmed to automatically save hourly values. The data are stored automatically at the server.
Calculation method (if applicable)
N/A
QA/QC procedures
In accordance with the manufacturers specifications a calibration is interval of every 3 years is recommended. This equipment has been calibrated on 14.08.2014 and 28.06.2016 respectively.
Purpose of data/parameter Calculation of baseline emission
Additional comments
As the measuring device convert the flow direct to normal conditions, no separate measurement of pressure and temperature is required as described in the PDD. This parameter is used to calculate the baseline emissions from LFG destruction at the gas engines.
Data/Parameter ID.25 / vCH4,t,db,engine
Unit m³ gas CH4/ m³ dry gas
Description Volumetric fraction of CH4 in a time interval t on a dry basis
Measured/calculated/ default
measured
Source of data The methane fraction in the LFG is measured continuously by a gas analyser.
Value(s) of monitored parameter
The weighted averages of this monitoring period are: 2016: 50.31% 2017: 50.95%
Monitoring equipment
For the measurement a Siemens Ultramat-23, Serial number 7MB2337-2CR10-3DR1 is used. Tolerance limit for the measurements are ±2.0%
Measuring/reading/recording frequency
The monitoring system works with continuous measurement devices. It is programmed to automatically save hourly values. The data are stored automatically at the server.
Calculation method (if applicable)
N/A
QA/QC procedures
In accordance with the Manufacturers specifications the calibration frequency has been recommended as 12 months The equipment has been calibrated on 17.09.2015, 29.03.2016 and 30.03.2017 respectively that covers the monitoring period.
Purpose of data/parameter Calculation of baseline emission
Additional comments
As the measuring device convert the flow direct to normal conditions, no separate measurement of pressure and temperature is required as described in the PDD. This parameter is used to calculate the baseline emissions from LFG destruction at the gas engines.
Data/Parameter ID.26 / Tt
Unit K
Description Temperature of the gaseous stream in a time interval t
CDM-MR-FORM
Version 06.0 Page 11 of 28
Measured/calculated/ default
measured
Source of data Temperature measure
Value(s) of monitored parameter
The maximum values during the monitoring period are: 2016: 46.1°C (319.25 °K) 2017: 42.3°C (315.45 °K) Since all parameters are converted to normal conditions during the monitoring process, this temperature is only monitored to verify the applicability condition for dry gas is met by a gas temperature below 60°C.
Monitoring equipment
The measurement is carried out by a temperature meter WIKA TR-10_H, serial number 110745Y6. The accuracy class of the device is class B which does mean a tolerance of +/- (0.3 + 0.0050 * |t|). |t| is the value of the temperature in °C without consideration of the sign.
Measuring/reading/recording frequency
The monitoring system works with continuous measurement devices. It is programmed to automatically save hourly values. The data are stored automatically at the server.
Calculation method (if applicable)
N/A
QA/QC procedures
In accordance with the “Regulation on “Measurement and Measuring Tools”, gaseous stream meters have to be calibrated within a frequency of once per 10 years. The calibration is renewed on 26.01.2015.
Purpose of data/parameter Calculation of baseline emission
Additional comments
Data/Parameter ID.27 / ECBL,y
Unit MWh
Description Net amount of electricity generated using LFG
Measured/calculated/ default
measured
Source of data monthly meter reading protocols
Value(s) of monitored parameter
The values of this monitoring period are: 2016: 32,550 MWh 2017: 16,561 MWh
Monitoring equipment
The measurements are carried out by electricity meters of the grid company. At the project site a device of the manufacturer Elster, A1500 Serial number 00443932-2011 is used. The accuracy class of the device is 0.5s Manufacturer of back-up meter is Elster. A1500 Serial Number is 00443931. The accuracy class of the device is 0.5s
Measuring/reading/recording frequency
The monitoring system works with continuous measurement devices. It is programmed to automatically save hourly values. The data are stored automatically at the server.
Calculation method (if applicable)
N/A
CDM-MR-FORM
Version 06.0 Page 12 of 28
QA/QC procedures
The grid company is responsible for maintenance and calibration of the device. In accordance with the “Regulation on “Measurement and Measuring Tools”, electricity meters have to be calibrated within a frequency of once per 10 years4. Both main and back-up meters were initially calibrated on 13/04/2011 and is valid for 10 years.
Purpose of data/parameter Calculation of baseline emission
Additional comments
Data/Parameter ID.28 / ECPJ,y
Unit MWh
Description Quantity of electricity consumed by the project activity
Measured/calculated/ default
measured
Source of data monthly meter reading protocols
Value(s) of monitored parameter
The values of this monitoring period are: 2016: 2.04 MWh 2017: 1.36 MWh
Monitoring equipment
The measurements are carried out by electricity meters of the grid company. At the project site a device of the manufacturer Elster, A1500 Serial number 00443932-2011 is used. The accuracy class of the device is 0.5s
Measuring/reading/recording frequency
The monitoring system works with continuous measurement devices. It is programmed to automatically save hourly values. The data are stored automatically at the server.
Calculation method (if applicable)
N/A
QA/QC procedures
The grid company is responsible for maintenance and calibration of the device. In accordance with the “Regulation on “Measurement and Measuring Tools”, electricity meters have to be calibrated within a frequency of once per 10 years5. The meter was initially calibrated on 13/04/2011 and is valid for 10 years.
Purpose of data/parameter Calculation of baseline emission
Additional comments -
Data/Parameter ID.29 / TDLk,y; TDLj,y
Unit -
Description Average technical transmission and distribution losses in year y
Measured/calculated/ default
default value
Source of data “Tool to calculate baseline, project and/or leakage emissions from electricity consumption” version 03.
4
Reference: http://www.mevzuat.gov.tr/Metin.Aspx?MevzuatKod=7.5.6381&MevzuatIliski=0&sourceXmlSearch= (Article 9.b)
5 Reference:
http://www.mevzuat.gov.tr/Metin.Aspx?MevzuatKod=7.5.6381&MevzuatIliski=0&sourceXmlSearch= (Article 9.b)
CDM-MR-FORM
Version 06.0 Page 13 of 28
Value(s) of monitored parameter
20%; 3%
Monitoring equipment N/A
Measuring/reading/recording frequency
N/A
Calculation method (if applicable)
N/A
QA/QC procedures
Purpose of data/parameter Calculation of baseline emission
Additional comments
D.3. Implementation of sampling plan
>> There are no data or parameter determined by a sampling approach.
SECTION E. Calculation of emission reductions or net anthropogenic removals
E.1. Calculation of baseline emissions or baseline net removals
>> The emission reductions resulting from the proposed project are calculated according to ACM0001 “Flaring or Use of Landfill Gas” version 15.0. According to the referred methodology the emission reductions are calculated with the following equation:
Yyy PEBEER (1)6
Where: ERy Emission reductions in year y (tCO2e/year) BEy Baseline emissions in year y (tCO2e/year) PEy Project emissions in year y (tCO2e/year)
Baseline emissions In accordance with ACM0001 “Flaring or Use of Landfill Gas” version 15.0, baseline emissions should comprise the following sources:
A) Methane emissions from the SWDS in the absence of the project activity; B) Electricity generation using fossil fuels or supplied by the grid in the absence of project
activity; C) Heat generation using fossil fuels in the absence of project activity; and D) Natural gas used from the natural gas network in the absence of the project activity.
Since there are no heat generation or natural gas usage in the baseline scenario, only baseline emissions from methane emissions from SWDS (A) and electricity generation (B) will be taken into account7. The baseline emissions are calculated as follows:
6 This equation is referred as (#26) under ACM0001
CDM-MR-FORM
Version 06.0 Page 14 of 28
yECyCHy BEBEBE ,,4
(2)8 Where: BEy Baseline emissions in year y (tCO2e/yr) BECH4,y Baseline emissions of methane from SWDS in year y (tCO2e/yr) BEEC,y Baseline emissions associated with electricity generation in year y (tCO2eq/yr)
Step (A): Baseline emissions of methane from the SWDS (BECH4,y) Baseline emissions of methane from the SWDS are determined as follows, based on the amount of methane that is captured under the project activity and the amount that would be captured and destroyed in the baseline. In addition, the effect of methane oxidation that is present in the baseline and absent in the project is taken into account.
4444*)(*)1( ,,,,, CHyBLCHyPJCHlayertopyCH GWPFFOXBE (3)9
Where: BECH4,y Baseline emissions of LFG from SWDS in year y (tCO2e/yr) OXtop-layer Fraction of methane in the LFG that would be oxidized in the top layer of the
SWDS in the baseline (dimensionless) FCH4,PJ,y Amount of methane in the LFG that which is flared and/or used in the project
activity in year y (tCH4/yr) FCH4,BL,y Amount of methane in the LFG that would be flared in the baseline in year y
(tCH4/yr)
Step A.1: Ex-post determination of FCH4,PJ,y During the crediting period FCH4,PJ,y is determined as the sum of quantities of methane flared and used in power plant(s) as follows:
yELCHyflaredCHyPJCH FFF ,,,,, 444 (4)10
Where: FCH4,PJ,y Amount of methane in the LFG that which is flared and/or used in the project
activity in year y (tCH4/yr) FCH4,flared,y Amount of methane in the LFG which is destroyed by flaring in year y (tCH4/yr) FCH4,EL,y Amount of methane in the LFG which is used for electricity generation in year
y (tCH4/yr) The working hours of the power plant(s) will be monitored. The amount of methane destroyed by electricity generation (FCH4,EL,y) FCH4,PJ,y is determined using the “Tool to determine the mass flow of a greenhouse gas in a gaseous stream” version 03.0.
7 This approach will be applied to each equation applicable.
8 This equation is referred as (#1) under ACM0001
9 This equation is referred as (#2) under ACM0001
10 This equation is referred as (#3) under ACM0001
CDM-MR-FORM
Version 06.0 Page 15 of 28
The tool provides procedures to determine the following parameter:
Parameter SI Unit Description
Fi,t11 kg/h Mass flow of greenhouse gas i (CO2, CH4, N2O, SF6 or a PFC) in the
gaseous stream in time interval t.
The mass flow of CH4 in LFG is determined through measurement of the flow and volumetric fraction of the gaseous stream (LFG). The “Tool to determine the mass flow of a greenhouse gas in a gaseous stream” version 03.0 provides 6 different ways to make these measurements and the corresponding calculation option for Fi,t. Table 12 Measurement options for Fi,t
Option Flow of Gaseus Stream Volumetric Fraction
A Volume flow-dry basis Dry or wet basis
B Volume flow-wet basis Dry basis
C Volume flow-wet basis Wet basis
D Mass flow-dry basis Dry or wet basis
E Mass flow-wet basis Dry basis
F Mass flow-wet basis Wet basis
Option A is applied in the proposed project activity. Since option B and E have not been selected as an option, the absolute humidity of the gaseous stream will not be determined. Option A: According to the “Tool to determine the mass flow of a greenhouse gas in a gaseous stream” version 03.0.0, flow measurement on a dry measurement is not doable for a wet gaseous stream. Therefore it will be demonstrated that the temperature of the gaseous stream (Tt) is less than 600C (333.15 K) at the flow measurement point. The mass flow of CH4 (FCH4,t)
12 is determined as follows:
tCHdbtCHdbttCH vVF ,,,,, 444** (5) 13
With
tu
CHt
tCHTR
MMP
*
*4
4 , (6) 1415
Where: FCH4,t Mass flow of CH4 in the gaseous stream in time interval t (kg gas/h) Vt,db Volumetric flow of the gaseous stream in time interval t on a dry basis (m3 dry
gas/h)
11
The parameter (Fi,t) under the “Tool to determine the mass flow of a greenhouse gas in gaseous stream” corresponds to the parameter (FCH4,EL,y) under ACM0001.
12 FCH4,t described under the “Tool to determine the mass flow of a greenhouse gas in a gaseous stream” corresponds to FCH4,EL,y described under ACM0001 “Flaring or use of a landfill gas”.
13 This equation is referred as (#5) under the “Tool to determine the mass flow of a greenhouse gas in a gaseous stream”
14 This equation is referred as (#6) under the “Tool to determine the mass flow of a greenhouse gas in a gaseous stream”
15 Since all the parameters are converted to normal conditions during the monitoring process, pCH4,n which is equal to 0.716 kg/m
3 will be used for equation (5) for ex-post calculation of mass flow of CH4 in the
gaseous stream.
CDM-MR-FORM
Version 06.0 Page 16 of 28
vCH4,t,db Volumetric fraction of CH4 in the gaseous stream in a time interval t on a dry basis (m3 gas CH4/m
3 dry gas) pCH4,t Density of CH4 in the gaseous stream in time interval t (kg gas CH4/ m
3 gas CH4)
Pt Absolute pressure of the gaseous stream in time interval t (Pa) MMCH4 Molecular Mass of CH4 (kg/kmol) Ru Universal ideal gases content (Pa.m3/kmol.K) Tt Temperature of gaseous stream in time interval t (K)
The amount of methane destroyed by flaring (FCH4,flared,y) According to ACM0001 “Flaring or Use of Landfill Gas” version 15.0, FCH4,flared,y is determined as the difference between the amount of methane emissions from flare(s), as follows:
4
44
,
,_,,,
CH
yflare
yflaresentCHyflaredCHGWP
PEFF
(8) 16 Where: FCH4,flared,y Amount of methane in the LFG which is destroyed by flaring in year y (tCH4/yr) FCH4,sent
flare,y Amount of methane in the LFG which is sent to the flare in year y (tCH4/yr)
PEflare,y Project emissions from flaring of the residual gas stream in year y (tCO2e/yr) GWPCH4 Global Worming potential of CH4 (tCO2e/tCH4)
In line with the requirements of ACM0001 “Flaring or Use of Landfill Gas” version 15.0, FCH4,sent flare,y is determined directly using the “Tool to determine the mass flow of a greenhouse gas in a gaseous stream” using option A as described under the relevant tool17. In accordance with the requirements of ACM0001 “Flaring or Use of Landfill Gas” version 15.0, PEflare,y will be determined using the “Project emissions from flaring”. If the LFG is flared through more than one flare, then PEflare,y is the sum of the emissions for each flare determined separately. In accordance with the requirements of the “Project emissions from flaring”, In the case of enclosed flares, project participants may choose between the following two options to determine the flare efficiency (nflare,).
A) Apply a default value for flare efficiency B) Measure the flare efficiency
The PP opts to apply the default value for flare efficiency. According to the tool, the flare efficiency for the minute m (nflare) is 90% when the following two conditions are met to demonstrate that the flare is operating:
(1) The temperature of the flare (TEG) and the flow rate of the residual gas to the flare (FRG) is within the manufactuırers specifications for the flare (SPECflare); and
(2) The flame is detected (Flame). Otherwise the (nflare,) is 0%
16
This equation is referred as (#4) under the ACM0001 Project emissions from flaring20
This equation is referred as (#2) under the “Tool to calculate baseline, project and leakage emissions from electricity consumption”
Project emissions from flaring20
This equation is referred as (#2) under the “Tool to calculate baseline, project and leakage emissions from electricity consumption”
CDM-MR-FORM
Version 06.0 Page 17 of 28
In line with the requirements of the “Project emissions from flaring”, PEflare,y will be calculated as follows:
3
,
8760
1
,,44, 10*)1(**
hflare
h
hRGCHCHyflare FGWPPE (9) 18
Where: PEflare,y Project emissions from flaring of the residual gas stream in year y (tCO2e) FCH4,RG,y Mass flow of methane in the residual gas in hour h (kg/h) nflare,h Flare efficiency in hour h. In line with the “Tool to determine project emissions
from flaring gases containing methane” v 01, a default value of 90% will be used for the flare efficiency19.
GWPCH4 Global Warming Potential of methane valid for commitment period
Step A.2: Determination of FCH4,BL,y The situation at the start of the project activity falls under case 1 since there are no legal requirements in Turkey to destroy methane and the LFG was not captured prior to the proposed project activity. Therefore: FCH4,BL,y=0 Step B: Baseline emissions associated with electricity generation (BEEC,y) The baseline emissions associated with electricity generation in year y (BEEC,y) is calculated in accordance with the “Tool to calculate baseline, project and leakage emissions from electricity consumption” version 2. The electricity source k in the tool corresponds to the sources of electricity generated by the grid, which is identified as the most plausible baseline scenario. ECBL,k,y in the tool is equivalent to the net amount of electricity generated using LFG in year y. Generic approach In the generic approach, baseline emissions from consumption of electricity are calculated based on the quantity of electricity consumed, an emission factor for electricity generation and a factor to account for transmission losses, as follows:
k
ykykELykBLyEC TDLEFECBE )1(** ,,,,,,
(10) 20 Where: BEEC,y Baseline emissions from electricity consumption in year y (tCO2e/yr) ECBL,k,y Net amount of electricity generated using LFG in year y (MWh/yr) EFEL,k,y Emission factor for electricity generation source k in year y ((tCO2e/MWh) TDLk,y Average technical and transmission and distribution losses for providing
electricity to source k in year y
Project emissions from flaring20
This equation is referred as (#2) under the “Tool to calculate baseline, project and leakage emissions from electricity consumption”
20 This equation is referred as (#2) under the “Tool to calculate baseline, project and leakage emissions from electricity consumption”
20 This equation is referred as (#2) under the “Tool to calculate baseline, project and leakage emissions from electricity consumption”
CDM-MR-FORM
Version 06.0 Page 18 of 28
k the sources of electricity generated by the grid Determination of the emission factor for electricity generation (EFEL,k,y) The emission for electricity generation is calculated ex-post as 0.542 tCO2eq/MWh and has been fixed through the first crediting period.
Table 3. Baseline Emissions21
Month/Year
ACM001 Electricity
FCH4,EL FCH4,
Flared FCH4,PJ BECH4 ECBL,y BEEC Total BE
tCH4 tCH4 tCH4 tCO2eq MWh tCO2eq tCO2eq
January 2016 605.36 0.00 599.30 13,484.33 2,963.05 1,654.15 15,138.48
February 2016 542.38 0.00 536.96 12,081.52 2,702.83 1,508.88 13,590.40
March 2016 593.04 0.00 587.11 13,209.98 2,899.48 1,618.66 14,828.64
April 2016 593.49 0.00 587.55 13,219.98 2,879.04 1,607.25 14,827.23
May 2016 584.94 0.00 579.09 13,029.47 2,882.05 1,608.94 14,638.41
June 2016 590.12 0.00 584.22 13,144.93 2,862.03 1,597.76 14,742.69
July 2016 534.85 0.00 529.50 11,913.75 2,715.79 1,516.12 13,429.87
August 2016 504.13 0.00 499.09 11.229,44 2.571,16 1.435,38 12.664,81
September 2016 518.74 0.00 513.55 11.554,87 2.504,93 1.398,40 12.953,27
October 2016 513.53 0.00 508.39 11,438.85 2.446,05 1,365.53 12,804.38
November 2016 499.26 0.00 494.26 11,120.92 2,470.73 1,379.31 12,500.23
December 2016 543.74 0.00 538.30 12,111.72 2,652.65 1,480.87 13,592.59
January 2017 662.47 0.00 655.85 14,756.61 3,211.96 1,793.11 16,549.72
February 2017 683.37 0.00 676.54 15,222.15 3,343.20 1,866.37 17,088.53
March 2017 691.50 0.00 684.58 15,403.10 3,443.99 1,922.64 17,325.74
April 2017 639.19 0.00 632.80 14,237.91 3,118.48 1,740.92 15,978.83
May 2017 688.95 0.00 682.06 15,346.38 3,443.57 1,922.41 17,268.78
Total 2016 (01/01/2016-31/12/2016)
6,623.56
0.00
6,557.32
147,539.74
32,549.79
18,171.25 165,710.99
Total 2017 (01/01/2017-31/05/2017)
3,365.48
0.00
3,331.83
74,966.16 16,561.19
9,245.45 84,211.61
Total Monitoring Period
(01/10/2016-31/05/2017)
9,989.04
0.00
9,899.15
222,505.90
49,110.98
27,416.70 249,922.60
E.2. Calculation of project emissions or actual net removals
>> In accordance with ACM0001 “Flaring or Use of Landfill Gas” version 15.0, the project emissions are calculated as follows:
21
During the monitoring period an insignificant total of 5.22 tCH4 destroyed by flaring. However the PP has accounted these baseline emissions as 0 as a conservative approach
CDM-MR-FORM
Version 06.0 Page 19 of 28
yECy PEPE , (17) 22
Where: PEEC,y Emission from consumption of electricity due to the project activity in year y
(tCO2e/yr). Since there are no consumption of fossil fuels due to the project activity, for the purpose other than electricity generation, there are no emissions from fossil fuel consumption and therefore PEFC,y is equal to “0” and has not been included in equation (17). The project emissions from consumption of electricity by the project activity PEEC,y shall be calculated using the “Tool to calculate baseline, project and/or leakage emissions from electricity consumption” version 2. When applying the tool, electricity sources j in the tool corresponds to the sources of electricity consumed due to the project activity. PEEC,y is calculated as follows:
j
yjyjELyPJyEC TDLEFECPE )1(** ,,,,,
(18) 23 Where: PEEC,y Project emissions from electricity consumption in year y (tCO2e/year) ECPJ,y Quantity of electricity consumed by the project electricity consumption source j
in year y (MWh/year) EFEL,j,y Emission factor for electricity generation for source j in year y (tCO2e/MWh) TDLj,y Average technical transmission and distribution losses for providing electricity
to source j in year y
Month/Year
Electricity Total PE
ECPJ,y*(1+TDL) PEEC
MWh tCO2eq tCO2eq
January 2016 0.44 0.24 0.24
February 2016 0.08 0.05 0.05
March 2016 0.74 0.40 0.40
April 2016 0.13 0.07 0.07
May 2016 0.29 0.16 0.16
June 2016 0.14 0.08 0.08
July 2016 0.07 0.04 0.04
August 2016 0.07 0.04 0.04
September 2016 0.07 0.04 0.04
October 2016 0.21 0.11 0.11
November 2016 0.04 0.02 0.02
December 2016 0.15 0.08 0.08
January 2017 0.08 0.04 0.04
February 2017 0.17 0.09 0.09
March 2017 0.41 0.22 0.22
22
This equation is referred as (#22) under ACM0001
23 This equation is referred as (#1) under “Tool to calculate baseline, project and/or leakage emissions from electricity consumption”
CDM-MR-FORM
Version 06.0 Page 20 of 28
April 2017 0.15 0.08 0.08
May 2017 0.83 0.45 0.45
Total 2016 (01/01/2016-31/12/2016)
2.45 1.33 1.33
Total 2017 (01/01/2017-31/05/2017)
1.63 0.88 0.88
Total Monitoring Period (01/10/2016-31/05/2017)
4.08 2.21 2.21
E.3. Calculation of leakage emissions
>> In accordance with ACM0001 “Flaring or Use of Landfill Gas” version 15.0, no leakage effects are accounted.
E.4. Calculation of emission reductions or net anthropogenic removals
Baseline GHG
emissions or baseline
net GHG removals (t CO2e)
Project GHG emissions or
actual net GHG
removals (t CO2e)
Leakage GHG
emissions (t CO2e)
GHG emission reductions or net anthropogenic GHG removals
(t CO2e)
Before 01/01/2013
From 01/01/2013
Total amount
Total 2016 (01/01/2016-31/12/2016)
165,710.99
1.33 0 0 165,709.66 165,709
Total 2017 (01/01/2017-31/05/2017)
84,211.61 0.88 0 0
84,210.73 84,210
Total Monitoring
Period (01/10/2016-31/05/2017)
249,922.60 2.21 0 0
249,920.39 249,919
E.5. Comparison of emission reductions or net anthropogenic removals achieved with estimates in the registered PDD
Amount achieved during this monitoring period (t CO2e)
Amount estimated ex ante (t CO2e)
249,919 181,107
E.6. Remarks on increase in achieved emission reductions
>> The actual emission reductions are measured as 249,919 compared with the estimated value of 181,107 approximately 38% difference. In LFG project activities a difference in the estimated and actual emission reductions are expected and natural since and could be based on several reasons, which in this case: The ex-ante estimations are based on FOD modelling, which involves several default values such as the “collection efficiency”, which by default is 50%, a MCF value of 1 by default and a “correction factor” of 0.75 etc. All these default values (in accordance with the applicable too land methodology) provide a rough ex ante estimation which is impossible to match exactly with ex-post
CDM-MR-FORM
Version 06.0 Page 21 of 28
measuring results. In addition to FOD modeling, factors such as instantaneous atmosphere pressure and temperature, methane ratio in the gas, and engine maintenance works effects the methane volume to engines.
SECTION F. Gold Standard Sustainable Development Indicators
According to the requirements of Gold Standard, the project activity must be assessed a matrix of sustainable development indicators. The contribution of the proposed project activity to the sustainable of the country is based on indicators of local/global environment sustainability, social sustainability & development and economic & technological development.
With regards to the project activity, 9 indicators were added to the monitoring plan under the registered GS Project Passport. All documents regarding these additional parameters can be presented to the DOE during the verification process.
F.1 Sustainability Monitoring Plan
No SD.1
Indicator: Air Quality
Chosen Parameter Levels of sulphide combusted in the landfill gas engines
Estimation of baseline situation of parameter
No sulphide is combusted in the baseline situation
Way of Monitoring
How In line with the registered GS Project Passport, the amount of sulphide is calculated based on the amount of landfill gas combusted in the engines as followed:
V sulphide destroyed=VLFG destroyed * 0.005
Where “V” represents the volume of LFG in m3.
When Annually
By who Project Participant
CDM-MR-FORM
Version 06.0 Page 22 of 28
Monitoring Result
Vintage Amount of LFG destroyed24
Amount of H2S destroyed
m3 m3
01/01/2016 – 31/12/2016
18,396,773 91,983
01/01/2017 – 31/05/2017
9,228,955 46,144
TOTAL 27,625,728 138,127
It is calculated that 138,127 cubic meters of H2S has been reduced due to the project activity within this monitoring period.
Additional comment: -
No SD.2
Indicator: Quality of employment
Chosen Parameter Provided trainings
Estimation of baseline situation of parameter
Trainings will be offered to employees (such as occupational health and safety instructions)
Way of Monitoring
How Attendance to trainings
When Annually
By who Project Participant
24
The amount of LFG destroyed is the sum of LFG sent to the engines and flare.
CDM-MR-FORM
Version 06.0 Page 23 of 28
Monitoring Result Evidence on trainings have been provided to the DOE
A list of trainings during the monitoring period are summarized below:
Date Training Attendance
20.01.2016 Occupational Health and Safety
7
20.01.2016 Occupational Health and Safety
1
15.06.2016 Waste Management
8
02.12.2016 Basic Fire Training
11
02.05.2017 Working near High Voltage Power Lines Training
1
12.05.2017 Occupational Health and Safety (electrification)
8
Additional comment: -
No SD.3
Indicator: Human and Institutional Capacity
Chosen Parameter İmprovements to the school library.
Estimation of baseline situation of parameter
The school library in in bad condition and the locals have requested support for improvement.
Way of Monitoring
How Visual observation and throught the interview of village muhtar
When Annually
By who Project Participant and Village Muhtar
CDM-MR-FORM
Version 06.0 Page 24 of 28
Monitoring Result New information technology system, computers, and shelves installed in the library.
Additional comment:
Computers installed.
Servers
CDM-MR-FORM
Version 06.0 Page 25 of 28
No SD.4
Indicator: Quantitative employment and income generation
Chosen Parameter Number of contracts
Estimation of baseline situation of parameter
The project activity will result in employment opportunities. It is estimated that approximately 8-10 people will be hired for the proposed project activity.
Way of Monitoring
How Through documentation of contracts
When Annually
By who Project Participant
Monitoring Result 17 people have been provided employment under the project activity.
CDM-MR-FORM
Version 06.0 Page 26 of 28
Additional comment:
# Designation Name Surname Position
1 Solaklar Emre Durmuş Electricity Generation / Plant Technician
2
Solaklar
Salim Serdar Engine Maintenance Technician
3
Solaklar Özgün Ümit
Şahin Warehouse Officer
4
Solaklar Turan Ümit
Kırgın Environmental Engineer
5
Solaklar
Rıdvan Altık Heavy Duty Vehicle Operator
6
Solaklar
Mücahit Bayam Environmental Engineer
7 Solaklar
Engin Ateş Plant Technician
8 Solaklar
Servet Bayrak Plant Technician
9 Solaklar
Cihan Arabacı Plant Technician
10 Solaklar
Musa Sevinç Plant Technician
11 Solaklar
Murat Başer Plant Technician
12 Solaklar
Furkan Durmuş Plant Technician
13 Solaklar
Murat Bulut Plant Technician
14
Solaklar
Cemalettin
Keskin Electricity Generation / Technician
15
Solaklar
Faruk Özgür Electricity Generation / Technician
16
Solaklar
Gürkan Suan Electricity Generation / Technician
17
Solaklar
Muharrem
Almaz Electricity Generation / Technician
CDM-MR-FORM
Version 06.0 Page 27 of 28
No SD.5
Indicator: Management of leachate
Chosen Parameter Management of leachate
Estimation of baseline situation of parameter
The leachate is collected and sent to treatment by IZAYDAS.
Way of Monitoring
How Evidences that the leachate is collected and is being treated by IZAYDAS (such as documentation or interviews with İZAYDAŞ). The evidence certificate which is provided to DOE is valid until 27/05/2019. The evidence certificate states that IZAYDAS treats residual waste water directly, industrial waste water indirectly and then discharges waste water into main sewage system. These processes are done according to Environmental Ministry procedures.
When Annually
By who Project Participant
Monitoring Result The leachate is collected and sent to treatment by IZAYDAS.
Additional comment:
F.2 Methane Utilization Ratio: The methane utilization ratio is calculated as LFG utilized by the engines over the total amount of LFG extracted (LFG utilized + LFG flared).
For the emission reductions in 2016 LFG flow to engines: 18,387,302 Nm3
LFG flow to flare: 9,471 Nm3 Methane Utilization Ratio: 99.95%
For the emission reductions in 2017 LFG flow to engines: 9,225,202 Nm3
LFG flow to flare: 3,753 Nm3 Methane Utilization Ratio: 99.96%
The ratios are more than 65% which is in line with requirement.