CDF Pulsar Board PULSAR: PULSer And Recorder People involved in this project A few words about CDF trigger (Level 2): why building this board? Pulsar design: (1) as L2 teststand tool; (2) as a prototype for possible L2 upgrade ; (3) as a general purpose tool Current status Possible applications for Pulsar (within and outside CDF) Ted Liu (Fermilab) , June 3 rd , 2002, lunch talk at UC

Transcript of CDF Pulsar Board - University of...

Page 1: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

CDF Pulsar Board

PULSAR: PULSer And Recorder

• People involved in this project• A few words about CDF trigger (Level 2): why building this board?• Pulsar design:

(1) as L2 teststand tool; (2) as a prototype for possible L2 upgrade;(3) as a general purpose tool

• Current status• Possible applications for Pulsar (within and outside CDF)

Ted Liu (Fermilab) , June 3rd, 2002, lunch talk at UC

Page 2: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

PULSAR: PULSer And Recorderis designed primarily as a teststand toolfor CDF Level 2 trigger system

• from UC: Mircea Bogdan, Harold Sanders, Henry Frisch, Mel Shochet• from Fermilab: TL, Natalia Kuznetsova, Sakari Pitkanen (visiting student from Finland)• from Upenn: Peter Wittich

People Involved (part time or full time)

Since building something to test something else seems somewhat out of character at CDF nowadays, people who are currently involved in this project are mostly volunteers.

Page 3: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

•Fully pipelined DAQ+Trigger:

•“Deadtimeless”:

Dead-time only incurred if all Level 2 or DAQ buffers are full

A few words about CDF trigger…

Page 4: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Front-end & Trigger Electronics Architecture

GlobalL2 decision

Today’s topic

Page 5: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Reces x 4L1

XTRP

SVT

CLIST

MUON

ISO

AlphasX 4

One SVT Cable each

6 fiber (hotlink)1 LVDS cable 16 fibers (hotlink) 7 fibers (taxi)

12 fibers(Taxi)3 L1 cable

Magic bus (128 bits)

L2 crate inputs

Global L2 decision crate:

ROC

TRACER

Track datacluster data

64bits L1MEtSumEt

•After L1A, data arrives to each interface board with different latency •most boards (L1, XTRP, CLIST, IsoList and SVT) will then request for bus, and send

its data to alpha over magicbus;• alpha will process the data, if it needs muon or Reces data (for certain events), it will then

get the data via programmed I/O over magicbus from muon and Reces boards• once decision is made, alpha board will handshake with Trigger Supervisor (via L2-TS cable)

Page 6: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

L1 trk svt clist Iso reces mu SumEt,MEtTracks

Jetselectronsphotonsmuons

Taus Tags

MetSumEt

What does Level 2 really do?• Create all the trigger objects needed, then• Count objects above thresholds, or,• Cut on kinematics quantities

Page 7: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Reces x 4L1

XTRP

SVT

CLIST

ISO

MUON

alphas

Magic bus96 bits/evt

1.5Kbits/evt

21bits/tk 117 /tk 40/cls 145/cls 512 flag bits/10.5Kb/evtassume typical event: 4 tracks and 6 clusters (x2 safety margin)Total per event: 96 + 21x4 + 117x4 + 40x6 + 145x6 + 512 (10.5K) + (1.5K)

= 2306 bits (300 bytes) or ~14Kbits (1.75Kbytes) if sent all50KHz L1A with 10% deadtime: need 10 us transfer time, 10 us processing time

peak(10us): 30MB/s (no muon and Reces data) or 174MB/s if sent all

Magic bus: send 128bits (16Bytes) every 200 ns: 80MB/s.This is the maximum bandwidth for MB, assume single burst from one interface board. Need to add arbitration overhead, program IO speed…etcfor the actual performance

A quick look at bandwidth:

largest datasize

Page 8: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

When I first joined CDF(almost 2 years ago), I was told by some L2 experts thateverything was already done and the only thing left to do was to write professional code for Alpha…

So I bought this book…and so far never had a chance to read it. And thecompany ceased to exist…

Page 9: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Reces x 4L1

XTRP

SVT

CLIST

ISO

MUON

AlphasX 4

One SVT Cable each

6 fiber (hotlink)1 LVDS cable 7 fibers (Taxi) 16 fibers (hotlink)

12 fibers(Taxi)L1 cables

Magic bus

L2 crate inputs

Asked 3 questions a while ago (the answer is in Pulsar design):(1) can one design an universal test (pulser)board? (testability)(2) can one design an universal interface board?(uniformity) (3) can the universal interface board be also a pre-processor?

So far, ~20 man years spent on commissioningthis crate in the past two years… The main difficulty is thatthe system was not designed for testability,simplicity/uniformity.

each board isdesigned differentlyby different groups,

Page 10: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Main Injector(new)

Tevatron

DØCDF

Chicago↓

p source

Booster

aSVT

XTRP

CLIST

ISO

L2 decision crate

L1

RecesHP scope

LogicalAnalyzer

HP scope

The way we have been debugging the Level 2 decision crate:

VERY often need to use CDF+Tevatronas a pulser, to run entire CDF DAQ system to debug L2.

The idea is to build test stand tools to “replace” CDF and Tevatron, to make life MUCH easier for EVERYONE.

L2 inputs

TS

Why diagnostic tools?

Page 11: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

aSVT

XTRP

CLIST

ISO

L2 decision crate

L1

Reces

Pulsar

Hotlink IO

Taxi IO

SVT/XTRPL1TS

CDFctrl

VME

MUON

Pulsar is designed to have all the data interfaces that Level 2 decision crate has. It is a data source for all triggerinputs to Level 2 decision crate, it can be used to record data from upstream as well.

PulsAR: Pulser And Recorder

Basic hardware requirement: have all hardware interfaces

Main difficulty for Pulsar design:Each subsystem data pathwas implemented differently,to design an universal testerboard is not all that easy…The only way is to use mezzanine cards…

TS

Page 12: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Fixed or variabledata length?

SVT XTRP L1 CLIST ISO Muon

Data with Buffer#?

Incoming dataClock rate

data size range

Latency range*

EOE with data? (or from separate path?)

B0 marker?

Data gap withinone event?

Reces

30Mhz 7.6Mhz 7.6Mhz 20Mhz 12Mhz 30Mhzcdfclk x 4

Interface hardware SVT cable SVT cable L1 cable Hotlink+fiber Taxi+fiber Hotlink+fiber

7.6 Mhzcdfclk

Taxi+fiber

96 bits/evt

fixed fixed

noyes yes - no no yes -

yes

Level 2 trigger input data paths were implemented differently

Flow control ?

150bits/trk 21 bits/trk 46bits/clu 145bits/clu 11Kbits/evt 1.5Kb/evt

~ 6 us

yesyes

~132 ns~1us - 10us

variable

yes

BC#

yes

not used

~10-100us

variable

yes

BC#

yes

Not used

yes

no

no

no

~1-20us

variable

yes

no

no

no

variable

no

fixed

no no

no

nono

~1-5 us~few us

* Latency range also depends on L1A history …

noyes

Page 13: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

aSVT

XTRP

CLIST

ISO

L2 decision crate

L1

RecesHP scope

LogicalAnalyzer

HP scope

What are the test tools ?

L2 inputs

MMB

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

MMBMagic

MysteryBoard

SVTformat

Magicbus

CDFctrl

Pulsar

Hotlink IO

Taxi IO

SVT/XTRPL1TS

CDFctrl

VME

MUON

L2 test crate

TS

Page 14: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Goals of Pulsar project

(1) Speed up the debugging process for L2 system:Alpha, Mbus, all interface boards

(2) test the robustness and rate capability of the L2 system without the need of beam or high luminosity beam;

(3) Long term maintenance of the system …

(4) If needed, Pulsar can be used as a prototype(candidate) for possible L2 upgrade path

Overall goal: make sure we have a robust L2 system with great performance wellinto Run2b …

Page 15: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

SVT

Control/Merger

TS

L1

Data IOSVT

Mezz cardconnectors

Pulsar design (general purpose tool)

9U VME(VME FPGA not shown)

P1

P2 userctrl

3 Altera APEX 20K400_652 (BGA) FPGAs

P3

SLINKsignal lines

Data IO

spare lines

Each FPGA has 502 user IO pins, all of them are used.

Page 16: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Control FPGA

L1 input L1 output

L1 cableconnectors

TRK

FIFO

TRK

SVT/XTRP input connector

TSI

TSI

SVT/XTRP output connector

Some details on SVT/XTRP, L1 and TSI interfaces

fromalpha

toTSI

external FIFO, follows SVT implementation

L1 inputand outputshare the sameIO pins, setby one enable bit

Page 17: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

MezzanineCard

PULSAR design

IO

Ctrl

IO

Hotlink/Taxi/S-LINK…

TS

L1

SVTSVT

L1

Front-panel(double width)

component sideThe mezzanine card connectors can be used either for user I/O or SLINK cards

To/from

Pulsar ora PC

SLINK

VME

LVDS connectorsMezzanine cards

Three FPGAs: Atlera APEX20K400

S-LINKLDC or LSC

S-LINKLDC or LSC

optionaluser definedsignal connectionfrom P2/P3

Page 18: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

VME interface to all three FPGAs:

• based on UC VMEchip used on other UC boards• the interface from UC VMEchip to three main FPGAs:

VMEdata(31:0), VMEaddr(23:2), vmeAS, vmeDS and vmeWrite

CDF control (P2) signals to all three FPGAs:• CDFCLK, BC, B0, L1A/R, L2B0/B1, Halt, Recover, Run, L2A/R, L2BD0/BD1,

CDF_error, GLIVE, STOP, RL(2:0) … essentially all CDF control signals arevisible to Pulsar

Pulsar inter-communication control lines (P2 user defined pins):• follows SVT implementation (can communicate with any SVT board)• A1: Pulsar_init• A2: Pulsar_error• A3: Pulsar_freeze• A4: Pulsar_lostlock• A5: Pulsar_spare

Any Pulsar board can drive and listen to these 5 lines from P2.

Pulsar interface to/from P1 and P2 backplane

Page 19: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Custom Mezzanine cards (follow CMC standard)• Hotlink: Tx and Rx (CLIST, Muon data paths)• Taxi: Tx and Rx (Iso, Reces data paths)

Altera EP1K30_144 FPGA

CMC Connectors (J1 and J3)

Hotlink or Taxi Tx/Rx chipsHotlink Tx/Rx: CY7B923JC/933JC

Taxi Tx/Rx: AM7968/7969-175JC

Hotlink Optical Tx/Rx: HFBR-1119T/2119T

Taxi Optical Tx/Rx: HFBR-1414T/2416T

CMC: Common Mezzanine Card standard

hotlink mezzanine card prototype

Page 20: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

The transition module is very simple (just a few SLINK CMC connectors).

It uses P2 type connector for P3. We will only use P3 for SLINK and spare (user defined) signals. (it doesn’t have to be P2 type connector).

Loaded with SLINKMezzanine cards

Can simply useCDF CAL backplane.

CERN sent ustwo transition modules

Page 21: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

CDF Pulsar board

Page 22: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

ATLAS will use one standard link (S-LINK) to move the data from all Read-out Drivers (RODs) from the subdetectors from the experiment 100 meter down under the ground to the Read-out Buffers (ROBs) located in buildings on the surface. Around 1500 of those links are needed, each one moving data at 160 MByte/s.

Page 23: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

SLINK format example: ATLAS SLINK data format

SLINK interface mezzanine card

Page 24: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

PCI to SLINKSLINK to PCI

Proven technology, has been used by a few experiments to takehundreds of TB data in the past few years

New 32-bit SLINK to 64 bit PCI interface card: S32PCI64

•highly autonomous data reception

• 32-bit SLINK, 64-bit PCI bus

• 33MHz and 66 MHz PCI clock speed

• up to 260MByte/s bandwidth

Page 25: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

New 32-bit SLINK to 64 bit PCI interface card: S32PCI64

High-speed follow up of the Simple SLINK to PCI interface card

• highly autonomous data reception• 32-bit SLINK, 64-bit PCI bus• 33MHz and 66 MHz PCI clock speed• up to 260MByte/s bandwidth

division EP ATE/DQ

CERN

Erik van der Bij

SLINK

SLINK

32to64

map

32to64

map

S-LINK to PCI-64 interfaceS-LINK to PCI-64 interface

INPUTBUFFER

FIFO(1024 x 64-bit)

INPUTBUFFER

FIFO(1024 x 64-bit)

BACKENDCONTROL

LOGIC

BACKENDCONTROL

LOGIC

PCIBURSTFIFO

128x64-bit

PCIBURST

FIFO

128x64-bit

REQUESTFIFO

(address, length)

REQUESTFIFO

(address, length)

ACKNOWLEDGEFIFO

(ctl words, length)

ACKNOWLEDGEFIFO

(ctl words, length)

CONTROL,STATUS &

INTERRUPTREGISTERS

CONTROL,STATUS &

INTERRUPTREGISTERS

64-BIT

PCI

CORE

64-BIT

PCI

CORE

DMAENGINE

33/66 MHz32/64-bit

PCI

33/66 MHz32/64-bit

PCI

division EP ATE/DQ

CERN

Erik van der Bij

SLINK

SLINK

32to64

map

32to64

map

S-LINK to PCI-64 interfaceS-LINK to PCI-64 interface

INPUTBUFFER

FIFO(1024 x 64-bit)

INPUTBUFFER

FIFO(1024 x 64-bit)

BACKENDCONTROL

LOGIC

BACKENDCONTROL

LOGIC

PCIBURSTFIFO

128x64-bit

PCIBURST

FIFO

128x64-bit

REQUESTFIFO

(address, length)

REQUESTFIFO

(address, length)

ACKNOWLEDGEFIFO

(ctl words, length)

ACKNOWLEDGEFIFO

(ctl words, length)

CONTROL,STATUS &

INTERRUPTREGISTERS

CONTROL,STATUS &

INTERRUPTREGISTERS

64-BIT

PCI

CORE

64-BIT

PCI

CORE

DMAENGINE

33/66 MHz32/64-bit

PCI

33/66 MHz32/64-bit

PCI

Page 26: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

New 32-bit SLINK to 64 bit PCI interface card: S32PCI64

High-speed follow up of the Simple SLINK to PCI interface card

• highly autonomous data reception• 32-bit SLINK, 64-bit PCI bus• 33MHz and 66 MHz PCI clock speed• up to 260MByte/s bandwidth

Page 27: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Possible applications for Pulsar

• As Pulser for Hit-Finder boards in SVT system

• As Pulser for L2 decision crate: can source any data path as well as multiple paths at the same time

• As Recorder for L2: can record data from upstream for any data path (or multiple paths)

• As a simple standalone DAQ system (in a test beam environment with custom mezz cards)à can receive external trigger signals (NIM etc) via AUX card in the back

• general diagnostics tool within and outside CDF• Future expansion is as cheap/fast/easy as designing a mezzanine card ……

the rest are all commercially available …

Other possible/potential applications:

The flexible design (“lego style”) makes it possible to use Pulsar as a general purpose tool within or outside CDF …

• Can sink/source G-link/TAXI/HotLink/LVDS data for generic DAQ/trigger diagnostics

• As spare interface board for the existing L2 decision crate

• could be used as a prototype for Level 2 upgrade if needed

Page 28: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

PC 1

One possible configuration of multiple Pulsars

S-LINK

PC 2

S-LINK

S-LINK

S-LINK

S-LINK

S-LINK

CustomMezzanine cards

Pulsar

Pulsar

Pulsar

Pulsar

Pulsar

Pulsar

The formation of Pulsar cluster

Page 29: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Examples: possible applications of Pulsar• as a pulser for CDF L2 system;• as a recorder for CDF L2 system (via VME);• general purpose recorder (data sink to PC);• possible candidate for CDF L2 upgrade

MezzanineCard

IO

Ctrl

IO

Hotlink/Taxi/S-LINK…

SLINK

VME

S-LINKLDC or LSC

S-LINKLDC or LSC

optionaluser definedsignal connectionfrom P2/P3

Page 30: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Basic requirement for a L2 data source board:

L1A for buffer n

Data block

latencyTo L2 interfaceBoard input

FIFO

RAM

Test pattern

(1) upon L1A for buffer n, start a counter for buffer n;

(2) At the same time clock data from RAM into the FIFO,

(3) once the counter reaches latency threshold, clock the data out from the FIFO at the speed which matches with that of the subsystem… the actual latency is controlled by when the data is clocked out the FIFO.

This is an over simplified picture

Page 31: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

FIFOFIFOFIFOFIFO

Optical IO FPGA

SRAM

InternalTest

RAM

controller

L1ABuf #

The latency is controlledby when the data is clockedout the FIFO

Pulsar in pulser mode:hotlink examples:

(only one mezzanine card shown)

128K x 36 SRAM

Page 32: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

8 bitsdata

8 bitsdata

8 bitsdata

4 Ctrlbits

load test pattern memory:use 36 bits data width, 32 will be for 4 fiber output (4 x 8), the highest 4 bits will be used as control bitsto mark the content of data. For each event worth data, the first one will be the header, and the 32 bitsdata will contain the latency (&number of words etc) for this particular event and this particular path. The last one is the trailer, which can contain other info if needed (such as what L2 decision should be etc)(either use internal RAM or use 128K x 36 external SRAM, CY7C1350):

Buffer0 data

Buffer1 data

Buffer2 data

Buffer3 data

36bits

8 bitsdata

The highest two address bits will be controlled by buffer number to divide automatically the memory for 4 buffers

Page 33: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

How does it work:(1) after L1A, read the first word(header) and get the latency, at the same time start a counter;(2) continue to readout the rest of the data words from the memory and clock them into a FIFO,

until the trailer is reached (can get the L2 decision information there)(3) once the counter reaches latency threshold, clock the data out from the FIFO at the speed

which matches with the subsystem.this way the latency for each event and each data path can be individually controlled by user.

Buffer 0 data memory

header

trailer

Latency for this event, and other info

data data data data

Other information (what L2 decision should be etc)

One could have morecontrol by insertinggaps in betweendata words…etc usingthe 4 control bits,to better mimic thereal situation for certain data paths.

This approach seem to bequite flexible

1st event

Ctrl bit 35: headerCtrl bit 34: trailerCtrl bit 33: gapCtrl bit 32: reserved

Page 34: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Initial thoughts on tester firmware design

FIFO

L1ABuf#

counter0counter1counter2

counter3

RAM

VME36bits

addr

State machine

FIFO

FIFO

FIFO

FIFO

data

ctrl ctrl

MezzanineCard side

• Latch L1A+buf#• read 1st word from RAM• save latency&comparewith counter

• continue reading datafrom RAM to FIFOs

• until last word• once counter countsup to latency, enableFIFO output and ctrlsignals for Tx chips• ready for next L1A

Buffer 0 data

Buffer 1 data

Buffer 2 data

Buffer 3 data

Page 35: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

null

L1A

header

RAMtoFIFO

Latency

done

output

Comments:Pro: simpleCon: not so elegant, as thestate machine has to finishsending all data out of the FIFObefore able to process nextone. Maybe ok if run at higher clock rate. Will be some intrinsicdelay between events.

Good starting point, allow us to simulate theboard soon.

Would be better to separatethe RAM to FIFO part fromthe actual data sending part

Possible implementation A:

Peter Wittich willtalk about pulser modefirmware design detail and status soon.

Page 36: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

null

L1A

header

RAMtoFIFO

done

Comments:Pro: more elegantCon: somewhat more

involved.

Implement this laterfor the real thing.

We decided to go for implementation A first.

Output controller

FIFO

Data ready to be sent

latencycounterQ

Possible implementation B:

Page 37: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

FIFOFIFOFIFOFIFO

Optical IO Unit

SRAM

InternalTest

RAM

controller

L1ABuf #

Configure the (S)RAMas a circular buffer for recording (for each L1A)and can be stopped

and read out via VME.

hotlink examples:

(only one mezzanine card shown)

Pulsar in recorder mode (readout via VME)

or

VME

Page 38: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

PULSAR

Magic bus

Level 2 Test Stand: Board level test

ALPHA

INTFACEdata input

Data source: Level2_PulsarData sink: Alpha, MMB+PulsarData patterns:

(1) hand made(2) derived from MC(3) derived from data bank(4) recorded from upstream,

catch errors and reproduce them

TRACER

ROC

L2 decision to TS

MMB

MagicbusAnalyzer

Full loop(s) test

• To just test interface board,one Pulsar + MMB is needed.

• To just test alpha and magicbus,one Pulsar and MMB is needed

• many other options…

Page 39: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Reces x 4L1

XTRP

SVT

CLIST

ISO

MUON

alphas

Magic bus

PULSAR

PULSAR

Driving the full system:

TRACER

L2 test crate

PULSAR

only 5 Pulsar boards needed to drive the full system

16 fibersX 3 =48

16 fibers

PULSAR

TS input

with different

PULSAR

ROC

L1A rate &Event patterns

Page 40: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

TRK

Merger

L1

OpticalIO

CDFctrl

OpticalIOSLINK

datactrlSLINK to PCI

PC

Pulsar in (general purpose) recorder mode (directly into a PC)

Mezzanine cardconnectors

Pulsar can convert any user data(via custom mezzanine cards)into SLINK format thentransfer the data into a PC

TS

TRK

Page 41: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Pulsar in recorder mode(into a PC): firmware design is similar to all three FPGAs

FIFO

FIFO

L1A(x4) queue

FIFOL1 trigger bits

(pulls oneevent worth

of data ata time)

*Checks dataconsistence

•merges and stamp data

SLINKFormatter

L1ABuffer(2)

Input 1

Input 2

headerinfo.

Page 42: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

DataIO FPGA

DataIO FPGA

Control/merger FPGA

P3

L1A

L1T

firmware design is similar to all three FPGAs

Data package (per L1A)in SLINK format sent to PC…Throughput: 160 MB/s into PC

Page 43: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Board Level simulation

SLINK output to P3

L1A

L1Trigger bits

input data1

input data2

Output from DataIO FPGA

Page 44: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Can we use Pulsar to upgrade Level 2 if needed?

it is possible…

Level2_PULSAR:

Level2_Processor Controller pre-processor/merger pULSer

AndReadout

Page 45: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

RecesPre-processor

X 3

16 x3fibers

Cluster Pre-processor

MuonPre-processor

L1 bitsXTRP

cluster6 fibersIso7 fibers

16 fibers

Global ProcessorController

L1SVT

TS

L2 decision

One possible configuration:

Reces/trk

Cluster/trk

Muon/trk

Slink to PCI

PCI to Slink

CPU

SumET,METfrom a L1 type cable(another mezzanine card)

SLINK

SLINK

SLINK

RecesPre-processor

X 3

3 RecesPre-processor

+ 1 merger

All use the same type of board: Pulsar

Page 46: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

16x3 fiberstaxi

6 hotlink+ LVDS

7 taxi fibers

12 hotlinkmatchbox

4 hotlinkprematchbox

XTRP

L1

SLINK

SumEt,MET

CPU

TS

L1 SVT

Possible configuration:

Reces/Trk

Cluster/trk

Muon/trkSLINK

Muon path

Clist and Iso path

Reces path

Page 47: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

XTRP

Control/Merger

TS

L1

Data IO

Pulsar as Muon Pre-processor (interface board)

P1

P2

P3

SLINKsignals

spare lines

0-120 degree

120-240 degree

240-360 degreeDataIO

SRAM

SRAM

Info available:L1, XTRP,Muon matchbox data (0-240 degree)

Info available:L1, XTRP,Muon matchbox,Pre-matchbox

ALL muon data available with Track info.

SVT

data from Matchbox (16 hotlink fibers)

data from pre-match box(4 hotlink fibers)

Can already create trigger objects at this stage

Page 48: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

XTRP

Control/Merger

TS

L1

Data IO

Pulsar as Cluster Pre-processor (interface board)

P1

P2

P3

SLINKsignals

spare lines

4 hotlink fibers

2 hotlink fibersPlus 1 LVDS cable

4 Taxi fibersDataIO

SRAM

SRAM

Info available:L1, XTRP,all clusters

Info available:L1, XTRP,isolation

ALL clusterInformationavailable withTrack info

Can already create trigger objects at this stage

SVT

CLIST input

IsoList input

3 Taxi fibers

Page 49: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Transfer A (1st 33ns)---------------------bit0 - data(0)bit1 - data(1)bit2 - data(2)bit3 - data(3)bit4 - data(4)bit5 - data(5)bit6 - data(6)

bit7 - VCC

Transfer B (2nd 33ns)---------------------bit0 - data(7)bit1 - data(8)bit2 - data(9)bit3 - data(10)bit4 - data(11)bit5 - data(12)bit6 - data(13)bit7 - VCC

Transfer C (3rd 33ns)---------------------bit0 - data(14)bit1 - data(15)bit2 - data(16)bit3 - data(17)bit4 - data(18)bit5 - data(19)bit6 - data(20)bit7 - Bunch Zero Marker

Transfer D (4th 33ns)---------------------bit0 - data(21)bit1 - data(22)bit2 - data(23)bit3 - GNDbit4 - GNDbit5 - GNDbit6 - L2 Endmarkbit7 - GND

Information from Eric James about muon input:

Each matchbox card sends up to 32 24-bit words for each fiber. The transfer time for each word is 132 ns. Each 24-bit word is encoded into 32-bit transfer over hotlink and come in as four groups of 8-bit words.

There is a register on the Matchbox card which gives one the ability to send zero, ten, twenty, or thirty words to L2. This feature was included in case we needed to complete our data transfer within a giventime window to make the system work. The central trigger primitives are sent in the first ten words, the forward trigger primitives are sent in the next ten words, and L1 trigger decision data is sent in the last ten words. If one looks at the table in section 29.5.1 of CDF4152, the words which get sent to L2 begin with the High Pt CMU East bits (P0+3) and end with the IMB Diagnostic bits (P0+32). Theoutput ordering of the words is the same as that shown in the table. The pre-match connections workIn exactly the same way. There are only 16 24-bit words output to L2 from each pre-match card.From the table in section 29.5.2 of CDF4152, the first word which gets sent is the CMP primitives for stacks 00-23 (P0+2). The last word sent is CMP/CSP west matches for stacks 72-95 (P0+17). The ordering is the same as in the table. There are also register bits on the Pre-Match to control the number of words being sent. For this card one would transfer either zero, eight, or sixteen words.

Page 50: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

FIFOFIFOFIFOFIFO

Optical IO FPGA firmwarefor muon case

Motherboard Optical IO FPGAEach matchbox card sends up to 32 24-bit words for each fiber. The transfer time for each word is 132 ns. Each 24-bit word is encoded into 32-bit transfer over hotlink and come in as four groups of 8-bit words.

D C B A

8 bits each, totalEncoded useful data is 24 bits @132 ns

8 bits data stream will be pushed into FIFO for each fiber, then they will be clocked into motherboard optical IO FPGA (pushed or pulled). The FIFO read clock can be faster than the write clock (depends on how fast one can clock data over CMC connectors). To be conservative, assume for now the read/write clock is about the same.

Page 51: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

XTRP lookup table(for both muon and Cal):XFT divides the COT into 288 segments (1.25 degree each),A wedge spanning 15 degree has 12 segments, each segmenthas a unique LUT within a wedge.

15 bits Address 18 bits output

0-1: phase CM IM00: CMU high Pt CAL01: CMU low Pt crack10: CMX high Pt IMU11: CMX low Pt IMU

2-8: 96 XFT signed-Pt

9-11: Local phi within segment

12: passed superlayer 8?13: Isolation (other tracks nearby?)14: reserved for future use

For CMU, CMX and IMU,the 18 bits represent the 18 triggertowers in three wedges (one +two neighbor wedges)

when even a part of tower is withinthe muon footprint and satisfiesthe Pt threshold, the bit corresponding to the tower is set to 1

Page 52: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

An example of LUT for CMUfor an isolated track with

Pt =-6.19 GeV/c, local phi=1.02 degree, andpassed superlayer 8 of COT

Bit address output content

001100011111100 000000000000000000001100011111101 000000000000100000001100011111110 000000000000000000001100011111111 000000000001110000

Phase:CMU high Pt

Pt bins for –6.19 GeV/c

local phi

passed SL8

isolation

Page 53: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

32-bit FIFO@132ns

(30 x 4 deep)8->32

Motherboard Optical IO FPGA (only shown 4 ch)

32-bit FIFO@132ns

32-bit FIFO@132ns

32-bit FIFO@132ns

8->32

8->32

8->32

8 bits@33ns

L1A(x4) queue

64-bit (x4) FIFO@132ns

L1 bits

24-bit FIFO@132ns

XTRP data

Muon Filter

Algorithm(pulls one

event worthof data at

a time)

*Checks dataconsistence

•Filters databased on L1bits and XTRPinformation

•muon-track Match…. etc.

SRAM

0-30 deg

30-60 deg

60-90 deg

90-120 deg

SLINKFormatter

32 bits data+ ctrl bits

L1ABuffer(2)

ToMergerFPGA

Page 54: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Muon data as an example.Each word is 24 bits (sent as4 8-bit words over hotlink).

Can pack them into 32-bitwords (SLINK is 32 bits):4 24-bit words can be packed into3 32-bit words.

Or can pack them in 24 bitsexactly as muon bank format,and use the other 8 bitsto stamp other information …

CDF Muon bank data format

Page 55: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Muon data path:

Muon path has 16 fiber (hotlink) inputs, large data size (11Kbits/evt).12 of them from matchbox, each fiber cover 30 degree in phi.4 from pre-matchbox.

Designed to have many options:Simple ways to suppress muon data (examples):• first check L1 bits: if no muon info is needed, send out

empty data package with only header and trailer, whereheader will be stamped with buffer number, bunch counter etc.

• if muon info is needed, then check XTRP(track) bits, may onlypass the ROI (Region-Of-Interest) phi data downstream;

• or zero suppress the data based on muon data itself

Sophisticated way to suppress muon data:• use XTRP LUT to pre-match tracks with muon data;

Page 56: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

FIFOFIFOFIFO

F E D C B A8 bits each @50ns, one cluster is encoded in 6 8-bit words in all 6 fibers

8 bits data stream will be pushed into FIFO for each fiber. The end of event marker comes from LVDS connector.

FIFOFIFOFIFOFIFO

Optical IO FPGA firmwarefor CLIST case

LVDS

Inputs: 6 fibers + LVDS

Page 57: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

48-bit FIFO8->48

Motherboard Optical IO FPGA for CLIST case

8->48

8->48

8->48

8 bits@50ns

L1A(x4) queue

64-bit (x4) FIFOL1 bits

24-bit FIFOXTRP data

Cluster FormatterAlgorithm

(pulls oneevent worth

of data ata time)

*sums all infofor each cluster*checks end of

event*Checks data

consistence•Stamp databased on L1bits and XTRPinformation

•cluster-track match?

(electron ID)

SRAM

SLINKFormatter

32 bits data+ 4 bits ctrl

L1ABuffer(2)

ToMergerFPGA

48-bit FIFO

48-bit FIFO

48-bit FIFO

48-bit FIFO

48-bit FIFO

8->48

8->48

8-bit FIFO4->16LVDS

Page 58: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Motherboard Merger FPGA

FIFO

FIFO

Iso input

L1A(x4) queue

64-bit (x4) FIFO@132nsL1 bits

24-bit FIFO@132ns

XTRP data

Cluster merger

Algorithm(pulls one

event worthof data at

a time)

*Checks dataconsistence

•merges and stamp data

for both clusterand Iso info

SRAM

SLINKFormatter

32 bits data+ 4 bits ctrl

L1ABuffer(2)

FromOptical IO FPGAs To

ControlFPGA

Cluster input

Page 59: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

SVT

Control/Merger

TS

L1

Data IO

Pulsar as Processor Controller

P1

P2

P3

SLINKsignal lines

spare lines

Reces/trk

Cluster/trk

Muon/trk

Met/SumEt

DataIO

SRAM

SRAM

Info available:L1, SVT, XTRP,Reces, Cluster, Iso

Info available:L1, SVT,XTRP,Muon,Met, SumEt

Tracks, Jets, e,photon,tau etc

Tracks, muon,Met,SumEt etc

ALL Info available for L2 decisions,

Can even make simple L2 decisions, only send complicated events to PC

Page 60: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

L1 trk svt clist Iso reces mu SumEt,MEtTracks

Jetselectronsphotonsmuons

Taus Tags

MetSumEt

What does Level 2 really do? (examples)• Create all the trigger objects needed, then• Count objects above thresholds, or,• Cut on kinematics quantities

Page 61: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Possible Baseline Design could be:

• PreProcessor/Interface versions of the board gather data fromeach subsystem and package the data. This can include sparsificationbased on L1 trigger bits, tracking, or the data itself.

• Processor controller/Merger version of the board merges data from interface boards and packages the data for transfer to a CPU. Thedata can be further sparsified at this stage. This board alsoprovide the interface between L2 and the TS.

• Both types of PreProcesor board can be used to readout data for TL2D

The default operation would have the final decisions made in codein the CPU.

Page 62: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Optical IO FPGA

DAQ buffersSRAMController

VME interface

Formatter/filter

RAM controller

RAM controller

MezzanineCard interface

CDF Ctrlinterface

upstreamdownstream

Blocks in green are common to all FPGA types, blocks in whiteare specific to this type of FPGA

Play/recordPlay/record

Page 63: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Mezzanine card interface

Mezzanine Card ID

Mezzanine cardIdentification

Mezzanine cardinterface

Feature: has a dedicated unit which identifies the mezzaninecard plugged into motherboard at power up.

At power up, all FPGAs will be configured, but the inputswill be “disconnected” by default. The mezzanine card identificationunit will first identify the mezzanine card type, if it is the wrongtype for this FPGA firmware, signal an error (error register&LED). If the right type is identified, the gate will be closed….

Mezzanine card identification at Power Up Mezzanine cardshave both inputand output types

gate

Page 64: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

MUON

RECES

PROCESSOR

ROC

TRACER

CLUSTER

RECES

RECES

Muon/trk

Cluster/trk

MERGER

NewL2Decisioncrate

SumEt,MEt

TS

Slinkto PCI

PCIto Slink

mem

CPU

Reces/trk

GHz PC orVME processor

All Pulsar boards take two slots (due to mezzanine cards)Total: 7 pulsar boards = 14 slots

Baseline design: use pre-processors tosimply suppress/organize data, use processorcontroller to simply pass data to CPU via Slink to PCI and also handshake with TS. All trigger algorithmwill be handled by CPU.

Page 65: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

MUON

RECES

PROCESSOR

ROC

TRACER

CLUSTER

RECES

RECES

Muon/trk

Cluster/trk

MEGER

NewL2Decisioncrate

PreFred

TS

Slinkto PCI

PCIto Slink

mem

CPU

Reces/trk

GHz PC orVME processor

We use SLINKproducts to:

(1) Send data from processor controller to CPU;(2) Receive L2 decision data from CPU to Pulsar(3) Link between pulsar boards

Page 66: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

48 fiberstaxi

6 hotlink+ LVDS

7 taxi fibers

12 hotlinkmatchbox

4 hotlinkprematchbox

XTRP

L1

SLINK

SumEt,MET

CPU

TS

L1 SVT

Another possible system configuration (3 Pulsar boards, use 1 MMB and 4 Reces)

Reces/Trk

Cluster/trk

Muon/trkSLINK

muon

cluster

Existing Reces boards

Short Mbus

MMBReces data in SVT or SLINK format

Page 67: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

FIFO

DAQ buffer

TestRAM

TestRAM

Upstream data

Downstreamdata

Initial estimate of FPGA RAM capacity requirements (worse case):Each FPGA needs to have up to 4 eventsFIFO like storage at input stage, needs to have 4 events DAQ buffers (not includingtest RAMs at input and output):Optical IO FPGA (worse case is muon input):

(1.3KB/evt * 4) *2 = 10.4 KBEP20K400 has 26KB maximum RAM capacity,

while EP20K200 has 13KB.

Merger FPGA (worse case is in processor controller mode): (1.8KB/evt * 4)*2 = 15 KB, EP20K400 should be big enough

Assuming no data suppression(for worse case)

Page 68: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

What has been done so far (project officially started last Dec.)

Pulsar design is “optimized and finalized”:

• schematics finished in April• core firmware in place, VHDL code in CVS• intensive board level simulation in progress• detailed firmware design and VHDL coding in progress• layout in progress • Pulsar web page is set up with all design details• hotlink mezzanine cards (Tx and Rx) prototype testing on going

Plan in the summer:

• First Pulsar prototype

Page 69: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Pulsar Top Level schematics

IO FPGA

Control FPGA

Page 70: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Initial Pulsar components placement in April (the placement has been changed since)

MANY IO pins are assigned by hand to make the routing easier. Criticalsignals (clocks etc) are assigned by compiler with core working VHDL code.

Page 71: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Initial Pulsar layout (as in April). this is old. the placement has been changed since

Page 72: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Pulsar firmware in CVS• common: library for lower level VHDL code• fpgapinmap: IO pin assignment files,

compile setting files, VHDL templates etc• Rx: VHDL code in various receiving modes• Tx: VHDL code in various pulser modes

crucial for team work and long term maintenance

Pulsar is designed for long term maintenance for Level 2

Page 73: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Hotlink mezzanine cardsprototypes (Tx and Rx)

Page 74: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

http://hep.uchicago.edu/~thliu/projects/Pulsar

Page 75: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Board Level simulation and prototype testing plan

Pulsar Mezzanine cards: hotlink Tx and Rx mezzanine cards have been simulated together,has a teststand setup at UC for prototype testing.

Pulsar motherboard:

• intensive board level simulation in progress• prepare for multi-board simulation: Pulsar + mezzanine cards• schedule depends on board level simulation work… • the goal is to validate the design with INTENSIVE board level simulation by the end of June. Send out the prototype in July,and continue board level simulation…

Board Level simulation:

Prototype testing plan:

• can use SLINK test tools first• then test with custom mezzanine cards

Page 76: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Transmitter Receiver

Mezzanine cards board level simulation

(1) 4 fiber case first(2) 2 fiber + LVDS case

This setup can test everything except CMC connectors

Natalia will talk aboutdetails later

Page 77: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Transmitter Receiver

Mezzanine card Prototype/production test plan I (use the working teststand setup at UC):

Pattern Generator HP LA

(1) Use PG + LA;(2) Use FPGA internal RAM + LA(3) Use BIST + LA (hotlink)(run for long time andset limit on bit-error-rate to

test for robustness)

This setup can test everything except CMC connectors

Page 78: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Pulsar + 4 hotlink mezzanine cards: prepare for multi-board simulation

Pulsar

Mezzanine cards

Page 79: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

PULSAR

IO

M

IO

Slink out

CPU

Use SLINK source card to send dataUse SLINK data sink to check data

Initial test plan for Pulsar board prototypePulsar board prototype can be first tested with SLINK test tools,

then can be tested with custom mezzanine cards

Page 80: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

SLINK data Drain test board

SLIN data source test board(ideal for initialPulsar prototype testing)

Page 81: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

GlobalL2 decision

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

PULSAR

(1) As pulser and recorder

(2) upgrade/replacement

What Pulsar can do for L2?

Page 82: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Summary: • Pulsar is designed primarily as a teststsand tool for CDF Level 2 trigger system;• The design is general enough that it can be used in many applicatons:

(1) as teststand tool for CDF L2 decision crate and SVT system;(2) as spare interface board for CDF L2 decision crate;(3) as upgrade path for L2 decision crate;(4) as general purpose DAQ/trigger diagnostics tool:

can source/sink/spy LVDS/Hotlink/Taxi/G-LINK etc.(5) as simple DAQ system (such as in a test beam environment) …

MezzanineCard

IO

Ctrl

IO

Hotlink/Taxi/Glink/S-LINK…

TS

L1

SVTSVT

L1

SLINK

VME

S-LINKLDC or LSC

S-LINKLDC or LSC

optionaluser definedsignal connectionfrom P2/P3

Future expansion is as cheap/fast/easy as designing a mezzanine card, the rest are commercially available(SLINK + PC)

The flexible design (“lego style”) makes it possible to use Pulsar as a general purpose tool (within and outside CDF)

Page 83: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

HOLAS-LINK

DestinationIntegrated

4 x

HOLAS-LINK

DestinationIntegrated

4 x

33to66

map

4 x

33to66

map

4 x

INPUTFIFO

(256 x 66-bit)

4 x

INPUTFIFO

(256 x 66-bit)

4 x

BACKENDCONTROL

LOGIC

BACKENDCONTROL

LOGIC

PCIBURST

FIFO

128x64-bit

PCIBURST

FIFO

128x64-bit

4 x REQUEST FIFO

(address)each 15 deep

4 x REQUEST FIFO

(address)each 15 deep

4 x ACK.FIFO

(ctl words, length)each 15 deep

4 x ACK.FIFO

(ctl words, length)each 15 deep

CONTROL,STATUS &

INTERRUPTREGISTERS

CONTROL,STATUS &

INTERRUPTREGISTERS

DMAENGINE

64-BIT

PCI

CORE

64-BIT

PCI

CORE

33/66 MHz32/64-bit

PCI

33/66 MHz32/64-bit

PCI

4 4

4

4

4

4

1

Next generation: FILAR (Quad HOLA S-LINK to 64-bit/66 Mhz PCI interface)

Page 84: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

4S32PCI64 QuadIn– Software and hardware design effort minimal

• Same programming model as S32PCI64– optimised even more: only 4 instead of 6 PCI accesses needed

per event (fixed buffer size, read ACK FIFO gives also empty status)

• all hardware components exist, just integration

4 x S-LINK LDC

integrated4 x Input Buffer FIFO 256*64 bit DMA

Engine

64 bitPCI Core

33/66 MHz

32/64 bit

3.3V only

Request FIFOAddress

ACK FIFOCTL Words, Length

ControlLogic

PCI

4S32PCI64 block diagram

44

4

4

Page 85: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose
Page 86: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Tx

Prototype test plan II: use one Pulsar prototype board

this would allow full tests (including the CMC connectors)

Rx

I/O

I/O

Mezzanine cardsproductioncan start ONLY AFTER

the prototypesare tested withPulsar prototype

M

Page 87: CDF Pulsar Board - University of Chicagohep.uchicago.edu/~thliu/edg/Pulsar/Pulsar_summary_june03... · 2010-02-15 · CDF Pulsar Board PULSAR: PULSer And ... as a general purpose

Groups involved in building the system

SMXR, SMD & SQUID(ANL, FNAL)

ADMEM + Café, (FNAL, UCLA,Texas Tech)

HADASD (Frascati)

TDC (Michigan, Pisa,Duke, LBL, FNAL)

Michigan

Michigan, ANL,UCLA, Yale

OSU, FNAL,Michigan

Illinois

Chicago

Chicago, Yale

Michigan

Pisa, Geneva, Trieste, Chicago

ANL

FNAL, YaleGlobal

L2 decision