CCW conference: Financing clean water solutions

16
Financing at the Local Financing at the Local Level Level Choose Clean Water Conference Joanne Throwe Environmental Finance Center June 4, 2013

Transcript of CCW conference: Financing clean water solutions

Page 1: CCW conference: Financing clean water solutions

Financing at the Local Financing at the Local LevelLevel

Choose Clean Water ConferenceJoanne Throwe

Environmental Finance Center June 4, 2013

Page 2: CCW conference: Financing clean water solutions

Understanding Local Understanding Local Stormwater FinancingStormwater Financing

Making the right decisionshould be:

o Fairo Transparent o Adequate revenueo Equitable

Is there:oEnough data?oMeasurable goals?oA tracking system?oWays to create efficiencies?

06/17/13 2

Page 3: CCW conference: Financing clean water solutions

Managing AssetsManaging AssetsWhen to Replace Lifecycle Costs

• Replace asset before repair costs reach catastrophic failure

• Replace too early and money wasted

• Replace too late and costs are excessive

06/17/13 3

Page 4: CCW conference: Financing clean water solutions

Easy Ways to Improve Program on Easy Ways to Improve Program on a Limited Budgeta Limited Budget

• Get departments to communicate better• Centralize stormwater responsibility• Let others do some of the work for you without guilt• Work together to reduce costs, create efficiencies

4

Page 5: CCW conference: Financing clean water solutions

Not Everything Has to Cost A LotNot Everything Has to Cost A Lot

06/17/13 5

Page 6: CCW conference: Financing clean water solutions

Getting at True Costs is Getting at True Costs is Important Important

• True Costs for what is needed in 1 year is:

$1,638,945

• Current Operating Expenditures

$376,600

• Current Capital Expenditures

$186,250

06/17/13 6

Current* (2013)

Year 1 (2014)

Year 2 (2015)

Year 3 (2016)

Year 4 (2017)

Year 5 (2018)

$186,250 $736,250 $302,250 $352,250 $579,750 $202,250

$186,250 $766,250 $317,250 $352,250 $579,750 $202,250

$562,850 $1,638,945 $1,211,762 $1,269,125 $1,519,547 $1,165,542

Sub-Total

Capital Expen

Total Expend

Page 7: CCW conference: Financing clean water solutions

Document, Track, and Record! Document, Track, and Record!

06/17/13 7

Page 8: CCW conference: Financing clean water solutions

Have a Staffing PlanHave a Staffing Plan

06/17/13 8

Page 9: CCW conference: Financing clean water solutions

Labor DashboardsLabor Dashboards• Total Annual Labor Cost

• Total Annual FTE

• FTE by position over time

• Cost by Position over time

• Post Construction Monitoring FTE Over Time

06/17/13 9

Page 10: CCW conference: Financing clean water solutions

Budget DashboardBudget DashboardLocal Permit Revenue / Permit Fee Revenue Less Labor Costs /

Reserve for Future Monitoring

06/17/13 10

Page 11: CCW conference: Financing clean water solutions

Output Flows into BudgetOutput Flows into Budget

06/17/13 11

Page 12: CCW conference: Financing clean water solutions

Results of ProcessResults of Process

06/17/13 12

• Provided a basis for discussion among staff & officials

• Enabled dialogue about staff requirements in “no hire” jurisdictions

• Shed light on unforeseen costs and future staff needs

• Able to plan for reserving fee revenues

• Can serve as a tool that can educate community

Page 13: CCW conference: Financing clean water solutions

Don’t be Afraid to Take RisksDon’t be Afraid to Take Risks

• Berlin, MD• Salisbury, MD• Bowie, MD• Lancaster, PA• Scranton, PA• Hampton, VA• Shenandoah Valley, VA

06/17/13 13

Page 14: CCW conference: Financing clean water solutions

Public Engagement is EssentialPublic Engagement is Essential

06/17/13 14

Page 15: CCW conference: Financing clean water solutions

Timing is EverythingTiming is Everything

06/17/13 15

Page 16: CCW conference: Financing clean water solutions

Thank youThank you

06/17/13Footer Text 16