CCC’s current and future use of BIM
Zuhair Haddad, CIO CCC
Chairman CCT
![Page 2: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/2.jpg)
Outline• Definition of BIM
• CCC’s methodology – BIM for Scope Management and Change Management
• Our Focus this year – transferring the BIM tools to Site
• Planning – We believe Lean Planning is a better approach to Planning – LCM Digital (Cloud-based)/ C3D Planner (Enterprise) – both systems use the same methodology and lean concepts and focus on site input
• Production Management to better manage execution inline with the lean planning• Better utilization of BIM and related tools in construction (Look Ahead Schedule, Crew Simulator, Kanban Board)
• Satisfy workface planning/ work packaging requirements in the Oil & Gas Industry
• Start realizing the peripheral benefits such as payment certificate, subcontractor management, etc.
• Start utilizing peripheral solutions when BIM model is not available – CCT Developed “Quantifier” for tagging and take off, and “2DtoBIM”
• Asset management – handover of data to Asset management and other utilities (CCC has been awarded a contract from Adnoc for digitizing the building)
![Page 3: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/3.jpg)
Definition of BIM• BIM is often misunderstood and the focus has mainly
been on the 3D models and multi-discipline coordination of design information.
• The "I" in BIM is the real benefit but in the same time the biggest challenge.
• CCC has used 3D/BIM based tools and linkages to build up its new Integrated Project Control System. This year we will also be showing what we can offer to contractors that do not have a scope enabled BIM model and how we can transfer BIM tools to site.
![Page 4: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/4.jpg)
CCC’s methodologyScope Management• Scope management is defining the scope of a project by defining a set of BOQs and
quantities. The BOQ description should reflect the project specification while the quantities are calculated on the level of each individual object.
• An object in CCC parlance is one physical item that needs to be completed such as columns, beams, rooms, structural steel bays, etc.
• Each of these objects have a set of BOQs/operations that needs to be completed to complete that object. So a room may need to have tiles, painting, windows, doors, furniture, HVAC components, firefighting components, etc.
• CCC’s BIM Centers issue these BOQs and quantities with every BIM model issued.
• BIM Centers also issue a tag name for each object corresponding to the WBS of the project along with a sequential number by class of object.
![Page 5: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/5.jpg)
Object Naming ConventionWe define an object as “The reasonably smallest portion of a building that reflects the logic of construction, facilitates the transfer of work between the different crews and can be reported in progress or QS (Quantity Surveying) reports”. For example a column, a beam, a room finish, a diffuser, a fan, an electric socket…etc)
Object ID = Building + Floor + Discipline + Object-Type + Sequential Number
![Page 6: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/6.jpg)
Typical Modeling Activity
Column (Object) Cost elements (in BOQ)
Concept of calculation:
• Reinforcement (032000RN)= V x 180 kg/m3 kg
• Formwork (031000FW) = ∑ (ai x bi) m2
• In-situ Concrete (033000CR)= 0.99 x V m3
bi
ai
All calculations adhere to specific Quantity Surveying Standards
![Page 7: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/7.jpg)
CCC’s methodologyChange Management• The number of BIM models being generated for an 80- floor tower can
exceed 2,000 and those models need to be maintained and updated regularly.
• Change management is the ability to track changes between different revisions of the same model and maintain a history of all these changes
• CCT has developed the Scenario Browser that allows to track changes between different model revisions.
• BricsCAD, Bentley and other 3D Vendors woke up to the need and are developing tools to track changes. What we have done is systemize the process of tracking changes and soon we will have a tool that places a new model in a quarantine area while staff are assessing the impact of changes and finding solutions for any arising issues (for example: demolishing an already built wall).
![Page 8: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/8.jpg)
Scenario Browser
![Page 9: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/9.jpg)
Our Focus this year
• Our focus this year is to transfer BIM tools to site
![Page 10: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/10.jpg)
Lean Planning• A good planning methodology will tell the user:
• Who will build What and When – the amount of time and resources needed to adequately build the scope given in planned time with no constraints active.
• As soon as one operation for one object is complete, the supervisor of the next operation is notified to start working. This sequence of operations to complete one object is taken from the BOQs, provided by BIM, and the true sequence is gleaned from site meetings using traditional lean methodology.
• Phased collection of work (Structural, Open Spaces, Finishing, Façade, etc.)
• Clearance of all constraints to allow a laminar flow of work.
• Site Input
• The sequence of which objects to complete (train stops)
• All operations to be completed per object and their sequence of execution (Fragnet)
• Actual Progress/ Assessment of performance and recruitment and release of work crews
![Page 11: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/11.jpg)
Lean Planning Software
• We believe Lean Planning is a better approach to Planning• LCM Digital is our Cloud-based Solution
• C3D Planner is our heavy duty Enterprise Solution
• Both systems use the same methodologies and lean concepts and focus on site input
![Page 12: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/12.jpg)
LCM Digital
![Page 13: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/13.jpg)
Production Management• Production Management to better manage execution
inline with the lean planning• Better utilization of BIM and related tools in construction (Look
Ahead Schedule, Crew Simulator (research done in collaboration with Stanford University), Kanban Board)
![Page 14: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/14.jpg)
Kanban Board on Site
• Kaban board is published in the war-room on site
• Kanban transfers the optimized process plan (4 weeks) to site
• Kanban allows for final coordination between Crews
![Page 15: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/15.jpg)
Progress Collection from Site
• Progress collection from site using QR code and mobile app
• Ability to link to any QC System: each operation has the required QC Form linked to it
![Page 16: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/16.jpg)
Work-face planning and Work packaging
![Page 17: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/17.jpg)
IWP – TAKT ZONE
➢ Electrical IWP
➢ Steel Structure IWP➢ Underground IWP
➢ Piping IWP
![Page 18: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/18.jpg)
Peripheral benefits such as payment certificate, subcontractor management• Once the BOQs are
readily available, we can link to our Estimate System, in order to do billing and also to check the billing of our subcontractors
• Linking to the estimate and budget can also give us the ability to compare the estimate/ budget to what is happening on site.
![Page 19: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/19.jpg)
Quantifier
Read
• Quantifier will read models of most formats and C3Dx models and generate construction tags (MemberMarks/ Object IDs) based on project specification
Generate• Generate BoQs for construction objects
Write• BoQ and Tags will be written back to CAD models (IFC and C3Dx)
Export• Export Tags and BoQs to native software
Revisions• Options for storing revision, keep existing tags and generate tags only for new object etc
![Page 20: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/20.jpg)
2DtoBIMSupports all engineering disciplines
HVAC System
Fire Fighting System
Electrical SystemChilled Water System
Drainage System
Water System
Structural and Architectural
![Page 21: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/21.jpg)
Asset Management
• Asset management is the handover of data to Asset management and other utilities (CCC has been awarded a contract by Adnoc for digitizing the building)
• Link to IOT devices
• Link to Maintenance management system
• Intelligent city concept - LOD 500?
![Page 22: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/22.jpg)
Articles from the trenches on LinkedIn
![Page 23: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/23.jpg)
Please join us on our Journey to BIM on Site
Contact:
Visit us at:
https://www.lcmdigital.com/
Contact:
Visit us at:
http://www.cctintl.com
![Page 24: CCC’s current and future use of BIM · 2019. 10. 12. · •The "I" in BIM is the real benefit but in the same time the biggest challenge. •CCC has used 3D/BIM based tools and](https://reader034.fdocuments.net/reader034/viewer/2022051813/6032a479451f08222172536d/html5/thumbnails/24.jpg)
Thank you!