CCA Proposal Group4
-
Upload
adbwaterforall -
Category
Documents
-
view
236 -
download
0
Transcript of CCA Proposal Group4
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 1/17
CCA Pro osalsGroup 4
(Malaysia)
by
or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.
ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any
consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 2/17
roposa
Project Title: Review of MADA main existingstructures and channel with res ect to climatechange
Project Objectives
• 1. Ensure that the main irrigation structurescan cope with climate change
• 2. Ensure that the main channel has thecapacity to drain the excess water
• ncrease e sp way capac y o e am
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 3/17
Project Partners•NAHRIM
•BPSB(MOA)
•Related oversea agencies
Main Pro ect Activities
• Projection of future climatic rainfall conditions up
to 2050
• Analysis of all the main structures and channelswith respect to future climatic condition
• Preliminary design of proposed upgraded/modifiedstructures and channel
• es gn o am sp way en argement
•Review existing coastal bund
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 4/17
a n ro ect utputs
• Future rainfall scenario
• Status of the main structures and channelswith respect to future climatic condition
•
•
Preliminary design of upgraded/ modified
• New spillway design
Indicative budget
– .
Preliminary design-RM 1.3 million
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 5/17
Proposal MADA 2
Project Title: To develop sufficient water forirri ation needs with res ect future drou hts
Project Objectives
• To ex lore new water resources for irrigation
• To develop and use the new water resources
as irrigation water
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 6/17
Project Partners:
•NAHRIM
•BPSP(MOA)
•
Overseas expert agencies related to the fieldMain Project Activities
• Projection of future drought up to 2050
• ev ew prev ous propose reservo r s tes suc as aoand Reman
• eta es gn ao am an en ang trans er
• Explore potential storage ponds in the Muda area andits vicinity
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 7/17
•Review the existing water recycling capacity and increase
Main Project Outputs
•
• Preliminary design of potential storage ponds
• ew recyc ng pump systems es gn
•
Drought forecasting toolsIndicatives budget
• Dams and reservoir designs = RM 12 million
• Preliminary storage ponds design = RM 3 million
• New recycling pump station design = RM 1 million
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 8/17
Proposal LUAS Pro ect Pro onent: LUAS
Project Title: The effect on groundwater regime under climatechange scenario for Sungai Selangor Basin (2050)
1. Water quality impact
2. Potential yield
Project Partners;
• JMG
• NAHRIM
• DOE
• Malaysian Meteorology Services Department
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 9/17
Main Project Activities
1. TOR for consultancy
2. Steering committee/technical committee
3. Project Study
Main Project Outputs
1. Development of adaptation /mitigation for ground water.
2. Wetland rehabilitation
3. Ground water artificial recharge.
Indicative budget
RM 5 mil.
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 10/17
Pro osal Putra a a Project Proponent: Perbadanan Putrajaya (PPj)
Project Title: Impact to wetland plants species under CC Scenarios(2011/RMK10) – Drought
Project Objectives
To ensure sustainable management of created wetland for CC
Exploration of new technology for less maintenance of thewetland lants.
Project Partners;
• LUAS
•DID/JPS
• Stakeholder/developer
• DOE
• Academic Institution
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 11/17
Main Project Activities
1. Study on plant management and maintenance under CC
. .
3. Water storage alternative
4. Public involvement/participation in planning/operation of createdwe an
Main Project Outputs
1. Report
2. Ensure sustainability of lake/wetland under CC
3.Sustainable use of flora and fauna
Study and physical work– RM 10 mill/year
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 12/17
Proposal PAAB Pro ect Pro onent: PAAB WAMCO- Water Asset Mana ement
Company)
Project Title: Ensuring Security/Safety of Water Supply/Sewerage Assets for CC Impacts (2050) – Flood/Drought
Project Objectives
To ensure security/safety of water/sewerage assets due toCC im act.
Project Partners;
• MOF
•KTAK
• SPAN
• OPERATORS
• NAHRIM
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 13/17
Main Project Activities
1. Create awareness CC impact to management/operators
2. Setting up Committee to manage development of
mitigation/adaptation plan – study on impact to river basin.
Main Project Outputs
1. Study report
2. Plan
Study – RM 1 mill
Physical Works
Water treatment plant expose to flood – 350 nos
Assume budget for one WTP – RM 1 mill
– =
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 14/17
STP expose to flood– (20% of 9,000 nos)– 1,800 nos
Assume budget for one STP – RM 0.5 mill
Budget for STP =1,800 nos x RM 0.5 mill = RM 900 mill
–
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 15/17
Proposal TNB Pro ect Pro onent: TNB
Project Title: Review of Reservoir Operation for Impact ofClimate Change – (Flood/Drought)
Optimization of resources
Dam safety aspect
Project Partners;
• ICOLD
• KTAK
• IPTA
• NAHRIM
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 16/17
8/6/2019 CCA Proposal Group4
http://slidepdf.com/reader/full/cca-proposal-group4 17/17