CCA Proposal Group4

17
8/6/2019 CCA Proposal Group4 http://slidepdf.com/reader/full/cca-proposal-group4 1/17 CCA Pro osals Group 4 (Malaysia) by or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Transcript of CCA Proposal Group4

Page 1: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 1/17

CCA Pro osalsGroup 4

(Malaysia)

by

or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.

ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any

consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Page 2: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 2/17

roposa  

Project Title: Review of MADA main existingstructures and channel with res ect to climatechange

Project Objectives

• 1. Ensure that the main irrigation structurescan cope with climate change

• 2. Ensure that the main channel has thecapacity to drain the excess water

• ncrease e sp way capac y o e am

Page 3: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 3/17

Project Partners•NAHRIM

•BPSB(MOA)

•Related oversea agencies

Main Pro ect Activities

• Projection of future climatic rainfall conditions up

to 2050

• Analysis of all the main structures and channelswith respect to future climatic condition

• Preliminary design of proposed upgraded/modifiedstructures and channel

• es gn o am sp way en argement

•Review existing coastal bund

Page 4: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 4/17

a n ro ect utputs

• Future rainfall scenario

• Status of the main structures and channelswith respect to future climatic condition

•  

Preliminary design of upgraded/ modified

• New spillway design

  Indicative budget

– .

Preliminary design-RM 1.3 million

Page 5: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 5/17

Proposal MADA 2  

Project Title: To develop sufficient water forirri ation needs with res ect future drou hts

Project Objectives

• To ex lore new water resources for irrigation

• To develop and use the new water resources

as irrigation water

Page 6: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 6/17

Project Partners:

•NAHRIM

•BPSP(MOA)

Overseas expert agencies related to the fieldMain Project Activities

• Projection of future drought up to 2050

• ev ew prev ous propose reservo r s tes suc as aoand Reman

• eta es gn ao am an en ang trans er

• Explore potential storage ponds in the Muda area andits vicinity

Page 7: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 7/17

•Review the existing water recycling capacity and increase

Main Project Outputs

•  

• Preliminary design of potential storage ponds

• ew recyc ng pump systems es gn

Drought forecasting toolsIndicatives budget

• Dams and reservoir designs = RM 12 million

• Preliminary storage ponds design = RM 3 million

• New recycling pump station design = RM 1 million

Page 8: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 8/17

Proposal LUAS Pro ect Pro onent: LUAS

Project Title: The effect on groundwater regime under climatechange scenario for Sungai Selangor Basin (2050)

 

1. Water quality impact

2. Potential yield

Project Partners;

• JMG

• NAHRIM

• DOE

• Malaysian Meteorology Services Department

Page 9: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 9/17

Main Project Activities

1. TOR for consultancy

2. Steering committee/technical committee

3. Project Study

 

Main Project Outputs

1. Development of adaptation /mitigation for ground water.

2. Wetland rehabilitation

3. Ground water artificial recharge.

Indicative budget

RM 5 mil.

Page 10: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 10/17

Pro osal Putra a a Project Proponent: Perbadanan Putrajaya (PPj)

Project Title: Impact to wetland plants species under CC Scenarios(2011/RMK10) – Drought

Project Objectives

To ensure sustainable management of created wetland for CC

Exploration of new technology for less maintenance of thewetland lants.

Project Partners;

• LUAS

•DID/JPS

• Stakeholder/developer

• DOE

• Academic Institution

Page 11: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 11/17

Main Project Activities

1. Study on plant management and maintenance under CC

. .

3. Water storage alternative

4. Public involvement/participation in planning/operation of createdwe an

Main Project Outputs

1. Report

2. Ensure sustainability of lake/wetland under CC

3.Sustainable use of flora and fauna

  Study and physical work– RM 10 mill/year

Page 12: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 12/17

Proposal PAAB Pro ect Pro onent: PAAB WAMCO- Water Asset Mana ement

Company)

Project Title: Ensuring Security/Safety of Water Supply/Sewerage Assets for CC Impacts (2050) – Flood/Drought

Project Objectives

To ensure security/safety of water/sewerage assets due toCC im act.

Project Partners;

• MOF

•KTAK

• SPAN

• OPERATORS

• NAHRIM

Page 13: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 13/17

Main Project Activities

1. Create awareness CC impact to management/operators

2. Setting up Committee to manage development of

mitigation/adaptation plan – study on impact to river basin.

Main Project Outputs

1. Study report

2. Plan

 

Study – RM 1 mill

Physical Works

Water treatment plant expose to flood – 350 nos

Assume budget for one WTP – RM 1 mill

 – = 

Page 14: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 14/17

STP expose to flood– (20% of 9,000 nos)– 1,800 nos

Assume budget for one STP – RM 0.5 mill

Budget for STP =1,800 nos x RM 0.5 mill = RM 900 mill

 – 

Page 15: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 15/17

Proposal TNB Pro ect Pro onent: TNB

Project Title: Review of Reservoir Operation for Impact ofClimate Change – (Flood/Drought)

 

Optimization of resources

Dam safety aspect

Project Partners;

• ICOLD

• KTAK

• IPTA

• NAHRIM

Page 16: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 16/17

Page 17: CCA Proposal Group4

8/6/2019 CCA Proposal Group4

http://slidepdf.com/reader/full/cca-proposal-group4 17/17